NRC Generic Letter 1992-07
-
6 sNUCLEAR
'K
UNITED STATES
REGULATORY COMMISSION
WASHINGTON, D. C. 20555 October 20, 1992 TO: All Holders of operating Licenses or Construction Permits for Nuclear Power Reactors SUBJECT: OFFICE OF NUCLEAR REACTOR REGULATION REORGANIZATION
(GENERIC LETTER 92-07)
of Nuclear This is to inform you that, effective October 4, 1992, the Officebetter aligns Reactor Regulation (NRR) was reorganized. The new organization for management of technical activities within the Associate Director to the Inspection and Technical Assessment (ADT), transfers some functions the responsibility for Associate Director for Projects (ADP), and transfers for conducting environmental reviews from ADP to the Associate Director Advanced Reactors and License Renewal (ADAR).
The number Some Senior Executive Service (SES) positions have been realigned. activities, of technical divisions remains at six. Responsibility for generic realigned from event followup and standard technical specifications has been branches, ADT to ADP. The organizational change includes realigning six into a single creating a new branch, and consolidating environmental functions are essentially branch level organization. Individual assignments and tasks chart which depicts the new structure and unchanged. The new NRR organization manager reporting relationships is enclosed.
and This generic letter contains no information collection requirements Act of therefore is not subject to the requirements of the Paperwork Reduction
1980 (44 U.S.C. 3501 et seq.).
Ja es G. Partlow As ociate Director for Projects Office of Nuclear Reactor Regulation Enclosures:
1. NRR Organization Chart
2. Recently Issued Generic Letters Contact: Richard H. Wessman, NRR
(301) 504-1202
9210150342 G AC
ENCLOSURE 1 OFFICE OF NUCLEAR REACTOR REGULATION ORGANIZATION CHART
CIFFI= OF NUCLEARINEACA SEGLA1DU
01OCMIOEWCTO DOOUM E. MURLEYI
I OU~~ic~com I RA(J MMO MiT. MMJCME. MIALT. ITAW --
lI FRANK?P. GESPIE
I I M IINS~wTK IUCENSMb POLICY aR
-1 RICHARDI Hwtsswell Nm9WT 0V I
ASSOCIATE OKR FOR ADVANCED
ASSOMTADIRSCMO JAMUG. PARTLCW NECTIORS Ak MS~cLl!
OPC7OAWEIM L~IM RENEWAL.
T.RLISSELL
ASOIT FCO DENNIS IL CRCFIALD,
DEP ASSOCLA'TE CIFCTOR WUWM D~TRAVER1S
I r? 1- -OFRACTORPRO.ECTS-iN LsTmcvmA1ON P.0 ROBERT C PEFUOM
DIVOONOF SYSTEMSSAFEWANDAAxLYSI LIC.RENEW AENI REVIEW P.D JOHN W.CRAIG
I
mAmi S EVUA VA WA
ADVAN4E REACTORSP.D. 4AMESELDYM
DIIETCR ASHIOK CLTRACIAN
AUITMATDM1O FORREO NCTM DEUTY DIRCTOR GAUN M.IIOLARMN
.SE A CALVO, SENIORACIVISO
PRO0ETOPIE!CmRATE M. ROBERT A,CAPRA FAUJSTROSA
PROJI DUCTORXIE 4 KwN $arTmS BRANCN CONRADE. MOC&CKAEN
CIAIIESL MILLER REC~TORSYS59S BRANCH
PIRMTCTOECTORATEI-3 WALTER R. MUTLER R(XERT C,JNE
