Pages that link to "Category:Letter type:TSTF"
Jump to navigation
Jump to search
The following pages link to Category:Letter type:TSTF:
Displayed 50 items.
- TSTF-16-10, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control, and Transmittal of Editorial Corrections to TSTF-542, Revision 2 (← links)
- TSTF-16-08, Withdrawal of TSTF-553, Revision 0, Add Action for Two Inoperable Creatcs Trains. (← links)
- TSTF-16-09, Technical Specifications Task Force - Revision 3 of TSTF-551, Revise Secondary Containment Surveillance Requirements. (← links)
- TSTF-16-07, Technical Specifications Task Force - Revision 2 of TSTF-551, Revise Secondary Containment Surveillance Requirements. (← links)
- TSTF-15-06, Transmittal of TSTF-546, Revision 0, Revise APRM Channel Adjustment Surveillance Requirement. (← links)
- TSTF-16-04, Withdrawal from NRC Review of TSTF-454, Revision 3, Extend PCIV Completion Times (NEDC-33046), and TSTF-537, Revision 0, Increase CIV Completion Time; Update of TSTF-373. (← links)
- TSTF-16-02, Technical Specifications Task Force - Response to NRC Request for Additional Information Regarding TSTF-542, Revision 1, Reactor Pressure Vessel Water Inventory Control and Submittal of Revision 2 (← links)
- TSTF-16-03, Technical Specifications Task Force - Comments on Draft Model Safety Evaluation of Traveler TSTF-529, Revision 3, Clarify Use and Application Rules, and Transmittal of TSTF-529, Revision 4 (← links)
- TSTF-15-12, Technical Specifications Task Force - Response to NRC Request for Additional Information Regarding TSTF-551, Revision 1, Revise Secondary Containment Surveillance Requirements. (← links)
- TSTF-15-13, TSTF Comments on Draft Model Safety Evaluation of Traveler TSTF-547, Revision 0, Clarification of Rod Position Requirements, and Transmittal of TSTF-547, Revision 1 (← links)
- TSTF-15-11, TSTF Comments on Draft Model Safety Evaluation of Traveler TSTF-545, TS Inservice Testing Program & Clarify SR Usage Rule Application to Section 5.5 Testing and Transmittal of TSTF-545, Revision 3 (← links)
- TSTF-15-08, Technical Specifications Task Force - Transmittal of TSTF-529, Revision 3, Clarify Use and Application Rules. (← links)
- TSTF-15-01, Technical Specifications Task Force - Response to NRC Request for Additional Information Regarding TSTF-542, Revision 0, Reactor Pressure Vessel Water Inventory Control, and Submittal of TSTF-542, Revision 1 (← links)
- TSTF-15-07, Transmittal of TSTF-551, Revision 1, Revise Secondary Containment Surveillance Requirements. (← links)
- TSTF-15-05, Withdrawal of TSTF-531, Revision 1, Revision of Specification 3.8.1, Required Actions B.3.1 and B.3.2. (← links)
- TSTF-15-03, Response to NRC Comments Regarding TSTF-545, Revision 1, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing and Submittal of TSTF-545, Revision 2 (← links)
- TSTF-14-17, Technical Specification Task Force - Response to NRC Request for Additional Information Regarding TSTF-454, Revision, Extend PCIV Completion Times (NEDC-33046) and Submittal of TSTF-454, Revision 3 (← links)
- TSTF-14-18, Transmittal of TSTF-551, Revision 0, Address Transient Secondary Containment Conditions (← links)
- TSTF-14-15, Withdrawal of TSTF-540, Revision 0, Provide Completion Times in Lieu of Immediate Shutdown (RITSTF Initiative 6) (← links)
- TSTF-14-03, Response to NRC Request for Additional Information Regarding TSTF-537, Revision 0, Increase CIV Completion Time; Update of TSTF-373 (← links)
- TSTF-14-06, Transmittal of TSTF-547, Revision 0, Clarification of Rod Position Requirements (← links)
