ML16109A092: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:Exelon Nuclear Job Performance Measure   Evaluate a Reactivity Change JPM Number: SA-a  Revision Number: 02  Date: 12/10/2015 Revised By: B. Peterson 12/10/2015  Instructor Date  Validated By: C. Berger 12/11/2015  SME or Instructor Date  Approved By: B. Lewin  12/11/2015   Operations Representative Date JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 and 12 below. __RFP__ 1. Task description and number, JPM description and number are identified. __RFP__ 2. Knowledge and Abilities (K/A) references are included. __RFP__ 3. Performance location specified. (in-plant, control room, simulator, or other) __RFP__ 4. Initial setup conditions are identified. __RFP__ 5. Initiating cue (and terminating cue if required) are properly identified. __RFP__ 6. Task standards identified and verified by SME review. __RFP__ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). __RFP__ 8. Verify the procedure(s) referenced by this JPM reflects the current revision: Procedure OP-AP-300-1004  Rev: 4  Procedure   Rev:  Procedure   Rev:  __RFP__ 9. Verify cues both verbal and visual are free of conflict. __RFP__ 10. Verify performance time is accurate __RFP__ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM. __RFP__ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:   B. Lewin/R. Peterson 12/11/2015   SME / Instructor Date        SME / Instructor Date        SME / Instructor Date Revision Record (Summary) Revision 00 Initial revision of JPM Comment Resolution     Revision 01 Revised JPM for modification of calculation Revision 02 Revised JPM for modification of calculation and time in core life.
{{#Wiki_filter:Exelon Nuclear Job Performance Measure Evaluate a Reactivity Change
INITIAL CONDITIONS: 1. Unit 2 is at 50% power, 9100 EFPH, 500 ppm boron, with CB D at 89 steps. 2. Tave is 0.5° less than Tref. 3. The QNE has recommended that Control Bank D be withdrawn 4 steps to control PDMA02 on the desired target, then to perform a reactivity change to match Tave to Tref. 4. The NSO has calculated a reactivity change to move rods then to match Tave with Tref. INITIATING CUES: 1. Evaluate the reactivity change to restore PDMA02 to target and to match Tave to Tref. 2. Review the Reactivity Change Determination Form for approval. Provide completed copy of OP-AP-300-1004, attachment 1, Rev 4, Pwr Boration and Dilution Requirements Provide copy of Unit 2 Rema Thumbrules Information For Evaluator's Use: UNSAT requires written comments on respective step.
 
JPM Number:
SA-a  Revision Number:
02  Date: 12/10/2015 Revised By: B. Peterson 12/10/2015  Instructor Date  Validated By:
C. Berger 12/11/2015  SME or Instructor Date  Approved By: B. Lewin  12/11/2015 Operations Representative Date JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
__RFP__ 1. Task description and number, JPM description and number are identified.
__RFP__ 2. Knowledge and Abilities (K/A) references are included.
__RFP__ 3. Performance location specified. (in
-plant, control room, simulator, or other)
__RFP__ 4. Initial setup conditions are identified.
__RFP__ 5. Initiating cue (and terminating cue if required) are properly identified.
__RFP__ 6. Task standards identified and verified by SME review.
__RFP__ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
__RFP__ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure OP-AP-300-1004  Rev: 4  Procedure Rev:  Procedure Rev:  __RFP__ 9. Verify cues both verbal and visual are free of conflict.
__RFP__ 10. Verify performance time is accurate
__RFP__ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM. __RFP__ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
B. Lewin/R. Peterson 12/11/2015 SME / Instructor Date        SME / Instructor Date        SME / Instructor Date Revision Record (Summary)
Revision 00 Initial revision of JPM Comment Resolution Revision 0 1 Revised JPM for modification of calculation Revision 02 Revised JPM for modification of calculation and time in core life.
 
INITIAL CONDITIONS:
: 1. Unit 2 is at 50% power, 9100 EFPH, 500 ppm boron, with CB D at 89 steps. 2. Tave is 0.
5° less than Tref.
: 3. The QNE has recommended that Control Bank D be withdrawn 4 steps to control PDMA02 on the desired target, then to perform a reactivity change to match Tave to Tref.
: 4. The NSO has calculated a reactivity change to move rods then to match Tave with Tref.
INITIATING CUES:
: 1. Evaluate the reactivity change to restore PDMA02 to target and to match Tave to Tref.
: 2. Review the Reactivity Change Determination Form for approval
. Provide completed copy of OP
-AP-300-1004, attachment 1, Rev 4, Pwr Boration and Dilution Requirements Provide copy of Unit 2 Rema Thumbrules Information For Evaluator's Use:
UNSAT requires written comments on respective step.
* Denotes critical steps 2 & 3 Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
* Denotes critical steps 2 & 3 Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. The timeclock starts when the candidate acknowledges the initiating cue. TASK STANDARDS: 1. Evaluate the reactivity change to match Tave to Tref. 2. Review the Reactivity Change Determination Form.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
MATERIALS: Completed OP-AP-300-1004, Rev 2, Pwr Boration and Dilution Requirements (Attachment 1 is attached) Unit 2 Rema Thumbrules at 8500-11000 EFPH RECORD START TIME:   EVALUATOR NOTE:  These steps may be performed in any order. STEP ELEMENT STANDARD SAT UNSAT CMT# CUE Provide completed copy of OP-AP-300-1004 and a copy of the Unit 2 Rema thumbrules 1 Refer to OP-AP-300-1004, Rev 2, Pwr Boration and Dilution Requirements Unit 2 Rema Thumbrules   In accordance with the provided: OP-AP-300-1004, Rev 2, Pwr Boration and Dilution Requirements Unit 2 Rema Thumbrules ___ ___ ___ *2 Part 1 Review Attachment 1 of OP-AP-300-1004 Determine wrong number of withdrawn rod steps calculated on form  Evaluate inaccurate calculation Should be 4 steps of Control Bank D at 50% power: Tave-Tref = 2° rise in temperature NOTE: When examinee identifies the deficiency, inform them to review the rest of the calculations   Station: Byron Unit: 2  Desired change  Withdraw Rods 2 steps for PDMA02 control Reason for change PDMA02 control Temperature control What is the method & am't for the reactivity change? 2 steps withdrawal of CB D  Inputs  Rema thumbrules ___ ___ ___ *3 Part 2 Review Attachment 1 of OP-AP-300-1004 Determine incorrect reactivity addition calculated on form due to using 100% REMA thumbrules. (Calculation is not required for success)  +0.3° - 0.5° (current mismatch) = -0.2°  465 gallons PW/1° x 0.2° =
The timeclock starts when the candidate acknowledges the initiating cue.
93 gallons dilution From inaccurate rod withdrawal, and 100% thumbrules, calculation is incorrect which yields an incorrect reactivity calculation Calculation has incorrect dilution value of 93 gallons. It should be a Boration of 37.5 gallons.  +2° - 0.5° (current mismatch) = +1.5°  25 gallons BA/1° x 1.5° = 37.5 gallons boration Inputs  Rema thumbrules ___ ___ ___ CUE This JPM is complete. RECORD STOP TIME:
TASK STANDARDS:
JPM SUMMARY Operator's Name:  Job Title:  EO  RO SRO  FS  STA/IA  SRO Cert JPM Title: Evaluate a Reactivity Change JPM Number: SA-a Revision Number: 02 Task Number and Title: S-AM-151, Perform proper reactivity management on unit startup and during normal plant operations K/A Number and Importance: GEN 2.1.37  Imp Factor 4.6 Suggested Testing Environment: Classroom Alternate Path: Yes  No SRO Only: Yes  No Time Critical: Yes  No Reference(s):  OP-AP-300-1004, Rev 4, Pwr Boration and Dilution Requirements Unit 2 Rema Thumbrules Actual Testing Environment: Simulator Control Room In-Plant  Other Testing Method: Simulate  Perform Estimated Time to Complete: 15 minutes Actual Time Used:   minutes EVALUATION SUMMARY: Were all the Critical Elements performed satisfactorily? Yes  No The operator's performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:                          Evaluator's Name:  (Print)
: 1. Evaluate the reactivity change to match Tave to Tref.
Evaluator's Signature:  Date:
: 2. Review the Reactivity Change Determination Form.
JOB PERFORMANCE MEASURE   INITIAL CONDITIONS: 1. Unit 2 is at 50% power, 9100 EFPH, 500 ppm boron, with CB D at 89 steps. 2. Tave is 0.5° less than Tref. 3. The QNE has recommended that Control Bank D be withdrawn 4 steps to control PDMA02 on the desired target, then to perform a reactivity change to match Tave to Tref. 4. The NSO has calculated a reactivity change to move rods then to match Tave with Tref. INITIATING CUES: 1. Evaluate the reactivity change to restore PDMA02 to target and to match Tave to Tref. 2. Review the Reactivity Change Determination Form for approval.
 
