Pages that link to "PY-CEI-NRR-2428, Submits Resolution to Seventh Question Proposed within NRC 980615 RAI Relating to Cooling Water Sys That Serve Containment Air Coolers & Assessment,Post Accident,Of Potential Water Hammer & two-phase Flow Conditions"
Jump to navigation
Jump to search
The following pages link to PY-CEI-NRR-2428, Submits Resolution to Seventh Question Proposed within NRC 980615 RAI Relating to Cooling Water Sys That Serve Containment Air Coolers & Assessment,Post Accident,Of Potential Water Hammer & two-phase Flow Conditions:
Displayed 50 items.
- PY-CEI-NRR-0567, Forwards Proposed Amends to Security Plan as Required by 10CFR73.55,per 861121 & 1208 Discussions W/Nrc. Implementation Schedule & Description of Vital Area Changes Also Encl.Encls Withheld (Ref 10CFR73.21).Fee Paid (← links)
- PY-CEI-NRR-0512, Forwards LERs 86-030-00 & 86-031-00 (← links)
- PY-CEI-NRR-2229, Forwards Rev 5 to PDB-F0001, COLR for Perry Nuclear Power Plant,Unit 1,Cycle 7 (Reload 6) & Rev 0 to J11-03060SRLR, Suppl Reload Licensing Rept for Perry Npp,Unit 1,Reload 6, Cycle 7 (← links)
- PY-CEI-NRR-0568, Forwards LERs 86-082-00 & 86-025-01 (← links)
- PY-CEI-NRR-0466, Forwards LERs 86-005-00 & 86-007-00 (← links)
- PY-CEI-NRR-0583, Forwards Description of Scope & Objectives for 870513 Annual Emergency Preparedness Exercise.Comments Requested by 870313 to Allow for Submittal of Detailed Scenario Description by 870327 (← links)
- PY-CEI-NRR-2215, Forwards Rev 3,change 2 to Vol 1 of Pnpp Inservice Exam Program in Form of Replacement Pages (← links)
- PY-CEI-NRR-2422, Forwards Addl Info Re ASME Section IX Relief Request (IR-023) for Inservice Examination Program at Pnpp,Submitted on 980826 (← links)
- PY-CEI-NRR-2202, Informs That USAR Change Was Implemented to Place Commitment Re Inclusion of Qualitative Assessment for Drywell Bypass Leakage from 961206 Submittal Into USAR App 1B on 970812. Change Incorporated Commitment in Entirety (← links)
- PY-CEI-NRR-0586, Forwards LERs 87-001-00 & 87-002-00 (← links)
- PY-CEI-NRR-0618, Submits Addl Relief Requests & Revs to 850821 & 860408 Relief Requests Re Pump & Valve Inservice Testing Program. ASME Section XI Program Upgraded to Comply W/Requirements of 1983 Edition W/Summer 1983 Addenda.Fee Paid (← links)
- PY-CEI-NRR-2410, Submits Response to NRC Request for Info Re GL 98-01, Y2K Readiness of Computer Sys at Npps. Attachment 1 Provides Y2K Readiness Disclosure for Plant (← links)
- PY-CEI-NRR-0606, Forwards Rept of Changes to Initial Test Program,Per License Condition 2.C(4) & 10CFR50.59.Rept Includes All Changes Made During 870210-0310 (← links)
- PY-CEI-NRR-0925, Forwards LERs 88-035-00,88-036-00 & 88-037-00 (← links)
- PY-CEI-NRR-2367, Forwards Rev 26 to Perry Nuclear Power Plant Security Plan, Per 10CFR50.54(p)(2).Util Determined That Changes Do Not Decrease Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 (← links)
- PY-CEI-NRR-2363, Forwards Semiannual fitness-for-duty Program Performance Data for Perry NPP for 980701-1231,IAW 10CFR26.71(d) (← links)
- PY-CEI-NRR-0487, Forwards LERs 86-016-00 & 86-017-00 (← links)
