Pages that link to "ML21225A006"
Jump to navigation
Jump to search
The following pages link to ML21225A006:
Displayed 50 items.
- RS-18-083, Response to Request for Additional Information Regarding Braidwood Station Fourth Inservice Inspection Interval Relief Request 14R-05 (← links)
- RS-17-036, Response to Request for Additional Information Regarding Relief Request I4R-10 (← links)
- RS-16-259, Response to Request for Additional Information for Relief Request I4R-10: Proposed Alternative Requirements for the Repair and Examination of Reactor Vessel Head Penetrations for the Fourth Inservice Inspection Interval (← links)
- RS-16-213, Response to Request for Additional Information Regarding Relief Request 13R-17 to Extend the Reactor Pressure Vessel Inservice Inspection Interval (← links)
- RS-16-224, Relief Request for Alternative Requirements for the Repair and Examination of Reactor Vessel Head Penetrations for the Fourth Inservice Inspection Interval (← links)
- RS-16-195, Supplemental Information for the Fourth Inservice Inspection Interval Relief Request 14R-08 (← links)
- RS-16-122, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident (← links)
- RS-15-319, Responds to Request for Additional Information Regarding Relief Request RP-1 Associated with the Fourth Inservice Testing Interval (← links)
- ML18338A235 (← links)
- NMP1L3221, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 & 2, R. E. Ginna - Response to Request for Additional Information License Amendment Request to Adopt Emergency Action Level Schemes. (← links)
- RS-17-085, Response to Request for Additional Information Regarding Amendments to Remove Obsolete License and Technical Specification Items (← links)
- RS-16-078, Clarification to Response to Requests for Additional Information for Relief for Alternate Requirements for Repair of Reactor Vessel Head Penetrations with Nozzles Having Pressure-Retaining Partial-Penetration J-Groove Welds (← links)
- RS-16-067, Supplement to Response to Requests for Additional Information for Relief for Alternate Requirements for Repair of Reactor Vessel Head Penetrations with Nozzles Having Pressure-Retaining Partial-Penetration J-Groove Welds (← links)
- RS-16-057, Supplement to Response to Requests for Additional Information for Relief for Alternate Requirements for Repair of Reactor Vessel Head Penetrations with Nozzles Having Pressure-Retaining Partial-Penetration J-Groove Welds (← links)
- RS-16-045, Response to Requests for Additional Information for Relief for Alternate Requirements for Repair of Reactor Vessel Head Penetrations with Nozzles Having Pressure-Retaining Partial-Penetration J-Groove Welds (← links)
- RS-15-264, Response to Request for Additional Information Regarding the License Amendment Request to Install New Low Degraded Voltage Relays and Timers on the 4.16 Kv Engineered Safety Features (ESF) Buses (← links)
- RS-15-251, Response to Request for Additional Information Follow-Up Clarification Regarding License Amendment Request for Diesel Generator Load Rejection Surveillance Requirement (← links)
- RS-15-181, Response to Request for Additional Information Regarding License Amendment Request for Diesel Generator Load Rejection Surveillance Requirement (← links)
- RS-18-143, Supplemental Information Supporting License Amendment Requests for Approval of Changes to Emergency Plan Staffing Requirements (← links)
- RS-18-072, Response to Request for Additional Information Regarding 50.69 Amendment (← links)
- RS-14-160, Co. - Submission of Standard Practice Procedure Plans and Foreign Ownership Control or Influence Package (← links)
- RS-17-168, Request for Relief for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(1) (← links)
- RS-19-051, Response to Request for Additional Information for the License Amendment Request to Utilize Tvel TVS-K Lead Test Assemblies (← links)
- RS-18-084, Response to Request for Additional Information Regarding Braidwood TORMIS Amendment Request (← links)
- RS-07-022, Response to Request for Additional Information Regarding Application for Steam Generator Tube Integrity Technical Specification (← links)
- RS-19-088, Response to Request for Additional Information Regarding Application to Revise Braidwood Station and Byron Station Technical Specifications to Adopt Risk Informed... (← links)
- RS-19-100, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended. (← links)
- RS-15-288, High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information, Per 10CFR50.54(f)Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (← links)
- RS-15-255, Response to NRC Audit Review Request for Additional Information Regarding Fukushima Lessons Learned - Flood Hazard Reevaluation Report (← links)
- RS-05-017, Response to Information Request Regarding Significance Determination Process Risk-Informed Inspection Notebook (← links)
- ML19318G170 (← links)
- RS-20-012, Response to Request for Additional Information Regarding Relief Request Associated with the Third Ten-Year Inservice Inspection Program Interval (← links)
- ML042860138 (← links)
- RS-20-010, Application to Revise Technical Specifications 5.6.5, Core Operating Limits Report (COLR) (← links)
- ML20080N889 (← links)
- RS-20-058, Supplement to License Amendment Request for a One-Time Extension of the Steam Generator Tube Inspections (← links)
- RS-20-057, Response to Request for Additional Information Regarding Emergency License Amendment Request for a One-Time Extension of the Steam Generator Tube Inspections (← links)
- RS-20-079, Application for Revision to TS 5.5.9, Steam Generator (SG) Program, for a One-Time Deferral of Steam Generator Tube Inspections (← links)
- ML20188A264 (← links)
- RS-20-100, Response to Request for Additional Information Regarding Application for Revision to TS 5.5.9, Steam Generator (SG) Program, for a One-Time Deferral of Steam Generator Tube Inspections (← links)
- ML20248H388 (← links)
- ML20310A115 (← links)
- RS-20-150, Response to Request for Additional Information Related to Subsequent Exemption from Part 26 Requirements (← links)
- RS-20-147, Response to Request for Additional Information Related to Exemption from Part 26 Requirements (← links)
- RS-20-143, Response to Request for Additional Information Regarding Application to Revise Technical Specifications 3.8.1, AC Sources- Operating (← links)
- RS-21-015, Response to Request for Additional Information Related to Relief Request for Braidwood I4R-11 and Byron I4R-18 (← links)
- RS-21-019, Response to Request for Additional Information Regarding Application for Revision to TS 5.5.9, Steam Generator (SG) Program, for a One-Time Deferral of Steam Generator Tube Inspections (← links)
- RS-21-024, Response to Request for Additional Information (RAI) Regarding Byron Station, Units 1 and 2, License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition (← links)
- RS-21-029, Response to RAI Re License Amendment Request - Proposed Changes to Byron & Dresden Stations Emergency Plan for Post-Shutdown and Permanently Defueled Condition (← links)
- ML21078A002 (← links)