OP-AP-300-1004  Revision 4 Page 4 of 4 ATTACHMENT 1 REACTIVITY CHANGE DETERMINATION FORM Station: Byron  Unit: 1 2 Time: Now  Date: Today  Desired change: (Parameter, Magnitude, and Direction: Reactor Power, Rod Position, RCS Temp, Delta I, etc.) Withdraw Rods 2 steps for PDMA02 control Dilute to raise Tave (0.2°F) to match Tref Reason for Change: (Temperature control, flux control, fuel burn up) PDMA02 control and temperature control  What is the method and amount required for the reactivity change? (Bleed Tank Volume, Gallons of Dilution/Boration/Blended Flow, Rod Insertion/Rod Withdrawal steps/percent) 2 steps withdrawal of CB D and 93 gallons Dilution  Inputs: (ReMA Thumbrules, ReMA maneuver guidance, Curve Book Figure/Table, Computer based trend plot, RCS Cb, EFPD - Preparer and Reviewer should use independent inputs when possible) Rema thumbrules for Unit 2 at 9100 EFPH  Calculation of change: (E.G. Bwd/Byr: ReMA Thumbrule identifies 20 gallons BA = 1.0°F RCS temp reduction. Desired change = 0.5°F drop. Calculation of change: (20 gal/1.0°F)
MATERIALS:
* 0.5°F = 10 gal., previously used borations and dilutions) (TMI: Procedure 1102-4 Power Operations Fig. 1, Volume of Deminerlized Water for 1% Rod Insertion)  Withdrawal of control rods 2 steps raises temp 0.3°F. Then dilute to raise temperature by 0.2°F: 465 gals/°F x (0.2°F) = 93 gals dilution. Joe Rowe    P Chech  ______________ Preparer Reviewer Approver  (RO) (RO/SRO) (SRO)  Shift Manager Notified:    Yes    No Exelon Nuclear Job Performance Measure   Minimum Shift Staffing JPM Number: SA-b  Revision Number: 2  Date: 7/20/2010 Revised By: R. F. Peterson 7/20/2010   Instructor Date  Validated By: S. Harvey 12/11/2015   SME or Instructor Date  Approved By: B. Lewin  12/11/2015   Operations Representative Date JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 and 12 below. __RFP__ 1. Task description and number, JPM description and number are identified. __RFP__ 2. Knowledge and Abilities (K/A) references are included. __RFP__ 3. Performance location specified. (in-plant, control room, simulator, or other) __RFP__ 4. Initial setup conditions are identified. __RFP__ 5. Initiating cue (and terminating cue if required) are properly identified. __RFP__ 6. Task standards identified and verified by SME review. __RFP__ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). __RFP__ 8. Verify the procedure(s) referenced by this JPM reflects the current revision: Procedure BAP 320-1  Rev: 22  Procedure BAP 320-1T1  Rev: 6  Procedure   Rev:  __RFP__ 9. Verify cues both verbal and visual are free of conflict. __RFP__ 10. Verify performance time is accurate __RFP__ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM. __RFP__ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:   Brian Lewin/Robert Peterson 10/6/2013   SME / Instructor Date  Brian Lewin/Robert Peterson 12/11/2015   SME / Instructor Date        SME / Instructor Date Revision Record (Summary) Revision 1  Put in current JPM Format Clarified the intent of the question and limited to asking for recommendations for desired staffing levels. Revision 2 Added requirement to validate TS manning and Administrative manning to JPM.
Completed OP
INITIAL CONDITIONS 1. You are the Shift Manager. 2. Unit 1 is in Mode 5 and Unit 2 is in Mode 1 at 100% power. 3. The following qualified people are inside the Protected Area as members of the oncoming shift operating crew: (Assume that AII LISTED personnel have the same shift rotation) Name Qual Position  Name Qual Position  Name Qual Position Joe  SRO/SM  Sam  NSO  Mary FB EO Bill FC SRO  Dave  NSO  Ted EC EO Tom FC SRO  Ron FB EO  Bob  RP Andy  SRO  Alan FB EO  Terry  Chem Arnie  SRO/STA  Sally FB EO  Karla EC Chem    Tim  EO      FC: Fire Chief qualified FB: Fire Brigade qualified EC: Emerg Comm qualified INITIATING CUES: DETERMINE if the crew meets the Desired staffing levels per BAP 320-1, and if not, do staffing levels meet Tech Spec Minimum staffing levels. If staffing levels are not met DETERMINE:  number of people in any given position needed to fill to the Tech Spec Minimum. number of people in any given position needed to fill to the Desired staffing levels. actions required to meet oncoming Shift Manning requirements. All Work Hour Rules have been determined to be in compliance. Fill in the JPM Start Time when the student acknowledges the Initiating Cue.  
-AP-300-1004, Rev 2, Pwr Boration and Dilution Requirements (Attachment 1 is attached)
Unit 2 Rema Thumbrules at 8500-11000 EFPH RECORD START TIME:
EVALUATOR NOTE:  These steps may be performed in any order.
STEP ELEMENT STANDARD SAT UNSAT CMT# CUE Provide completed copy of OP
-AP-300-1004 and a copy of the Unit 2 Rema thumbrules 1 Refer to OP-AP-300-1004, Rev 2, Pwr Boration and Dilution Requirements Unit 2 Rema Thumbrules In accordance with the provided:
OP-AP-300-1004, Rev 2, Pwr Boration and Dilution Requirements Unit 2 Rema Thumbrules
___ ___ ___ *2 Part 1 Review Attachment 1 of OP
-AP-300-1004 Determine wrong number of withdrawn rod steps calculated on form  Evaluate inaccurate calculation Should be 4 steps of Control Bank D at 50% power: Tave
-Tref = 2° rise in temperature NOTE: When examinee identifies the deficiency, inform them to review the rest of the calculations Station: Byron Unit: 2  Desired change  Withdraw Rods 2 steps for PDMA02 control Reason for change PDMA02 control Temperature control What is the method & am't for the reactivity change?
2 steps withdrawal of CB D  Inputs  Rema thumbrules
___ ___ ___ *3 Part 2 Review Attachment 1 of OP
-AP-300-1004 Determine incorrect reactivity addition calculated on form due to using 100% REMA thumbrule
: s. (Calculation is not required for success)  +0.3° - 0.5° (current mismatch) =  
-0.2°  465 gallons PW/1° x 0.2° =
93 gallons dilution From inaccurate rod  
 
withdrawal, and 100% thumbrules, calculation is incorrect which yields an incorrect reactivity calculation Calculation has incorrect dilution value of 93 gallons. It should be a Boration of 37.5 gallons.  +2° - 0.5° (current mismatch) = +1.5°  25 gallons BA/1° x 1.5° = 37.5 gallons boration Inputs  Rema thumbrules
___ ___ ___ CUE This JPM is complete.
RECORD STOP TIME:
 
