NRC Generic Letter 1992-007 - Office of Nuclear Reactor Regulation Reorganization
ML031130418
Person / Time
Site: Beaver Valley, Millstone, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Mcguire, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Pilgrim, Arkansas Nuclear, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Seabrook, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Crystal River, Haddam Neck, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Robinson, Clinton, South Texas, San Onofre, Cook, Comanche Peak, Yankee Rowe, Maine Yankee, Quad Cities, Humboldt Bay, La Crosse, Big Rock Point, Rancho Seco, Zion, Midland, Bellefonte, Fort Calhoun, FitzPatrick, McGuire, LaSalle, Fort Saint Vrain, Washington Public Power Supply System, Shoreham, Satsop, Trojan, Atlantic Nuclear Power Plant, Clinch River, Crane  Entergy icon.png
Issue date: 10/20/1992
From: Partlow J
Office of Nuclear Reactor Regulation
To:
References
GL-92-007, NUDOCS 9210150342
Download: ML031130418 (8)


-UNITED STATES 6 sNUCLEAR REGULATORY

COMMISSION

'K WASHINGTON, D. C. 20555 October 20, 1992 TO: All Holders of operating Licenses or Construction Permits for Nuclear Power Reactors SUBJECT: OFFICE OF NUCLEAR REACTOR REGULATION

REORGANIZATION (GENERIC LETTER 92-07)This is to inform you that, effective October 4, 1992, the Office of Nuclear Reactor Regulation (NRR) was reorganized.

The new organization better aligns management of technical activities within the Associate Director for Inspection and Technical Assessment (ADT), transfers some functions to the Associate Director for Projects (ADP), and transfers the responsibility for conducting environmental reviews from ADP to the Associate Director for Advanced Reactors and License Renewal (ADAR).Some Senior Executive Service (SES) positions have been realigned.

The number of technical divisions remains at six. Responsibility for generic activities, event followup and standard technical specifications has been realigned from ADT to ADP. The organizational change includes realigning six branches, creating a new branch, and consolidating environmental functions into a single branch level organization.

Individual assignments and tasks are essentially unchanged.

The new NRR organization chart which depicts the new structure and manager reporting relationships is enclosed.This generic letter contains no information collection requirements and therefore is not subject to the requirements of the Paperwork Reduction Act of 1980 (44 U.S.C. 3501 et seq.).Ja es G. Partlow As ociate Director for Projects Office of Nuclear Reactor Regulation Enclosures:

1. NRR Organization Chart 2. Recently Issued Generic Letters Contact: Richard H. Wessman, NRR (301) 504-1202 9210150342 G AC

ENCLOSURE

1 OFFICE OF NUCLEAR REACTOR REGULATION

ORGANIZATION

CHART CIFFI= OF NUCLEARINEACA

SEGLA1DU 01OCMIOE WCTO DOOUM E. MURLEYI I OU~~ic~com I RA(J MMO MiT. MMJC ME. MIALT. ITAW --lI I I INS~wTK IUCENSMb POLICY aR FRANK? P. GESPIE RICHARDI H wtsswell I MI ASSOMTADIRSCMO

JAMUG. PARTLCW I r? 1- -OFRACTORPRO.ECTS-iN

I mAmi S EVU A VA WA MS~cLl! OPC7OAWEIM

T. RLISSELL DIVOONOF SYSTEMSSAFEWANDAAxLYSI

DIIETCR ASHIOK CL TRACIAN DEUTY DIRCTOR GAUN M. IIOLARMN SENIORACIVISO

FAUJSTROSA

KwN $arTmS BRANCN CONRADE. MOC&CKAEN REC~TOR SYS59S BRANCH R(XERT C, JNE COW(ANMDENTSYSTERSANDSEVERIE

VACANT PM0BAB&=CSARElYASSE3SSEW

WILLPAMBECKNER

BRANCH-1 ASSOCIATE

OKR FOR ADVANCED NECTIORS Ak L~IM RENEWAL.ASOIT FCO DENNIS IL CRCFIALD, DEP ASSOCLA'TE

CIFCTOR WUWM D~ TRAVER1S LsTmcvmA1ON

P.0 ROBERT C PEFUOM LIC. RENEW A ENI REVIEW P.D JOHN W. CRAIG ADVAN4E REACTORSP.D.

