ML17290A097
From kanterella
Revision as of 22:43, 18 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML17290A097 | |
Person / Time | |
---|---|
Site: | Technical Specifications Task Force |
Issue date: | 06/14/2011 |
From: | Office of Nuclear Reactor Regulation |
To: | Technical Specifications Task Force |
Honcharik M | |
Shared Package | |
ML17290A003 | List: |
References | |
TSTF-505, Rev 2 | |
Download: ML17290A097 (8) | |
Similar Documents at Technical Specifications Task Force | |
---|---|
Category:Spreadsheet File
MONTHYEARML17290A0972011-06-14014 June 2011
[Table view]Draft Table 1 of TSTF-505, Revision 2, Affected Technical Specifications ML0632003862006-11-16016 November 2006 TSTF Traveler Milestone Schedule (11-16-06 R1 Snapshot) 2011-06-14 Category:Technical Specifications MONTHYEARML24016A2702023-12-12012 December 2023
[Table view]TSTF-585, Draft Revision 3, Revise LCO 3.0.3 to Require Managing Risk ML22320A5942022-10-24024 October 2022 Draft TSTF-596, Rev. 0, Expand the Applicability of the Surveillance Frequency Frequency Control Panel (Sfcp), Improved Standard Technical Specifications Change Traveler ML22244A2192022-07-0707 July 2022 Revised Draft TSTF-588, Revise List of COLR Methods (July 2022) ML21316A2362021-10-26026 October 2021 Draft TSTF-589,Eliminate Automatic Diesel Generator Start During Shutdown ML21316A2352021-09-24024 September 2021 Draft TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation ML21109A2952021-04-22022 April 2021 Draft Traveler TSTF-585, Revise LCO 3.0.3 ML21117A3522021-02-0101 February 2021 TSTF-576, Rev 1, Revise Safety/Relief Valve Requirements Draft ML20181A2212020-06-29029 June 2020 Draft TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML19323C9002019-11-19019 November 2019 Comparison of the Original Draft Justification and the Revised Draft Justification of TSTF-576, Revise Safety/Relief Valve Requirements TSTF-17-16, Technical Specifications Task Force - Transmittal of TSTF-568, Clarify Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.22017-12-19019 December 2017 Technical Specifications Task Force - Transmittal of TSTF-568, Clarify Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 TSTF-17-17, Transmittal of TSTF-557, Revision 1, Spent Fuel Storage Rack Neutron Absorber Monitoring Program2017-12-19019 December 2017 Transmittal of TSTF-557, Revision 1, Spent Fuel Storage Rack Neutron Absorber Monitoring Program ML17023A0082017-01-23023 January 2017 Draft of TSTF-567, Add Containment Sump TS to Address GSI-191 Issues. TSTF-16-09, Technical Specifications Task Force - Revision 3 of TSTF-551, Revise Secondary Containment Surveillance Requirements.2016-10-0303 October 2016 Technical Specifications Task Force - Revision 3 of TSTF-551, Revise Secondary Containment Surveillance Requirements. TSTF-15-08, Technical Specifications Task Force - Transmittal of TSTF-529, Revision 3, Clarify Use and Application Rules.2015-09-14014 September 2015 Technical Specifications Task Force - Transmittal of TSTF-529, Revision 3, Clarify Use and Application Rules. TSTF-15-05, Withdrawal of TSTF-531, Revision 1, Revision of Specification 3.8.1, Required Actions B.3.1 and B.3.2.2015-04-15015 April 2015 Withdrawal of TSTF-531, Revision 1, Revision of Specification 3.8.1, Required Actions B.3.1 and B.3.2. ML15028A1282015-01-28028 January 2015 TSTF-14-13 TSTF Concerns with Proposed RIS on Pressure Boundary Leakage TSTF-13-09, Transmittal of TSTF-545, Revision 0, TS Inservice Testing (IST) Program Removal.2013-11-0404 November 2013 Transmittal of TSTF-545, Revision 0, TS Inservice Testing (IST) Program Removal. TSTF-13-12, Transmittal of TSTF-541, Revision 0, Add Exceptions to Surveillance Requirements When the Safety Function Is Being Performed2013-09-10010 September 2013 Transmittal of TSTF-541, Revision 0, Add Exceptions to Surveillance Requirements When the Safety Function Is Being Performed TSTF-12-04, Transmittal of TSTF-537, Revision 0, Increase CIV Completion Time; Update of TSTF-3732012-03-27027 March 2012 Transmittal of TSTF-537, Revision 0, Increase CIV Completion Time; Update of TSTF-373 TSTF-12-01, Transmittal of TSTF-454, Revision 2, Extend PCIV Completion Times (NEDC-33046).2012-02-22022 February 2012 Transmittal of TSTF-454, Revision 2, Extend PCIV Completion Times (NEDC-33046). TSTF-11-17, Proposed Revision to the Model Application for TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b.2011-10-12012 October 2011 Proposed Revision to the Model Application for TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b. ML17339A1682011-06-14014 June 2011 Draft Table 2 of TSTF-505, Revision 2, Conditions Requiring Plant-Specific Technical Justification ML17290A0822011-06-14014 June 2011 Draft Traveler TSTF 505, Revision 2, Provide Risk Informed Extended Completion Times - RITSTF Initiative 4B. ML17290A0972011-06-14014 June 2011 Draft Table 1 of TSTF-505, Revision 2, Affected Technical Specifications ML18115A4822011-06-14014 June 2011 NRC Revised TSTF-505, Revision 2, Draft Model Application TSTF-11-02, Correction to TSTF-510, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection2011-03-0101 March 2011 Correction to TSTF-510, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection ML1104205302011-02-0909 February 2011 ITSB Resolution of