- PM-82-132, RO 50-321/1982-003:on 821127,air Compressor in Cooling Tower 1B Fire Protection Spray Sys Failed,Dropping Air Pilot Detection Sys Pressure.Dropped Pressure Caused Actuation of Two Deluge Valves Which Started Fire Pumps (← links)
- HL-1691, Special Rept:On 910526,fixed Water Spray Nozzles Inoperable for Longer than 14 Days Identified During Insp of Fire Sprinkler Sys.Cause Indeterminate.Conduits Routed Away from Vicinity of Spray Nozzles (← links)
- HL-4773, Special Rept:On 950113,monitor Displayed Microcomputer Error Code Indicating Inoperability of Flow Transducer in Sampling Sys.Caused by Component Failure.Several Components Replaced or Adjusted in Accordance W/Mfg Recommendations (← links)
- HL-0476, Special Rept 2-95-01:on 950110 Unit 2 Drywell High Range Radiation Inoperable Longer than 7 Days.Caused by Exceeding Procedural Limits of 34SV-SUV-019-2S.Technicians Checked High Voltage Power Supply Which Powers Radiation Detectors (← links)
- PM-82-114, RO 50-321/1979-021,Revision 5.Provides Updated Data on Tritium Levels in Groundwater Samples Taken from Locations Where Average Value Over Third Quarter of 1982 Exceeded Samples Per ETS Table 3.2-3 (← links)
- HL-1649, Special Rept:On 910420,fire Barrier Assemblies Inoperable for Period Longer than 14 Days Discovered During Insp.Caused by Personnel Error.Penetrations 2Z43-H66OC & 2Z43-HO27C Resealed & Partially Drilled Hole Repaired (← links)
- HL-4727, Special Rept:On 941007,discovered That Required Hourly Fire Watch Patrol Initiated for Fire Area 0040 on 920629 Inappropriately Terminated Due to Personnel Error.Hourly Fire Watch Patrol for Affected Area re-established (← links)
- HL-4590, Special Rept 2-94-001:on 940517,fire Rated Assembly Was Inoperable for Longer than 14 Days as Result of Planned Activities.Caused by Affected Assemblies & Sealed Devices (← links)
- HL-1470, Special Rept:On 901119,discrepancy Noted in Number of SRM & IRM Detectors During Inventory.Caused by Inadequate Recordkeeping Controls.Responsibility for Control & Accountability of Detectors Returned to Reactor Engineering (← links)