PITOJET EETORATE 4 I COW(ANMDENTSYSTERSANDSEVERIE VACANT
JOHN F.STOLZ
A~arINWMcTOR FORm9Q~ACTml PM0BAB&=CSARElYASSE3SSEW WILLPAMBECKNER
BRANCH
ArmTv~
A~
r O R_ _ _ _ __ _ - _ S_C. LAM&AS
PROJET DIFECTORATE 3I I
PM&MCI9ECTORA1TE5 IEIBWERTN.X~
PRCUJCT'OIECTMRTE34 DAVIDMATTHEWS DIVEISMOFENGMEER116B
P1:10JET NFECFORATE 54 FRDRC J EI
DIRCTOR JAMES E. RK04ADoN
I DEPTYOF0*TOABOeORARLLAW
MATERIASAJ5DCH1ICAL, JAK R. STRDSIDER
MEN(IkEB BRANH~s BAC WS
CIUOO OFRACTOR PgRam. 1%rV,
CIVILEN5NM4 ANDGECICIECE COTAN BA=*
BRANCH
ADIREI IT SC10U JACKWACWE R.ECRICALENGNE BRANCH CAFL H. DBERUNGE
PRCUECT DIECToAAm 5-1 Pm0JE TvwE TU TAE3 PROJECTDfCr=T*34 A3SSWAXTWICTOR
LEDYAWr.1LMARSH
FXXV6O, MANEIT
JOHN.X HAN0=O
upR""nowVC~
I MMUCO IAMCTOCOIROLS ANSHIlAN FACTORS
DIROECTOR
EPJTY DIRETOR
IN5STRUMENTATKO AND CONTRKXS
BIRCE A.BOGER
CMOLO.7NOMA
SCOTT F. NEWBERRY
PF OU=DlTlE ATI 2V. JOHN T.LAKISs HUMAN ACTOUSASSESSaENT .AhRE&WERIE
FIR0JET DFICTORAT! V-I 3ZANNEC, BLACK
~TWOI PA1!
E CVT IEODO PER. Ot Y B
CRHR
AN NH D RT . GA .
UWIOI'OF FEACTOIR INSPECT= AND UCESEEPERFORMANCE
DIECO OHALES RDSS
DEPTY DIRECTOR ROY
IIRCTO
ZIMMEAN
VENDOR lkSPECflc" BRAWNC LEF J. lORROL15M
DIRECTOR aDAX X OWES SPECWJI INSPECTION BRANCH
VETS ASSESSMBIfIfWBRNC AL.RL E C AfE EBoENE V.NBRO
GENEIC COMu.NlCAT10.s BRANCH PERORMNCEAOUALITY GARY~Q 0E
GAL N.MARCUS EVALUATION BRANCH
TECH4ALSPCFIAT4BRANCH CHRSTOPHE I OWES
NO*P0WEl EARFEA&DTORMI SEYMOUR H.WE3I
PRIJECOIECTR~ATE DWMXM OF RADIATMO SAFElY AM SA1DUAMM
DEITY ONETOR
FRAINKJ. CONGE
EWAAIDJ. BUTCHER
EMER(NCY PREA~REEzS BRANcm Roeml A.swClm P"TICM PROTECTION BRANCH LMOIRE UNINMOM
SAFEMARD BRANCH PHILLIP F MCKEE
ENCLOSURE 2 LIST OF RECENTLY ISSUED GENERIC LETTERS
Generic Date of Letter No. Subj ect Issuance Issued To
83-28 REQUIRED ACTIONS BASED ON 10/07/92 ALL LIGHT-WATER
SUPPTL.MENWTm 1 GENERIC IMPLICATIONS OF SALEM REACTOR LICENSEES
ATWS EVENTS AND APPLICANTS
92-06 OPERATOR LICENSING NATIONAL 09/06/92 ALL POWER REACTOR
EXAMINATION SCHEDULE LICENSEES AND
APPLICANTS FOR AN
OPERATING LICENSE
92-05 NRC WORKSHOP ON THE 09/04/92 ALL HOLDERS OF
SYSTEMATIC ASSESSMENT OF OP LICENSES OR
LICENSEE PERFORMANCE CONST. PERMITS FOR
(SALP) PROGRAM NUCLEAR PWR REACTORS
92-04 RESOLUTION OF THE ISSUES 08/19/92 ALL BWR LICENSEES
RELATED TO REACTOR VESSEL FOF OPERATING
WATER LEVEL INSTRUMENTATION IN REACTORS
BWRs PURSUANT TO 10CFR50.54(F)
90-02 ALTERNATIVE REQUIREMENTS 07/31/92 ALL LWR LICENSEES
SUPPLEMENT 1 FOR FUEL ASSEMBLIES IN THE AND APPLICANTS
DESIGN FEATURES SECTION OF
TECHNICAL SPECIFICATIONS
87-02 SAFETY EVALUATION-REPORT 05/22/92 ALL USI A-46 SUPPT.LFMET
_ 1 NO. 2 ON SQUG GENERIC
_ X
LICENSEES WHO
IMPLEMENTATION PROCEDURE, ARE SQUG MEMBERS
REVISION 2.