- PY-CEI-NRR-0937, Forwards Supplemental Response to Violation Noted in Insp Rept 50-440/88-09,per 881025 Request.Failures to Use &/Or Adhere to Procedures Required by 10CFR50,App B Not Result of Lack of Knowledge That Procedures Must Be Followed (← links)
- PY-CEI-NRR-2397, Forwards Revised COLR Cycle 8, & Rev 1 to J11-03371SRLR, Supplemental Reload Licensing Rept for Pnpp,Unit 1 Reload 7,Cycle 8, IAW TS Section 5.6.5 (← links)
- PY-CEI-NRR-0934, Forwards LERs 88-040-00 & 88-041-00 for Facility (← links)
- PY-CEI-NRR-0614, Forwards Rev 0 to ISI-GEN-T2004, 10-Yr Inservice Insp Program Plan for Perry Nuclear Power Plant Unit 1. Plan Delineates Components Subj to Insp & Exam,W/Exception of Pump & Valve Testing,During First Insp Interval.Fee Paid (← links)
- PY-CEI-NRR-0445, Forwards Seven Addl Relief Requests to Util Inservice Testing Program for Pumps & Valves.Requests Needed in Order to Maintain Sys/Component Operability.Minor Changes Summarized on Encl Index (← links)
- PY-CEI-NRR-2384, Provides Supplemental Info Re 990325 Request for Approval of Repair Plan for Feedwater Nozzle to safe-end Weld. Clarification Provided on Listed Three Items,Per 990329 Telcon with NRC (← links)
- PY-CEI-NRR-2380, Requests Approval of Attached Repair Plan for Feedwater Nozzle to safe-end Weld N4C-KB.Proposed Weld Overlay Design & Installation Plan Details Included in Attachment 1. Attachment 2 Provides Applicable Preliminary Weld Procedure (← links)
- PY-CEI-NRR-0609, Responds to NRC Re Violations Noted in Insp Rept 50-441/87-01.Corrective Actions:Piping Recribbed on Dunnage & Sloped to Allow for Drainage.End Caps Placed Only on High End of Piping Spools.Piping Spools Inspected Annually (← links)
- PY-CEI-NRR-2376, Submits Clarification of Intent of Ltr Entitled Suppl to Lar:Improved Licensing & Design Basis for Isolation of FW Penetrations. No Regulatory Commitments Contained in Ltr (← links)
- PY-CEI-NRR-0505, Forwards Rev 1 to Environ Qualification Rept of Two Duct Sealants, Per Sser 8,FSAR & Reg Guide 1.52.Rept & Testing Demonstrate That Integrity of Sealants in Conjunction W/Ductwork Acceptable (← links)
- PY-CEI-NRR-0511, Suppls 860618 & 0718 Ltrs by Providing Addl Change to Tech Specs Re Reactor Protection Sys Electric Power Monitoring. Justification & Proposed Tech Specs Encl.Amend Not Requested Since Change Does Not Affect Operability (← links)
- PY-CEI-NRR-0605, Provides Info on Levels of Property Insurance Coverage for Facility,Per Requirement of 10CFR50.54(W)(4) (← links)
- PY-CEI-NRR-0524, Suppls 860729 Info Re Plant Emergency Instructions for Emergency Containment Venting (← links)
- PY-CEI-NRR-2256, Forwards fitness-for-duty Rept for Period Jul-Dec 1997 (← links)
- PY-CEI-NRR-0496, Suppls & Provides List of Addl Changes to Be Included in Full Power OL Tech Specs.Changes Do Not Affect Ability to Safely Operate Plant Under Current License. Justifications & marked-up Tech Specs Encl (← links)
- PY-CEI-NRR-0493, Forwards Perry Nuclear Power Plant Control Room Validation Summary Rept, Per Section 2.7 of Suppl 1 to Dcrdr.Submittal Re Control Room Review Process,Required Prior to Issuance of Full Power Ol,Completed (← links)
- PY-CEI-NRR-2255, Informs That Review of 971223 Boiling Water Reactor Vessel Internals Project Ltr Re Reactor Vessel Structual Integrity, Has Not Identified Any Impact on Pnpp Vessel Info Previously Supplied.Ltr Closes Out 960819 NRC Request to Supply (← links)