JPM SUMMARY Operator's Name
:  Job Title
:  EO  RO SRO  FS  STA/IA  SRO Cert JPM Title:
Evaluate a Reactivity Change JPM Number:
SA-a Revision Number:
02 Task Number and Title:
S-AM-151, Perform proper reactivity management on unit startup and during normal plant operations K/A Number and Importance: GEN 2.1.37  Imp Factor 4.6 Suggested Testing Environment:
Classroom Alternate Path:
Yes  No SRO Only:
Yes  No Time Critical:
Yes  No Reference(s):  OP-AP-300-1004, Rev 4, Pwr Boration and Dilution Requirements Unit 2 Rema Thumbrules Actual Testing Environment:
Simulator Control Room In-Plant  Other Testing Method:
Simulate  Perform Estimated Time to Complete:
15 minutes Actual Time Used:
minutes EVALUATION SUMMARY:
Were all the Critical Elements performed satisfactorily?
Yes  No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Satisfactory Unsatisfactory Comments:                          Evaluator's Name
:  (Print)
Evaluator's Signature
:  Date:
JOB PERFORMANCE MEASURE INITIAL CONDITIONS:
: 1. Unit 2 is at 50% power, 9100 EFPH, 500 ppm boron, with CB D at 89 steps.
: 2. Tave is 0.
5° less than Tref.
: 3. The QNE has recommended that Control Bank D be withdrawn 4 steps to control PDMA02 on the desired target, then to perform a reactivity change to match Tave to Tref.
: 4. The NSO has calculated a reactivity change to move rods then to match Tave with Tref.
INITIATING CUES:
: 1. Evaluate the reactivity change to restore PDMA02 to target and to match Tave to Tref.
: 2. Review the Reactivity Change Determination Form for approval.
 
OP-AP-300-1004  Revision 4 Page 4 of 4 ATTACHMENT 1 REACTIVITY CHANGE DETERMINATION FORM Station: Byron  Unit: 1 2 Time: Now  Date: Today  Desired change:
(Parameter, Magnitude, and Direction: Reactor Power, Rod Position, RCS Temp, Delta I, etc.)
Withdraw Rods 2 steps for PDMA02 control Dilute to raise Tave (0.2°F) to match Tref Reason for Change:
(Temperature control, flux control, fuel burn up)
PDMA02 control and temperature control  What is the method and amount required for the reactivity change?
(Bleed Tank Volume, Gallons of Dilution/Boration/Blended Flow, Rod Insertion/Rod Withdrawal steps/percent) 2 steps withdrawal of CB D and 93 gallons Dilution  Inputs: (ReMA Thumbrules, ReMA maneuver guidance, Curve Book Figure/Table, Computer based trend plot, RCS Cb, EFPD  
- Preparer and Reviewer should use independent inputs when possible)
Rema thumbrules for Unit 2 at 9100 EFPH  Calculation of change:
(E.G. Bwd/Byr: ReMA Thumbrule identifies 20 gallons BA = 1.0°F RCS temp reduction.
Desired change = 0.5°F drop. Calculation of change: (20 gal/1.0°F)
* 0.5°F = 10 gal.,
previously used borations and dilutions)
(TMI: Procedure 1102
-4 Power Operations Fig. 1, Volume of Deminerlized Water for 1% Rod Insertion)  Withdrawal of control rods 2 steps raises temp 0.3°F. Then dilute to raise temperature by 0.
2°F: 465 gals/°F x (0.2°F) = 93 gals dilution. Joe Rowe    P Chech  ______________
Preparer Reviewer Approver  (RO) (RO/SRO) (SRO)  Shift Manager Notified:    Yes    No
 
Exelon Nuclear Job Performance Measure Minimum Shift Staffing JPM Number:
SA-b  Revision Number:
2  Date: 7/20/2010 Revised By:
R. F. Peterson 7/20/2010 Instructor Date  Validated By:
S. Harvey 12/11/2015 SME or Instructor Date  Approved By:
B. Lewin  12/11/2015 Operations Representative Date JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below. __RFP__ 1. Task description and number, JPM description and number are identified.
__RFP__ 2. Knowledge and Abilities (K/A) references are included.
__RFP__ 3. Performance location specified. (in
-plant, control room, simulator, or other)
__RFP__ 4. Initial setup conditions are identified.
__RFP__ 5. Initiating cue (and terminating cue if required) are properly identified.
__RFP__ 6. Task standards identified and verified by SME review.
__RFP__ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
__RFP__ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure BAP 320-1  Rev: 22  Procedure BAP 320-1T1  Rev: 6  Procedure Rev:  __RFP__ 9. Verify cues both verbal and visual are free of conflict.
__RFP__ 10. Verify performance time is accurate
__RFP__ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
__RFP__ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
Brian Lewin/Robert Peterson 10/6/2013 SME / Instructor Date  Brian Lewin/Robert Peterson 12/11/2015 SME / Instructor Date        SME / Instructor Date Revision Record (Summary)
Revision 1  Put in current JPM Format Clarified the intent of the question and limited to asking for recommendations for desired staffing levels.
Revision 2 Added requirement to validate TS manning and Administrative manning to JPM.
INITIAL CONDITIONS
: 1. You are the Shift Manager.
: 2. Unit 1 is in Mode 5 and Unit 2 is in Mode 1 at 100% power. 3. The following qualified people are inside the Protected Area as members of the oncoming shift operating crew: (Assume that AII LISTED personnel have the same shift rotation)
Name Qual Position  Name Qual Position  Name Qual Position Joe  SRO/SM  Sam  NSO  Mary FB EO Bill FC SRO  Dave  NSO  Ted EC EO Tom FC SRO  Ron FB EO  Bob  RP Andy  SRO  Alan FB EO  Terry  Chem Arnie  SRO/STA  Sally FB EO  Karla EC Chem    Tim  EO      FC: Fire Chief qualified FB: Fire Brigade qualified EC: Emerg Comm qualified INITIATING CUES:
DETERMINE if the crew meets the Desired staffing levels per BAP 320
-1, and if not, do staffing levels meet Tech Spec Mi nimum staffing levels.
If staffing levels are not met DETERMINE
:  number of people in any given position needed to fill to the Tech Spec Minimum
. number of people in any given position needed to fill to the Desired staffing levels.
actions required to meet oncoming Shift Manning requirements.
All Work Hour Rules have been determined to be in compliance.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
 
Information For Evaluator's Use:
UNSAT requires written comments on respective step.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages.
Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
RECORD START TIME:
ELEMENT STANDARD SAT UNSAT Comment Number 1. Refer to BAP 320
-1, Shift Staffing Cue:  Provide a copy of BAP 320
-1 and BAP 320
-1T1 after correct procedure has been determined.
The staffing determination can be determined in any order.
Determines that BAP 320
-1 is needed to make determination.
: 2. Review Desired Staffing requirement for Shift Manager.
Determine that minimum Desired Staffing and TS Staffing for Shift Manager IS satisfied
.   
: 3. Review Desired Staffing requirement for Unit Supervisor.
Determine that minimum Desired Staffing and TS Staffing for Unit Supervisor IS satisfied.