92-03 COMPILATION OF THE CURRENT 03/19/92 ALL NUCLEAR POWER
LICENSING BASIS: REQUEST PLANT APPLICANTS
FOR VOLUNTARY PARTICIPATION AND LICENSEES
IN PILOT PROGRAM
92-01 REACTOR VESSEL STRUCTURAL 03/06/92 ALL HOLDERS OF OP
REVISION 1 INTEGRITY, 10CFR50.54(f) LICENSES OR CONST.
PERMITS FOR NUCLEAR
PWR PLANTS (EXCEPT
YANKEE ATOMIC FOR
92-02 RESOLUTION OF GENERIC 03/06/92 ALL HOLDERS OF OP
ISSUE 79, UNANALYZED REACTOR LICENSES OF CONST.
VESSEL (PWR) THERMAL STRESS PERMITS FOR PWRs DURING NATURAL CONVECTION
COOLDOWN
October ad, 1992 TO: ALL Holders of Operating Licenses or Construction Permits for Nuclear Power Reactors SUBJECT: OFFICE OF NUCLEAR REACTOR REGULATION REORGANIZATION
(GENERIC LETTER 92-07)
This is to inform you that, effective October 4, 1992, the Office of Nuclear ReactqprRegulation (NRR) was reorganized. The new organization better aligns management of technical activities within the Associate Director for Inspection and Technical Assessment (ADT), transfers some functions to the Associate Director for Projects (ADP), and transfers the responsibility for conducting environmental reviews from ADP to the Associate Director for Advanced Reactors and License Renewal (ADAR).
Some Senior Executive Service (SES) positions have been realigned. The number of technical divisions remains at six. Responsibility for generic activities, event followup and standard technical specifications has been realigned from ADT to ADP. The organizational change includes realigning six branches, creating a new branch, and consolidating environmental functions into a single branch level organization. Individual assignments and tasks are essentially unchanged. The new NRR organization chart which depicts the new structure and manager reporting relationships is enclosed.
This generic letter contains no information collection requirements and therefore is not subject to the requirements of the Paperwork Reduction Act of
1980 (44 U.S.C. 3501 et seq.).
ORIGINAL SIGNED:
James G. Partlow Associate Director for Projects Office of Nuclear Reactor Regulation Enclosures:
1. NRR Organization Chart
2. Recently Issued Generic Letters Contact: Richard H. Wessman, NRR
(301) 504-1202 DISTRIBUTION
Central File NRC PDR MRushbrook LBarnett RWessman GMarcus FGillespie JPartlow BGrimes
- SEE PREVIOUS CONCURRENCES
ADM/PMSB* ADM/PMSB* TECH/ED* PMSB/PMAS* D/PMSB* OGCB/DORS*
MRushbrrook:bp LBarnett JMain RWessman FGillespie GMarcus
10/06/92 10 92 10/6/92 10/8/92 10/8/92 10/9/92 D:DORS* AMP
BGrimes JParpo
10/13/92 10/1- /9 OFFICIAL RECORD COPY
DOCUMENT NAME: G:\REORG.GL
TO: All HolderF f Operating Licenses or Constrk ion Permits for Nuclear Pow.- Reactors SUBJECT: OFFICE OF NUCLEAR REACTOR REGULATION REORGANIZATION
(GENERIC LETTER 92- )
4, The purpose of this Generic Letter is to inform you that, effective October
1992, the Office of Nuclear Reactor Regulation (NRR) was reorganized.
