MONTHYEARIR 05000528/20244042024-08-0808 August 2024 Cybersecurity Inspection Report 05000528/2024404, 05000529/2024404 and 05000530/2024404 ML24213A3232024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 71: Re-Submittal of RR-30 ML24213A3292024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 72: Re-Submittal of RR-39 IR 05000528/20240022024-07-29029 July 2024 Integrated Inspection Report 05000528/2024002 and 05000529/2024002 and 05000530/2024002 ML24173A3302024-07-24024 July 2024 Pressurizer Surge Line Inspection Program ML24159A4702024-07-17017 July 2024 Issuance of Amendment Nos. 223, 223, and 223 Revision to Technical Specifications 3.5.1 and 3.5.2 Using Risk Informed Process for Evaluations ML24198A0662024-07-16016 July 2024 Program Review - Simulator Testing Methodology ML24193A3442024-07-11011 July 2024 Fourth 10-Year Interval, Second Period Owner’S Activity Report Number 3R24 ML24129A0522024-07-0303 July 2024 Review of the Spring 2023 Steam Generator Tube Inspection Report ML24177A3212024-06-25025 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canisters Identification Numbers AMZDFX180, AMZDFX181, AMZDFX182 Vertical Concrete Cask Identification Nu IR 05000528/20240042024-06-25025 June 2024 Notification of Inspection (NRC Inspection Report 05000528/2024004, 05000529/2024004, 05000530/2024004) ML24170A9962024-06-18018 June 2024 Response to Second Request for Additional Information to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) – Operating, TS 3.5.2, Safety Injection Tanks (Sits) – Shutdown a ML24129A2062024-06-14014 June 2024 Issuance of Amendment Nos. 222, 222, and 222 Revision to Technical Specifications to Adopt TSTF-266-A ML24159A0262024-06-0303 June 2024 Annual Report of Guarantee of Payment of Deferred Premium ML24135A2482024-05-14014 May 2024 Response to Second Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24164A2582024-05-0909 May 2024 10-PV-2024-04 Post-Exam Comments ML24128A2702024-05-0707 May 2024 Docket Nos. Stn 50-528/529/530 - Response to NRC Regulatory Issue Summary (RIS) 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24129A1482024-05-0707 May 2024 and Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Casks with Applied Changes IR 05000528/20240012024-05-0202 May 2024 Independent Spent Fuel Storage Installation, Integrated Inspection Report 05000528/2024001, 05000529/2024001, 05000530/2024001, 07200044/2024001, and Exercise of Enforcement Discretion ML24119A0022024-04-26026 April 2024 2023 Annual Environmental Operating Report ML24116A2082024-04-24024 April 2024 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2023 IR 05000528/20244012024-04-22022 April 2024 Security Baseline Inspection Report 05000528/2024401 and 05000529/2024401 and 05000530/2024401 (Cover Letter) IR 05000528/20243012024-04-22022 April 2024 NRC Initial Operator Licensing Examination Approval 05000528/2024301, 05000529/2024301, and 05000530/2024301 ML24112A0012024-04-19019 April 2024 Core Operating Limits Report, Revision 32 ML24108A1982024-04-16016 April 2024 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Casks with Applied Changes Authorized by an Amended Certificate of Compliance ML24103A2482024-04-12012 April 2024 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2023 ML24131A0972024-04-10010 April 2024 Annual Radiological Environmental Operating Report 2023 ML24096A2202024-04-0505 April 2024 Transmittal of Technical Specification Bases Revision 78 ML24032A1542024-04-0303 April 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) ML24089A1892024-03-28028 March 2024 Present Levels of Financial Protection ML24068A2522024-03-0808 March 2024 License Amendment Request to Revise Technical Specifications 3.5.1 and 3.5.2 Using Risk-Informed Process for Evaluations ML24066A0472024-03-0606 March 2024 Response to Request for Additional Information to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) – Operating, TS 3.5.2, Safety Injection Tanks (Sits) – Shutdown and TS IR 05000528/20240122024-03-0404 March 2024 Age-Related Degradation Inspection Report 05000528/2024012, 05000529/2024012 and 05000530/2024012 IR 05000528/20230062024-02-28028 February 2024 Annual Assessment Letter for Palo Verde Nuclear Generating Station, Units 1, 2 and 3 Report 05000528/2023006 and 05000529/2023006 and 05000530/2023006 ML24053A3972024-02-22022 February 2024 License Renewal - Alloy 600 Management Program Plan ML24047A3632024-02-16016 February 2024 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Transportable Storage Canisters Identification Numbers AMZDFX177, AMZDFX178, AMZDFX179 Vertical Concrete Cask Identification No. AMZDNE179, AMZDNE178 IR 05000528/20230042024-02-12012 February 2024 Integrated Inspection Report Report 05000528/2023004 and 05000529/2023004 and 05000530/2023004 ML24019A2012024-01-19019 January 2024 Fourth 10-Year Interval, Second Period Owners Activity Report Number 1R24 ML24019A1362024-01-18018 January 2024 Inservice Inspection Request for Information ML24012A2452024-01-12012 January 2024 Response to Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24010A1532024-01-10010 January 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection ML23341A0062023-12-21021 December 2023 Project Manager Assignment IR 05000528/20230112023-12-18018 December 2023 License Renewal Inspection Report 05000528/2023011 ML23335A0782023-11-30030 November 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1602023-11-17017 November 2023 Supplemental Submittal - Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20234032023-11-13013 November 2023 NRC Security Inspection Report 05000528 2023403, 05000529 2023403, 05000530 2023403 (Full Report) ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23299A3052023-10-26026 October 2023 Response to Request for Additional Information Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20230032023-10-17017 October 2023 Integrated Inspection Report 05000528 2023003 and 05000529 2023003 and 05000530 2023003 ML23270B9232023-09-28028 September 2023 Notification of Age-Related Degradation Inspection (05000528/2024012, 05000529/2024012, and 05000530/2024012) and Request for Information 2024-08-08
[Table view] |
Text
1' Z AAS A subsidiaryof Pinnacle West Capital Corporation Dwight C. Mims Mail Station 7605 Palo Verde Nuclear Senior Vice President Tel. 623-393-5403 P. 0. Box 52034 Generating Station Nuclear Regulatory and Oversight Fax 623-393-6077 Phoenix, Arizona 85072-2034 102-06599-DCM/RKR/GAM September 28, 2012 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 50-528, 50-529, and 50-530 Pressurized Water Reactor (PWR) Internals Aging Management Program Plan By letter no. 102-06423, dated October 11, 2011, (ADAMS Accession No. ML11297A118) Arizona Public Service Company (APS) submitted to the Nuclear Regulatory Commission (NRC) the following updated commitment to submit a reactor vessel internals inspection program:
APS will submit the PVNGS Units 1, 2, and 3 reactor vessel internalsaging managementprogram and inspection plans in accordancewith MRP-227-A no later than October 1, 2012, for NRC review and approval.