Information For Evaluator's Use: UNSAT requires written comments on respective step.
ELEMENT STANDARD SAT UNSAT Comment Number 4. Review Desired Staffing requirement for WEC.
* Denotes critical steps. Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system. Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. The timeclock starts when the candidate acknowledges the initiating cue. RECORD START TIME:  ELEMENT STANDARD SAT UNSAT Comment Number 1. Refer to BAP 320-1, Shift Staffing Cue:  Provide a copy of BAP 320-1 and BAP 320-1T1 after correct procedure has been determined. The staffing determination can be determined in any order. Determines that BAP 320-1 is needed to make determination.  
Note: The candidate should determine that the WEC SRO is not required for TS minimum manning and should be used to meet minimum NSO TS Manning.
: 2. Review Desired Staffing requirement for Shift Manager. Determine that minimum Desired Staffing and TS Staffing for Shift Manager IS satisfied.  
Determine that minimum Desired Staffing for WEC IS satisfied.
: 3. Review Desired Staffing requirement for Unit Supervisor. Determine that minimum Desired Staffing and TS Staffing for Unit Supervisor  IS satisfied.  
: 5. Review Desired Staffing requirement for FS/Fire Brigade Chief. Determine that minimum Desired Staffing for FS IS satisfied.


ELEMENT STANDARD SAT UNSAT Comment Number 4. Review Desired Staffing requirement for WEC. Note: The candidate should determine that the WEC SRO is not required for TS minimum manning and should be used to meet minimum NSO TS Manning. Determine that minimum Desired Staffing for WEC  IS satisfied.  
  *6. Review Desired Staffing requirement for NSO.
: 5. Review Desired Staffing requirement for FS/Fire Brigade Chief. Determine that minimum Desired Staffing for FS  IS satisfied
Determine that minimum Desired Staffing for NSO's IS NOT satisfied.
2 more are desired. Determine that minimum TS Staffing for NSO's IS satisfied (an SRO is used to fill TS staffing levels)


  *6. Review Desired Staffing requirement for NSO. Determine that minimum Desired Staffing for NSO's      IS NOT satisfied.      2 more are desired. Determine that minimum TS Staffing for NSO's IS satisfied (an SRO is used to fill TS staffing levels)
___   
___   


Line 43: Line 197:


___   
___   
: 7. Review Desired Staffing requirement for STA. Determine that minimum Desired Staffing for STA IS satisfied.       
: 7. Review Desired Staffing requirement for STA.
Determine that minimum Desired Staffing for STA IS satisfied.       
 
  *8. Review Desired Staffing requirement for EO (SSD/FB).
Determine that minimum Desired Staffing for EO's IS NOT satisfied.
2 more SSD EO's are desired. Determine that minimum TS Staffing for EO's IS satisfied (3 SSD EO's needed, with 0 FB needed)


  *8. Review Desired Staffing requirement for EO (SSD/FB). Determine that minimum Desired Staffing for EO's      IS NOT satisfied. 2 more SSD EO's are desired. Determine that minimum TS Staffing for EO's IS satisfied (3 SSD EO's needed, with 0 FB needed)
___   
___   


Line 52: Line 210:
___   
___   


ELEMENT STANDARD SAT UNSAT Comment Number *9. Review Desired Staffing requirement for RP. Determine that minimum Desired Staffing for RP IS NOT satisfied. 1 more is desired. Determine that minimum TS Staffing for RP IS satisfied (1 RP required)
ELEMENT STANDARD SAT UNSAT Comment Number *9. Review Desired Staffing requirement for RP.
Determine that minimum Desired Staffing for RP IS NOT satisfied.
1 more is desired.
Determine that minimum TS Staffing for RP IS satisfied (1 RP required)
 
___   
___   


Line 58: Line 220:


___   
___   
: 10. Review Desired Staffing requirement for Chemistry. Determine that minimum Desired Staffing for Chemistry IS satisfied.         11. Review Desired Staffing requirement for Emergency Communicator. Determine that minimum Desired Staffing for Emergency Communicator IS satisfied - the extra Chemistry person (or any qualified station staff person)  
: 10. Review Desired Staffing requirement for Chemistry.
: 12. Determine need to fill positions with offgoing shift. Cue:  Ask candidate on what actions are needed to meet immediate manning requirements for the oncoming shift? Determine that the oncoming crew will not be able to fill all of the positions of BAP 320-1T1 with qualified individuals -AND- Determine that personnel from the current shift will be held over to fill all required positions until callout relief is in the Protected Area   ___
Determine that minimum Desired Staffing for Chemistry  
 
