MONTHYEARIR 05000272/20240052024-08-29029 August 2024 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Report 05000272/2024005 and 05000311/2024005) IR 05000272/20244032024-03-20020 March 2024 And Hope Creek Generating Station - Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000272/2024403, 05000311/2024403, and 05000354/2024403 IR 05000272/20230062024-02-28028 February 2024 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023006 and 05000311/2023006 ML24004A1542024-01-0808 January 2024 Notification of Conduct of a Fire Protection Team Inspection IR 05000272/20230052023-08-31031 August 2023 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023005 and 05000311/2023005) IR 05000272/20220062023-03-0101 March 2023 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2022006 and 05000311/2022006) ML22318A1062022-11-14014 November 2022 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000272/2023011 and 05000311/2023011 IR 05000272/20220052022-08-31031 August 2022 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2022005 and 05000311/2022005) ML22234A0362022-08-22022 August 2022 Request for Information to Support Triennial Baseline Design - Basis Capability of Power-Operated Valves Inspection; Inspection Report 05000272/2022011 and 05000311/2022011 IR 05000272/20224022022-04-14014 April 2022 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000272/2022402 and 05000311/2022402 IR 05000272/20210062022-03-0202 March 2022 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2021006 and 05000311/2021006) IR 05000272/20210052021-09-0101 September 2021 Updated Inspection Plan for the Salem Nuclear Generating Station (Report 05000272/2021005 and 05000311/2021005) IR 05000272/20200062021-03-0303 March 2021 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2020006 and 05000311/2020006) LR-N21-0014, Snubber Program Plan, Fifth Ten-Year Inspection Interval, Effective from January 1, 2021 Through December 31, 20302021-02-16016 February 2021 Snubber Program Plan, Fifth Ten-Year Inspection Interval, Effective from January 1, 2021 Through December 31, 2030 ML20281A5172020-10-13013 October 2020 Notification of Conduct of a Fire Protection Team Inspection IR 05000272/20200052020-08-31031 August 2020 Updated Inspection Plan (Inspection Report 05000272/2020005 and 05000311/2020005) ML20077L3492020-03-20020 March 2020 Ti 2515/194 Inspection Documentation Request IR 05000272/20190062020-03-0303 March 2020 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2019006 and 05000311/2019006) IR 05000272/20190052019-08-28028 August 2019 Updated Inspection Plan (Inspection Reports 05000272/2019005 and 05000311/2019005) IR 05000272/20180062019-03-0404 March 2019 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2018006 and 05000311/2018006) IR 05000272/20180052018-08-28028 August 2018 Updated Inspection Plan (Inspection Reports 05000272/2018005 and 05000311/2018005) IR 05000272/20170062018-02-28028 February 2018 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2017006, 05000311/2017006, 05000272/2017402, 05000311/2017402, 05000272/2017501, and 05000311/2017501 IR 05000272/20170052017-08-28028 August 2017 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2017005 and 05000311/2017005) IR 05000272/20160062017-03-0101 March 2017 Annual Assessment Letter for Salem Nuclear Generating Station (Salem), Units 1 and 2 (Reports 05000272/2016006 and 05000311/2016006) IR 05000272/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Salem Nuclear Generating Station - Unit Nos. 1 and 2 (Report 05000272/2016005 and 05000311/2016005) IR 05000272/20150062016-03-0202 March 2016 ROP 16 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 & 2 (Inspection Report 05000272/2015006 and 05000311/2015006) IR 05000272/20150052015-09-0101 September 2015 ROP-16 Mid-Cycle Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Report 05000272/2015005 and 05000311/2015005) IR 05000272/20140012015-03-0404 March 2015 ROP-15 Annual Assessment Letter for Salem Nuclear Generating Station Units 1 and 2 (Report 05000272/2014001 and 05000311/2014001) IR 05000272/20140062014-09-0202 September 2014 ROP-15 Mid-Cycle Performance Review and Inspection Plan Report 05000272/2014006 and 05000311/2014006 IR 05000272/20130012014-03-0404 March 2014 ROP-14 2013 Salem Nuclear Generating Station Units 1 and 2, Annual Assessment