Pages that link to "RA-23-0024, Response to Request for Additional Information (RAI) for Relief Request for RPV Reactor Coolant System Welds"
Jump to navigation
Jump to search
The following pages link to RA-23-0024, Response to Request for Additional Information (RAI) for Relief Request for RPV Reactor Coolant System Welds:
Displayed 43 items.
- RA-21-0157, Independent Spent Fuel Storage Installation - Requests Registration for Use of Cask (← links)
- JAFP-21-0087, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments (← links)
- RA-21-0027, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (← links)
- RA-21-0259, Response to Request for Additional Information for Request to Use Provisions of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI for Repair/ Replacement Activities in Accordance with 10 CFR 50.55a(g)(4 (← links)
- RA-19-0245, of DPC-NE-1007-P, Conditional Exemption of the EOC Mtc Measurement Methodology (← links)
- RA-21-0263, Cycle 28, Revision 0, Core Operating Limits Report (COLR) (← links)
- RA-21-0320, License Amendment Request (LAR) to Revise the Applicability Term for Pressure and Temperature Limit Curves of Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) Limits (← links)
- RA-21-0342, End of Cycle 27 (M2R27) Inservice Inspection Summary Report (← links)
- RA-22-0003, Response to Requests for Additional Information for Reactor Vessel Closure Stud Exam Extension Alternative (← links)
- RA-21-0302, Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition (← links)
- RA-22-0127, Interim Part 21 Report of a Deviation or Failure to Comply for Cutler-Hammer Relay (← links)
- RA-22-0101, End of Cycle 27 (M2R27) Steam Generator Tube Inspection Report (← links)
- RA-22-0149, Supplement to the Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System (← links)
- RA-22-0133, Cycle 29, Revision 0, Core Operating Limits Report (COLR) (← links)
- RA-22-0080, Independent Spent Fuel Storage Installation, McGuire, Units 1 & 2, Independent Spent Fuel Storage Installation, Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System (← links)
- RA-22-0102, Response to Request for Additional Information (RAI) Regarding Revision 1 of DPC-NE-1007-P, Conditional Exemption of the EOC Mtc Measurement Methodology (← links)
- RA-21-0304, Emergency Plan Revision 21-2 and 21-3 (← links)
- RA-22-0147, Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC, Response to Request for Additional Information (RAI) Regarding License Amendment Request for Relocating the Duke Energy Emergency Operations Facility (← links)
- RA-22-0253, Independent Spent Fuel Storage Installation (Isfsi), Register Use of Casks (← links)
- RA-22-0238, Relief Requested in Accordance with 10 CFR 50.55a(z)(2) for Pressurizer Power Operated Relief Valve (PORV) Block Valve 2NC-31 B Inservice Testing (← links)
- RA-22-0178, End of Cycle 28 (M1R28) Inservice Inspection Summary Report (← links)
- RA-22-0024, Relief Requested in Accordance with 10 CFR 50.55a(g)(5)(iii) for Volumetric Examination of Class 1 Components (← links)
- RA-22-0303, End of Cycle 28 (M1 R28) Steam Generator Tube Inspection Report (← links)
- RA-22-0312, Report of Changes to McGuire Emergency Plan Annex (← links)
- RA-22-0291, Report of Changes to Emergency Plan Implementing Procedures (← links)
- RA-23-0024 (redirect page) (← links)
- ML23059A340 (redirect page) (← links)
- ML23159A271 (← links)
- RA-23-0065, Report of Changes to McGuire EAL Technical Basis Document (← links)
- RA-18-0090, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors (← links)
- RA-18-0190, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (← links)
- RA-23-0025, End of Cycle 28 (M1R28) Steam Generator Tube Inspection Report Response to Request for Additional Information (RAI) (← links)
- RA-23-0079, Cycle 29, Revision 0, Core Operating Limits Report (COLR) (← links)
- RA-23-0076, Supplement to Response to Request for Additional Information (RAI) Regarding McGuire Nuclear Station Unit 1 Spring, 2022 Outage Steam Generator Tube Inspection Report (← links)
- RA-23-0117, Report of Changes to Duke Energy McGuire Emergency Plan Annex (← links)
- RA-23-0118, Cycle 29, Revision 1, Core Operating Limits Report (COLR) (← links)
- RA-23-0127, 10 CFR 50.55a(g)(4)(iv) Request to Use a Subsequent Edition of ASME Section XI Referenced in 10 CFR 50.SSa(a) for ISI Code of Record (← links)
- RA-23-0154, Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) (← links)
- RA-23-0136, Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) (← links)
- RA-23-0142, Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require (← links)
- RA-19-0425, License Renewal Surge Line and Safety Injection Nozzle Inspection (← links)
- RA-23-0279, Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power (← links)
- RA-23-0242, Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations in Accordance with 10 CFR 50.55a(z)(2) (← links)
- RA-23-0295, Delay of Planned End Date for Fourth 10-Year Inservice Testing (1ST) Program Interval (← links)