MONTHYEARML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23156A3042023-05-31031 May 2023 Acceptance of Requested Licensing Action Amendment Request to Remove Period of Applicability from Pressure Temperature Limits and Low Temperature Over Pressure Protection Curves ML23109A1862023-04-19019 April 2023 and Turkey Point Acceptance of Requested Licensing Action Proposed Alternative to Asme Section XI Authorizing Implementation of Asme Code Case N-752-1 ML23066A1892023-03-0303 March 2023 OEDO-22-00419: Email Dated 3-3-2023 to Petitioner on Seabrook ASR Petition ML23066A0892023-02-24024 February 2023 OEDO-22-00419 - Email Dated 02/24/2023 to Petitioner on Seabrook Unit 1 ASR Petition ML23020A9392023-01-19019 January 2023 Acceptance of Requested Licensing Action Amendment Request to Revise Cooling Tower Service Water Loop or Cell Requirements (EPID L-2022-LLA-0183) (Email) ML23011A3082023-01-11011 January 2023 Request for Additional Information Regarding Relief Request 4RA-22-001 (L-2022-LLR-0074) ML22341A0012022-12-0606 December 2022 Acceptance of Requested Licensing Action Relief Request 4RA-22-001, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) ML22333A7452022-11-22022 November 2022 OEDO-22-00419 - Email: C-10 Response on PRB Initial Assessment - C-10 Petition on Seabrook ASR Concrete Degradation ML22287A1472022-10-13013 October 2022 2.026 Petition Screen-in Email ML22228A0552022-08-15015 August 2022 Request for Additional Information Steam Generator Tube Inspection Report Review ML22200A1082022-07-19019 July 2022 Acceptance Review for TSTF-577 Amendment ML22153A4152022-05-31031 May 2022 Request for Additional Information Re 120V Inverter LAR from TS Branch - Final ML22116A2442022-04-26026 April 2022 Acceptance of Requested Licensing Action Relief Request 3IR-18 and 3IR-19 for End of Third 10-Year ISI Interval for Examinations with Limited Coverage ML22048B5522022-02-17017 February 2022 LTR-22-0010 Reply to Geoff Gilbert Email Concern About Seabrook Station Concrete Degradation ML22062B6642022-02-0707 February 2022 Request for Additional Information 120V Inverter LAR from the Electrical Branch ML22063A0002022-01-25025 January 2022 Requests for Additional Information from Risk Branch Regarding 120V Inverter LAR ML22020A2542022-01-20020 January 2022 LTR-22-0010 Geoff Gilbert, E-mail Concern About Seabrook Station Concrete Degradation ML21097A2512021-04-0707 April 2021 Request for Additional Information Regarding Steam Generator Tube Inspection Report Review for RFO 20 (EPID L-2020-LRO-0066) (Email) ML21054A0482021-02-23023 February 2021 Request for Additional Information Regarding Heat Flux Hot Channel Requirement Amendment Request ML20343A0942020-12-0303 December 2020 Request for Additional Information Regarding Seabrook (COVID-19) Part 73 Force-on-Force Exemption Request (L-2020-LLE-0219) ML20273A2812020-09-22022 September 2020 Acceptance of Requested Licensing Action License Amendment Request to Resolve Non-Conservative Heat Flux Hot Channel Factor Requiments ML20258A1502020-09-14014 September 2020 Request for Additional Information Related to Seabrook License Amendment Request Regarding One-Time Change to the AC Sources Operating TS ML20260H4932020-09-11011 September 2020 NRR E-mail Capture - Comanche Peak - Acceptance of Requested Licensing Action - Request to Use Later Code Edition of ASME OM Code ML20230A2962020-08-14014 August 2020 Acceptance of Requested Licensing Action License Amendment Request to Allow a One-Time Change to the AC Sources Operating TS ML20167A1842020-06-11011 June 2020 Request for Additional Information Related to Seabrook License Amendment Request Regarding TSTF-411 and TSTF-418 (L-2019-LLA-0237) ML20124A0012020-05-0101 May 2020 Cancellation of Call with Seabrook on Steam Generator Tube Inspections ML20114E1592020-04-23023 April 2020 Email and Request for Additional Information Related to Seabrook License Amendment Request to Degraded Voltage Time Delay Setpoint (L-2020-LLA-0012) ML20101N0932020-04-10010 April 2020 Acceptance of Requested Licensing Action Re Relief Request to Defer ASME Inspections Due COVID-19 (EPIDs L-2020-LLR-0055, -56, and -57) ML20101L0402020-04-10010 April 2020 Acceptance of Requested Licensing Action Relief Request to Use Code Case OMN-13 with 2012 Edition of the OM Code ML20101H3912020-04-0808 April 2020 Verbal Authorization for Seabrook Relief Request 3IIR-7 ML20087K8262020-03-27027 March 2020 Upcoming Steam Generator Tube Inservice Inspection ML20063J9792020-02-28028 February 2020 Acceptance of Requested Licensing Action Amendment Request to Revise Degraded Voltage Time Delay Setpoint ML19347C6732019-12-13013 