ML20066D382

From kanterella
Revision as of 15:47, 21 December 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
to Monthly Operating Rept for June 1981
ML20066D382
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/08/1982
From: Sarsour B
TOLEDO EDISON CO.
To:
Shared Package
ML20066D281 List:
References
NUDOCS 8211110310
Download: ML20066D382 (1)


Text

.

    • Revision s

1 - 1/8/82 . .

OPERATING DATA REPORT DOCKET NO. _50-346 DATE .lanuary_8,1982 COSIPLETED BY Bilal Sntsour TELEPHONE (419) 259-5000 Ext. 251

_ OPERATING STATUS Notes

1. Unit Name: Davis-Besse Unit #1 ,

June, 19S1

2. Reporting Period:

2772

3. Licensed Thermal Power (51Wt):
4. Nameplate Rating (Gross 31We): 925 906
5. Design Electrical Rating (Net 31We):
6. h!aximum Dependable Capacity (Gross S!We): 918 1
7. 51aximum Dependable Capacity (Net 51We):

874

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To which Restricted. If Any (Net 31We):
10. Reasons For Restrictions.If Any:

This alonth Yr.-to-Date Cumulative 720 4,343 25.584

11. Hours in Reporting Period l 565.4 3.025.6 11.108.2

~

12. Number Of Hours Reactor Was Critical 0 34.8 2,513.4
13. Reactor Resene Shutdown Hours
14. Hours Generator On-Line 565.4 2,879.0 12.221.3
15. Unit Reserve Shutdown Hours 0 0' i _733 _ g 1,146,943 6,392,283 ?7.480.785
16. Gross Thermal Energy Generated (31WH) 383.055 2,138,383 9.165.536 1 17. Gross Electrical Energy Generated ( A!Wil) _ _ ,
18. Net Electrical Energy Generated (31WH) 359.837 2,002.585 8.536.434 78.5 66.3 47.8
19. Unit Senice Factor
20. Unit Availability Factor 78.5 66.3 54.5
21. Unit Capacity Factor IUsing 31DC Net) - 56.2 51.8 38.2 55.2 50.9 36.8
22. Unit Capacity Factor IUsing DER Net) ,
23. Unit Forced Outage Rate 21.5 25.9 25.3
24. Shutdowns Scheduled Oser Next 6 Stonths (Type. Date,and Duration of Eacht: .

2

25. If Shut Down At Eni! Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operationi: Forecast Achiesed INITIA L CRITICA LITY INITIAL ELECTRICITY CO\1NIERCIAL OPER ATION 8211110310 820108 '

PDR ADOCK 05000346 R

, PDR ("/778

~ e .'