Pages that link to "RNP-RA/17-0042, Submittal of the PWROG-14048-P, Revision 1, to Satisfy the Regulatory Commitment Related to the Pressurized Water Reactor Internals Program Plan for Aging Management of Reactor Internals"
Jump to navigation
Jump to search
The following pages link to RNP-RA/17-0042, Submittal of the PWROG-14048-P, Revision 1, to Satisfy the Regulatory Commitment Related to the Pressurized Water Reactor Internals Program Plan for Aging Management of Reactor Internals:
Displayed 50 items.
- RNP-RA/16-0090, Notification of Rescheduled Date for 2017 Emergency Preparedness Graded Exercise (← links)
- RNP-RA/16-0089, Request for Withdrawal of License Amendment Request for Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (← links)
- RNP-RA/16-0079, Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Light Water Reactor Electric Generating Plants. (← links)
- RNP-RA/16-0078, Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors (← links)
- RNP-RA/16-0071, Transmittal of Emergency Procedure Revisions and 10 CFR 50.54(q) Summary of Analysis (← links)
- RNP-RA/16-0044, Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (← links)
- RNP-RA/16-0073, Response to Request for Additional Information Regarding License Amendment Request to Revise Reactor Coolant System Pressure and Temperature Limits (← links)
- RNP-RA/16-0065, Supplement to Proposed Amendment to Technical Specification 5.5.16 for the Adoption of Option B of 10 CFR 50, Appendix J for Type B and Type C Testing and the Permanent Change in 10 CFR 50, Appendix J, Integrated Leak Rate Test. (← links)
- RNP-RA/16-0037, Seismic Probabilistic Risk Assessment Plans in Response to Request for Information Per Near-Term Task Force Recommendation 2.1 (← links)
- RNP-RA/16-0034, Transmittal of 2015 Annual Radiological Environmental Operating Report and Offsite Dose Calculation Manual, Current Revision 34 (← links)
- RNP-RA/16-0031, Supplemental Response to Request for Additional Information Regarding License Amendment Request to Revise Reactor Coolant System Pressure and Temperature Limits (← links)
- RNP-RA/16-0021, Post-License Examination Documentation - Follow-up (← links)
- RNP-RA/16-0024, Response to Request for Additional Information Regarding License Amendment Request to Revise Reactor Coolant System Pressure and Temperature Limits (← links)
- RNP-RA/16-0019, Transmittal of Emergency Procedure Revision and 10 CFR 50.54(q) Summary of Analysis, Revision 27 to AOP-034, Security Events. (← links)
- RNP-RA/16-0017, Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Light Water Reactor Electric Generating Plants. (← links)
- RNP-RA/16-0012, Transmittal of Emergency Procedure Revision and 10 CFR 50.54(q) Summary of Analysis, Per Revision 17 to EPTSC-06, Emergency Security Team Leader (← links)
- RNP-RA/16-0007, Transmittal of Emergency Procedure Revisions and 10CFR50.54(q) Summary of Analysis, Including Revision 26 to EPOSC-01, Revision 15 to EPOSC-02, Revision 16 to EPEOF-01, and Revision 19 to EPTSC-01 (← links)
- RNP-RA/16-0003, Independent Spent Fuel Storage Installation (Isfsis) - Annual Radioactive Effluent Release Report (← links)
- RNP-RA/16-0001, Transmittal of Emergency Procedure Revision and 10 CFR 50.54(q) Summary of Analysis, Revision 14 to EPCLA-04, Emergency Action Level Technical Bases Document. (← links)
- RNP-RA/15-0094, Reactor Operator and Senior Reactor Operator Initial Examinations (← links)
- RNP-RA/15-0117, Supplement to Request for Technical Specification Change to Reactor Coolant System Pressure and Temperature Limits (← links)
- RNP-RA/15-0093, Reactor and Senior Reactor Operator Initial Examination Outlines (← links)
- RNP-RA/15-0101, Response to NRC Request for Additional Information Regarding License Amendment Request to Change Emergency Action Levels (Eals) Scheme Based on NEI 99-01, Revision 6 (← links)
