Pages that link to "RS-16-016, Supplement to Request for License Amendment Regarding Transition to Areva Fuel"
Jump to navigation
Jump to search
The following pages link to RS-16-016, Supplement to Request for License Amendment Regarding Transition to Areva Fuel:
Displayed 47 items.
- RS-16-018, Response to Request for Additional Information Regarding Request for License Amendment Regarding Transition to Areva Fuel (← links)
- RS-16-199, Supplement to Request for License Amendment Regarding Transition to Areva Fuel (← links)
- RS-16-139, Supplement to Request for License Amendment Regarding Transition to Areva Fuel (← links)
- RS-16-105, Supplemental Information in Support of Request for License Amendment Regarding Transition to Areva Fuel (← links)
- RS-10-021, License Amendment Request to Eliminate Main Steam Isolation Valve Closure and Low Condenser Vacuum Scram Functions During Startup Mode (← links)
- RS-15-237, /Quad Cities Nuclear Power Station, Units 1 and 2 - Supplemental Information in Support of Request for License Amendment Regarding Transition to Areva Fuel (← links)
- RS-13-148, License Amendment Request - Use of Neutron Absorbing Inserts in Units 1 and 2 Spent Fuel Pool Storage Racks (← links)
- SVPLTR 07-0005, Request for Enforcement Discretion Technical Specification 3.1.7, Standby Liquid Control (SLC) System. (← links)
- RS-19-093, Secondary Containment Drawdown Analysis (← links)
- RS-05-075, Request for Amendment to Technical Specifications Associated with Feedwater System and Main Turbine High Water Level Trip Instrumentation (← links)
- RS-05-007, Request for Amendment to Technical Specifications Associated with Isolation Condenser System Heat Removal Capability Surveillance (← links)
- RS-04-062, Technical Specifications Changes Related to Main Steam Line Flow-High Isolation Instrumentation (← links)
- RS-04-004, Request for Amendment to Technical Specificaiton 5.5.12, Primary Containment Leakage Rate Testing Program. (← links)
- RS-03-204, Request for Technical Specifications Change for Minimum Critical Power Ratio Safety Limit (← links)
- RS-03-140, Request for Amendment to Technical Specifications Associated with Direct Current Electrical Power (← links)
- RS-03-115, Additional Information Regarding Request for License Amendment Related to Heavy Loads Handling (← links)
- RS-03-087, Request for Amendment to Technical Specifications Surveillance Requirements for the Main Steam Line Relief Valves and Relief Request RV-30D (← links)
- RS-03-051, Additional Information Supporting Request for License Amendment Regarding Minimum Critical Power Ratio Safety Limit (← links)
- L-98-010, Request for Technical Specifications Changes Related to Reactor Protection System Instrumentation (Scram Discharge Volume Water Level - High) (← links)
- RS-03-044, Request for Amendment to Technical Specification 5.5.12, Primary Containment Leakage Rate Testing Program. (← links)
- RS-03-045, Request for License Amendment Related to Heavy Loads Handling (← links)
- RS-03-023, Request for License Amendment Regarding Minimum Critical Power Ratio Safety Limit (← links)
- RS-03-026, Request for TS Changes Related to Primary Containment Isolation Instrumentation for the Isolation Condenser System (← links)
- RS-02-215, Request for License Amendment to Eliminate Main Steam Isolation Valve Closure & Low Condenser Vacuum Scram Functions During Startup Mode (← links)
- RS-02-175, Request for Technical Specification Changes Related to Main Steam Safety Valve Operability Requirements (← links)
- RS-02-171, Request for License Amendment Related to Heavy Loads Handling (← links)
- RS-02-168, Request for License Amendment Related to Heavy Loads Handling (← links)
- RS-02-152, . Request for Technical Specifications Surveillance Requirement 3.3.4.1.2 Change Related to Anticipated Transient Without Scram- Recirculation Pump Trip Instrumentation (← links)
- RS-02-095, Application for Amendment to License DPR-29 for Quad Cities, Unit 1 Ts. Amendment Would Revise Values of Safety Limit for Minimum Critical Power Ratio (Slmcpr)In TS 2.1.1 for Cycle 18 (← links)
- RS-02-044, Request for Technical Specification Change, Revises Emergency Diesel Generator Required Start Time (← links)
- RS-02-080, Request for Technical Specifications Changes Related to Reactor Protection System Instrumentation (← links)
- RS-02-073, Request for Amendment, Request for Technical Specifications Change for Minimum Critical Power Ratio Safety Limit (← links)
- RS-20-046, Emergency License Amendment Request - Increase Technical Specifications Allowable MSIV Leakage Rates in TS 3.6.1.3 (← links)
- RS-20-116, License Amendment Request - Proposed Changes to Unit 1 Technical Specifications Section 6.1, Responsibility, and Units 2 and 3 Technical Specifications 1.1, Definitions, and 5.0, Administrative (← links)
- RS-20-132, License Amendment Request, Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition (← links)
- ML20323A254 (← links)
- RS-21-021, License Amendment Request - Proposed Changes to the Dresden Nuclear Power Station Emergency Plan and Emergency Action Level Scheme for the Permanently Defueled Condition (← links)
- ML21257A420 (← links)
- RS-21-065, License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies with Proposed Change to Technical Specifications Section 4.3.1 (← links)
- RS-21-108, Application to Revise Technical Specification 3.1.4, Control Rod Scam Times (← links)
- RS-22-064, License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies with Proposed Change to Technical Specifications Section 4.3.1 (← links)
- RS-22-066, License Amendment Request to Revise Technical Specification 3.1.4, Control Rod Scram Times (← links)
- RS-22-065, License Amendment Request Regarding Transition to GNF3 Fuel (← links)
- RS-23-007, Application to Adopt TSTF-564, Safety Limit MCPR (← links)
- RS-23-032, Application to Move SR 3.5.1.2 Note to LCO 3.5.1 in Accordance with TSTF-416, LPCI Valve Alignment Verification Note Location (← links)
- RS-23-060, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors (← links)
- RS-23-059, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (← links)