ML18199A122

From kanterella
Revision as of 21:04, 20 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Letter to Framatome Accept for Review of Physical Protection Plan Version 11(L-2018-SPR-0001)
ML18199A122
Person / Time
Site: Framatome ANP Richland
Issue date: 07/18/2018
From: Kevin Ramsey
Fuel Manufacturing Branch
To: Travis Tate
Framatome
Ramsey K
References
EPID L-2018-DFA-0001
Download: ML18199A122 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 18, 2018 Mr. T. J. Tate, Manager Environmental, Safety, Health and Licensing Framatome Inc.

2101 Horn Rapids Road Richland, WA 99354-5102

SUBJECT:

ACCEPTANCE FOR REVIEW OF FRAMATOME PHYSICAL PROTECTION PLAN, VERSION 11.0 (ENTERPRISE PROJECT IDENTIFIER L-2018-DFA-0001)

Dear Mr. Tate:

The U.S. Nuclear Regulatory Commission (NRC) has received your submittal dated June 29, 2018, transmitting your Version 11.0 of your physical protection plan. Your request has been assigned Enterprise Project Identifier L-2018-SPR-0001. Please reference this number in any future correspondence associated with this request.

We have completed our acceptance review of your submittal and have identified no administrative omissions or deficiencies that would prevent us from proceeding with a detailed review. Please note that the complete review of this submittal may identify issues that require additional information. Based on our preliminary evaluation and projection of current schedules, we anticipate completing our formal review by December 2018. This date could change depending on the findings of our technical review, urgent assignments, or other factors. We will promptly communicate any significant changes to this schedule. In addition, we estimate that completing the review will require approximately 80 staff hours.

In accordance with Title 10 of the Code of Federal Regulations, Section 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

If you have any questions concerning this letter, please contact me by phone at (301) 415-7506, or via e-mail at Kevin.Ramsey@nrc.gov.

Sincerely,

\RA\

Kevin M. Ramsey, Senior Project Manager Fuel Manufacturing Branch Division of Fuel Cycle Safety, Safeguards, and Environmental Review Office of Nuclear Material Safety and Safeguards Docket No. 70-1257 License No. SNM-1227

T. Tate 2

SUBJECT:

ACCEPTANCE FOR REVIEW OF FRAMATOME PHYSICAL PROTECTION PLAN, VERSION 11.0 (ENTERPRISE PROJECT IDENTIFIER L-2018-DFA-0001)

DATED: July 18, 2018 DISTRIBUTION:

FCSE r/f MBaker, FMB NPitoniak, RII EMichel, RII THarris, NSIR ADAMS Accession Number: ML18199A122 OFFICE FCSE/FMB FCSE/FMB FCSE/FMB FCSE/FMB NAME KRamsey TBrockington RJohnson KRamsey DATE 07/18/2018 07/18/2018 07/18/2018 07/18/2018 OFFICIAL RECORD COPY