Pages that link to "RNP-RA/17-0042, Submittal of the PWROG-14048-P, Revision 1, to Satisfy the Regulatory Commitment Related to the Pressurized Water Reactor Internals Program Plan for Aging Management of Reactor Internals"
Jump to navigation
Jump to search
The following pages link to RNP-RA/17-0042, Submittal of the PWROG-14048-P, Revision 1, to Satisfy the Regulatory Commitment Related to the Pressurized Water Reactor Internals Program Plan for Aging Management of Reactor Internals:
Displayed 50 items.
- ML17180A384 (redirect page) (← links)
- ML16063A103 (← links)
- ML15009A284 (← links)
- ML14167A345 (← links)
- ML14115A440 (← links)
- ML14016A279 (← links)
- ML13266A240 (← links)
- ML13249A000 (← links)
- ML13240A499 (← links)
- ML13135A184 (← links)
- ML13079A293 (← links)
- ML12307A408 (← links)
- ML12278A399 (← links)
- TAC:ME9633 (← links)
- ML16280A200 (← links)
- RNP-RA/18-0044, Supplement to License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transform (← links)
- RNP-RA/17-0015, H.B. Robinson Steam Electric Plant & ISFSIs - Report of Changes Pursuant to 10 CFR 72.48 (← links)
- RNP-RA/16-0057, License Amendment Request to Modify the Licensing Basis Alternate Source Term (← links)
- RNP-RA/14-0119, Registration of Use of Spent Fuel Casks (← links)
- RNP-RA/12-0073, Redacted - H. B. Robinson, Unit 2 and Independent Spent Fuel Storage Installation - Submittal of Revision 23 to the Independent Spent Fuel Storage Installation Safety Analysis Report (← links)
- RNP-RA/12-0040, 2011 Annual Radioactive Effluent Release Report (← links)
- RNP-RA/11-0057, LER 011-001-00 for H. B. Robinson, Unit 2, Regarding Condition Prohibited by Technical Specifications When Non-Seismic System Was Aligned to Refueling Water Storage Tank Due to Regulatory Requirements Not Adequately Incorporated in Pl (← links)
- RNP-RA/10-0117, Request for Technical Specification Changes to Section 3.8.3, Diesel Fuel Oil and Starting Air, and Section 3.8.5, DC Sources - Shutdown (← links)
- RNP-RA/10-0108, H. B. Robinson,Response to Request for Additional Information Regarding Changes to Technical Specification Section 3.3.2, Engineered Safety Feature Actuation System Instrumentation, and Section 3.3.6, Containment Ventilation Isolation (← links)
- RNP-RA/02-0071, Advance Notification of Spent Fuel Shipment Consisting of Radioactive Material in IF-300 Series Shipping Cask(S): Cask Id No. USA/9001/B()F; S/N IF-301, S/N IF-302 (← links)
- RNP-RA/02-0082, Advance Notification of Spent Fuel Shipment Consisting of Radioactive Material in IF-302 Series Shipping Cask(S) (← links)
- RNP-RA/17-0042, H. B. Robinson Steam Electric Plant, Unit No. 2 - Submittal of the PWROG-14048-P, Revision 1, to Satisfy the Regulatory Commitment Related to the Pressurized Water Reactor Internals Program Plan for Aging Management of Reactor Interna (redirect page) (← links)
- RNP-RA/17-0042 (redirect page) (← links)
- RNP-RA/16-0062, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (← links)
- RNP-RA/14-0090, Supplement to H.B. Robinson Steam Electric Plant, Unit 2 (HBRSEP2) Orginal Submittal Regarding License Amendment Request for Technical Specifications Change to Use NRC-Approved TSTF-491, Revision 2, Removal of Main Steam and Main Feed (← links)
- RNP-RA/14-0051, Supplemental Submittal to H. B. Robinson, Unit No. 2 (HBRSEP2) Original Submittal and Response to NRC RAI Regarding License Amendment Request to Modify Technical Specification 3.8.1 Proposed Changes to Diesel Generator Testing Require (← links)
- RNP-RA/14-0039, Errata Letter for 10 CFR 50.54(F) Submittal of Seismic Hazard Evaluation (← links)
- RNP-RA/12-0050, Response to Request for Additional Information, H. B. Robinson Steam Electric Plant, Unit 2 Inservice Inspection Program Plan for the Fifth Ten-Year Interval Relief Request RR-05 and RR-06 (← links)
- RNP-RA/18-0050, Response to Supplemental Request for Additional Information Regarding License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Change (← links)
- RNP-RA/18-0041, Independent Spent Fuel Storage Installation - Register as User for Cask (← links)
- RNP-RA/18-0029, Submittal of 2017 Annual Radiological Environmental Operating Report (← links)
- RNP-RA/18-0024, Report of Changes Pursuant to 10 CFR 50.59(d)(2) (← links)
- RNP-RA/17-0086, Transmittal of Emergency Procedure Revision and 10 CFR 50.54(q) Summary of Analyses (← links)
- RNP-RA/17-0081, Submittal of Change in Licensed Operators Medical Status (← links)
- RNP-RA/17-0068, Response to NRC Request for Additional Information Related to License Amendment Request Regarding Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (← links)
- RNP-RA/17-0037, License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specifications 3.8.1, AC Sources-Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers (← links)
- RNP-RA/17-0058, Notification of Change in Licensed Operator Status (← links)
- RNP-RA/17-0055, Transmittal of Core Operating Limits Report for Cycle 31 (← links)
- RNP-RA/17-0050, Transmittal of Core Operating Limits Report for Cycle 31 (← links)
- RNP-RA/17-0041, Transmittal of Technical Specifications Bases Revisions (← links)
- RNP-RA/17-0031, Provides Additional Information Regarding License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler 522, Revision 0 (← links)
- RNP-RA/17-0033, Flood Hazard Mitigating Strategies Assessment (MSA) Report Submittal (← links)
- RNP-RA/17-0028, Submittal of Engineering Calculation in Support of a Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (← links)
- RNP-RA/17-0014, Resubmittal of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (← links)
- RNP-RA/17-0021, Transmittal of Core Operating Limits Report (← links)