Pages that link to "CRV"
← CRV
Jump to navigation
Jump to search
The following pages link to CRV:
Displayed 50 items.
- RC-15-0161, Relief Request RR-III-12, Proposed Alternative Inspection Requirements for Piping Welds (← links)
- ULNRC-06218, 10CFR50.55a Requests: Relief from Impractical Examination Coverage Requirements for the Third Ten-Year Inservice Inspection Program Interval (← links)
- HNP-14-099, Relief Request I3R-14, Deferral of Reactor Vessel Inspections Inservice Inspection Program - Third Ten-Year Interval Response to Request for Additional Information (← links)
- L-2014-207, Inservice Inspection Plan Third Ten-Year Interval Unit 2 Relief Request No. 16 (← links)
- L-MT-13-051, MNGP Updated Final Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (← links)
- RNP-RA/12-0023, Inservice Inspection Program for the Fifth Ten-Year Interval (← links)
- HNP-09-095, Response to Request for Additional Information Regarding Relief Requests 2R1-018, 2R1-019, 2R1-020, 2R1-021, 2R1-022, 2R2-009, 2R2-010, & 2R2-011 for the Second 10-Year Inservice Inspection Program (← links)
- 2CAN061402, Results of Dissimilar Metal Weld Examinations (← links)
- 1CAN110804, Summary of Weld Overlay Ultrasonic Examinations of Hot Leg Nozzle Dissimilar Metal Weld for Alloy 600 Mitigation at ANO-1 (← links)
- 2CAN040803, Summary of Weld Overlay Ultrasonic Examinations for Hot Leg Surge, Shutdown Cooling, and Drain Nozzle-to-Safe End Welds (← links)
- L-MT-08-025, Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process (← links)
- LIC-07-0046, Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process (← links)
- L-2006-181, Response to Request for Additional Information (RAI) Regarding Third 10-Year Inservice Inspection Interval Relief Requests 1A, 14A, 15A (← links)
- RNP-RA/06-0001, Submittal of 90 Day Inservice Inspection Summary Report (← links)
- ML19010A307 (← links)
- RBG-47913, Request for Alternative in Accordance with 10 CFR 50.55a(g)(5)(iii) Proposed Alternative to CFR 50.55a Examination Requirements for Third Interval Volumetric Exams (RBS-ISI-021) (← links)
- GNRO-2018/00054, Relief Request No. GG-ISI-023, Inservice Inspection Impracticality: Limited Coverage Examination During the Third 10-Year Inservice Inspection Interval (← links)
- IR 05000263/2018004 (← links)
- ML18270A326 (← links)
- ML18270A325 (← links)
- ML18270A324 (← links)
- ML18270A322 (← links)
- ML063050203 (← links)
- LR-N18-0087, Submittal of Relief Request Associated with the Third Inservice Inspection (ISI) Interval (← links)
- L-MT-18-008, Initial and Final Part 21.21(d)(4) Report Notification of Failure to Comply or Existence of a Defect Regarding Westinghouse Breaker Cubicle (← links)
- PNP 2016-052, Relief Request Number RR 4-25 Impracticality - Limited Coverage Examinations During the Fourth 10-year Inservice Inspection Interval (← links)
- RS-16-228, License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition (← links)
- PNP 2016-046, License Amendment Request for Editorial and Administrative Changes to Technical Specifications (← links)
- PNP 2016-037, Response to Request for Additional Information Regarding the License Amendment Request for Implementation of an Alternate Repair Criterion on the Steam Generator Tubes (CAC No. MF7435 (← links)
- ML19084A286 (← links)
- PNP 2014-042, License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-426, Revise or Add Actions to Preclude Into LCO 3.0.3 - RITSTF Initiatives 6b & 6c, Using the Consolidated Line Item Improvement Process (← links)
- RNP-RA/14-0014, Submittal of Ninety Day Inservice Inspection Summary Report (← links)
- RNP-RA/12-0063, Submittal of 90 Day Inservice Inspection Summary Report (← links)
- ULNRC-05821, Union Electric Co. Application for Amendment to Facility Operating License NPF-30 (Ldcn 10-0036) Revision of Technical Specification 3.3.8 TAC ME5173) (← links)
- SBK-L-11132, Submittal of Third Ten-Year Interval Inservice Inspection and Second Ten-Year Containment Inservice Inspection Program (← links)
- NL-10-061, CFR 50.55a Relief Requests RR-3-49 and RR-3-50 from Examinations of Component Welds with Less than Essentially 100% Examination Coverage for Third Ten-Year Inservice Inspection Interval (← links)
- RNP-RA/09-0010, Submittal of 90 Day Inservice Inspection Summary Report for Refueling Outage 25 (← links)
- LR-N08-0222, Responses to Requests for Additional Information Regarding Proposed License Amendment - Technical Specification Requirements for Inoperable Inverters (← links)
- RNP-RA/07-0077, Submittal of 90 Day Inservice Inspection Summary Report (← links)
- 1CAN041801, Requests for Relief from American Society of Mechanical Engineers (ASME) Section XI Volumetric Examination Requirements Fourth 10-Year Interval, Second and Third Period (← links)
- CNL-17-057, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Inservice Inspection (ISI) Program, Third Ten Year Interval Request for Relief for 17-ISI-1 (← links)
- NOC-AE-11002645, Request for Relief from ASME Section XI Code Requirements for Weld Examinations (Revision 2) Relief Request RR-ENG-2-55 (← links)
- IR 05000263/2019001 (← links)
- RBG-46968, Supplement to Requests for Relief from ASME Section XI Volumetric and Visual Examination Requirements - Second 10-Year Interval (← links)
- 1CAN050902, Arkansas, Unit 1, Requests for Relief from ASME Section XI Volumetric, Surface and Visual Examination Requirements - Third 10-Year Interval (← links)
- ULNRC-05183, Requests for Relief from ASME Section XI Code Inservice Examination Requirements (← links)
- L-MT-06-054, Supplemental Submittal Regarding Full Scope Application of an Alternative Source Term (AST) (← links)
- L-2006-050, Closeout of the Third Ten-Year Inservice Inspection (ISI) Interval Relief Requests 1A, 14A & 15A (← links)
- ML19198A340 (← links)
- ML19178A400 (← links)