ML15085A229

From kanterella
Revision as of 00:52, 5 December 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Agenda for Forthcoming Public Meeting Between the U.S. Nuclear Regulatory Commission and the TSTF
ML15085A229
Person / Time
Site: Technical Specifications Task Force
Issue date: 04/02/2015
From: Michelle Honcharik
NRC/NRR/DPR/PSPB
To:
Honcharik, Michelle 415-1774
Shared Package
ML15085A192 List:
References
Download: ML15085A229 (2)


Text

Agenda for TSTF /NRC Meeting April 16, 2015 9:30 a.m. - 4:00 p.m.

TWFN 10-C02 I. Administrative (9:30 a.m. - 9:40 a.m.) (NRC)

A. Introductions B. Agenda Review C. Other Administrative Issues II. Process Issues (9:40 a.m. - 9:50 a.m.)

A. Status of Regulatory Issue Summary (RIS) Withdrawing RIS 2005-20 (NRC)

B. Other Process Issues BREAK III. Issues with Previously Approved Travelers (10:00 a.m. - 11:15 a.m.)

A. NRC Response to TSTF Proposed Resolution of NRC Concerns with TSTF-471, TSTF-286, and TSTF-51 (NRC)

A. NRC Comments on TSTF Draft Letter Clarifying Information Requirements for TSTF-425 Submittals (NRC)

B. NRC Status on TSTF Response to Questions on TSTF-412, "Provide Actions for One Steam Supply to Turbine Driven AFW/EFW Pump Inoperable" (NRC)

C. Results of NRC Consideration of Travelers that Contain Commitments (NRC)

D. NRC Response to Proposed TSTF-493 Supplement (NRC)

IV. Active Traveler Review Status (11:15 a.m. - 12:00 p.m.)

A. Discuss Status of All Travelers Currently Under NRC Staff Review (All)

1. TSTF-454, Rev. 2, Extend PCIV Completion Times (NEDC-33046)
2. TSTF-529, Rev. 1, Clarify Use and Application Rules
3. TSTF-531, Rev. 0, Revision of Specification 3.8.1, Required Actions B.3.1 and B.3.2
4. TSTF-537, Rev. 0, Increase CIV Completion Time; Update of TSTF-373
5. TSTF-541, Rev. 0, Add Exceptions to Surveillance Requirements When the Safety Function is Being Performed
6. TSTF-542, Rev. 0, Reactor Pressure Vessel Water Inventory Control
7. TSTF-545, Rev. 0, TS Inservice Testing (IST) Program Removal Enclosure

a) Status of request to extend submittal period under enforcement guidance memorandum (EGM) 2012-01 from 4 months to 12 months. (NRC)

8. TSTF-547, Rev. 0, Clarification of Rod Position Requirements
9. TSTF-551, Rev. 0, "Address Transient Secondary Containment Conditions" B. TSTF Traveler Review Priority (TSTF)

LUNCH V. Technical Issues (1:00 p.m. - 3:30 p.m.)

A. Discussion of Improvements to the Reactor Coolant System (RCS) Pressure Boundary Leakage Technical Specifications Requirements (All)

B. NRC Response to TSTF Comments on Revision to Inspection Manual Chapter (IMC)-0326, Appendix C.13 (NRC)

C. NRC Feedback on Concept of Traveler for Pressurized Water Reactor (PWR) Mode 3 End States (NRC)

D. NRC Proposal Regarding Motor Operated Valve (MOV) Surveillance Requirements (SR) with Frequency Controlled by IST Program (NRC)

BREAK VI. Future Planning (3:15 p.m. - 3:45 p.m.)

A. Future Traveler Submittals (TSTF)

1. TSTF-552, "Diesel Generator Frequency and Voltage Tolerances (WCAP-17308)"

(following draft SE issuance)

B. Next Meeting (All)

1. July 23, 2015 VII. Designated Time for Public Comments VIII. Closing Remarks (All)

IX. Adjourn (4:00 p.m.)