ML11221A321

From kanterella
Revision as of 16:20, 12 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
521- R326C B&W Tech Cross Training - Chapter 17 ANO-1 Seal Failure
ML11221A321
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 08/01/2011
From:
NRC/HR/ADHRTD/RTTB-PWR
To:
References
Download: ML11221A321 (5)


Text

ANO-1 Seal Failure Chapter 17.0 B&W Cross-Training Cross Training Course R-326C 1

OBJECTIVES

1. Describe how control room instrumentation can be used to determine RCP seal failures.
2. Explain the different methods that can be used d tto initiate i iti t Hi High hPPressure IInjection.

j ti

3. Explain why isolation of the Core Flood Tanks is necessary during plant cooldown.

2

  • Observation and trend of seal flows and pressures can be used to determine seal failures.
  • Methods to place HPI In-Service:

Manually placing HPI in service => Individual Components.

Components Manual Actuation of ESFAS

  • CFTs should be isolated during plant cooldown to ensure an inadvertent injection from the CFTs.

3

Appendix - Sequence of Events 4

Appendix - Sequence of Events 5