IS satisfied.
: 11. Review Desired Staffing requirement for Emergency Communicator.
Determine that minimum Desired Staffing for Emergency Communicator IS satisfied  
- the extra Chemistry person (or any qualified station staff person)
: 12. Determine need to fill positions with offgoing shift.
Cue:  Ask candidate on what actions are needed to meet immediate manning requirements for the oncoming shift?
Determine that the oncoming crew will not be able to fill all of the positions of BAP 320
-1T1 with qualified individuals
-AND- Determine that personnel from the current shift will be held over to fill all required positions until callout relief is in the Protected Area
___
___
___
___
CUE: The JPM is complete. RECORD STOP TIME:
___
JPM SUMMARY Operator's Name:  Job Title:  EO  RO SRO  FS  STA/IA  SRO Cert JPM Title: Minimum Shift Staffing JPM Number: SA-b Revision Number: 1 Task Number and Title: S-AM-029 Ensure Minimum Shift Staffing and Authorize Additional Shift Staffing as Necessary K/A Number and Importance: 2.1.5  3.9 Suggested Testing Environment: Classroom Alternate Path: Yes  No SRO Only: Yes  No Time Critical: Yes  No Reference(s):   BAP 320-1, Rev 19, Shift Staffing BAP 320-1T1 CRITICAL STEPS (*) 6, 8 & 9 Actual Testing Environment: Simulator Control Room In-Plant  Other Testing Method: Simulate  Perform Estimated Time to Complete: 20 minutes Actual Time Used:   minutes EVALUATION SUMMARY: Were all the Critical Elements performed satisfactorily? Yes  No The operator's performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:                        Evaluator's Name:  (Print) Evaluator's Signature:  Date:
CUE: The JPM is complete.
INITIAL CONDITIONS 1. You are the Shift Manager. 2. Unit 1 is in Mode 5 and Unit 2 is in Mode 1 at 100% power. 3. The following qualified people are inside the Protected Area as members of the oncoming shift operating crew: (Assume that AII LISTED personnel have the same shift rotation) Name Qual Position  Name Qual Position  Name Qual Position Joe  SRO/SM  Sam  NSO  Mary FB EO Bill FC SRO  Dave  NSO  Ted EC EO Tom FC SRO  Ron FB EO  Bob  RP Andy  SRO  Alan FB EO  Terry  Chem Arnie  SRO/STA  Sally FB EO  Karla EC Chem    Tim  EO      FC: Fire Chief qualified FB: Fire Brigade qualified EC: Emerg Comm qualified INITIATING CUES: DETERMINE if the crew meets the Desired staffing levels per BAP 320-1, and if not, do staffing levels meet Tech Spec Minimum staffing levels. If staffing levels are not met DETERMINE:  number of people in any given position needed to fill to the Tech Spec Minimum. number of people in any given position needed to fill to the Desired staffing levels. actions required to meet oncoming Shift Manning requirements. All Work Hour Rules have been determined to be in compliance.
RECORD STOP TIME
Exelon Nuclear Job Performance Measure   Initiate a LCOAR JPM Number: SA-c  Revision Number: 0  Date: 11/30/2015 Revised By: Robert Peterson 11/30/2015 Instructor Date  Validated By: Shane Harvey 12/11/2015 SME or Instructor Date  Approved By: Brian Lewin  12/11//2015  Facility Representative Date JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 and 12 below. See File Copy 1. Task description and number, JPM description and number are identified. 2. Knowledge and Abilities (K/A) references are included. 3. Performance location specified. (in-plant, control room, simulator, or other) 4. Initial setup conditions are identified. 5. Initiating cue (and terminating cue if required) are properly identified. 6. Task standards identified and verified by SME review. 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). 8. Verify the procedure(s) referenced by this JPM reflects the current revision: Procedure BAP 1400-6  Rev: 33  Procedure 1BOL 7.2  Rev: 6  Procedure BAR 1-1-E5  Rev:  5  Procedure 1BOSR MS-W1  Rev:  11  Procedure BOP MS-5  Rev:  19  9. Verify cues both verbal and visual are free of conflict. 10. Verify performance time is accurate 11. If the JPM cannot be performed as written with proper responses, then revise the JPM. 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:       SME / Instructor Date          SME / Instructor Date        SME / Instructor Date Revision Record (Summary) Revision 0  Comment Resolution Modified SA3 Rev. 0 Changed component that is in LCOAR INITIAL CONDITIONS 1. You are the Unit 1 Unit Supervisor. 2. Unit 1 is in MODE 1 3. MSIV 1D Hyd/Pneu Press Hi/Lo Alarm (1-1-E5) is LIT. 4. 5 minutes ago that the TR Operator reports that 1D MSIV Standby Nitrogen Pressure is 4750 psig. 5. IR 1234567 has been written to document the issue. 6. No other LCOARs or DELs exist on Unit 1. INITIATING CUE Evaluate condition and Initiate the LCOAR paperwork as necessary. Fill in the JPM Start Time when the student acknowledges the Initiating Cue. Information For Evaluator's Use: UNSAT requires written comments on respective step.
:
JPM SUMMARY Operator's Name
:  Job Title
:  EO  RO SRO  FS  STA/IA  SRO Cert JPM Title:
Minimum Shift Staffing JPM Number:
SA-b Revision Number:
1 Task Number and Title:
S-AM-029 Ensure Minimum Shift Staffing and Authorize Additional Shift Staffing as Necessary K/A Number and Importance:
2.1.5  3.9 Suggested Testing Environment:
Classroom Alternate Path:
Yes  No SRO Only:
Yes  No Time Critical:
Yes  No Reference(s):
BAP 320-1, Rev 19, Shift Staffing BAP 320-1T1 CRITICAL STEPS
(*) 6, 8 & 9 Actual Testing Environment:
Simulator Control Room In-Plant  Other Testing Method:
Simulate  Perform Estimated Time to Complete:
20 minutes Actual Time Used:
minutes EVALUATION SUMMARY:
Were all the Critical Elements performed satisfactorily?
Yes  No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Satisfactory Unsatisfactory Comments:                        Evaluator's Name
:  (Print) Evaluator's Signature:  Date:
INITIAL CONDITIONS
: 1. You are the Shift Manager.
: 2. Unit 1 is in Mode 5 and Unit 2 is in Mode 1 at 100% power.
: 3. The following qualified people are inside the Protected Area as members of the oncoming shift operating crew: (Assume that AII LISTED personnel have the same shift rotation)
Name Qual Position  Name Qual Position  Name Qual Position Joe  SRO/SM  Sam  NSO  Mary FB EO Bill FC SRO  Dave  NSO  Ted EC EO Tom FC SRO  Ron FB EO  Bob  RP Andy  SRO  Alan FB EO  Terry  Chem Arnie  SRO/STA  Sally FB EO  Karla EC Chem    Tim  EO      FC: Fire Chief qualified FB: Fire Brigade qualified EC: Emerg Comm qualified INITIATING CUES:
DETERMINE if the crew meets the Desired staffing levels per BAP 320
-1, and if not, do staffing levels meet Tech Spec Minimum staffing levels
. If staffing levels are not met DETERMINE
:  number of people in any given position needed to fill to the Tech Spec Minimum
. number of people in any given position needed to fill to the Desired staffing levels.
actions required to meet oncoming Shift Manning requirements.
All Work Hour Rules have been determined to be in compliance.
 
Exelon Nuclear Job Performance Measure Initiate a LCOAR JPM Number:
SA-c  Revision Number:
0  Date: 11/30/2015
 
Revised By: Robert Peterson 11/30/2015 Instructor Date  Validated By:
Shane Harvey 12/11/2015 SME or Instructor Date  Approved By:
Brian Lewin  12/11//2015  Facility Representative Date JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
See File Copy 1. Task description and number, JPM description and number are identified.
: 2. Knowledge and Abilities (K/A) references are included.
: 3. Performance location specified. (in
-plant, control room, simulator, or other)
: 4. Initial setup conditions are identified
. 5. Initiating cue (and terminating cue if required) are properly identified.
: 6. Task standards identified and verified by SME review.
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure BAP 1400-6  Rev: 33  Procedure 1BOL 7.2  Rev: 6  Procedure BAR 1-1-E5  Rev:  5  Procedure 1BOSR MS-W1  Rev:  11  Procedure BOP MS-5  Rev:  19  9. Verify cues both verbal and visual are free of conflict. 10. Verify performance time is accurate
: 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date          SME / Instructor Date        SME / Instructor Date Revision Record (Summary)
Revision 0  Comment Resolution Modified SA3 Rev. 0 Changed component that is in LCOAR
 
INITIAL CONDITIONS
: 1. You are the Unit 1 Unit Superviso
: r. 2. Unit 1 is in MODE 1 3. MSIV 1D Hyd/Pneu Press Hi/Lo Alarm (1 E5) is LIT.
: 4. 5 minutes ago that the TR Operator reports that 1D MSIV Standby Nitrogen Pressure is 4750 psig.
: 5. IR 1234567 has been written to document the issue.
: 6. No other LCOARs or DELs exist on Unit 1. INITIATING CUE Evaluate condition and Initiate the LCOAR paperwork as necessary.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
UNSAT requires written comments on respective step.
* Denotes critical steps 1a, 3, 4, 10 Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
* Denotes critical steps 1a, 3, 4, 10 Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system. Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. The timeclock starts when the candidate acknowledges the initiating cue.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
RECORD START TIME:   ELEMENT STANDARD SAT UNSAT Comment Number NOTE Once the student demonstrates the ability to locate referenced procedure provide the student with a copy of the procedure. 1. Refer to BAP 1400-6, Technical Specification Limiting Conditions for Operation Action Requirements (LCOAR)   LOCATE and OPEN BAP 1400-6      *1.a  Evaluate required LCOAR entry T.S 3.7.2 and/or Bases 1BOL 7.2  BAR 1-1-E5  1BOSR MS-W1  BOP MS-5  Identify that 1BOL 7.2 LCOAR entry is required. Utilize references as required      2. Refer to 1BOL 7.2, LCOAR Main Steam Isolation Valves (MSIVs) - Tech Spec LCO # 3.7.2  LOCATE and OPEN 1BOL 7.2      *3. Section A of 1BOL 7.2  Note: Notification occurred 5 minutes ago per initiating Cue. ENTER into Section A:   Time/Date: Today/5 minutes ago   By: Candidate's name Title: Unit Supervisor   Present mode: 1 Initiating event: Initiating event: 1MS001D Standby Pneumatic Pressure <4800 psig. Condition: A ELEMENT STANDARD SAT UNSAT Comment Number *4. Safety function determination Cue: All other MSIVs pass operability. PERFORM SFD Indicate No in Section C Sign Coversheet Indicate NO on coversheet for invalidating current SFD        4.a  LCO 3.0.6 Evaluation Note:  Acceptable if left Blank or may be placekept. Placekeep OR Leave Blank   5. Update DEL o Check "N/A" box       6. Determine Planned or Unplanned o Mark UNPLANNED on coversheet         NOTE Examinee may inform SM of entry at this time, however, the SM Notified and time/date is typically completed after Peer Check received by another SRO. 7. Related WR/WO block Note: IR # will be recorded here   List IR # 1234567      8. Fill in Related Clearance Orders Note:  Acceptable if left Blank o N/A OR Leave Blank       9. Was an IR written? o Check "Yes" box ELEMENT STANDARD SAT UNSAT Comment Number *10. LCOAR TABLE of 1BOL 7.2   
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
 