- RNP-RA/15-0090, Proposed Amendment to Technical Specification 5.5.16 for the Adoption of Option B of 10 CFR 50, Appendix J for Type B and Type C Testing and the Permanent Change in 10 CFR 50, Appendix J, Integrated Leak Rate Test Interval And.. (← links)
- RNP-RA/15-0102, Pressurizer Power Operated Relief Valve Position Indication (← links)
- RNP-RA/15-0083, Submits Request for Technical Specification Change to Reactor Coolant System Pressure and Temperature Limits (← links)
- RNP-RA/15-0086, Transmittal of Technical Specifications Bases Revisions (← links)
- RNP-RA/15-0081, Submittal of Ninety-Day Inservice Inspection Summary Report (← links)
- RNP-RA/15-0078, Request for Revised Approval Date Regarding License Amendment Request to Modify Technical Specification 3.3.1, Reactor Protection System Instrumentation Turbine Trip Function (← links)
- RNP-RA/15-0077, Submittal of Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report, 14-Day Report for the Inoperability of Pressurizer Power Operated Relief Valves Position Indication (← links)
- RNP-RA/15-0069, Addendum to Submittal of Revision to Seismic Hazard Evaluation to Include New Ground Motion Response Spectra (GMRS) Using New Geotechnical Data and Shear-Wave Testing (← links)
- RNP-RA/15-0053, Compliance Letter and Final Integrated Plan in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-04) (← links)
- RNP-RA/15-0071, Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Light Water Reactor Electric Generating Plants. (← links)
- RNP-RA/15-0045, Submits Revision to Seismic Hazard Evaluation to Include New Ground Motion Response Spectra (GMRS) Using New Geotechnical Data and Shear-Wave Testing (← links)
- RNP-RA/15-0040, Completion of Required Actions for NRC Order EA-12-051 with Regard to Reliable Spent Fuel Pool Level Instrumentation (← links)
- RNP-RA/15-0059, Submittal of Snubber Examination and Testing Program (← links)
- RNP-RA/15-0041, Submittal of 2014 Annual Radiological Environmental Operating Report (← links)
- RNP-RA/15-0047, Response to Follow-up Request for Additional Information (RAI) Associated with Response to 90-Day RAI Related to License Amendment Request to Adopt National Fire Protection Association (NFPA) Standard 805 (← links)
- RNP-RA/15-0042, Response to Request for Additional Information Regarding the Flood Hazard Reevaluation Report (FHRR) (← links)
- RNP-RA/15-0034, Proposed Changes to Emergency Plan (← links)
- RNP-RA/15-0031, Response to NRC Request for Additional Information Regarding Seismic Re-Evaluations Related to Southeastern Catalog Changes (← links)
- RNP-RA/15-0039, Submittal of 2014 Annual Radioactive Effluent Releae Report (← links)
- RNP-RA/15-0026, Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of Pressurizer Power Operated Relief Valves Position Indication (← links)
- RNP-RA/15-0021, Supplemental Response to 120-Day Response Submittal to Request for Additional Information Associated with License Amendment Request to Adopt National Fire Protection (NFPA) Standard 805 (← links)
- RNP-RA/15-0015, Fourth Six-Month Status Reports in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) (← links)
- RNP-RA/15-0023, Response (60-Day) to Request for Additional Information Associated with License Amendment Request to Adopt National Fire Protection Association (NFPA) Standard 805 (← links)
- RNP-RA/15-0018, Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of the Power Range Neutron Flux Channel (← links)
- RNP-RA/15-0009, Fourth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) (← links)
- RNP-RA/14-0134, Response (90-Day) to Request for Additional Information Associated with License Amendment Request to Adopt National Fire Protection Association (NFPA) Standard 805 (← links)
- RNP-RA/14-0129, Expedited Seismic Evaluation Process Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima. (← links)