Pages that link to "ML20206H286"
Jump to navigation
Jump to search
The following pages link to ML20206H286:
Displayed 50 items.
- ML20245G988 (← links)
- ML20236M777 (← links)
- ML20211P553 (← links)
- ML20236P438 (← links)
- ML20214T725 (← links)
- ML20211D576 (← links)
- ML20210E774 (← links)
- ML20209D368 (← links)
- DCL-99-045, 1998 Annual Financial Rept for PG&E Corp. with (← links)
- ML20204E919 (← links)
- DCL-86-106, Special Rept SR 86-02:on 860331,main Steam Line Radiation Monitor RM-71 Inoperable for More than 7 Days.Caused by Failed Power Supply & Log Rate Circuit Boards.Alternate Radiation Monitoring Methods Established (← links)
- DCL-86-088, Special Rept SR 86-01:on 860315,all Monitor Channels on Primary Meteorological Tower Incapacitated Due to Lightning. Temp Channels Required Replacement.On 860317,spare Processor Failed.Replacement Expected by 860402 (← links)
- DCL-86-012, Special Rept SR 85-09:on 851223,during Mode 1,diesel Generator 1-1 Failed to Start During Performance of Surveillance Test.Caused by Failure of 125-volt Dc Converter That Powers tach-pak.Converter Replaced.Procedures Revised (← links)
- DCL-86-312, Rev 1 to Special Rept SR 85-09:on 851223,w/unit in Mode 1, Diesel Generator Failed to Start During Performance of Surveillance Test.Caused by Dc Converter Failing to Operate Manually.Converter Replaced (← links)
- ML20154M490 (← links)
- ML20151H107 (← links)
- DCL-97-045, Pacific Gas & Electric Co 1996 Annual Rept (← links)
- DCL-85-282, Potential Part 21 Problem Re Pipe Clamps Mfg by Natl Valve & Mfg Co Reported to NRC on 850620 by Pacific Scientific Co. Facility Unaffected.No Class 1 Pipe Clamps Mfg by Natl Valve & Mfg Co Used (← links)
- DCL-85-237, Annual Rept of Facility Changes,Oct 1983 - Sept 1984 (← links)
- ML20236D073 (← links)
- ML20236B957 (← links)
- ML20236B938 (← links)
- ML20236B024 (← links)
- DCL-96-155, Revised Special Rept SR 95-05:on 950806,EDG 1-2 to Achieve Rated Output Frequency within TS Limits.Caused by Degraded Electronic Governor Performance.Replaced Electronic Governor Motor Operated Potentiometer & Electronic Governor (← links)
- DCL-84-377, Special Rept 84-14:on 841102,Unit 1 18-month Fire Barrier Insp Identified Six Conduits & One Cable Penetration Not Sealed in Accordance W/Installation Procedure DCP 2.Fire Watch Established.Related Correspondence (← links)
- DCL-85-074, Final Deficiency Rept Re Cracks in Welds on Pipe Rupture Restraints Made by Pullman Power Products.Unacceptable Welds Repaired or Modified (← links)
- DCL-84-306, Special Rept 84-10:on 840728,addition of Cool Feedwater to Steam Generators Resulted in Decrease in Reactor Coolant Temp to Low Setpoint.At Same Time,Hi Steam Flow Bistables Tripped for Surveillance Testing (← links)
- DCL-84-007, Final Deficiency Rept Re Containment Spray Initiation Timing.Timer Setting for Starting of Containment Spray Pump Changed from Original FSAR Table 8.3-4 Value to Value of 26 & 22 for Pumps 1 & 2,respectively (← links)
- DCL-84-086, Final Deficiency Rept Re Malfunction of Valve Operator Mfg by Limitorque.Initially Reported on 830627.Existing Screws Will Be Replaced on Affected Valves Prior to Fuel Load.Maint Procedures Modified (← links)
- DCL-84-079, Special Rept 84-02:on 840123,fire Water Pump 1 Declared Inoperable After Pump Motor Circuit Breaker Tripped. Caused by Frequent Motor Starts in Short Time Period. Surveillance Test Conducted & Pump Returned to Svc (← links)
- DCL-84-042, Ro:On 831230,conduit Installed Through Fire Barrier Wall in Cable Spreading Room.On 840107,four Fire Doors Removed & Replaced W/Heavy Duty Fire Doors.On 840109,fire Barrier Penetrations Nonfunctional Due to Mods (← links)
- DCL-84-026, Ro:On 831215,fire Barrier Wall Between Containment Penetration Area & Auxiliary Bldg Removed.Wall Replaced W/Concrete Barrier for Addl Strength in Event of Steam Pipe Leak Prior to Operation (← links)
- ML20058A586 (← links)
- ML20057B608 (← links)
- ML20057B555 (← links)
- ML20248D404 (← links)
- ML20244C877 (← links)
- ML20244C855 (← links)
- ML20210C505 (← links)
- ML20209G431 (← links)
- ML20209D045 (← links)
- ML20209B176 (← links)
- ML20209B144 (← links)
- ML20207A718 (← links)
- 05000275/LER-1986-007-01, :on 860710,15 & 30,automatic Isolation of Containment Ventilation Sys Occurred.Caused by Spurious Noise Signals on Instrument Ac Power Supply Lines.Noise Reduction Task Force Investigating Problem (← links)
- ML20205B606 (← links)
- 05000323/LER-1986-020, :on 860705,reactor & Turbine Trip Occurred. Caused by hi-hi Water Level in Steam Generator SG 2-1 & Inability of Operators to Respond Quickly to Feedwater Flow (← links)
- 05000323/LER-1986-018, :on 860627,reactor Trip Breakers Actuated When Power Fuse Removed from Intermediate nuclear-range Instrument.Caused by Technician Performing Procedural Step Out of Sequence.Technician Counseled (← links)
- 05000323/LER-1986-027, :on 861213,time Limit of Tech Spec 4.11.2.1.2, Table 4.11-2,Item 4 (Continuous Particulate Sample),Exceeded for Plant Vent Particulate Sample.Caused by Personnel Error. Personnel Counseled & Tailboard Meeting Held (← links)
- 05000323/LER-1986-011-03, :on 860330,manual Unit Trip Initiated Due to Condenser Tube Failure.Caused by Condenser Steam Dump Valve Malfunctioning Due to Mechanical Problem Bending Positioner Linkage on Valve.Valve Repair Underway (← links)