4AMESELDYM

AUITMATDM1O

FORREO NCTM .SE A CALVO, PRO0ETOPIE!CmRATE

M. ROBERT A, CAPRA PROJI DUCTORXIE

4 CIAIIES L MILLER PIRMTCTOECTORATEI-3 WALTER R. MUTLER PITOJET EETORATE 4 JOHN F. STOLZ A~arINWMcTOR

FORm9Q~ACTml A m T A ~ r v ~ r O R _ _ _ _ _ _ _ -S_ _ C. LA M &AS PROJET DIFECTORATE

3I PM&MCI9ECTORA1TE5 IEIBWERTN.X~

PRCUJCT'OIECTMRTE34 DAVID MATTHEWS P1:10JET NFECFORATE

54 FRDRC J EI I I I CIUOO OF RACTOR PgRam. 1% rV, ADIREI IT SC10U JACKWACWE PRCUECT DIECToAAm

5-1 LEDYAWr.1LMARSH

Pm0JE TvwE TU TAE 3 FXXV6O, MANEIT PROJECT DfCr=T*34 JOHN.X HAN0=O A3SSWAXTWICTOR

upR""nowVC~

PF OU= DlTlE ATI 2V. JOHN T. LAKISs FIR0JET DFICTORAT!

V-I 3ZANNEC, BLACK~T O P E C W I A 1! VT IE ODO PE R. Ot Y DIRECTOR aDAX X OWES VETS ASSESSMBIfIfWBRNC

AL.RL E C AfE GENEIC COMu.NlCAT10.s BRANCH GAL N. MARCUS TECH4ALSPCFIAT4BRANCH

CHRSTOPHE

I OWES NO*P0WEl EARFEA&DTORMI

SEYMOUR H. WE3I PRIJECOIECTR~ATE

I DIVEISMOFENGMEER116B

DIRCTOR JAMES E. RK04ADoN DEPTYOF0*TOABOeORARLLAW

MATERIASAJ5DCH1ICAL, JAK R. STRDSIDER MEN(IkEB BRANH~s BAC W S CIVIL EN5NM4 ANDGECICIECE

COTAN BA=*BRANCH R.ECRICALENGNE

BRANCH CAFL H. DBERUNGE MMUC O IAMCTOCOIROLS

ANS HIlAN FACTORS DIROECTOR

BIRCE A. BOGER EPJTY DIRETOR CMOLO. 7NOMA IN5STRUMENTATKO

AND CONTRKXS SCOTT F. NEWBERRY HUMAN ACTOUSASSESSaENT .AhRE&WERIE

B R A N C HR N H D R T .G A .UWIOI'OF FEACTOIR INSPECT= AND UCESEEPERFORMANCE

DIECO OHALES RDSS DEPTY DIRECTOR ROY ZIMMEAN VENDOR lkSPECflc" BRAWNC LEF J. lORROL15M SPECWJI INSPECTION

BRANCH EBoENE V. NBRO PERORMNCE

AOUALITY GARY~ Q 0E EVALUATION

BRANCH DWMXM OF RADIATMO SAFElY AM SA1DUAMM IIRCTO FRAINKJ. CONGE DEITY ONETOR EWAAIDJ. BUTCHER EMER(NCY PREA~REEzS

BRANcm Roeml A. swClm P"TICM PROTECTION

BRANCH LMOIRE UNINMOM SAFEMARD BRANCH PHILLIP F MCKEE

ENCLOSURE

2 LIST OF RECENTLY ISSUED GENERIC LETTERS Generic Letter No.Subj ect Date of Issuance Issued To 83-28 SUPPTL.MENWTm

1 REQUIRED ACTIONS BASED ON 10/07/92 GENERIC IMPLICATIONS

OF SALEM ATWS EVENTS ALL LIGHT-WATER

REACTOR LICENSEES AND APPLICANTS

92-06 OPERATOR LICENSING

NATIONAL 09/06/92 EXAMINATION

SCHEDULE ALL POWER REACTOR LICENSEES

AND APPLICANTS

FOR AN OPERATING

LICENSE 92-05 NRC WORKSHOP ON THE SYSTEMATIC

ASSESSMENT

OF LICENSEE PERFORMANCE (SALP) PROGRAM 09/04/92 ALL HOLDERS OF OP LICENSES OR CONST. PERMITS FOR NUCLEAR PWR REACTORS ALL BWR LICENSEES FOF OPERATING REACTORS 92-04 RESOLUTION