December 2019 Acceptance of Requested Licensing Action Amendment Request to Adopt TSTF-418 ML19296D9122019-10-23023 October 2019 NRR E-mail Capture - Request for Additional Information Related to Seabrook Inverter Amendment (L-2019-LLA-0216) ML19295F5422019-10-15015 October 2019 NRR E-mail Capture - Seabrook Station, Unit No. 1 - Acceptance of Requested Licensing Action Amendment Request to Revise Onsite Power Distribution Requirements ML19275G7832019-10-0101 October 2019 Limited Appearance Statement from New Hampshire State Representative, Robert Harb Regarding the Seabrook Station Unit 1 License Amendment Application ML19270E6512019-09-27027 September 2019 Limited Appearance Statement from Joanna Hammond Regarding the Seabrook Station Unit 1 License Amendment Application ML19270E6542019-09-26026 September 2019 Limited Appearance Statement from Brian Campbell Regarding the Seabrook Station Unit 1 License Amendment Application ML19196A3592019-07-15015 July 2019 NRR E-mail Capture - Seabrook Station, Unit No. 1 - Acceptance of Requested Licensing Action Amendment Request to Revise the Emergency Core Cooling System Accumulator Technical Specifications ML19169A2412019-06-13013 June 2019 NRR E-mail Capture - Seabrook Station, Unit No. 1 - Acceptance of Requested Licensing Action Relief Requests for the Containment Building Spray Pump Flow and Vibration Testing (Epids L-2019-LLR-00 and L-2019-LLR-00) ML19162A0662019-06-0404 June 2019 Reply to Mr. Rick Jakious'S E-mail of 5-29-2019 to Stephen B. Comley Sr., We the People with Attachments ML19112A1782019-04-22022 April 2019 NRR E-mail Capture - Point Beach; Seabrook; Turkey Point - Acceptance of Requested Licensing Action Amendment Request to Revise Technical Specifications to Adopt TSTF-563 ML19101A4042019-04-11011 April 2019 NRR E-mail Capture - Point Beach; Seabrook; St. Lucie; Turkey Point - Acceptance of Licensing Action Relief Request to Use Encoded Phased Array Ultrasonic Examination Techniques for Ferritic and Austenitic Welds ML19070A2382019-03-10010 March 2019 LTR-19-0088 Maura Healey, Attorney General, the Commonwealth of Massachusetts, Ltr NextEras Requests for a License Amendment and Twenty-year Extension Prior to Issuance of a Final Decision in Adjudicatory Hearing on Concrete Degradation at ML19056A4522019-02-25025 February 2019 Comment from Philip Hurzeler Regarding the Emergency Petition Filed by C-10 on February 13, 2019 ML19056A4582019-02-25025 February 2019 Comment from Deborah A. Jones Regarding the Emergency Petition Filed by C-10 on February 13, 2019 ML19056A4602019-02-25025 February 2019 Comment from Lisa Conti Regarding the Emergency Petition Filed by C-10 on February 13, 2019 ML19050A2212019-02-19019 February 2019 NRR E-mail Capture - Seabrook Station, Unit No. 1 - Acceptance of Requested Licensing Action Relief Request Proposed Alternative 3IR-17 Implementation of an Extended Reactor Vessel Inservice Inspection Interval ML19050A3202019-02-13013 February 2019 Package from Stephen B. Comley, Sr. at February 13, 2019 Seabrook Station, Unit 1, Public Meeting 2023-06-22
[Table view] |
Text
1 SeabrookNPEm Resource From:Plasse, Richard Sent: Wednesday, November 03, 2010 2:13 PM To: Cliche, Richard
Subject:
section 2.4 draft RAIs Attachments:
ML103020009.pdf
Hearing Identifier: Seabrook_License_Renewal_NonPublic Email Number: 2229 Mail Envelope Properties (Richard.Plasse@nrc.gov20101103141300)
Subject:
section 2.4 draft RAIs Sent Date: 11/3/2010 2:13:22 PM Received Date: 11/3/2010 2:13:00 PM From: Plasse, Richard Created By: Richard.Plasse@nrc.gov Recipients: "Cliche, Richard" <Richard.Cliche@fpl.com>
Tracking Status: None Post Office: Files Size Date & Time MESSAGE 3 11/3/2010 2:13:00 PM ML103020009.pdf 89902 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:
October 29, 2010 MEMORANDUM TO: David J. Wrona, Branch Chief Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation FROM: Meena K. Khanna, Branch Chief /RA/ Mechanical and Civil Engineering Branch Division of Engineering Office of Nuclear Reactor Regulation
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION RELATED TO SECTION 2.4, SCOPING AND SCREENING RESULTS: STRUCTURES FOR SEABROOK STATION UNIT 1, LICENSE RENEWAL APPLICATION (TAC NO. ME4028)
The staff of the Mechanical and Civil Engineering Branch of the Division of Engineering has completed its review of Section 2.4, Scoping and Screening Results: Structures, of the Seabrook Station Unit 1, license renewal application (LRA). The staff has determined that additional information is needed to complete the review. The staffs request for additional information is provided in the enclosure.
