Pages that link to "LR-N19-0006, Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program"
Jump to navigation
Jump to search
The following pages link to LR-N19-0006, Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program:
Displayed 50 items.
- LR-N07-0030, License Change Request S06-010, Steam Generator Feedwater Pump Trip, Feedwater Isolation Valve Response Time Testing and Containment Cooling System (← links)
- LR-N07-0005, One Time License Change Request LCR S07-01 Steam Generator Alternate Repair Criteria (17 Inch Inspection Distance) (← links)
- LR-N06-0233, Request for Change to Technical Specifications Containment Ventilation System, Containment Isolation Valves (← links)
- LR-N06-0309, Request for Changes to Technical Specifications Refueling Operations - Decay Time (← links)
- LR-N06-0201, Request for Change to Technical Specifications to Eliminate Requirements for Hydrogen Recombiners and Hydrogen Analyzers Using the Consolidated Line Item Improvement Process (← links)
- LR-N06-0051, Request for Amendment to Technical Specifications Maximum Allowable Power with Inoperable Steam Line Safety Valves (← links)
- LR-N18-0129, License Amendment Request to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements. (← links)
- LR-N18-0059, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (← links)
- LR-N16-0175, License Amendment Request - Administrative Controls (← links)
- LR-N14-0224, License Amendment Request to Update Appendix B to the Renewed Facility Operating License (← links)
- LR-N13-0265, License Amendment Request for Approval of the Revised PSEG Nuclear Cyber Security Plan Milestone 8 Implementation Schedule (← links)
- LR-N12-0200, for License Amendment Request - Cyber Security Plan Implementation Schedule Milestones (← links)
- LR-N12-0108, Unit 1 - License Amendment Request: Revision to Technical Specification (TS) 6.8.4.i, Steam Generator (SG) Program, and TS 6.9.1.10, Steam Generator Tube Inspection Report, for a Permanent Alternate Repair Criteria (← links)
- LR-N10-0032, Request Amendment of Proposed Revision to Technical Specifications - Removal of Reactor Coolant System Structural Integrity Requirements (← links)
- LR-N09-0218, Unit 2 - License Amendment Request (LAR) S09-06 Revision to Technical Specification 4.0.5, Surveillance Requirements for Inservice Inspection and Testing of ASME Code Components (← links)
- LR-N09-0214, Stations, Unit 1 - License Amendment Request for One-Time Extension of the Type a Test Interval (← links)
- LR-N19-0006 (redirect page) (← links)
- ML19098B529 (redirect page) (← links)
- ML19122A482 (← links)
- ML19330F156 (← links)
- EPID:L-2019-LLA-0074 (← links)
- ML19122A482 (← links)
- LR-N09-0001, License Amendment Request to Eliminate Unnecessary Reporting Requirements in the Operating License and the Administrative Controls Section of the Technical Specifications (← links)
- LR-N06-0055, Request for Change to Technical Specifications to Add Requirements for Steam Generator Tube Integrity, Steam Generator Program and Steam Generator Tube Inspection Report and to Revise Reactor Coolant System Operational Leakage Requiremen (← links)
- LR-N19-0065, License Amendment Request for Approval of Changes to Emergency Plan Staffing Requirements (← links)
- LR-N19-0064, License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions and License Transfer (← links)
- LR-N16-0142, Special Report 05000272/2016002-00, Pursuant to the Requirements of Technical Specification (TS) 3.3.3.1, Action 23, for the Containment Gaseous Activity Radiation Monitor (1R12A) Inoperable for >7 Days (← links)
- ML19030A873 (← links)
- ML19030A839 (← links)
- ML19030A836 (← links)
- ML19030A833 (← links)
- LR-N19-0055, License Amendment Request: Revise Minimum Required Channels, Mode Applicability and Actions for the Source Range and Intermediate Range Neutron Flux Reactor Trip System Instrumentation Technical Specifications (← links)
- LR-N05-0392, Request for Change to Technical Specifications Accident Monitoring Instrumentation (← links)
- LR-N05-0336, Request for Changes to Technical Specifications Relocation of Response Time Testing Time Limits to the Updated Final Safety Analysis Report (← links)
- LR-N05-0386, Unit 1 and Unit 2, Supplement to Request for Change to Technical Specification to Extend the Inspection Interval for Reactor Coolant Pump Flywheels Using the Consolidated Line Item Improvement Process (← links)
- LR-N05-0319, Technical Specification Bases Change S05-05B Re Radiation Monitoring Channels (← links)
- ML052100328 (← links)
- LR-N05-0342, Response to Request for Additional Information Regarding Amendment Request to Revise Technical Specification - Emergency Core Cooling Systems Tavg ≪ 350 F, Salem Generating Station - Unit 1 and Unit 2 (← links)
- LR-N05-0094, Proposed License Transfer and Conforming License Amendments Relating to the Merger of Public Service Enterprise Group and Exelon Corporation (← links)
- LR-N04-0311, Request for Change to Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process (← links)
- LR-N05-0018, Request for Change to Technical Specifications to Add Requirements for Steam Generator Tube Integrity, Steam Generator Program, & Steam Generator Tube Inspection Report & to Revise Reactor Coolant System Operational. (← links)
- LR-N05-0036, Request for Changes to Technical Specifications Deletion of Reactor Coolant System Volume (← links)
- LR-N05-0003, Request for Change to Technical Specifications Emergency Core Cooling Systems Tavg <335 Degrees F, (← links)
- LR-N04-0466, Request for Change to Technical Specifications to Eliminate Requirements to Provide Monthly Operating Reports and Occupational Radiation Exposure Reports Using the Consolidated Line Item Improvement Process (← links)
- ML19330F156 (← links)
- ML043150240 (← links)
- LR-N04-0345, Request for Change to Technical Specifications to Extend the Inspection Interval for Reactor Coolant Pump Flywheels Using the Consolidated Line Item Improvement Process (← links)
- LR-N04-0343, Revised Request for Changes to Technical Specifications Containment Systems - Containment Cooling System (← links)
- LR-N04-0238, Request for Change to Technical Specifications, to Modify Definition of Operable (← links)
- LR-N04-0021, Units I and 2 - Implementation of Alternative Source Term (AST) Request for Changes to Technical Specifications and Updated Final Safety Analysis Report (← links)
- ML032731418 (← links)
- ML031960056 (← links)