Letter, Report 05000272-13-001 and 05000311-13-001),and Inspection Plan IR 05000272/20130062013-09-0303 September 2013 ROP-14 Mid-Cycle Performance Review and Inspection Plan Report 05000272/2013006 and 05000311/2013006 IR 05000272/20120012013-03-0404 March 2013 Annual Assessment Letter for Salem Nuclear Generating Station, Unit 1 and 2 (Report 05000272/2012001 and 05000311/2012001) ML12248A0402012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan 2012 - Salem Nuclear Generating Station, Units 1 and 2 IR 05000272/20110012012-03-0505 March 2012 Annual Assessment Letter for Salem Nuclear Generating Station, Unit Nos. 1 and 2 (Report 05000272/2011001 and 05000311/2011001) ML1124112942011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan 2011 - Salem Nuclear Generating Station, Units 1 and 2 IR 05000272/20100012011-03-0404 March 2011 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2, EOC-11 (Report 05000272/2010001 and 05000311/2010001) ML1024403642010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan 2010 - Salem Nuclear Generating Station, Units 1 and 2 ML1029505872010-03-12012 March 2010 Email from Ohara, Timothy to Conte, Richard, FW: Salem U1 Inspection Plan. ML1006208082010-03-0303 March 2010 EOC Letter and Report 22 ML0924403092009-09-0101 September 2009 Mid-Cycle Performance Review and Inspection Plan - Salem Nuclear Generating Station, Unit Nos. 1 and 2 (September 1, 2009) IR 05000272/20090012009-03-0404 March 2009 Annual Assessment Letter - Salem Nuclear Generating Station, Units 1 and 2 (05000272-09-001 and 05000311-09-001) IR 05000272/20080012008-03-0303 March 2008 Annual Assessment Letter EOC 2007 ROP8 - Salem Station (05000272-08-001, 05000311-08-001) ML0734706552007-12-13013 December 2007 ROP 8 - Salem - Change to Inspection Plan, 12/13/07 ML0724309472007-08-31031 August 2007 Mid-Cycle Review and Inspection Plan IR 05000272/20070012007-03-0202 March 2007 Annual Assessment Letter EOC 2006 - Salem Generating Station (Report 05000272-07-001, 05000311-07-001) ML0624306512006-08-31031 August 2006 Mid-cycle Performance Review and Inspection Plan - Salem Nuclear Generating Station IR 07200200/19600012006-03-0202 March 2006 2006-001 - Annual Assessment Letter - Salem Nuclear Generating Station (Report 05-272/2006001 and 05-311/2006001) ML0406307982004-03-0303 March 2004 2003-04 Annual Assessment Letter - Salem ML0323905112003-08-27027 August 2003 2003 Mid-Cycle Performance Review and Inspection Plan for Salem Units 1 and 2 ML0306206932003-03-0303 March 2003 2003 Annual Assessment Letter - Salem Nuclear Generating Station 2024-08-29
[Table view] Category:Letter
MONTHYEARIR 05000272/20240032024-10-30030 October 2024 Integrated Inspection Report 05000272/2024003 and 05000311/2024003 ML24296B1932024-10-23023 October 2024 Project Manager Assignment LR-N24-0068, Core Operating Limits Report - Cycle 282024-10-21021 October 2024 Core Operating Limits Report - Cycle 28 LR-N24-0063, Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF)2024-10-0707 October 2024 Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF) IR 05000272/20244022024-09-23023 September 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024402, 05000272/2024402, and 05000311/2024402 (Cover Letter Only) ML24267A1082024-09-23023 September 2024 Submittal of the Reactor Vessel Material Surveillance Program Capsule Technical Report IR 05000272/20240052024-08-29029 August 2024 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Report 05000272/2024005 and 05000311/2024005) IR 05000272/20240022024-07-30030 July 2024 Integrated Inspection Report 05000272/2024002 and 05000311/2024002 LR-N24-0012, Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding2024-07-24024 July 2024 Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding ML24145A1772024-07-15015 July 2024 And Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 236, 349, and 331 Modify Exclusion Area Boundary IR 05000272/20245012024-06-12012 June 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2024501, 05000272/2024501 and 05000311/2024501 ML24099A1572024-05-29029 May 2024 Issuance of Amendment Nos. 348 and 330 Permanent Extension of Type a and Type C Containment Leak Rate Test Frequencies ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement LR-N24-0041, Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response2024-05-22022 