Although the previous NRR organization was basically sound, some organizational realignments were needed to more effectively provide for the Office's dual focus role in the oversight of operating reactors and the review of advanced plant and license renewal activities.
The reorganization has realigned a number of NRR branches and reportin relationships, but individual assignments and tasks are essentially uchanged.
The organizational change includes realigning six branches, creati 'a new branch, and consolidating environmental functions into a single anch level organization. The number of technical divisions remains at si Responsi- bility for generic activities, event followup and standard t nical specifications has been realigned from the Associate Direc for Inspection and Technical Assessment (ADT) to the Associate Director or Projects (ADP).
The new organization better aligns management of technifl activities within ADT, transfers some functions to ADP, and transfers tpit responsibility for conducting environmental reviews from ADP to the As ciate Director for Advanced Reactors and License Renewal (ADAR). So Senior Executive Service (SES) positions have been realigned. The new NRP organization chart which depicts the new structure and manager reportin relationships is attached.
The organizational change will provide sign icant benefits and enable NRR to conduct its mission more effectively by: onsolidating certain functions within individual divisions for more eff ctive resolution of technical issues and conduct of reviews, improving coor nation of efforts to oversee operating plants, and yielding a better alignm t between headquarters and field activities.
James G. Partlow Associate Director for Projects Office of Nuclear Reactor Regulation Enclosures:
1. NRR Organization Ch t
2. Recently Issued G eric Letters Contact: Richard . Wessman, NRR
(301) 4-1202 DISTRIBUTION
Central Fil NRC PDR MRushbrook LBarnett RWessman GMarcus FGillespi JPartlow BGrimes DIR/PMAS* TECH ED
FGillespie Jeff Main
- SEE PRVIOUS CONCURRENCES 10/08/92 10/06/92 M/ SB ADM/PMSB* TECH/ED* PMSB/PMAS* D/PMSB* OGCB/DORS*
b ok:bp LBarnett JMain RWessman FGillespie GMarcus
10/6/92 10/6/92 10/8/92 10/8/92 10/9/92 ADP
B mes JPartlow
/ /13/92 10/ /92 OFFICIAL RECORD COPY
DOCUMENT NAME: G:\REORG.GL
TO: All Holder.- f Operating Licenses or Constrt ion Permits for Nuclear Poh.-- Reactors SUBJECT: OFFICE OF NUCLEAR REACTOR REGULATION REORGANIZATION
(GENERIC LETTER 92- )
The purpose of this Generic Letter is to inform you th , effective October 4,
1992, the Office of Nuclear Reactor Regulation (NRR) a reorganized.
Although the previous NRR organization was basically 6und, some organizational realignments were needed to more eff tively provide for the Office's dual focus role in the oversight of operang reactors and the review of advanced plant and license renewal activities.
The reorganization has realigned a number of N branches and reporting relationships, but individual assignments and sks are essentially unchanged.
The organizational change includes realignin ix branches, creating a new branch, and consolidating environmental fun ons into a single branch level organization. The number of technical divi ons remains at six, with the Division of Operational Events Assessment ving from the Associate Director for Inspection and Technical Assessment ( T) to the Associate Director for Projects (ADP). The new organization be er aligns management of technical activities within ADT, transfers some f ctions to ADP, and transfers the responsibility for conducting environm 'tal reviews from ADP to the Associate Director for Advanced Reactors and Li se Renewal (ADAR). Some Senior Executive Service (SES) positions hay been realigned. The new NRR
organization chart which depicts the ew structure and manager reporting relationships is attached.
The organizational change will pro de significant benefits and enable NRR to conduct its mission more effectiv )y by: consolidating certain functions within individual divisions for Ae effective resolution of technical issues and conduct of reviews, improvin coordination of efforts to oversee operating plants, and yielding a better a gnment between headquarters and field activities.