OF THE ISSUES 08/19/92 RELATED TO REACTOR VESSEL WATER LEVEL INSTRUMENTATION

IN BWRs PURSUANT TO 10CFR50.54(F)

90-02 SUPPLEMENT

1 ALTERNATIVE

REQUIREMENTS

FOR FUEL ASSEMBLIES

IN THE DESIGN FEATURES SECTION OF TECHNICAL

SPECIFICATIONS

SAFETY EVALUATION-REPORT

NO. 2 ON SQUG GENERIC IMPLEMENTATION

PROCEDURE, REVISION 2.07/31/92 05/22/92 ALL LWR LICENSEES AND APPLICANTS

ALL USI A-46 LICENSEES

WHO ARE SQUG MEMBERS 87-02 SUPPT.LFMET

1_ _ X 92-03 COMPILATION

OF THE CURRENT LICENSING

BASIS: REQUEST FOR VOLUNTARY

PARTICIPATION

IN PILOT PROGRAM 03/19/92 ALL NUCLEAR POWER PLANT APPLICANTS

AND LICENSEES 92-01 REVISION 1 REACTOR VESSEL STRUCTURAL

INTEGRITY, 10CFR50.54(f)

03/06/92 ALL HOLDERS OF OP LICENSES OR CONST.PERMITS FOR NUCLEAR PWR PLANTS (EXCEPT YANKEE ATOMIC FOR YANKEE NUC PWR STA.)92-02 RESOLUTION

OF GENERIC 03/06/92 ISSUE 79, UNANALYZED

REACTOR VESSEL (PWR) THERMAL STRESS DURING NATURAL CONVECTION

COOLDOWN ALL HOLDERS OF OP LICENSES OF CONST.PERMITS FOR PWRs October ad, 1992 TO: ALL Holders of Operating Licenses or Construction Permits for Nuclear Power Reactors SUBJECT: OFFICE OF NUCLEAR REACTOR REGULATION

REORGANIZATION (GENERIC LETTER 92-07)This is to inform you that, effective October 4, 1992, the Office of Nuclear ReactqprRegulation (NRR) was reorganized.

The new organization better aligns management of technical activities within the Associate Director for Inspection and Technical Assessment (ADT), transfers some functions to the Associate Director for Projects (ADP), and transfers the responsibility for conducting environmental reviews from ADP to the Associate Director for Advanced Reactors and License Renewal (ADAR).Some Senior Executive Service (SES) positions have been realigned.

The number of technical divisions remains at six. Responsibility for generic activities, event followup and standard technical specifications has been realigned from ADT to ADP. The organizational change includes realigning six branches, creating a new branch, and consolidating environmental functions into a single branch level organization.

Individual assignments and tasks are essentially unchanged.

The new NRR organization chart which depicts the new structure and manager reporting relationships is enclosed.This generic letter contains no information collection requirements and therefore is not subject to the requirements of the Paperwork Reduction Act of 1980 (44 U.S.C. 3501 et seq.).ORIGINAL SIGNED: James G. Partlow Associate Director for Projects Office of Nuclear Reactor Regulation Enclosures:

1. NRR Organization Chart 2. Recently Issued Generic Letters Contact: Richard H. Wessman, NRR (301) 504-1202 DISTRIBUTION

Central File NRC PDR MRushbrook LBarnett RWessman GMarcus FGillespie JPartlow BGrimes*SEE PREVIOUS CONCURRENCES

ADM/PMSB*

ADM/PMSB*

TECH/ED* PMSB/PMAS*

D/PMSB* OGCB/DORS*

MRushbrrook:bp LBarnett JMain RWessman FGillespie GMarcus 10/06/92 10 92 10/6/92 10/8/92 10/8/92 10/9/92 D:DORS* AMP BGrimes JParp o 10/13/92 10/1- /9 OFFICIAL RECORD COPY DOCUMENT NAME: G:\REORG.GL

TO: All HolderF f Operating Licenses or Constrk ion Permits for Nuclear Pow.- Reactors SUBJECT: OFFICE OF NUCLEAR REACTOR REGULATION

REORGANIZATION (GENERIC LETTER 92- )The purpose of this Generic Letter is to inform you that, effective October 4, 1992, the Office of Nuclear Reactor Regulation (NRR) was reorganized.