May 2024 Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response IR 05000272/20240102024-05-16016 May 2024 Fire Protection Team Inspection Report 05000272/2024010 and 05000311/2024010 05000272/LER-2024-001, Pressure Boundary Leakage Through a Reactor Coolant Pump Thermal Barrier Heat Exchanger2024-05-0909 May 2024 Pressure Boundary Leakage Through a Reactor Coolant Pump Thermal Barrier Heat Exchanger IR 05000272/20240012024-05-0707 May 2024 Integrated Inspection Report 05000272/2024001 and 05000311/2024001 LR-N24-0039, Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage2024-05-0606 May 2024 Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage LR-N24-0034, 2023 Annual Radioactive Effluent Release Report (ARERR)2024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) LR-N24-0035, 2023 Annual Radiological Environmental Operating Report (AREOR)2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) LR-N24-0024, Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-26026 April 2024 Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary LR-N24-0011, Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-0505 April 2024 Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20240112024-04-0101 April 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Plant Modification and Annual Problem Identification and Resolution Inspection Report 05000354/2024011, 05000272/2024011, and 05000311/2024011 LR-N24-0028, And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal2024-03-28028 March 2024 And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal LR-N24-0021, And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2024-03-20020 March 2024 And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums IR 05000272/20244032024-03-20020 March 2024 And Hope Creek Generating Station - Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000272/2024403, 05000311/2024403, and 05000354/2024403 ML24071A2132024-03-12012 March 2024 Senior Reactor and Reactor Operator Initial License Examinations LR-N24-0020, Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report2024-03-0707 March 2024 Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report LR-N24-0022, Spent Fuel Cask Registration2024-02-29029 February 2024 Spent Fuel Cask Registration IR 05000272/20230062024-02-28028 February 2024 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023006 and 05000311/2023006 IR 05000272/20244012024-02-26026 February 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024401, 05000272/2024401 and 05000311/2024401 (Cover Letter Only) LR-N24-0009, In-Service Inspection Activities2024-02-0505 February 2024 In-Service Inspection Activities IR 05000272/20230042024-02-0505 February 2024 Integrated Inspection Report 05000272/2023004 and 05000311/2023004 ML24009A1022024-01-26026 January 2024 – Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000272/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000272/2023401 and 05000311/2023401 ML24004A1542024-01-0808 January 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N23-0079, Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days2023-12-0707 December 2023 Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement LR-N23-0077, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion2023-11-29029 November 2023 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion ML23324A3072023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24250A0582023-11-14014 November 2023 PSEG to Marine Mammal Stranding Center, Salem Sea Turtle Stranding Response Services IR 05000272/20230032023-11-13013 November 2023 Integrated Inspection Report 05000272/2023003 and 05000311/2023003 LR-N23-0072, Core Operating Limits Report – Cycle 302023-11-0101 November 2023 Core Operating Limits Report – Cycle 30 IR 05000272/20230102023-10-12012 October 2023 Biennial Problem Identification and Resolution Inspection Report O5000272/2023010 and 05000311/2023010 IR 05000272/20234022023-10-12012 October 2023 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) LR-N23-0045, And Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 And Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement ML23249A2612023-09-0606 September 2023 License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20230052023-08-31031 August 2023 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023005 and 05000311/2023005) ML23233A0762023-08-21021 August 2023 Requalification Program Inspection ML23192A8212023-08-14014 August 2023 And Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location 2024-09-23
