Pages that link to "ML20116B925"
Jump to navigation
Jump to search
The following pages link to ML20116B925:
Displayed 50 items.
- U-602995, Part 21 Interim Rept 21-98-021 Re Deficiencies in Matl Dedication Process Used by Goulds Pumps During Use of Portable Metal Analyzer.Util Identified Discrepancies Which Are Acceptable W/Some Exception of Some Replacement Parts (← links)
- U-601443, Part 21 Rept Re Failure of Solenoid Operated Air Pilot Valves for Main Steam Sys Safety/Relief Valves to Meet Environ Qualification Requirements.Following Rev of Vendor Manual,Util Will Install Raychem Heat Shrink Sleeves (← links)
- U-602994, Part 21 Rept Re Final Rept 21-98-008,on 980113,reliance Electric Motors Supplied by Rockwell International for Hydrogen Recombiner Cooling Fans Do Not Have nameplate- Specified High Temperature Bearings.Fan Motors Acceptable (← links)
- U-601463, Part 21 Rept Re Incorrectly Sized Stem Nut for Actuator of Anchor/Darling Gate Valve.Initially Reported on 890609.Stem Nut for Valve 1E22-FO15 Replaced (← links)
- U-601030, Part 21 Rept Re HPCS (Div III) Diesel Generator Exciter Leads Built by Beloit Power Sys & Supplied by Ge.Initially Reported on 870729.Temporary Repair Completed on 870813. Detailed Repair Plan Being Developed by GE (← links)
- U-603033, Part 21 Rept 21-98-039 Re Shrinkage of Medium & High Density Silicone Seals Designed & Installed by Bisco Using Dow Corning Sylgard 170 Matl.Caused by Coefficient of Thermal Expansion.Will Inspect & Rework/Repair Suspected Seals (← links)
- U-601078, Advises That Part 21 Defect 21-87-03 Re Damaged High Pressure Core Spray Diesel Generator Exciter Leads Will Be Replaced During Dec 1987 Instead of During Fall Maint Outage Due to Schedule Constraints (← links)
- U-601100, Amended Part 21 Rept Re Addl Damage to Div III Diesel Generator Discovered During Implementation of Corrective Actions.Initial Damage Reported on 870729.Reworking of Diesel Generator Complete.Damaged Exciter Leads Replaced (← links)
- U-602823, Part 21 Rept Re Improper Clearance for W Model 50DHP350 Circuit Breaker Arc Chute Rear Arc Horn.Caused by Installation of Arc Chute Having Potential to Cause Line Pole to Deflect.Replace Deficient Arc Chutes (← links)
- U-602968, Interim Part 21 Rept 21-97-055 Re Westinghouse Dhp Circuit Breaker Auxiliary Switch Operating Assembly Anomalies. Initially Reported on 980116.Util Currently Evaluating Suppliers Response to Questions Re Issue (← links)
- U-602954, Interim Part 21 rept,21-98-008 Re Identification That Bearings Installed in Hydrogen Recombiner B Cooling Fan Motor 0HG04CB Were Not Same as Bearings Specified on Motor Nameplate.Will Complete Evaluation of Issue by 980513 (← links)
- U-602979, Final Part 21 Rept 21-97-059 Re Discrepancies Found During Receipt Insp of Three Refurbished safety-related W Dhp Circuit Breakers.Util Completed Evaluation,Per 10CFR21 & Concludes That Condition Is Not Reportable (← links)
- U-602952, Part 21 Interim Rept 21-98-001:ITT Barton Model 580A Series Dp Indicating Switch Operating Force Concerns.Initially Reported on 980107.Evaluation of Subj Issue Will Be Completed by 980530 (← links)
- U-600721, Interim Deficiency Rept 55-86-06 Re Watertight Seals & Openings in Vital Area Boundaries.Initially Reported on 860828.Screenhouse Walked Down to Identify Floodproofing Deficiencies.Final Rept Due Prior to Initial Criticality (← links)
- U-600724, Potentially Reportable Interim Deficiency Rept 55-86-08 Re Improper Installation of Raychem Insulation on Splices in Class 1E Circuits.Initially Reported on 860902.Splice Installations Will Be Inspected & Reworked (← links)
- U-600778, Final Deficiency Rept 55-86-08 Re Improper Installation of Raychem Insulation on Splices in Class 1E Circuits.Initially Reported on 860902.Defective Splices Reworked & Repaired (← links)
