ML13114A734

From kanterella
Revision as of 21:24, 28 April 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
2013 Byron Nuclear Station Initial License Examination Forms ES-301-2
ML13114A734
Person / Time
Site: Byron  Constellation icon.png
Issue date: 04/29/2013
From: McNeil D R
NRC/RGN-III/DRS/OLB
To:
Exelon Generation Co
References
ES-301-2, 50-454/13-301, 50-455/13-301
Download: ML13114A734 (3)


Text

ES-301 Control Room/In

-Plant Systems Outline Form ES-301-2 Facility: _Byron Nuclear Station_______

Date of Examination:

_02/29/2013__________

Exam Level: RO / SRO-I / SRO-U Operating Test No.: __2013301___________

Control Room Systems

@ (8 for RO; 7 for SRO

-I; 2 or 3 for SRO

-U) System / JPM Title Type Code*

Safety Function a. Purification / Excess Letdown Operation P, D, S 1 b. Purification / Letdown Orifice Operation N, S 2 c. RHR / Swap to HL Recirc M,A,EN,L,S 3 d. SX / Align SX Twr for LOCA Conditions D,A,E,EN,L,S 4S e. CS / Align CS for Recirc D,A,E,EN,L,S 5 f. AC Elec / Sync a SAT to a Bus Being Fed by a D/G D, S 6 g. Change RM-11 Setpoints in Preparation for WGDT Release D, S 9 h. Prepare U-1 for RSDP Ops D, L, S 8 In-Plant Systems

@ (3 for RO; 3 for SRO

-I; 3 or 2 for SRO

-U) i. RSP / Trip the Reactor Outside the Control Room D, A, E, EN 1 j. DC Elec / Place Battery on Equalize Charge N, A 6 k. FP Cool / Align FP Cooling for CV Pp D, E, L, R 4S @ All control room (and in

-plant) systems must be different and serve different safety functions; in

-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO

-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in

-plant (L)ow-Power (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 9 / 8 / 4 1 / 1 / 1 1 / 1 / 1 2 / 2 / 1 3 / 3 / 2 (randomly selected) 1 / 1 / 1 ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: _Byron Nuclear Station_______

Date of Examination: _02/29/2013__________

Exam Level: RO / SRO-I / SRO-U Operating Test No.: __2013301___________

Control Room Systems

@ (8 for RO; 7 for SRO

-I; 2 or 3 for SRO

-U) System / JPM Title Type Code*

Safety Function a. Purification / Excess Letdown Operation P, D, S 1 b. Purification / Letdown Orifice Operation N, S 2 c. RHR / Swap to HL Recirc M,A,EN,L,S 3 d. SX / Align SX Twr for LOCA Conditions D,A,E,EN,L,S 4S e. CS / Align CS for Recirc D,A,E,EN,L,S 5 f. AC Elec / Sync a SAT to a Bus Being Fed by a D/G D, S 6 g. n/a n/a 9 h. Prepare U-1 for RSDP Ops D, L, S 8 In-Plant Systems

@ (3 for RO; 3 for SRO

-I; 3 or 2 for SRO

-U) i. RSP / Trip the Reactor Outside the Control Room D, A, E, EN 1 j. DC Elec / Place Battery on Equalize Charge N, A 6 k. FP Cool / Align FP Cooling for CV Pp D, E, L, R 4S @ All control room (and in

-plant) systems must be different and serve different safety functions; in

-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO

-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in

-plant (L)ow-Power (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 9 / 8 / 4 1 / 1 / 1 1 / 1 / 1 2 / 2 / 1 3 / 3 / 2 (randomly selected) 1 / 1 / 1 ES-301 Control Room/In

-Plant Systems Outline Form ES-301-2 Facility: _Byron Nuclear Station_______

Date of Examination: _02/29/2013__________

Exam Level: RO / SRO-I / SRO-U Operating Test No.: __2013301___________

Control Room Systems

@ (8 for RO; 7 for SRO

-I; 2 or 3 for SRO

-U) System / JPM Title Type Code*

Safety Function a. n/a n/a b. Purification / Letdown Orifice Operation N, S 2 c. n/a n/a d. n/a n/a e. CS / Align CS for Recirc D,A,E,EN,L,S 5 f. n/a g. n/a n/a 9 h. n/a n/a In-Plant Systems

@ (3 for RO; 3 for SRO

-I; 3 or 2 for SRO

-U) i. RSP / Trip the Reactor Outside the Control Room D, A, E, EN 1 j. DC Elec / Place Battery on Equalize Charge N, A 6 k. FP Cool / Align FP Cooling for CV Pp D, E, L, R 4S @ All control room (and in

-plant) systems must be different and serve different safety functions; in

-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO

-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in

-plant (L)ow-Power (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 9 / 8 / 4 1 / 1 / 1 1 / 1 / 1 2 / 2 / 1 3 / 3 / 2 (randomly selected) 1 / 1 / 1