RECORD START TIME:
ELEMENT STANDARD SAT UNSAT Comment Number NOTE Once the student demonstrates the ability to locate referenced procedure provide the student with a copy of the procedure.
: 1. Refer to BAP 1400
-6, Technical Specification Limiting Conditions for Operation Action Requirements (LCOAR)
LOCATE and OPEN BAP 1400-6      *1.a  Evaluate required LCOAR entry T.S 3.7.2 and/or Bases 1BOL 7.2  BAR 1-1-E5  1BOSR MS-W1  BOP MS-5  Identify that 1BOL 7.2 LCOAR entry is required.
Utilize references as required      2. Refer to 1BOL 7.2, LCOAR Main Steam Isolation Valves (MSIVs)
- Tech Spec LCO  
# 3.7.2  LOCATE and OPEN 1BOL 7.2      *3. Section A of 1BOL 7.2  Note: Notification occurred 5 minutes ago per initiating Cue. ENTER into Section A:
Time/Date: Today/5 minutes ago By: Candidate's name
 
Title: Unit Supervisor Present mode
: 1 Initiating event
: Initiating event: 1MS001D Standby Pneumatic Pressure <4800 psig. Condition
: A ELEMENT STANDARD SAT UNSAT Comment Number *4. Safety function determination Cue: All other MSIVs pass operability.
PERFORM SFD Indicate No in Section C Sign Coversheet Indicate NO on coversheet for invalidating current SFD        4.a  LCO 3.0.6 Evaluation
 
Note:  Acceptable if left Blank or may be placekept.
Placekeep OR Leave Blank
: 5. Update DEL o Check "N/A" box
: 6. Determine Planned or Unplanned o Mark UNPLANNED on coversheet NOTE Examinee may inform SM of entry at this time, however, the SM Notified and time/date is typically completed after Peer Check received by another SRO.
: 7. Related WR/WO block
 
Note: IR # will be recorded here List IR #
1234567      8. Fill in Related Clearance Order s
Note:  Acceptable if left Blank o N/A OR Leave Blank
: 9. Was an IR written?
o Check "Yes" box  
 
ELEMENT STANDARD SAT UNSAT Comment Number *10. LCOAR TABLE of 1BOL 7.2   
 
Cue:  This JPM is completed. COMPLETE LCOAR Table:
CIRCLE Condition A  ENTER notification Time/Date AND sign Condition A        RECORD STOP TIME
:
JPM SUMMARY Operator's Name
:  Job Title
:  EO  RO SRO  FS  STA/IA  SRO Cert JPM Title:
Initiate a LCOAR. (SRO)
JPM Number:
SA-c (Mod from S A3) Revision Number:
0 Task Number and Title:
8E.TS-007  ENSURE compliance with all applicable Tech Spec Action Statements.
K/A Number and Importance:
2.2.23  4.6 Suggested Testing Environment:
Simulator Alternate Path:
Yes  No SRO Only:
Yes  No Time Critical:
Yes  No Reference(s):
BAP 1400-6, Technical Specification Limiting Conditions for Operation Action Requirements (LCOAR) (Rev
: 33)  1BOL 7.2, LCOAR Main Steam Isolation Valves (MSIVs) Tech Spec LCO # 3.7.2 (Rev 6)  BAR 1-1-E5, MSIV 1D HYD/PNEU Press High/Low (Rev 5) 1BOSR MS-W1, Unit One MSIV Checks Weekly Surveillance (Rev 11)
BOP MS-5, MSIV Accumulator Operability Check (Rev 19) CRITICAL STEPS
(*) 1a, 3, 4, 10 Actual Testing Environment:
Simulator Control Room In-Plant  Other Testing Method:
Simulate  Perform Estimated Time to Complete:
15 minutes Actual Time Used:
minutes EVALUATION SUMMARY:
Were all the Critical Elements performed satisfactorily?
Yes  No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Satisfactory Unsatisfactory Comments:                  Evaluator's Name
:  (Print)  Evaluator's Signature
:  Date:
INITIAL CONDITIONS
: 1. You are the Unit 1 Unit Supervisor.
: 2. Unit 1 is in MODE
: 1. 3. MSIV 1D Hyd/Pneu Press Hi/Lo Alarm (1 E5) is LIT.
: 4. 5 minutes ago that the TR Operator reports that 1D MSIV Standby Nitrogen Pressure is 4750 psig.
: 5. IR 1234567 has been written to document the issue.
: 6. No other LCOARs or DELs exist on Unit 1
. INITIATING CUE Evaluate condition and Initiate the LCOAR paperwork as necessary.
 
Exelon Nuclear Job Performance Measure Review Liquid Release Package JPM Number:
SA d  Revision Number:
02  Date: 10/18/2013 Developed By:
Robert Peterson 10/18/2013 Instructor Date  Validated By:
S. Harvey 12/11/2015 SME or Instructor Date  Approved By:
B. Lewin  12/11/2015 Operations Representative Date INITIAL CONDITIONS You are the Unit Supervisor
. A Liquid Radwaste Release Form BCP 400
-TWX01 is currently being processed.
 
You have the Liquid Release Package and it is completed up to step 7.5 for your approval
. INITIATING CUES You are to review BCP 400
-TWX01 and ensure it has been completed properly to authorize the liquid release.
TASK STANDARDS:
: 1. Determine that section 6.8.5 Rad Monitor Setpoints were incorrectly chosen.
: 2. Determine that the signature is missing for the Radiation Protection Supervisor in section 5.9 . 3. Determine that section 6.16.1 is incorrectly indicating the wrong release path (0WX001 is recorded instead of 0WX630).
: 4. Determine that step 6.16.10 is missing a verification initial.
 
RECORD START TIME:
EVALUATOR NOTE:  These steps may be performed in any order.
STEP ELEMENT STANDARD SAT UNSAT CMT# 1 Refer to BCP 400
-TWX01, Liquid Radwaste Release Form. Determine procedure is completed up to step 8.5 where the Field Supervisor is to review Release Package to ensure it is completed properly.
___ ___ ___ *2. Determine that the Rad Protection Supervisor did not sign step 5.9.
STEP 5.9 The Rad Protection Supervisor signature is missing. ___ ___ ___ *3 Determine that the Rad Monitor Setpoints are incorrect.
STEP 6.8.5 Alert and Hig h Alarm Setpoints are reversed
. ___ ___ ___ *4 Determine that the NSO recorded the wrong release flow path in step 6.16.1.
STEP 6.16.1 NSO recorded the incorrect flow path. Should
 
be 0WX001 NOT 0WX630. ___ ___ ___ *5 Determine the verification blank for step 6.16.10 is not initialed.
STEP 6.16.10 The Verification Blank is not initialed for the Rad Monitor setpoints.
___ ___ ___ CUE This JPM is complete.
RECORD STOP TIME:
 
