Pages that link to "ET 18-0035, Operating Corp., Supplemental Response to RAI for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term"
Jump to navigation
Jump to search
The following pages link to ET 18-0035, Operating Corp., Supplemental Response to RAI for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term:
Displayed 50 items.
- ET 15-0025, Supplemental Information Related to Generic Letter 96-06 (← links)
- ET 15-0024, Results of the Nineteenth Steam Generator Tube Inservice Inspection (← links)
- ET 15-0022, Fourth Ten-Year Interval Submittal Snubber Program Plan and Inservice Testing Program Plan, WCOP-29, Revision 0 (← links)
- ET 15-0020, Operating Corporation'S Fifth Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (← links)
- ET 15-0014, Operating Corporation'S Compliance Report for the Implementation of Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (← links)
- ET 15-0015, Response to Request for Additional Information Regarding Expedited Seismic Evaluation Process (ESEP) Report (← links)
- ET 15-0010, Response to Second Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation. (← links)
- ET 15-0009, CFR 50.55a Request 13R-12, Extension of the Third Inservice Inspection Program Interval to Perform Reactor Vessel Stud Hole Ligament Examinations (← links)
- ET 15-0008, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation. (← links)
- ET 15-0006, Operating Corporation, Fourth Six-Month Status Report for the Implementation of Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. (← links)
- ET 15-0005, Operating Corporation'S Fourth Six - Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (← links)
- ET 15-0002, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.6.5, for Large Break Loss-of-Coolant (LOCA) Analysis Methodology (← links)
- ET 15-0001, Response to Request for Additional Information Regarding License Amendment Request to Revise the Fire Protection Program Related to Alternative Shutdown Capability (← links)
- ET 14-0039, CFR 50.55a Request for Alternative to ASME Code Case N-579, Use of Nonstandard Nuts, Class 1, 2, and 3, Mc, CS Components and Supports Construction Section III, Division 1. (← links)
- ET 14-0041, Withdrawal of 10 CFR 50.55a Request 4VR-02 for the Fourth Ten-Year Interval Inservice Testing (IST) Program (← links)
- ET 14-0037, Supplemental Information Regarding License Amendment Request for Revision to the Wolf Creek Generating Station Fire Protection Program Related to Alternative Shutdown Capability (← links)
- ET 14-0038, Supplemental Information Regarding License Amendment Request for Revision to Technical Specification 5.6.5 for Large Break Loss-of-Coolant Accident (LOCA) Analysis Methodology (← links)
- ET 14-0034, Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process (← links)
- ET 14-0033, Updated Notification of Readiness for Supplemental Inspection (← links)
- ET 14-0032, Exigent License Amendment Request for Technical Specification 3.4.15, RCS Leakage Detection Instrumentation Completion Time Extension (← links)
- ET 14-0029, Response to Request for Additional Information Regarding 10CFR50.55a Requests 13R-08 and 13R-09 (← links)
- ET 14-0024, Third Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (← links)
- ET 14-0025, Six-Month Status Report for the Implementation of Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. (← links)
- ET 14-0026, Response to Request for Additional Information Regarding Request for Alternative 13R-1 1 (← links)
- ET 14-0019, 10 CFR 50.55a Request 13R-11 for the Third Inservice Inspection Program Interval (← links)
- ET 14-0018, 10CFR50.55a Request I3R-10 for Third Inservice Inspection Program Interval (← links)
- ET 14-0017, Withdrawal of License Amendment Request for the Transition to Westinghouse Core Design and Safety Analysis (← links)
- ET 14-0012, Flood Hazard Reevaluation Report in Response to NRC Request for Information Regarding Recommendation 2.1, Flooding, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (← links)
- ET 14-0008, Application for Amendment to Revise Specification 5.6.5, Core Operating Limits Report (Colr), for Large Break Loss-of-Coolant Accident Analysis Methodology (← links)
- ET 14-0011, Second Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (← links)
- ET 14-0010, Operating Corporation'S Second Six-Month Status Report for the Implementation of Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (← links)
- ET 14-0009, Response to Request for Additional Information Regarding License Amendment Request for the Transition to Westinghouse Core Design and Safety Analysis (← links)
- ET 14-0005, Response to Request for Additional Information Regarding Response to Bulletin 2012-01, Design Vulnerability in Electric Power System. (← links)
- ET 14-0002, Correction to the Response to a Nuclear Regulatory Commission Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ic (← links)
- ET 14-0006, Response to Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Flooding Walkdowns at Wolf Creek Generating Station (← links)
- ET 14-0003, Operating Corporation - Response to Request for Additional Information Regarding License Amendment Request for the Transition to Westinghouse Core Design and Safety Analysis (← links)
- ET 13-0039, Response to Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns (← links)
- ET 13-0035, Fire Protection Program Re Alternative Shutdown Capability (← links)
- ET 13-0036, Submittal of Information Related to the Request for Notice of Enforcement Discretion for Technical Specification Limiting Condition for Operation 3.0.3, TS 3.8.4, DC Sources - Operating, TS 3.8.7, Lnverters - Operating, and TS 3.8.9,. (← links)
- ET 13-0030, Results of the Eighteenth Steam Generator Tube Inservice Inspection (← links)
- ET 13-0028, Application to Revise Technical Specifications to Replace a Methodology to TS 5.6.5, Core Operating Limits Report. (← links)
- ET 13-0029, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident - 1.5 Year Response for CEUS Sites (← links)
- ET 13-0026, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) (← links)
- ET 13-0027, Operating Corporation'S First Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (← links)
- ET 13-0023, License Amendment Request for the Transition to Westinghouse Core Design and Safety Analysis (← links)
- ET 13-0025, Corporation'S Response to Request for Additional Information Regarding Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Level Instrumentation (Order EA-12-05 (← links)
- ET 13-0024, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification (TS) 3.8.1, AC Sources - Operating Surveillance Requirement 3.8.1.10 (← links)
- ET 13-0021, Supplement to 180-Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.3 (Seismic) of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (← links)
- ET 13-0017, Operating Corporation Proposed Path to Closure of Generic Safety Issue - 191, Assessment of Debris Accumulation on Pressurized-Water Reactor Sump Performance. (← links)
- ET 13-0012, Request for Review of Information to Support Resolution of Example 2 of Non-cited Violation 05000482/2011007-03, Failure to Ensure Post-Fire Safe Shutdown Components Remain Free of Fire Damage (← links)