- U-600765, Final Deficiency Rept 55-86-06 Re Openings in Vital Area Boundaries That Exceeded Personnel Access Criteria.Initially Reported on 860828.Plant Mod A-047 Issued to Resolve All Vital Area Boundary Deficiencies (← links)
- U-600767, Final Deficiency Rept 55-86-07 Re Broken Tack Welds on Valves 1G33-F042A & 1G33-F042B.Initially Reported on 860828. Caused by Valve Throttling Between 0-20% of Open Position. Valves Will Be Designed for Extreme Throttling Applications (← links)
- U-600653, Part 21 Rept 21-86-03 Re Bbc Brown Boveri K600/K800 Circuit Breakers That May Have Cut Harness Wires Caused by Contact W/Racking Gear Inside Breakers.Evaluation Continuing (← links)
- U-600686, Deficiency Rept 55-86-05 Re Unsealed Gaps in 3-h Rated Fire Wall.Initially Reported on 860717.Investigation Continuing. Addl Fire Watches Established.Final Rept Will Be Submitted in Approx 30 Days (← links)
- U-602855, Part 21 Rept Re Discrepancies Between GE BWR Design Requirements Documents & Sys Vendor Manuals.Util Does Not Have Firm Date for Resolving Issue But Will Provide Update on Resolution Progress by 971218 (← links)
- U-600750, Final Deficiency Rept 55-86-05 Re Unsealed Gaps in 3 H Rated Fire Wall.Initially Reported on 860717.Maint Standing Orders 23 & 25 Issued to Identify Mechanism for Proper Control of Fire Seals & to Eliminate Future Seal Violations (← links)
- U-600824, Amended Final Deficiency Rept 55-86-09 Re Broken Tack Welds Between Valve Disc & Disc Nut.Initially Reported on 860828. Caused by Vibration Created by Extreme Throttling.Valves Will Be Replaced W/Valves Designed for Extreme Throttling (← links)
- U-600722, Interim Deficiency Rept 55-86-07 Re Broken Tack Welds on Valves 1G33F042A & B.Initially Reported on 860828.Anchor/ Darling Valves Found to Fail from Vibration Caused by Extreme Throttling Conditions.Investigation Continuing (← links)
- U-600480, Amend to Final Deficiency Rept 55-82-09 Re Small Bore/ Instrumentation Piping & Conduit Support Design Calculations.Reviews of Conduit Support Calculations Reduced to 20 Calculations Per Quarter (← links)
- U-600825, Amended Final Deficiency Rept 55-86-06 Re Watertight Seals & Openings in Vital Area Boundaries.Initially Reported on 860828.Deficiencies Identified During Verification Activities Corrected (← links)
- U-600829, Final Deficiency Rept 55-86-10 Re Plant Mods Performed W/O Adequate Specification of Required Testing & Test Acceptance Criteria.Initially Reported on 860919.Revised Mod Process to Incorporate in-line QA Review Initiated (← links)
- U-600701, Interim Deficiency Rept 55-86-04 Re Mod of Limiter Plates on Limitorque Valve Operators.Review of Deficiencies Re motor- Operated Valves Continuing.Addl 15 Days Required Prior to Submittal of Final Rept (← links)
- U-600651, Final Deficiency Rept 55-86-02 Re Electrical Lugs Installed on Vendor Leads of Limitorque Operators.Initially Reported on 860508.Affected safety-related motor-operated Valves Verified Acceptable or Reworked Using Listed Methods (← links)
- U-600642, Final Deficiency Rept 55-86-03 Re Fire Pumps OFP01PA & OFP01PB Not Meeting Requirements of Spec K-2830.Initially Reported on 860613.Condition Investigated & Found Not Reportable Under 10CFR50.55(e) (← links)
- U-603204, Final Part 21 Rept 21-99-003 Re Deficiency in Commercial Grade Dedication Process Used by Circuit Breaker Refurbishment Supplier Trentec for Westinghouse Breaker 1AP05EH.Issue Determined Not Reportable Per 10CFR21 (← links)
- U-600608, Potentially Reportable Deficiency 55-86-02 Interim Rept Re Electrical Lugs Installed on Vendor Leads of Limitorque Operators.Initially Reported on 860508.Leads W/Unacceptable Size Lugs Will Be Reworked (← links)
- U-600594, Amended Final Deficiency Rept 55-80-10 Re Welding of Temporary & Permanent Nonsafety Attachments to safety-related Structures & Components.Internal Repts, Documenting Investigation Provided to Region III (← links)
