ANO-1 Seal Failure Chapter 17.0 B&W Cross Training Course 1
B&W Cross-Training Course R-326C
OBJECTIVES
- 1. Describe how control room instrumentation can be used to determine RCP seal failures.
- 2. Explain the different methods that can be d t i iti t Hi h P I j ti 2
used to initiate High Pressure Injection.
- 3. Explain why isolation of the Core Flood Tanks is necessary during plant cooldown.
- Observation and trend of seal flows and pressures can be used to determine seal failures.
- Methods to place HPI In-Service:
Manually placing HPI in service => Individual Components Components.
Manual Actuation of ESFAS
3
Appendix - Sequence of Events 4
Appendix - Sequence of Events 5