[Table view] |
Inspection Report - Salem - 2015005 |
---|
|
|
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 September 1, 2015 Mr. Robert Braun President and Chief Nuclear Officer PSEG Nuclear LLC N09 P.O. Box 236 Hancocks Bridge, NJ 08038 SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2 (REPORT 05000272/2015005 AND 05000311/2015005)
Dear Mr. Braun:
On August 12, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Salem Nuclear Generating Station, Unit Nos. 1 and 2 (Salem). The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2014 through June 30, 2015. This letter informs you of r future inspections at your facility. The NRC determined the performance at Salem Unit 2 during the most recent quarter was Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The NRC determined the performance at Salem Unit 1 during the most recent quarter was within the Regulatory Response Column of the NRCs ROP Action Matrix because in the fourth Unplanned Scrams per 7,000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> criticalthreshold, which moved Salem Unit 1 to the Regulatory Response Column from the Licensee Response Column. You were notified of this change to the ROP Action Matrix Column in the NRC Annual Assessment Letter 05000272/2014001, issued March 4, 2015 (ADAMS Accession No. ML15062A086). Although the above described PI returned to the nominal, expected range (i.e., green) in the second quarter of 2015, completion of the required supplemental inspection in accordance with Inspection Procedure (IP) 95001 Two is required to return Salem Unit 1 to the Licensee Response Column. On May 29, 2015, your staff notified the NRC of your readiness to conduct a supplemental inspection to review the actions taken to address the White PI described above. In response, the NRC conducted a supplemental inspection in accordance with IP 95001 during the week of July 20, 2015. The objectives of the IP 95001 inspection were to provide assurance that the root cause and contributing causes of risk significant performance issues were understood, the extent of condition and extent of cause were understood, and the corrective actions were sufficient to address the root and contributing causes and prevent recurrence. As of the date of this letter, the IP 95001 inspection report and assessment follow up letter have not been issued. The NRC will notify you of the results of this inspection via a separate inspection report which will be publically available. The enclosed inspection plan lists the inspections scheduled through June 30, 2017. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the second half of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. In addition to baseline inspections, the NRC will conduct Inspection Procedure (IP) 60855.1, -the license conditions added as part of the renewed operating license, regulatory commitments, selected aging management programs (AMPs), and time limited aging analyses (TLAAs) are implemented and/or completed in accordance with 10 CFR Part 54. As discussed below, the NRC will also perform Temporary Instruction (TI) 2515-Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans In response to the accident at Fukushima, the Commission issued Order EA-12-Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-o Reliable Spent Fuel Pool wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. The on-site portion of the audit has been completed at Salem Units 1 and 2, and the information gathered will aid staff in development of the Final Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Final Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing TI 2515-191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans. From July 1, 2014 through June 30, 2015, the NRC issued two Severity Level IV traditional enforcement violations associated with impeding the regulatory process (one) and deliberate misconduct (one). Therefore, the NRC plans to conduct Inspection Procedure -up on Correcti-up on these violations. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact Glenn Dentel at (610) 337-5233 with any questions you have regarding this letter.
