ML11221A321
From kanterella
Revision as of 16:20, 12 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
ML11221A321 | |
Person / Time | |
---|---|
Site: | Arkansas Nuclear |
Issue date: | 08/01/2011 |
From: | NRC/HR/ADHRTD/RTTB-PWR |
To: | |
References | |
Download: ML11221A321 (5) | |
Similar Documents at Arkansas Nuclear | |
---|---|
Category:Training Manual
MONTHYEARML11221A3212011-08-0101 August 2011
[Table view]521- R326C B&W Tech Cross Training - Chapter 17 ANO-1 Seal Failure ML11221A3172008-05-0101 May 2008 521- R326C B&W Tech Cross Training - Chapter 17 ANO-1 Seal Failure 2011-08-01 Category:Slides and Viewgraphs MONTHYEARML24264A1592024-09-30030 September 2024
[Table view]Adtf Exemption Request Pre-submittal Meeting Presentation ML24190A1452024-07-0808 July 2024 Public Meeting Slides for Arkansas Nuclear One 2023 Annual Assessment, Pope County Quorum Court ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML23296A1002023-10-24024 October 2023 Entergy Presentation Slides for Pre-Submittal Meeting on 10/24/23, Mtc LAR ML23223A2032023-08-11011 August 2023 (ANO) Unit 1 Licensee'S Slide Presentation for 8/15/23 Public Meeting Pressurizer Heaters ML22193A0262022-07-12012 July 2022 (ANO) RICT License Amendment Request TSTF-505 NRC Pre-Submittal Meeting Presentation - July 13, 2022 ML22164A8012022-06-13013 June 2022 Entergy Fleet (GGNS, RBS, and WF-3) - Code Case N-752 RR 6-14-22 Pre-Submittal Public Meeting Presentation Slides ML22124A0692022-05-10010 May 2022 RVCH Penetration No. 1 Relief Request Public Meeting May 10, 2022 (EPID L-2022-LRM-0036) (Slides) ML21351A0282021-12-16016 December 2021 Preliminary Information of ANO-1 1R17 (2002) Findings on CRDM Nozzle 56, and Presentation Slides for PT Exam of Nozzle 56 ML21348A1262021-12-14014 December 2021 RCP TS LAR Pre-Submittal Meeting Slides, December 16, 2021 ML21319A2452021-11-15015 November 2021 Natrium Energy Island Decoupling Strategy - 11-17-2021 ML21309A0622021-11-0909 November 2021 NRC Slides for November 9, 2021, Technology Inclusive Content of Application Project Public Meeting ML21306A3162021-11-0909 November 2021 Digital IC Presentation 11/09/2021 ML21312A0342021-11-0909 November 2021 Combined Slides for November 9, 2021, Technology Inclusive Content of Application Project Public Meeting ML21200A1792021-07-31031 July 2021 Scale/Melcor Non-LWR Source Term Demonstration Project - High Temperature Gas-Cooled Reactor 0CAN062101, Presentation Information for Pre-Submittal Meeting Regarding the Response to Request for Additional Information - Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Emergency Cooling2021-06-15015 June 2021 Presentation Information for Pre-Submittal Meeting Regarding the Response to Request for Additional Information - Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Emergency Cooling ML21095A2122021-04-0808 April 2021 Pre-Submittal Meeting - ANO-1 LAR Related to RCS Primary Activity and Primary-to-Secondary Leak Rate ML20344A0572020-12-10010 December 2020 Combined Industry and NRC Slides for the December 10, 2020, Public Meeting on Technology Inclusive Content of Application Project, Advanced Reactor Content of Application Project and Applicability of Regulations to Non-Light Water Reactors ML20315A1582020-11-17017 November 2020 Presentation Meeting Slides for the 11/17/20 Teleconference ML20269A3452020-09-28028 September 2020 Pre-submittal Meeting for Request for One-Time Exemption from 10 CFR Part 50, Appendix E, Biennial EP Exercise (Offsite) Due to COVID-19- Entergy Presentation Slides ML20255A0242020-09-11011 September 2020 (Ano), Pre-Submittal Meeting with NRC - Request to Extend Allowable Outage Time (AOT) for the Emergency Cooling Pond (ECP) ML20211L7052020-08-0404 August 2020 (ANO) Units 1 & 2, Pre-Submittal Slide Presentation for August 4, 2020 Public Meeting ML20114E2752020-04-29029 April 2020 (ANO) Carbon Fiber Reinforced Polymer (Cfrp) Relief Request Pre-Submittal Meeting with NRC - April 29, 2020 ML18107A3342018-04-10010 April 2018 Tech Spec 3.3.5.2a Change Pre-Submittal Meeting Presentation