Pages that link to "TS-3.10.5"
Jump to navigation
Jump to search
The following pages link to TS-3.10.5:
Displayed 50 items.
- ML20082D944 (← links)
- ML20082B144 (← links)
- ML20080K944 (← links)
- ML20098F159 (← links)
- ML20090F489 (← links)
- ML20117K958 (← links)
- ML20072C538 (← links)
- ML20137S940 (← links)
- ML20134N566 (← links)
- ML20133G784 (← links)
- ML20133G774 (← links)
- ML20132E225 (← links)
- ML20127J275 (← links)
- ML20134J104 (← links)
- ML20133G777 (← links)
- ML20205H185 (← links)
- IR 05000352/1986003 (← links)
- IR 05000341/1988012 (← links)
- IR 05000400/1986093 (← links)
- ML20247M402 (← links)
- ML20236F802 (← links)
- ML20211G730 (← links)
- NRC-99-0089, Forwards Rev 13 to Fermi 2 ITS Submittal Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev (← links)
- IR 05000277/2021004 (← links)
- ML22199A309 (← links)
- SNRC-1181, Proposed Tech Spec 3.10.5 Suspending Provisions of Tech Spec 3.6.6.2 During Performance of Startup Test Program Until Reactor Has Operated for 120 EFPD (← links)
- RBG-42766, Application for Amends to Licenses NPF-29 & NPF-47,adding Addl Acceptable Method of Fuel Movement,Control Rods Removed or Withdrawn from Defueled Core Cells (← links)
- B15159, Proposed Tech Spec 3.10.5,allowing More than One Control Bank to Be Fully Withdrawn from Core Simultaneously for Rod Drop Time Response Testing (← links)
- ML20127J278 (← links)
- ML20241A246 (← links)
- ML20055D830 (← links)
- ML24219A406 (← links)
- ML21088A203 (← links)
- 05000400/LER-1986-008-03, :on 861206,digital Rod Position Indication Sys Not Operable During Power Ascension Test.Caused by Failure to Review Procedure Against Requirements of Tech Spec Special Test Exception 3.10.5 (← links)
- ML20148U301 (← links)
- 05000244/LER-1985-016, :on 850915,control Rod Deviation Alarm Occurred.Caused by Intermittent Fluctuation in RPI & Change in Reactor Coolant Temp.On 850916,control Rod Indication Sys Made Inoperable to Replace Power Supplies (← links)
- ML20115B342 (← links)
- 05000456/LER-1995-018-04, :on 951207,manual Reactor Trip Inserted During Rod Control Sys Testing Following Failure of Shutdown Rod D-2 to Withdraw on Demand.Fuse Holders Cleaned & Fuses Replaced (← links)
- 05000456/LER-1995-016-04, :on 951117,RT Was Inserted During Drpi Operability Testing Due to Blown Stationary Gripper Fuse in Cbb for Rod K-12.Tested Indicator & Fuse FU19 W/Ohmmeter & Found Open (← links)
- ML20093M037 (← links)
- ML20093H758 (← links)
- 05000413/LER-1984-010-02, :on 840901,reactor Control Rods from More than One Bank Withdrawn at Same Time.Caused by Procedural Deficiency.Main Reactor Trip Breakers Opened.Procedures Revised to Guard Against Similar Occurrences (← links)
- ML20087B679 (← links)
- ML20086G670 (← links)
- ML20086G663 (← links)
- ML20080K967 (← links)
- 05000457/LER-1994-008-10, :on 941111,failure to Open Breakers During Digital Rod Position Indication Occurred.Caused by Combination of Personnel Errors & Programmatic Deficiency. Personnel Involved Counselled (← links)
- ML20062C024 (← links)
- ML20044C330 (← links)
- ML20034B361 (← links)