Although the previous NRR organization was basically sound, some organizational realignments were needed to more effectively provide for the Office's dual focus role in the oversight of operating reactors and the review of advanced plant and license renewal activities.

The reorganization has realigned a number of NRR branches and reportin relationships, but individual assignments and tasks are essentially uchanged.The organizational change includes realigning six branches, creati 'a new branch, and consolidating environmental functions into a single anch level organization.

The number of technical divisions remains at si Responsi-bility for generic activities, event followup and standard t nical specifications has been realigned from the Associate Direc for Inspection and Technical Assessment (ADT) to the Associate Director or Projects (ADP).The new organization better aligns management of technifl activities within ADT, transfers some functions to ADP, and transfers tpit responsibility for conducting environmental reviews from ADP to the As ciate Director for Advanced Reactors and License Renewal (ADAR). So Senior Executive Service (SES) positions have been realigned.

The new NRP organization chart which depicts the new structure and manager reportin relationships is attached.The organizational change will provide sign icant benefits and enable NRR to conduct its mission more effectively by: onsolidating certain functions within individual divisions for more eff ctive resolution of technical issues and conduct of reviews, improving coor nation of efforts to oversee operating plants, and yielding a better alignm t between headquarters and field activities.

James G. Partlow Associate Director for Projects Office of Nuclear Reactor Regulation Enclosures:

1. NRR Organization Ch t 2. Recently Issued G eric Letters Contact: Richard .Wessman, NRR (301) 4-1202 DISTRIBUTION

Central Fil NRC PDR MRushbrook LBarnett RWessman GMarcus FGillespi JPartlow BGrimes DIR/PMAS*

TECH ED FGillespie Jeff Main*SEE PRVIOUS CONCURRENCES

10/08/92 10/06/92 M/ SB ADM/PMSB*

TECH/ED* PMSB/PMAS*

D/PMSB* OGCB/DORS*

b ok:bp LBarnett JMain RWessman FGillespie GMarcus 10/6/92 10/6/92 10/8/92 10/8/92 10/9/92 ADP B mes JPartlow/ /13/92 10/ /92 OFFICIAL RECORD COPY DOCUMENT NAME: G:\REORG.GL

TO: All Holder.- f Operating Licenses or Constrt ion Permits for Nuclear Poh.-- Reactors SUBJECT: OFFICE OF NUCLEAR REACTOR REGULATION

REORGANIZATION (GENERIC LETTER 92- )The purpose of this Generic Letter is to inform you th , effective October 4, 1992, the Office of Nuclear Reactor Regulation (NRR) a reorganized.

Although the previous NRR organization was basically

6 und, some organizational realignments were needed to more eff tively provide for the Office's dual focus role in the oversight of operang reactors and the review of advanced plant and license renewal activities

.The reorganization has realigned a number of N branches and reporting relationships, but individual assignments and sks are essentially unchanged.

The organizational change includes realignin ix branches, creating a new branch, and consolidating environmental fun ons into a single branch level organization.

The number of technical divi ons remains at six, with the Division of Operational Events Assessment ving from the Associate Director for Inspection and Technical Assessment ( T) to the Associate Director for Projects (ADP). The new organization be er aligns management of technical activities within ADT, transfers some f ctions to ADP, and transfers the responsibility for conducting environm 'tal reviews from ADP to the Associate Director for Advanced Reactors and Li se Renewal (ADAR). Some Senior Executive Service (SES) positions hay been realigned.

The new NRR organization chart which depicts the ew structure and manager reporting relationships is attached.The organizational change will pro de significant benefits and enable NRR to conduct its mission more effectiv )y by: consolidating certain functions within individual divisions for Ae effective resolution of technical issues and conduct of reviews, improvin coordination of efforts to oversee operating plants, and yielding a better a gnment between headquarters and field activities.