JPM SUMMARY Operator's Name
:  Job Title
:  EO  RO SRO  FS  STA/IA  SRO Cert JPM Title:
Review Liquid Release Packa ge JPM Number:
SA d Revision Number:
01 Task Number and Title:
S-HP-001 Authorize Liquid Rad Waste Release K/A Number and Importance:
GEN 2.3.6, Imp Factor 2.0/3.8 Suggested Testing Environment:
Classroom Alternate Path:
Yes  No SRO Only:
Yes  No Time Critical:
Yes  No Reference(s):
BCP 400-TWX01 Rev 65  Chemistry Sample results from 0WX01T Radiation Protection analysis for a Liquid Release Package Actual Testing Environment:
Simulator Control Room In-Plant  Other Testing Method:
Simulate  Perform Estimated Time to Complete:
20 minutes Actual Time Use d:  minutes EVALUATION SUMMARY:
Were all the Critical Elements performed satisfactorily?
Yes  No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Satisfactory Unsatisfactory Comments:                          Evaluator's Name
:  (Print)
Evaluator's Signature
:  Date:
Exelon Nuclear Job Performance Measure Classify Event and Fill Out a NARS Form (Loss of Required Vital DC in Mode 5
)  JPM Number:
SA-e  Revision Number: 00  Date: 11/30/2015 Revised By:
R. F. Peterson 11/30/2015 Instructor Date  Validated By:
S. Harvey  12/11/2015 SME or Instructor Date  Approved By:
B. Lewin  12/11/2015 Operations Representative Date Page 2 of 5  INITIAL CONDITIONS
: 1. You are the Shift Emergency Director.
: 2. The Unit 1 Supervisor has provided you with information related to a Unit 1 event and informed you to perform an Emergency Plan evaluation.
PLANT CONDITIONS:
: 1. Unit 1 is shutdown in MODE 5 preparing for refueling.
: 2. DC bus 111 is currently Out of Service (De
-Energized) for a Planned Bus Outage.
: 3. DC Bus 112 just experienc ed a loss of Vital DC Power, indicated by voltage readings of 0VDC at DC112.
: 4. DC112 Feed Breaker is tripped and cannot be reclosed.
: 5. Electrical Maintenance Technicians and Engineering are currently in the EM Shop reviewing prints and developing a Troubleshooting plan.
INITIATING CUE
: 1. Perform an Emergency Plan evaluation and fill out the NARS form for transmittal for the plant conditions provided
: 2. This is a time critical JPM
.
Page 3 of 5 JPM START TIME:
ELEMENT STANDARD SAT UNSAT Comment Number NOTE The completion of Step 2 fulfills the critical time portion of this JPM.
: 1. Refer to Exelon Nuclear
- Radiological Emergency Plan Annex for Byron Station.
Note:  This step may be performed at any ti me  Locate and Open, EP
-AA-1002 Addendum 3, Classification of Emergencies
      *2. Classify the Event utilizing Section 3, Classification of Emergencies.
Critical portion stop time ______
Classify event as Unusual Event, from CU3 Loss of Required DC power for 15 Minutes or Longer (<108VDC on unit 125VDC batter busses 111 and 112)
Time from start to Classification =
________ minutes
&#xa2; < 15 minutes
: 3. Obtain NARS form, EP-MW-114-100-F-01, Nuclear Accident Reporting System (NARS).
Note:  Step 3 may be performed at any time  Obtain NARS form.
NOTE Provide the examinee with a copy of the NARS form.
 
Page 4 of 5 ELEMENT STANDARD SAT UNSAT Comment Number 4. Refer to EP
-MW-114-100, MWROG Offsite Notifications, to complete NARS form.
Note:  Step 4 is optional and may be performed at any time Locate and Open, EP
-MW-114-100, MWROG Offsite Notifications, Section 4.1, to complete NARS form.
NOTE Provide the examinee with Wind Speed and Wind Direction cues after examinee has explained where to obtain the information from the computer or from the main control board.
  *5. Fill out NARS form according to instructions, EP-MW-114-100, Section 4.1, Completing the NARS Form.
Cue: The wind direction on AM004 is 286. Cue: The wind speed on AM001 is 16 meters/sec.
Cue: An SRO has provided a peer check and signed the "Verified With:" section.
Fill out NARS form according to instructions, EP-MW-114-100, Section 4.1 Completing the NARS Form. BLOCKS 2 thru 9 must be filled correctly to meet the critical portion of filling out the NARS form. (See attached KEY). o Block 10 should be filled in "None" o Verified with another SRO peer check CUE: The JPM is complete.
JPM STOP TIME
:
Page 5 of 5 JPM SUMMARY Operator's Name
:  Job Title
:  EO  RO SRO  FS  STA/IA  SRO Cert JPM Title:
Classify Event and Fill Out a NARS Form Earthquake JPM Number:
SA-a Revision Number
: 00 Task Number and Title:
8F.ZP-008 CLASSIFY/RECLASSIFY Emergency Action Levels K/A Number and Importance: 2.4.41  4.6 Suggested Testing Environment:
Simulator Alternate Path:
Yes  No SRO Only:
Yes  No Time Critical:
Yes  No Reference(s):
EP-MW-114-100 (Rev 16), Midwest Region Offsite Notifications EP-MW-114-100-F-01 (Rev. H) Nuclear Accident Reporting System (NARS) Form EP-AA-1002 Addendum 3 (Rev 0) Emergency Action Levels for Byron Station EP-AA-1002 (Rev 34) Exelon Nuclear Radiological Emergency Plan Annex for Byron Station CRITICAL STEPS
(*) 2 & 5 Actual Testing Environment:
Simulator Control Room In-Plant  Other Testing Method:
Simulate  Perform Estimated Time to Complete:
20 minutes Actual Time Used:
minutes EVALUATION SUMMARY:
Were all the Critical Elements performed satisfactorily?
Yes  No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Satisfactory Unsatisfactory Comments:                      Evaluator's Name
:  (Print) Evaluator's Signature
:  Date:
Exelon Nuclear Job Performance Measure Evaluate a Reactivity Change
 
JPM Number:
SA-a  Revision Number:
02  Date: 12/10/2015 Revised By: B. Peterson 12/10/2015  Instructor Date  Validated By:
C. Berger 12/11/2015  SME or Instructor Date  Approved By: B. Lewin  12/11/2015 Operations Representative Date JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
__RFP__ 1. Task description and number, JPM description and number are identified.
__RFP__ 2. Knowledge and Abilities (K/A) references are included.
__RFP__ 3. Performance location specified. (in
-plant, control room, simulator, or other)
__RFP__ 4. Initial setup conditions are identified.
__RFP__ 5. Initiating cue (and terminating cue if required) are properly identified.
__RFP__ 6. Task standards identified and verified by SME review.
__RFP__ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
__RFP__ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure OP-AP-300-1004  Rev: 4  Procedure Rev:  Procedure Rev:  __RFP__ 9. Verify cues both verbal and visual are free of conflict.
__RFP__ 10. Verify performance time is accurate
__RFP__ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM. __RFP__ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
B. Lewin/R. Peterson 12/11/2015 SME / Instructor Date        SME / Instructor Date        SME / Instructor Date Revision Record (Summary)
Revision 00 Initial revision of JPM Comment Resolution Revision 0 1 Revised JPM for modification of calculation Revision 02 Revised JPM for modification of calculation and time in core life.