James G. Partlow Associate Director for Projects Office of Nuclear Reactor Regulation Enclosures:
1. NRR Organization Chart
2. Recently Issued Generi Letters Contact: Richard H. Wess an, NRR
(301) 504-1202 DISTRIBUTION
Central File NRC PdR MRushbrook LBarnett RWessman GMarcus FGillespie ow DIR/PMAS* TECH ED
FGillespie Jeff Main
- SEE PREVIOUS CONCURRAICE 10/08/92 10/06/92 OFFICE: ADM/PMSB* ADM/PMSB* PMSB/PMAS* OGCB/DORS ADPR
NAME: MRushbrook Ap LBarnett RWessman GMarcus ye JPartlow DATE: 10/06/92 10/06/92 10/08/92 10/q /92 10/ /92
.a OFFICIAL RECORD COPY
DOCUMENT NAME: G:\REORG.GL
TO: All Holders-f Operating Licenses or Construction Permits for Nuclear Power Reactors SUBJECT: OFFICE OF NUCLEAR REACTOR REGULATION REORGANIZATION
(GENERIC LETTER 92- )
The purpose of this Generic Letter is to inform you that, effectiv ctober 4,
1992, the Office of Nuclear Reactor Regulation (NRR) was reorgan ed.
Although the previous NRR organization was basically sound, so organizational realignments were needed to more effectively ovide for the Office's dual focus role in the oversight of operating rea ors and the review of advanced plant and license renewal activities.
The reorganization has realigned a number of NRR bra es and reporting relationships, but individual assignments and tasks re essentially unchanged.
The organizational change includes realigning six ranches, creating a new branch, and consolidating environmental functio into a single branch level organization. The number of technical divisio remains at six, with the Division of Operational Events Assessment mo ng from the Associate Director for Inspection and Technical Assessment (A to the Associate Director for Projects (ADP). The new organization be r aligns management of technical activities within ADT, transfers some f ctions to ADP, and transfers the responsibility for conducting environ ntal reviews from ADP to the Associate Director for Advanced Reactors and I ense Renewal (ADAR). Some Senior Executive Service (SES) positions ye been realigned to better utilize the managerial skills of individuals certain key positions. The new NRR
organization chart which depict the new structure and manager reporting relationships is attached.
The organizational change 1 provide significant benefits and enable NRR to conduct its mission more fectively by: consolidating certain functions within individual divisi ns for more effective resolution of technical issues and conduct of reviews improving coordination of efforts to oversee operating plants, and yielding better alignment between headquarters and field activities.
James G. Partlow Associate Director for Projects Office of Nuclear Reactor Regulation Enclosures:
1. NRR Or nization Chart
2. Recen y Issued Generic Letters Contac v Richard H. Wessman, NRR
(301) 504-1202 TINIBUTION
Ce tral File NRC PDR MRushbrook LBarnett RWessman GMarcus F illespie JPartlow a d dPMAS V4* TECH ED
FGI1 2Sie Nc9b Jeff Main E
- SEE PREVIOUS CONCURRENCE
OFFICE: ADM/PMSB*
NAME: MRushbrook:b ADM/P
fi PMSB/ m S
RWAS n
10 92 OGCB/DORS
GMarcus ADPR
10/06/92 JPartlow DATE: 10/06/92 1O/0t92 10/1 /92 10/ /92 10/ /92 OFFICIAL RECORD COPY - .
DOCUMENT NAME: G:\REORG.GL
Multiple Addresses - 2 -
For further information on the details of the NRR reorganization /refer to SECY-92-279 "Reorganization of NRR," as approved by the Commis /on on August 12, 1992. /
Sincerely, James G. Part ow Associate (rector for Projects Office o uclear Reactor Regulation Enclosure:
NRR Organization Chart
CONTACT
- Richard H. Wessman, NRR
(301) 504-1202 DISTRIBUTION
Central File pcpDC
MRushbrook LBarnett RWessman f GMarcus /
FGillespie JPartlow r kei4; 1X
iFFICE: ADM/PMSB ADM PMSB/PMAS OGCB/DORS ADPR
NAME: MR:us b kkb{ RWessman GMarcus JPartlow DATE: 10/kj/92 10/4 /92 10/ /92 1o/ /92 10/ /92 OFFICIAL RECORD COPY
DOCUMENT NAME: G:\REORG.GL