James G. Partlow Associate Director for Projects Office of Nuclear Reactor Regulation Enclosures:

1. NRR Organization Chart 2. Recently Issued Generi Letters Contact: Richard H. Wess an, NRR (301) 504-1202 DISTRIBUTION

Central File FGillespie NRC PdR MRushbrook ow LBarnett RWessman DIR/PMAS*FGillespie

10/08/92 GMarcus TECH ED Jeff Main 10/06/92*SEE PREVIOUS CONCURRAICE

OFFICE: ADM/PMSB*

ADM/PMSB*

PMSB/PMAS*

OGCB/DORS

ADPR NAME: MRushbrook Ap LBarnett RWessman GMarcus y e JPartlow DATE: 10/06/92 10/06/92 10/08/92 10/q /92 10/ /92.a OFFICIAL DOCUMENT RECORD COPY NAME: G:\REORG.GL

TO: All Holders-f Operating Licenses or Construction Permits for Nuclear Power Reactors SUBJECT: OFFICE OF NUCLEAR REACTOR REGULATION

REORGANIZATION (GENERIC LETTER 92- )The purpose of this Generic Letter is to inform you that, effectiv ctober 4, 1992, the Office of Nuclear Reactor Regulation (NRR) was reorgan ed.Although the previous NRR organization was basically sound, so organizational realignments were needed to more effectively ovide for the Office's dual focus role in the oversight of operating rea ors and the review of advanced plant and license renewal activities.

The reorganization has realigned a number of NRR bra es and reporting relationships, but individual assignments and tasks re essentially unchanged.

The organizational change includes realigning six ranches, creating a new branch, and consolidating environmental functio into a single branch level organization.

The number of technical divisio remains at six, with the Division of Operational Events Assessment mo ng from the Associate Director for Inspection and Technical Assessment (A to the Associate Director for Projects (ADP). The new organization be r aligns management of technical activities within ADT, transfers some f ctions to ADP, and transfers the responsibility for conducting environ ntal reviews from ADP to the Associate Director for Advanced Reactors and I ense Renewal (ADAR). Some Senior Executive Service (SES) positions ye been realigned to better utilize the managerial skills of individuals certain key positions.

The new NRR organization chart which depict the new structure and manager reporting relationships is attached.The organizational change 1 provide significant benefits and enable NRR to conduct its mission more fectively by: consolidating certain functions within individual divisi ns for more effective resolution of technical issues and conduct of reviews improving coordination of efforts to oversee operating plants, and yielding better alignment between headquarters and field activities.

James G. Partlow Associate Director for Projects Office of Nuclear Reactor Regulation Enclosures:

1. NRR Or nization Chart 2. Recen y Issued Generic Letters Contac v Richard H. Wessman, NRR (301) 504-1202 TINIBUTION

Ce tral File NRC PDR MRushbrook LBarnett RWessman GMarcus F illespie JPartlow a d dPMAS V4 TECH ED FGI1 2Sie Nc9b Jeff Main*SEE PREVIOUS CONCURRENCE

10 92 10/06/92 E OFFICE: ADM/PMSB*

ADM/P PMSB/ m S OGCB/DORS

ADPR NAME: MRushbrook:b f i RWAS n GMarcus JPartlow DATE: 10/06/92 1O/0t92 10/1 /92 10/ /92 10/ /92 OFFICIAL RECORD COPY -.DOCUMENT NAME: G:\REORG.GL

Multiple Addresses

-2 -For further information on the details of the NRR reorganization

/refer to SECY-92-279 "Reorganization of NRR," as approved by the Commis /on on August 12, 1992. /Sincerely, James G. Part ow Associate (rector for Projects Office o uclear Reactor Regulation Enclosure:

NRR Organization Chart

CONTACT

Richard H. Wessman, NRR (301) 504-1202 DISTRIBUTION

Central File pcpDC MRushbrook LBarnett RWessman f GMarcus /FGillespie JPartlow r kei4; 1X iFFICE: ADM/PMSB ADM PMSB/PMAS

OGCB/DORS

ADPR NAME: MR:us b kkb{ RWessman GMarcus JPartlow DATE: 10/kj/92 10/4 /92 10/ /92 1o/ /92 10/ /92 OFFICIAL RECORD COPY DOCUMENT NAME: G:\REORG.GL

Template:GL-Nav