In accordance with this commitment, the PVNGS Units 1, 2, and 3 PWR Internals Aging Management Program Plan, consistent with MRP-227-A, is provided in the Enclosure to this letter for NRC review and approval. Approval is requested within one year of the date of this letter.
This letter contains the following regulatory commitment:
APS will incorporatea summary description of the PVNGS Units 1, 2, and 3 reactorvessel internalsaging managementprogram into the Updated Final Safety Analysis Report (UFSAR) no later than the next scheduled update requiredby 10 CFR 50.71(e) following NRC approvalof the program. This summary description shall reference the "PWR InternalsAging Management ProgramPlan for Palo Verde Nuclear Generating Station Units 1, 2, and 3."
A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway -Comanche Peak - Diablo Canyon - Palo Verde - San Onofre - South Texas - Wolf Creek
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Reactor Vessel Internals Inspection Program and Plans Page 2 Should you need further information regarding this submittal, please contact Robert K. Roehler, Acting Licensing Section Leader, at (623) 393-5241.
Sincerely, DCM/RKR/GAM
Enclosure:
PWR Internals Aging Management Program Plan for Palo Verde Nuclear Generating Station Units 1, 2, and 3 cc: E. E. Collins Jr. NRC Region IV Regional Administrator L. K. Gibson NRC NRR Project Manager for PVNGS M. A. Brown NRC Senior Resident Inspector for PVNGS
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Reactor Vessel Internals Inspection Program and Plans Page 3 FOR INTERNAL USE ONLY bcc:
K. A. Rasmussen electronic G.) N.Michael electronic M. R. Fallon electronic B. E3erryman electronic M. L. Lacal electronic D. C. Mims electronic J. J. Cadogan electronic R. 3. Bement electronic R. K. Edington electronic M. 3. Green electronic R. A. Barnes electronic T. INJ. Weber electronic E. A. O'Neill electronic [for the OSRC]
T. 0. Miller electronic [for the OSRC]
PVOC (Ann Purcell) electronic S./ ,. Baum 8695 Daoer PVNGS Owner Services electronic STARS Distribution electronic CERTREC (pvupdateacertrec.com)
SOURCE DOCUMENTS:
SDOC MN755-A00003 COMMITMENTS:
As described in the letter ACTION TRACKING:
RCTSAI: 4244359; Action Group: 9737 ENGNRNG INSPCTNS Parent RCTS: 4244356; Unit 9; Trend Code (RCTSAI): Active N Date Due: 9/30/13; Milestone ID: (If Applicable) N/A
==
Description:==
APS will incorporatea summary descriptionof the PVNGS Units 1, 2, and 3 reactorvessel internalsaging management program into the Updated Final Safety Analysis Report (UFSAR) no later than the next scheduled update requiredby 10 CFR 50.71(e) following NRC approvalof the program. This summary descriptionshall reference the "PWR InternalsAging Management ProgramPlan for Palo Verde Nuclear Generating Station Units 1, 2, and 3." [NOTE: The RCTSAI due date should be adjusted following NRC approval of the program, which was requested within one year of the date of the submittaL]
Contact Licensing Section Leader priorto changing the description or due date for this action, and upon closure of this action. This action was credited in the following submittal to the NRC: 102-06599, September 28, 2012.
NO MODE/CONDITION RESTRAINT
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Reactor Vessel Internals Inspection Program and Plans Page 4 FOR INTERNAL USE ONLY VERIFICATION OF ACCURACY:
RA Preparer: I have prepared the attached document and validated selected statements of fact to the identified source and Licensing Basis documents (QV&V).
/ Glenn Michael /
Signature Printed Date Originator/Requestor: I have reviewed and verified that the technical information has been accurately translated and correctly described.
IZ24 Edison Fernandez /
Signature
- Printed Date RA Peer Reviewer: I have reviewed the attached document for completeness, QV&V adequacy and submittal quality.
/ _S-Sc1L A)/9 Signature Printed Date Other Licensing Document Changes:
UFSAR [ ] NO [X ] Yes LDCR number to be assigined when implementingq the commitment tracked in RCTSAI 4244359 TSBases [X] NO [ ]Yes LDCR n/a TRM [X] NO [ ]Yes LDCR n/a OTHER [X] NO [] Yes Tracking Number n/a