- TSTF-14-05, Transmittal of TSTF-545, Revision 1, TS Inservice Testing Program Removal. (← links)
- TSTF-14-04, Request to Begin Review Prior to NRC Decision on Fee Waiver for TSTF-542, Revision 0, Reactor Pressure Vessel Water Inventory Control. (← links)
- TSTF-14-02, Transmittal of TSTF-529, Revision 2, Clarify Use and Application Rules. (← links)
- TSTF-14-01, Withdrawal of TSTF-538, Revision 0, Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6b & 6c. (← links)
- TSTF-13-15, Transmittal of TSTF-542, Revision 0, Reactor Pressure Vessel Walter Inventory Control (← links)
- TSTF-13-16, Request for Fee Exemption for TSTF-542, Reactor Pressure Vessel Water Inventory Control. (← links)
- TSTF-13-10, Technical Specifications Task Force - Request for Fee Exemption for TSTF-545, TS Inservice Testing (IST) Program Removal (← links)
- TSTF-13-09, Transmittal of TSTF-545, Revision 0, TS Inservice Testing (IST) Program Removal. (← links)
- TSTF-13-13, Withdrawal of TSTF-536, Revision 0, Resolve CE Digital TS Inconsistencies Regarding CPCs and Ceacs. (← links)
- TSTF-13-12, Transmittal of TSTF-541, Revision 0, Add Exceptions to Surveillance Requirements When the Safety Function Is Being Performed (← links)
- TSTF-13-11, TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation Corrected Pages (← links)
- TSTF-13-05, Transmittal of TSTF-536, Revision 0, Resolve CE Digital TS Inconsistencies Regarding CPCs and Ceacs (← links)
- TSTF-13-01, Response to NRC Request for Additional Information Regarding TSTF-531, Revision 0, Revision of Specification 3.8.1, Required Actions B.3.1 and B.3.2 (← links)
- TSTF-13-03, Transmittal of TSTF-529, Revision 1, Clarify Use and Application Rules (← links)
- TSTF-13-02, Submittal of TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation. (← links)
- TSTF-12-14, Response to NRC Request for Supplemental Information and Withdrawal Regarding TSTF-534, Revision 0, Clarify Application of Pressure Boundary Leakage Definition. (← links)
- TSTF-12-15, Response to NRC Request for Additional Information Regarding TSTF-523, Revision 1, Generic Letter 2008-01, Managing Gas Accumulation. (← links)
- TSTF-12-11, Transmittal of TSTF-540, Revision 0, Provide Completion Times in Lieu of Immediate Shutdown (RITSTF Initiative 6) (← links)
- TSTF-12-08, Transmittal of TSTF-523, Revision 1, Generic Letter 2008-01, Managing Gas Accumulation (← links)
- TSTF-12-07, Transmittal of TSTF-531, Revision 0, Revision of Specification 3.8.1, Required Actions B.3.1 and B.3.2 (← links)
- TSTF-12-09, Correction to TSTF-510-A, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection. (← links)
- TSTF-12-04, Transmittal of TSTF-537, Revision 0, Increase CIV Completion Time; Update of TSTF-373 (← links)
- TSTF-12-06, Transmittal of TSTF-538, Revision 0, Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6b & 6c. (← links)
- TSTF-12-01, Transmittal of TSTF-454, Revision 2, Extend PCIV Completion Times (NEDC-33046). (← links)
- TSTF-12-02, Proposed Revision to the Model Application for TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (← links)
- TSTF-11-18, Withdrawal of TSTF-490, Revision 1, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec. (← links)
- TSTF-11-19, Proposed Model Application for TSTF-432, Revision 1, Change in Technical Specifications End States (WCAP-16294). (← links)
- TSTF-11-17, Proposed Revision to the Model Application for TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b. (← links)
- TSTF-11-16, Proposed Revision to the Notice of Availability for TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (← links)