Pages that link to "ML20151Q858"
Jump to navigation
Jump to search
The following pages link to ML20151Q858:
Displayed 18 items.
- LD-88-021, Forwards Response to NRC 871208 Request for Addl Info Re Reg Guides That Appear in CESSAR-DC,QA.Suggest That Meeting W/Nrc Staff Be Scheduled to Allow Overview Program Changes (← links)
- LD-78-095, Forwards Amend 2 to Appendix a to CESSAR-FSAR Tendering Draft (← links)
- LD-85-063, Forwards Corrected Final Draft CESSAR Sys 80 Sts.Certifies That Tech Specs Adequately Envelope Design Basis Events & Consistent W/Cessar Up to & Including Amend 10 & Ssers 1 & 2 (← links)
- LD-85-039, Informs That Vendor Will Add Interface to CESSAR App B Item III.A.1.2 (Upgrade Emergency Support Facilities) to Facilitate Closeout of SPDS Issue.Requirement Will Be Added to CESSAR in Amend 10 or 11 (← links)
- LD-89-035, Forwards Vols 1-17,consisting of Chapters 1-18,to CESSAR Design Certification, for Approval,Per 10CFR52 (← links)
- LD-87-009, Forwards Response to 851029 Request for Addl Info Re Review of CESSAR Confirmatory Issues on Natural Circulation Cooldown & Steam Generator Tube Rupture.Info Needed to Complete Review (← links)
- LD-85-021, Withdraws Encl Info Re Proposed CESSAR Changes to Reduce Min Required LPSI & HPSI Flows.Reanalysis of CESSAR Events Provided on plant-specific Basis.Evaluation of Events for HPSI & LPSI Changes Impractical (← links)
- LD-84-070, Forwards Proposed Changes to CESSAR Re Startup Testing for Review.Changes Currently in FSAR Change Process & Will Be Incorporated in CESSAR Amend 10 (← links)
- LD-84-051, Discusses Potential Single Failure of Sys 80 Auxiliary Pressurizer Spray Sys.Potential Failure Involves Possibility of Valve CH-240 Sticking in Full Open Position.Info Closes Out CESSAR Confirmatory Issues 1 & 2,per NUREG-0852 (← links)
- LD-84-041, Responds to 840327 Request for Info Re Potential Single Failure in Auxiliary Pressurizer Spray sys.C-E Completed Preliminary Review of Info Requested.Info Expected to Be Provided by Sept 1984 (← links)
- LD-84-042, Forwards Items for Updating When SER Generated to Close Out Remaining Issues.Items Include Steam Generator Tube Rupture,Radiological Consequences of DBA & Shutdown Cooling (RHR) Sys (← links)
- LD-84-009, Forwards Interface Requirements Re Block Valves on Atmospheric Dump Valves to Close Out Confirmatory Item 2 of Sser 2 Re Steam Generator Tube Rupture Analysis (← links)
- LD-83-016, Advises That Response to NRC Re Util 820330 Submittal on Core Protection Calculators Will Be Submitted by 830331 (← links)
- LD-83-051, Summarizes 830425 Meeting W/Nrc Re Natural Circulation Cooldown Analysis for CESSAR-F.Reanalysis to Be Submitted by 830729 (← links)
- LD-83-008, Requests CESSAR-F Ser,Section 5.4.3, Shutdown Cooling Sys, Be Changed to Reflect Commitment to Perform Boron Mixing Testing on First Sys 80 Reactor (← links)
- LD-91-014, Forwards Response to NRC Request for Addl Info Re Design Certification,CESSAR-DC,per (← links)
- LD-91-010, Responds to NRC 881223 Request for Addl Info Re CESSAR-DC. Forwards Proposed Revisions to CESSAR-DC (← links)
- LD-83-036, Forwards Sys 80 CESSAR Fsar,Responses to Questions on Steam Line Break Method, Per SER Confirmatory Item 14.Proprietary Responses Withheld (Ref 10CFR2.790) (← links)