- U-603182, Part 21 Rept Re Deficiency in Commercial Grade Dedication Process Used by Circuit Breaker Refurbishment Supplier, Trentec.Condition Rept 1-99-01-136 Was Initiated to Track Investigation & Resolution of Issue (← links)
- U-600685, Interim Deficiency Rept 55-86-04 Re safety-related Limitorque Valve Sys Operators That Could Not Achieve Required Thrust as Recommended by Mfg.Initially Reported on 860715.Investigation Continuing (← links)
- U-602939, Part 21 Interim Rept 21-97-060 Re Sentry Equipment Corp Commercial Grade Dedication Program Deficiencies.Evaluation of Issue Will Be Completed by 980404 (← links)
- U-602932, Interim Part 21 Rept 21-97-059 Re Several Discrepancies Found During Receipt Insp of Three safety-related W Dhp Circuit Breakers.Sent Subject Circuit Breakers to Nuclear Logistics Inc for Refurbishment (← links)
- U-602876, Interim Part 21 Rept Re 970929 Discovery of Deviations in safety-related Battery Chargers.Evaluation of Conditions Under Part 21 Continuing.Update on Resolution Progress Will Be Provided by 980129 (← links)
- U-602925, Part 21 Rept 21-97-058 Re Oil Leaking Around Diaphragm of Replacement Pressure Reducing/Dump Valve Installed on Itt Barton Hydromotor Actuator.Caused by Poor Workmanship of Valve at Time of Manufacture.Valves Sent to Vendor (← links)
- U-602920, Part 21 Interim Rept 21-97-044/047/048 Re 970929 Failure of safety-related Battery Charger.Caused by Inadequate Soldered Wire Connections.Util Will Issue Rept of Issues IAW Provisions of 10CFR21 & 10CFR50.73 by 980217 (← links)
- U-600590, Part 21 & Deficiency Rept 21-85-18 Re Anchor/Darling,Velan, Atwood-Morill & Walworth Valve Cos 410 Stainless Steel Valve Stem Corrosion Failures.Valves Tested for Stem Hardness & Cracks & Hard Stems Replaced (← links)
- U-602910, Part 21 Interim Rept 21-97-055,identified Adverse Trend in Auxiliary Switch Operating Assembly Anomalies in W Dhp Circuit Breakers on 971120.Condition Rept 1-97-11-388 Initiated to Track Investigation & Resolution (← links)
- U-603115, Part 21 Interim Rept 21-98-021 Re Deficiencies in Matl Dedication Process Used by Goulds Pumps in Supplying SR Parts to Npps.Issue Is Not Reportable Under 10CFR21. Dedication Process Did Not Affect Ability of Components (← links)
- U-602894, Final Part 21 Rept Re Discrepancies Between GE BWR Reactor Design Requirements Documents & Sys Vendor Manuals.Util Completed Evaluation & Concluded That Issue Is Not Reportable Per 10CFR21 as Reported in 971029 Rept (← links)
- U-600733, Interim Deficiency Rept 55-86-10 Re Plant Mods Performed W/O Adequate Spec & Required Testing & Test Criteria. Initially Reported on 860919.Mods Affecting Structures,Sys or Components Reviewed (← links)
- U-603114, Part 21 Rept 21-98-049 Re W Dhp Circuit Breaker Refurbished by Nuclear Logistics,Inc Which Failed to Operate.Caused by Trip Latch out-of-adjustment & Incorrectly Sized Ratchet Lever Assembly Bushing.Breakers Were Returned to Vendor (← links)
- U-601113, Part 21 Rept Re Beloit Power Sys HPCS Div III Diesel Generator Rear Bearing & Rotor Shaft Damage.Shaft Repaired & Bearings Replaced (← links)
- U-600524, Part 21 Rept 21-86-02 Re Bbc Brown Boveri,Inc Eight Pole K-1600 or K-2000 Auxiliary Switch Control Wire Insulation. Insulation May Be Cut by Top Edge of Dust Shield When Circuit Breaker Racked Out to Full Disconnect Position (← links)
- U-600465, Part 21 Rept (21-85-06) Re Potential Failure of Sway Strut & Snubber Pipe Clamps Supplied by Basic Engineers.Caused by Loose Clamp Bolts.Revised Clamp Load Capacity Data Sheets & Installation Instructions Encl (← links)
- U-600520, Part 21 Rept Re Missing Lock Welds on Anchor/Darling Check Valve Hinge Pin Setscrews,Per 860117 Agreement.Evaluation Being Performed & Appropriate Corrective Action Will Be Taken.Anchor/Darling Valve Co Notified (← links)