Excel Services Corporation Proposed TSTF-426 Wording ML1027306882011-02-0202 February 2011 Model Application and Model SE of TSTF-423, Revision 1, Technical Specification End States, NEDC-32988-A ML1027804862010-09-28028 September 2010 Response to Nrc'S Request for Additional Information Regarding TSTF-432, Revision 0, Change in Technical Specifications End States, (WCAP-16294) TSTF-09-24, Technical Specification Task Force Recommended Changes to Be Incorporated in Revision 4 of the Standard Technical Specifications, NUREG-1430 Through 14342009-11-30030 November 2009 Technical Specification Task Force Recommended Changes to Be Incorporated in Revision 4 of the Standard Technical Specifications, NUREG-1430 Through 1434 TSTF-09-15, Transmittal of TSTF-517, Revision 0, Allowance for Non-TS Cooling / Ventilation Systems Degradation on Support System Operability and Associated Implementation Guidance2009-10-28028 October 2009 Transmittal of TSTF-517, Revision 0, Allowance for Non-TS Cooling / Ventilation Systems Degradation on Support System Operability and Associated Implementation Guidance TSTF-09-10, Transmittal of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b, Sections 3.1.1 - 3.7.52009-03-18018 March 2009 Transmittal of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b, Sections 3.1.1 - 3.7.5 TSTF-08-21, Transmittal of TSTF-513, Revision 0, Revise Operability Requirements and Actions for RCS Leakage Instrumentation.2008-11-14014 November 2008 Transmittal of TSTF-513, Revision 0, Revise Operability Requirements and Actions for RCS Leakage Instrumentation. TSTF-08-19, Transmittal of TSTF-500, Revision 1, DC Electrical Rewrite - Update to TSTF-360.2008-11-0505 November 2008 Transmittal of TSTF-500, Revision 1, DC Electrical Rewrite - Update to TSTF-360. TSTF-08-18, Transmittal of TSTF-512, Revision 0, Revise SR 3.0.3 to Address SRs That Cannot Be Performed or Are Not Met.2008-10-14014 October 2008 Transmittal of TSTF-512, Revision 0, Revise SR 3.0.3 to Address SRs That Cannot Be Performed or Are Not Met. TSTF-08-16, Transmittal of TSTF-511, Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26.2008-09-17017 September 2008 Transmittal of TSTF-511, Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26. TSTF-08-13, TSTF-426, Revision 1, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6b & 6c2008-08-0505 August 2008 TSTF-426, Revision 1, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6b & 6c TSTF-08-08, TSTF-508, Revision 0, Revise Control Room Habitability Actions to Address Lessons Learned from TSTF-448 Implementation.2008-07-0303 July 2008 TSTF-508, Revision 0, Revise Control Room Habitability Actions to Address Lessons Learned from TSTF-448 Implementation. TSTF-08-07, Proposed Model Application for TSTF-500, Revision 0, DC Electrical Rewrite - Update to TSTF-360.2008-03-11011 March 2008 Proposed Model Application for TSTF-500, Revision 0, DC Electrical Rewrite - Update to TSTF-360. TSTF-08-04, TSTF-446, Revision 3, Risk Informed Evaluation of Extensions to Containment Isolation Valve Completion Times (WCAP-15791).2008-02-19019 February 2008 TSTF-446, Revision 3, Risk Informed Evaluation of Extensions to Containment Isolation Valve Completion Times (WCAP-15791). TSTF-08-01, Response to NRC June 25, 2007 Request for Additional Information Regarding TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions.2008-01-18018 January 2008 Response to NRC June 25, 2007 Request for Additional Information Regarding TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions. ML0721201452007-07-25025 July 2007 NRC Response to 4/16/2007 Submittal of TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions, Enclosure 5a - CEOG_3.3.01a_B for TSTF-493R2eITSB ML0720702512007-07-25025 July 2007 NRC Response to 4/16/2007 Submittal of TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions, Enclosure 2 - 493 R2 pp-1_12 Markup Rev. B ML0720702602007-07-25025 July 2007 NRC Response to 4/16/2007 Submittal of TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions, Enclosure 3a - Bwog - 3.3.01_ B for TSTF -493R23e ITSB ML0720702692007-07-25025 July 2007 NRC Response to 4/16/2007 Submittal of TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions, Enclosure 3b-BWOG - 3.3.05_B for TSTF-493R23e ITSB ML0720703552007-07-25025 July 2007 NRC Response to 4/16/2007 Submittal of TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions, Enclosure 4a - BWR4_3.03.1.01_B for TSTF-493R2eITSB ML0720703582007-07-25025 July 2007 NRC Response to 4/16/2007 Submittal of TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions, Enclosure 4b - BWR4_3.03.2.01_B for TSTF 493 R2eITSB ML0721200762007-07-25025 July 2007 NRC Response to 4/16/2007 Submittal of TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions, Enclosure 4d - BWR4_3.03.5.01_B for TSTF-493R2eITSB ML0721201192007-07-25025 July 2007 NRC Response to 4/16/2007 Submittal of TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions, Enclosure 4k - BWR6_3.03.6.05_B for TSTF-493R2eITSB ML0721201112007-07-25025 July 2007 NRC Response to 4/16/2007 Submittal of TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions, Enclosure 4j -BWR6_3.03.5.02_B for TSTF-493R2eITSB 2023-12-12 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML17290A097&oldid=1689837"