Sincerely,
/RA/ Michael L. Scott, Director Division of Reactor Projects Docket Nos. 50-272, 50 311 License Nos. DPR 70, DPR 75 Enclosure: Salem Inspection/Activity Plan cc w/encl: Distribution via ListServ
ML15229A044 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP RI/DRP NAME PFinney/MSD per email MDraxton/ MSD GDentel/ GTD MScott/ MLS DATE 08/24 /15 08/25 /15 08/25 /15 08/ 31/15 Page 1 of 4 08/25/2015 10:29:30 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site SalemInspection / Activity Plan 07/01/2015-06/30/2017 EP-EP PROGRAM INSPECTION 2 1, 2 IP A lert and Notification System Testing7111402 07/13/2015 07/17/2015 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 07/13/2015 07/17/2015 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 07/13/2015 07/17/2015 95001-SUPPLEMENTAL INSPECTION FOR WHITE PI 2 1 IP Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area 95001 07/20/2015 07/24/2015 71003-UNIT 1 LR COMMITMENT INSPECTION PHASE II 5 1 IP Post-Approval Site Inspection for License Renewal 71003 07/20/2015 07/24/2015 1 IP Post-Approval Site Inspection for License Renewal 71003 08/03/2015 08/07/20157111111B-REQUAL INSP W/ P/F RESULTS 2 1, 2 IP Licensed Operator Requalification Program7111111B 09/07/201509/11/2015 ISFSI-ISFSI LOADING INSPECTION 2 1, 2 IP Operation Of An ISFSI 60855 07/27/2015 07/31/2015 1, 2 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 07/27/2015 07/31/2015 12/14EXM-INITIAL OL EXAM 4 1 FY16 - SALEM INITIAL OPERATOR LICENSING EXAM U0191011/16/201511/20/2015 1 FY16 - SALEM INITIAL OPERATOR LICENSING EXAM U01910 12/14/2015 12/24/201571124-RADIATION PROTECTION 1 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 10/05/2015 10/09/2015 1, 2 IP Occupational ALARA Planning and Controls71124.02 10/05/2015 10/09/2015 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 10/05/2015 10/09/2015 1, 2 IP Occupational Dose Assessment71124.04 10/05/2015 10/09/2015 1, 2 IP Radiation Monitoring Instrumentation71124.05 10/05/2015 10/09/201571124.08-RADWASTE 1 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 10/19/2015 10/23/20157111108P-U2 INSERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR7111108P11/02/201511/13/201571124-RADIATION PROTECTION 1 2 IP Radiological Hazard Assessment and Exposure Controls71124.0111/02/201511/06/2015 2 IP Occupational ALARA Planning and Controls71124.0211/02/201511/06/2015 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.0311/02/201511/06/2015 2 IP Occupational Dose Assessment71124.0411/02/201511/06/2015 2 IP Radiation Monitoring Instrumentation71124.0511/02/201511/06/2015 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Page 2 of 4 08/25/2015 10:29:30 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site SalemInspection / Activity Plan 07/01/2015-06/30/201771124-RADIATION PROTECTION 1 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.0111/16/201511/20/2015 1, 2 IP Occupational ALARA Planning and Controls71124.0211/16/201511/20/2015 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.0311/16/201511/20/2015 1, 2 IP Occupational Dose Assessment71124.0411/16/201511/20/2015 1, 2 IP Radiation Monitoring Instrumentation71124.0511/16/201511/20/2015 1, 2 IP Performance Indicator Verification7115111/16/201511/20/201571124-RADIATION PROTECTION 1 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 03/07/201603/11/2016 1, 2 IP Occupational ALARA Planning and Controls71124.02 03/07/201603/11/2016 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 03/07/201603/11/2016 1, 2 IP Occupational Dose Assessment71124.04 03/07/201603/11/2016 1, 2 IP Radiation Monitoring Instrumentation71124.05 03/07/201603/11/2016 EP-EP EXERCISE EVALUATION 4 1, 2 IP Exercise Evaluation7111401 05/16/2016 05/20/201671124-RADIATION PROTECTION 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.0104/11/2016 04/15/2016 1 IP Occupational ALARA Planning and Controls71124.0204/11/2016 04/15/2016 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.0304/11/2016 04/15/2016 1 IP Occupational Dose