- PY-CEI-NRR-0491, Informs That Three of Four Remaining Human Engineering Deficiencies (Hed) Completed Prior to Exceeding 5% Rated Power.Procedural Note Which Generated Fourth Hed Determined Unnecessary & Deleted.Completed Heds Encl (← links)
- PY-CEI-NRR-2353, Forwards Changes to Emergency Plan for Pnpp,Per 10CFR50.54(q).Changes Constitute Revs,Temporary Changes or Reissued Pages (← links)
- PY-CEI-NRR-0483, Forwards Design Control Procedure 2.10, Perry Power Plant Confirmatory Program of 860131 Ohio Earthquake Effect, Providing Final Results to Confirmatory Activity in Sser 9, Sections 3.7.2 & 3.10.1 (← links)
- PY-CEI-NRR-2253, Submits Supplemental Response to NOV EA-96-253.Util Accepts DOL Administrative Review Board Ruling as Further Clarification on Issue of What Does & Does Not Constitute Protected Activity Under Section 211 of ERA (← links)
- PY-CEI-NRR-2226, Informs of Completion of Requested Actions Prior to Startup from First Refueling Outage Commencing One Yr After Issuance of GL 96-01, Testing of SR Logic Circuits. Actions,Listed (← links)
- PY-CEI-NRR-2248, Forwards Sixth ISI Summary for Pnpp,Documenting ISI Exam Activities Conducted from Return to Commercial Operation from Fifth Refueling Outage Until Completion of Sixth Refueling Outage (← links)
- PY-CEI-NRR-0390, Suppls 850624 Response to Action Plan 5 to Resolve Addl Containment Issues in SER Outstanding Issue 8.Configuration of Seals Modified & Description of Revised Seal Assembly Configuration Encl (← links)
- PY-CEI-NRR-2348, Forwards Response to NRC RAI During 981119 Telcon Re License Amend Request for Extension of EDG TS Action Completion Time to 14 Days for Div 1 or 2 EDG (← links)
- PY-CEI-NRR-2345, Notifies NRC of Change to Commitment Made in Re Adequacy & Availability of Design Bases Info for Pnpp (← links)
- PY-CEI-NRR-1257, Forwards LERs 90-029 & 90-030 (← links)
- PY-CEI-NRR-0464, Informs of Organization Changes Resulting from 860429 Merger Between Util & Toledo Edison Co.Util Now Subsidiary of Centerior Energy Corp.Mgt Organization Changes Implemented Per RM Guinn .Tech Specs & FSAR Unaffected (← links)
- PY-CEI-NRR-0462, Responds to Request for Info,Including Current Programs, Equivalency Criteria to Engineering Degree & Future Plans,Re Generic Ltr 86-04 Concerning Engineering Expertise on Shift (← links)
- PY-CEI-NRR-2347, Requests That Revised Info Be Inserted Into Licensee 981130 Submittal to License Application,Per 10CFR50.80 & 10CFR50.90.Proposed Clarification Does Not Change SA or Significant Hazards Considerations Previously Submitted (← links)
- PY-CEI-NRR-2241, Responds to NRC 971118 NOV & Proposed Imposition of Civil Penalty - $100,000.Corrective Actions:Isolate/Operate Solenoid Valves Replaced & Turbine Control Sys Evaluated & Found Unaffected (← links)
- PY-CEI-NRR-2244, Forwards Relief Request IR-031 for Approval to Use ASME Code Case N-524 as Alternative to ASME Section XI Code Requirements at Plant by 980518.Approval Will Facilitate close-out of First 10-year Insp Interval Which Ends 981118 (← links)
- PY-CEI-NRR-0880, Forwards LERs 88-020-00 & 88-021-00 (← links)