Slides ML18075A1232018-03-20020 March 2018 Entergy Nuclear Operations - March 20, 2018, Presentation Slides for Surveillance Frequency Control Program, UFSAR Change Considerations ML18081A1922018-03-20020 March 2018 Presentation at the PRA Workshop ML17328A3652017-11-30030 November 2017 Workshop on Sharing Operating Experience from Rigging, Lifting and Load Handling Events - Temporary Overhead Crane Failure at Arkansas Nuclear One Presented to IAEA ML15132A1752015-05-21021 May 2015 Summary of Annual Assessment Meeting with Entergy Operations Inc., Regarding ANO 2014 Performance ML15014A0842015-01-14014 January 2015 NRC ANO Unit 1 Stator Drop SDP Evaluation ML14329B2092014-11-25025 November 2014 Summary of Regulatory Conference to Discuss Safety Significance of Arkansas Nuclear One Flood Protection Deficiencies ML14259A5972014-09-16016 September 2014 Summary of Annual Performance Assessment Meeting for Arkansas Nuclear One Performance ML14169A0722014-06-19019 June 2014 Entergy Public Meeting Presentation Slides ML13142A2272013-05-22022 May 2013 Summary of Public Meeting to Discuss Results of Augmented Inspection at Arkansas Nuclear One ML12332A1792012-11-26026 November 2012 Power Point Presentation by Entergy at the November 26, 2012 Meeting (TAC No. ME9706.) ML12275A5492012-10-0101 October 2012 Summary of Meeting with Entergy Operations, Inc., to Discuss the Performance of the Subject Facilities, Recent Organizational Changes, and Current Regulatory Issues ML1218003062012-06-28028 June 2012 Handouts at the June 29, 2012 NFPA 805 Meeting at the Hq - Power Point Slides ML1202501112012-01-25025 January 2012 Licensee Slides Arkansas Nuclear One, Unit 1 - Steam Generators Tube to Tube Wear ML1126502692011-09-22022 September 2011 Licensee Handouts for 10/05/2011 Presubmittal Meeting ML11221A3212011-08-0101 August 2011 521- R326C B&W Tech Cross Training - Chapter 17 ANO-1 Seal Failure ML1110401532011-04-13013 April 2011 Licensee Slides from 4/13/11 Meeting with Entergy Operations, Inc., to Discuss Proposed National Fire Protection Programs Standards 805 License Amendment Submittal for Arkansas Nuclear One, Units 1 & 2 ML1107504262011-03-15015 March 2011 Licensee Slides from 3/15/11 Pre-Sumittal Meeting SWS Room Cooling Required Action ML1107504162011-03-15015 March 2011 Licensee Slides from 3/15/11 Meeting with Entergy Operations on Technical Specification Change - Testing of Idle RCS Cooling Loop ML1016705012010-06-17017 June 2010 Discussion of Screening Criteria - Arkansas Nuclear One (ANO) ML0935201272009-12-18018 December 2009 Nrc/Entergy Operations, Inc., Management Meeting ML0913104172009-05-11011 May 2009 Summary of Meeting with Entergy to Discuss Arkansas Nuclear One 2008 Performance ML0831102062008-11-0606 November 2008 Summary of Meeting with Entergy to Discuss an Open Substantive Crosscutting Issue at Arkansas Nuclear One ML0828000612008-10-0101 October 2008 Enclosure 3-Technical Papers 2 - Plant Application of Weld Onlay for Butt Weld Mitigation ML0828300322008-08-31031 August 2008 NRC Presentation Arkansas Nuclear One - Unit One ML0814306742008-05-22022 May 2008 Summary of Annual Performance Assessment Meeting for Arkansas Nuclear One ML0718004262007-06-29029 June 2007 Summary of Arkansas Nuclear One End-Of-Cycle Public Meeting 2024-09-30 |
Text
ANO-1 Seal Failure Chapter 17.0 B&W Cross-Training Cross Training Course R-326C 1
OBJECTIVES
- 1. Describe how control room instrumentation can be used to determine RCP seal failures.
- 2. Explain the different methods that can be used d tto initiate i iti t Hi High hPPressure IInjection.
j ti
- 3. Explain why isolation of the Core Flood Tanks is necessary during plant cooldown.
2
- Observation and trend of seal flows and pressures can be used to determine seal failures.
- Methods to place HPI In-Service:
Manually placing HPI in service => Individual Components.
Components Manual Actuation of ESFAS
3
Appendix - Sequence of Events 4
Appendix - Sequence of Events 5
Retrieved from "https://kanterella.com/w/index.php?title=ML11221A321&oldid=2114385"