Pages that link to "GNRO-2020/00018, Annual Radiological Effluent Release Report"
Jump to navigation
Jump to search
The following pages link to GNRO-2020/00018, Annual Radiological Effluent Release Report:
Displayed 50 items.
- GNRO-2018/00007, Application to Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control. (← links)
- GNRO-2018/00006, Spent Fuel Storage Radioactive Effluent Release Report for 2017 (← links)
- GNRO-2017/00061, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis (← links)
- GNRO-2017/00060, Submittal of 2017 Report of Changes and Errors to 10CFR50.46 (← links)
- GNRO-2017/00058, Special Report Regarding Gaseous Radwaste Treatment System Out of Service (← links)
- GNRO-2017/00053, Response to Eseb RAI-1, Results of IWE and Iwl Inspections (← links)
- GNRO-2017/00049, NRC Form 536 Response to Regulatory Issue Summary 2017-03 (← links)
- GNRO-2017/00042, Report Pursuant to 10 CFR 71.95 (a)(3) and (B) of Seven Potential Instances of Noncompliance with Certificate of Compliance No. 9233 for TN-RAM Package (← links)
- GNRO-2017/00043, Amended Annual Radioactive Effluent Release Report (ARERR) for 2015 (← links)
- GNRO-2017/00039, Steam Dryer Visual Inspection Results for the First Two Scheduled Refueling Outages (← links)
- GNRO-2017/00045, Request for Severe Accident Management Guidelines (Samgs) Commitment Schedule Relaxation (← links)
- GNRO-2017/00038, Focused Evaluation of External Flooding (← links)
- GNRO-2017/00035, Notice of Readiness of 95001 Supplemental Inspection (← links)
- GNRO-2017/00041, NRC Form 536 Response to Regulatory Issue Summary 2017-03 (← links)
- GNRO-2017/00017, Three Relief Requests for Jockey Pumps for the Third 10-year Inservice Testing Interval (← links)
- GNRO-2017/00031, NRC Form 536 Response to Regulatory Issue Summary 2017-03 (← links)
- GNRO-2017/00029, Annual Radiological Environmental Operating Report (← links)
- GNRO-2017/00027, Entergy Operations Inc. Intent to Submit a License Amendment Request to Implement Tornado Missile Risk Evaluator and Request for Pilot Plant Status (← links)
- GNRO-2017/00025, Annual Report of Individual Monitoring - NRC Form 5 for 2016 Per 10 CFR 20.2206 (← links)
- GNRO-2017/00023, Notification of Deviation from BWRVIP-41 (← links)
- GNRO-2017/00018, Spent Fuel Storage Radioactive Effluent Release Report for 2016 (← links)
- GNRO-2017/00015, Emergency Plan, Revision 75 (← links)
- GNRO-2016/00053, Mitigating Strategies Assessment (MSA) for Flooding Submittal (← links)
- GNRO-2016/00062, License Amendment Request (LAR) for One Cycle Extension of Appendix J Type a Integrated Leakage Rate Test and Drywell Bypass (← links)
- GNRO-2016/00060, Supplemental Report of 10CFR50.59 Evaluations - July 1, 2012 Through June 30, 2014 (← links)
- GNRO-2016/00050, Correction to Safety Analysis Report for Constant Pressure Power Uprate (← links)
- GNRO-2016/00059, Response to Generic Letter 2016-01 Regarding Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (← links)
- GNRO-2016/00051, Application to Revise the Technical Specifications to Allow the Adoption of Technical Specification Task Force Traveler TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System.. (← links)
- GNRO-2016/00052, Clarification of Grand Gulf Nuclear Station Containment Leak Rate Program Description (← links)
- GNRO-2016/00040, Response to Request for Additional Information (RAI) on Severe Accident Mitigation Alternatives (SAMA) for Grand Gulf Nuclear Station License Renewal Environmental Review (← links)
- GNRO-2016/00037, Entergy Mitigating Strategies Assessment (MSA) for New Seismic Hazard Information, NEI 12-06, Revision 2, Appendix H.4 (← links)
- GNRO-2016/00010, Entergy Update to Response to NRC Technical Issues for Resolution Regarding Licensee Communication Submittals Associated with Near-Term Task Force Recommendation 9.3 (← links)
- GNRO-2016/00046, Report of 10CFR50.59 Evaluations and Commitment Change Evaluations for the Period July 1, 2014 Through June 30, 2016 (← links)
- GNRO-2016/00047, Submittal of Report of 10CFR72.48 Evaluations - July 1, 2014 Through June 30, 2016 (← links)
- GNRO-2016/00036, Response to Requests for Additional Information (Rais) Regarding Final Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation (← links)
- GNRO-2016/00033, Submittal of 2016 Inservice Inspection Summary Report (← links)
- GNRO-2016/00032, NRC Form 536 Revision June 2016 (← links)
- GNRO-2016/00029, Comments Regarding License Renewal Safety Evaluation Report ML16090A252 Dated April 4, 2016 (← links)
- GNRO-2016/00006, Notification of Full Compliance with NRC Order EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) (← links)
- GNRO-2016/00007, Notification of Full Compliance with NRC Order EA-12-051. Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) (← links)
- GNRO-2016/00024, Operating License Manual Update Submittal (← links)
- GNRO-2016/00023, Updated Final Safety Analysis Report (UFSAR) Submittal (← links)
- GNRO-2016/00021, Annual Report of Individual Monitoring - NRC Form 5 for 2015 (← links)
- GNRO-2016/00020, Transmittal of 2015 Annual Radioactive Effluent Release Report (← links)
- GNRO-2016/00019, Transmittal of 2015 Annual Radiological Environmental Operating Report (AREOR) (← links)
- GNRO-2016/00017, Core Operating Limits Report Cycle 21 (← links)
- GNRO-2015/00094, Maximum Extended Load Limit Analysis Plus (Mellla+) Time Critical Operator Action Training Results (← links)
- GNRO-2016/00013, Supplemental Correction Response to License Renewal Amendment Request for Additional Information Set 47 (← links)
- GNRO-2016/00008, Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) (← links)
- GNRO-2016/00003, Sixth (Final) Six-Month Status Report in Response to March 12, 2102 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) (← links)