Docket No: 50-443
Enclosure:
As stated
CONTACTS: Juan Uribe, NRR/DE/EMCB (301) 415-3809
October 29, 2010 MEMORANDUM TO: David J. Wrona, Branch Chief Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation FROM: Meena K. Khanna, Branch Chief /RA/ Mechanical and Civil Engineering Branch Division of Engineering Office of Nuclear Reactor Regulation
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION RELATED TO SECTION 2.4, SCOPING AND SCREENING RESULTS: STRUCTURES FOR SEABROOK STATION UNIT 1, LICENSE RENEWAL APPLICATION (TAC NO. ME4028)
The staff of the Mechanical and Civil Engineering Branch of the Division of Engineering has completed its review of Section 2.4, Scoping and Screening Results: Structures, of the Seabrook Station Unit 1, license renewal application (LRA). The staff has determined that additional information is needed to complete the review. The staffs request for additional information is provided in the enclosure.
Docket No: 50-443
Enclosure:
As stated
CONTACTS: Juan Uribe, NRR/DE/EMCB (301) 415-3809
DISTRIBUTION
- EMCB R/F RidsNrrDeDlr RPlasse CRoquecruz
ADAMS ACCESSION NO.: ML103020009 OFFICE NRR/DE/EMCBNRR/DE/EMCB NAME JUribe MKhanna DATE 10/29/10 10/ 29 /10 OFFICIAL RECORD COPY ENCLOSURE REQUEST FOR ADDITIONAL INFORMATION ON SECTION 2.4 SCOPING AND SCREEINING RESULTS: STRUCTURES SEABROOK STATION UNIT 1, LICENSE RENEWAL APPLICATION (LRA)
(TAC NO. ME4028)
RAI 2.4.1-1 Please clarify if there are any trash racks, basket strainers, traveling screens or any other debris prevention/removing mechanisms that are part of the Intake Transition Structure that would be required to be in scope of license renewal in accordance with 10 CFR 54.4. If so, also identify the applicable aging effects and the aging managing program (AMP) related to these components.
RAI 2.4.1-2
Please confirm whether the following components credited for flood protection per UFSAR Section 3.4.1.1 would be required to be in scope of license renewal in accordance with 10 CFR 54.4. If so, also identify the applicable aging effects and the aging managing program (AMP) related to these following components:
- The rolling steel door in the Fuel Storage Building (located at elevation 20 feet 6 inches MSL),
- The double doors into the entrance vestibule of the Equipment Vault section of the Primary Auxiliary Building (located at elevation 20 feet 8 inches MSL).
RAI 2.4.1-3 LRA Section 2.4.1 states that only the foundations of the fire protection water storage tanks are included in the scope of LR and subject to an AMR. Please provide additional information on the structural configuration of the tanks and the foundations, specifically, if there is any steel framing attached to the tanks that would provide additional support consistent with 10 CFR 54.4(3).
RAI 2.4.6-1 Please confirm the inclusion of the structural bellows in the scope of license renewal, as applicable, and subject to an aging management review (AMR) per 10 CFR 54.21 (a)(1)(i) and provide the location where they are covered. Otherwise, justify the exclusion from the scope of license renewal.
RAI 2.4.6-2
LRA Section 2.4.6 states that the BORAFLEX utilized in the region 2 racks is not credited with the neutron-absorbing capacity in the criticality analyses and therefore will not be managed for reduction of neutron-absorbing. However, UFSAR Section 9.1.2.1 states that the Region 2 spent fuel racks contain BORAFLEX as a neutron absorbing material to assure a Keff < 0.95.. Please clarify this discrepancy and confirm the inclusion or justify the exclusion of the BORAFLEX from the scope of LR and subject to an AMR.