Assessment71124.0404/11/2016 04/15/2016 1 IP Radiation Monitoring Instrumentation71124.0504/11/2016 04/15/2016 71003-U1 LR COMMITTMENTS - OUTAGE 1 1 IP Post-Approval Site Inspection for License Renewal 71003 04/18/2016 04/22/2016 ISI-U1 INSERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 04/18/2016 04/29/201671124-RADIATION PROTECTION 1 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 05/16/2016 05/20/2016 1, 2 IP Occupational ALARA Planning and Controls71124.02 05/16/2016 05/20/2016 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 05/16/2016 05/20/2016 1, 2 IP Occupational Dose Assessment71124.04 05/16/2016 05/20/2016 1, 2 IP Radiation Monitoring Instrumentation71124.05 05/16/2016 05/20/201671124-ENVIRONMENTAL 1 1 IP Radiological Environmental Monitoring Program71124.07 06/06/2016 06/10/2016 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Page 3 of 4 08/25/2015 10:29:30 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site SalemInspection / Activity Plan 07/01/2015-06/30/20177111117T-MODS INSPECTION 3 1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 07/18/2016 07/22/2016 1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 08/01/2016 08/05/2016 EXM12/12-SALEM INITIAL EXAMINATION 4 1 FY17-SALEM INITIAL OPERATOR LICENSING EXAM U0193011/14/201611/18/2016 1 FY17-SALEM INITIAL OPERATOR LICENSING EXAM U01930 12/12/2016 12/23/201671124-RADIATION PROTECTION 1 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 08/08/2016 08/12/2016 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 08/08/2016 08/12/2016 1, 2 IP Occupational Dose Assessment71124.04 08/08/2016 08/12/2016 1, 2 IP Radiation Monitoring Instrumentation71124.05 08/08/2016 08/12/201671124-RADIATION PROTECTION 1 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.0111/07/201611/11/2016 1, 2 IP Occupational ALARA Planning and Controls71124.0211/07/201611/11/2016 1, 2 IP Occupational Dose Assessment71124.0411/07/201611/11/2016 1, 2 IP Occupational Exposure Control Effectiveness71151-OR0111/07/201611/11/2016 1, 2 IP RETS/ODCM Radiological Effluent Occurrences71151-PR0111/07/201611/11/2016711107T-TRIENNIAL HEAT SINK 1 1, 2 IP Heat Sink Performance7111107T11/14/201611/18/2016TI-191-FUKUSHIMA LESSONS-LEARNED 1 1, 2 IP Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 2515/19111/14/201611/18/201671124-RADIATION PROTECTION 1 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 04/03/2017 04/07/2017 1, 2 IP Occupational ALARA Planning and Controls71124.02 04/03/2017 04/07/2017 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 04/03/2017 04/07/2017 2 IP Occupational Dose Assessment71124.04 04/03/2017 04/07/2017 1, 2 IP Radiation Monitoring Instrumentation71124.05 04/03/2017 04/07/20177111108P-U2 INSERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR7111108P 04/24/2017 05/05/201771124-RADIATION PROTECTION 1 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 05/01/2017 05/05/2017 1, 2 IP Occupational ALARA Planning and Controls71124.02 05/01/2017 05/05/2017 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 05/01/2017 05/05/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Page 4 of 4 08/25/2015 10:29:30 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site SalemInspection / Activity Plan 07/01/2015-06/30/201771124-RADIATION PROTECTION 1 1, 2 IP Occupational Dose Assessment71124.04 05/01/2017 05/05/2017 1, 2 IP Radiation Monitoring Instrumentation71124.05 05/01/2017 05/05/201771152B-PI&R BIENNIAL 2 1, 2 IP Problem Identification and Resolution71152B 05/22/2017 05/26/2017 1, 2 IP Problem Identification and Resolution71152B 06/05/2017 06/09/201771124-RADIOACTIVE EFFLUENTS 1 1, 2 IP Radiation Monitoring Instrumentation71124.05 06/12/2017 06/16/2017 1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 06/12/2017 06/16/2017 CDBI-COMPONENT DESIGN BASIS INSPECTION 6 1, 2 IP Component Design Bases Inspection7111121 06/12/2017 06/16/2017 1, 2 IP Component Design Bases Inspection7111121 06/26/2017 06/30/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.