ENS 55999

From kanterella
Revision as of 15:00, 4 January 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
ENS 55999 +/-
Where
Valcor Engineering Company
York, South Carolina (NRC Region 1)
Organization: Valcor Engineering Company
Reporting
10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component

10 CFR 21.21(d)(3)(i), Failure to Comply or Defect
Time - Person (Reporting Time:+1448.15 h60.34 days <br />8.62 weeks <br />1.984 months <br />)
Opened: Michael Swirad
12:09 Jul 18, 2022
NRC Officer: Ernest West
Last Updated: Sep 12, 2022
55999 - NRC Website
Loading map...