Cue:  This JPM is completed. COMPLETE LCOAR Table:  CIRCLE Condition A  ENTER notification Time/Date AND sign Condition A        RECORD STOP TIME:
INITIAL CONDITIONS:
JPM SUMMARY Operator's Name:  Job Title:  EO  RO SRO  FS  STA/IA  SRO Cert JPM Title: Initiate a LCOAR. (SRO) JPM Number: SA-c (Mod from SA3) Revision Number: 0 Task Number and Title: 8E.TS-007  ENSURE compliance with all applicable Tech Spec Action Statements. K/A Number and Importance: 2.2.23  4.6 Suggested Testing Environment: Simulator Alternate Path:  Yes  No SRO Only:  Yes  No Time Critical:  Yes  No Reference(s):  BAP 1400-6, Technical Specification Limiting Conditions for Operation Action Requirements (LCOAR) (Rev 33)  1BOL 7.2, LCOAR Main Steam Isolation Valves (MSIVs) Tech Spec LCO # 3.7.2 (Rev 6)  BAR 1-1-E5, MSIV 1D HYD/PNEU Press High/Low (Rev 5)  1BOSR MS-W1, Unit One MSIV Checks Weekly Surveillance (Rev 11)  BOP MS-5, MSIV Accumulator Operability Check (Rev 19) CRITICAL STEPS (*) 1a, 3, 4, 10 Actual Testing Environment:  Simulator  Control Room  In-Plant  Other Testing Method:  Simulate  Perform Estimated Time to Complete: 15 minutes Actual Time Used:  minutes EVALUATION SUMMARY: Were all the Critical Elements performed satisfactorily?  Yes  No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:  Satisfactory  Unsatisfactory  Comments:                  Evaluator's Name:  (Print)  Evaluator's Signature:  Date:
: 1. Unit 2 is at 50% power, 9100 EFPH, 500 ppm boron, with CB D at 89 steps. 2. Tave is 0.
INITIAL CONDITIONS 1. You are the Unit 1 Unit Supervisor. 2. Unit 1 is in MODE 1. 3. MSIV 1D Hyd/Pneu Press Hi/Lo Alarm (1-1-E5) is LIT. 4. 5 minutes ago that the TR Operator reports that 1D MSIV Standby Nitrogen Pressure is 4750 psig. 5. IR 1234567 has been written to document the issue. 6. No other LCOARs or DELs exist on Unit 1. INITIATING CUE Evaluate condition and Initiate the LCOAR paperwork as necessary.
5&deg; less than Tref.
Exelon Nuclear  Job Performance Measure  Review Liquid Release Package  JPM Number: SA d  Revision Number: 02  Date: 10/18/2013  Developed By: Robert Peterson  10/18/2013  Instructor Date  Validated By: S. Harvey  12/11/2015  SME or Instructor Date  Approved By: B. Lewin  12/11/2015  Operations Representative Date INITIAL CONDITIONS You are the Unit Supervisor. A Liquid Radwaste Release Form BCP 400-TWX01 is currently being processed.
: 3. The QNE has recommended that Control Bank D be withdrawn 4 steps to control PDMA02 on the desired target, then to perform a reactivity change to match Tave to Tref.
You have the Liquid Release Package and it is completed up to step 7.5 for your approval. INITIATING CUES  You are to review BCP 400-TWX01 and ensure it has been completed properly to authorize the liquid release. TASK STANDARDS: 1. Determine that section 6.8.5 Rad Monitor Setpoints were incorrectly chosen. 2. Determine that the signature is missing for the Radiation Protection Supervisor in section 5.9 . 3. Determine that section 6.16.1 is incorrectly indicating the wrong release path (0WX001 is recorded instead of 0WX630). 4. Determine that step 6.16.10 is missing a verification initial.
: 4. The NSO has calculated a reactivity change to move rods then to match Tave with Tref.
RECORD START TIME:  EVALUATOR NOTE:  These steps may be performed in any order. STEP ELEMENT STANDARD SAT UNSAT CMT# 1 Refer to BCP 400-TWX01, Liquid Radwaste Release Form. Determine procedure is completed up to step 8.5 where the Field Supervisor is to review Release Package to ensure it is completed properly. ___ ___ ___ *2. Determine that the Rad Protection Supervisor did not sign step 5.9. STEP 5.9 The Rad Protection Supervisor signature is missing. ___ ___ ___ *3 Determine that the Rad Monitor Setpoints are incorrect. STEP 6.8.5 Alert and High Alarm Setpoints are reversed. ___ ___ ___ *4 Determine that the NSO recorded the wrong release flow path in step 6.16.1. STEP 6.16.1 NSO recorded the incorrect flow path. Should be 0WX001 NOT 0WX630. ___ ___ ___ *5 Determine the verification blank for step 6.16.10 is not initialed. STEP 6.16.10 The Verification Blank is not initialed for the Rad Monitor setpoints. ___ ___ ___ CUE This JPM is complete. RECORD STOP TIME:
INITIATING CUES:
JPM SUMMARY Operator's Name:  Job Title:  EO  RO SRO  FS  STA/IA  SRO Cert JPM Title: Review Liquid Release Package JPM Number: SA d Revision Number: 01 Task Number and Title: S-HP-001 Authorize Liquid Rad Waste Release K/A Number and Importance: GEN 2.3.6, Imp Factor 2.0/3.8 Suggested Testing Environment: Classroom Alternate Path:  Yes  No SRO Only:  Yes  No Time Critical:  Yes  No Reference(s):  BCP 400-TWX01 Rev 65  Chemistry Sample results from 0WX01T  Radiation Protection analysis for a Liquid Release Package  Actual Testing Environment:  Simulator  Control Room  In-Plant  Other Testing Method:  Simulate  Perform Estimated Time to Complete: 20 minutes Actual Time Used:  minutes EVALUATION SUMMARY: Were all the Critical Elements performed satisfactorily?  Yes  No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:  Satisfactory  Unsatisfactory  Comments:                          Evaluator's Name:  (Print)
: 1. Evaluate the reactivity change to restore PDMA02 to target and to match Tave to Tref.
Evaluator's Signature:  Date:
: 2. Review the Reactivity Change Determination Form for approval
Exelon Nuclear  Job Performance Measure  Classify Event and Fill Out a NARS Form  (Loss of Required Vital DC in Mode 5)  JPM Number: SA-e  Revision Number: 00  Date: 11/30/2015  Revised By: R. F. Peterson  11/30/2015  Instructor Date  Validated By: S. Harvey  12/11/2015  SME or Instructor Date  Approved By: B. Lewin  12/11/2015  Operations Representative Date Page 2 of 5  INITIAL CONDITIONS 1. You are the Shift Emergency Director. 2. The Unit 1 Supervisor has provided you with information related to a Unit 1 event and informed you to perform an Emergency Plan evaluation. PLANT CONDITIONS: 1. Unit 1 is shutdown in MODE 5 preparing for refueling. 2. DC bus 111 is currently Out of Service (De-Energized) for a Planned Bus Outage. 3. DC Bus 112 just experienced a loss of Vital DC Power, indicated by voltage readings of 0VDC at DC112. 4. DC112 Feed Breaker is tripped and cannot be reclosed. 5. Electrical Maintenance Technicians and Engineering are currently in the EM Shop reviewing prints and developing a Troubleshooting plan. INITIATING CUE 1. Perform an Emergency Plan evaluation and fill out the NARS form for transmittal for the plant conditions provided  2. This is a time critical JPM.
. Provide completed copy of OP
Page 3 of 5 JPM START TIME:  ELEMENT STANDARD SAT UNSAT Comment Number NOTE The completion of Step 2 fulfills the critical time portion of this JPM. 1. Refer to Exelon Nuclear - Radiological Emergency Plan Annex for Byron Station. Note:  This step may be performed at any time  Locate and Open, EP-AA-1002 Addendum 3, Classification of Emergencies      *2. Classify the Event utilizing Section 3, Classification of Emergencies. Critical portion stop time ______  Classify event as Unusual Event, from CU3 Loss of Required DC power for 15 Minutes or Longer (<108VDC on unit 125VDC batter busses 111 and 112)      Time from start to Classification =  ________ minutes &#xa2; < 15 minutes      3. Obtain NARS form, EP-MW-114-100-F-01, Nuclear Accident Reporting System (NARS). Note:  Step 3 may be performed at any time  Obtain NARS form.      NOTE Provide the examinee with a copy of the NARS form.
-AP-300-1004, attachment 1, Rev 4, Pwr Boration and Dilution Requirements Provide copy of Unit 2 Rema Thumbrules Information For Evaluator's Use:
Page 4 of 5 ELEMENT STANDARD SAT UNSAT Comment Number 4. Refer to EP-MW-114-100, MWROG Offsite Notifications, to complete NARS form. Note:  Step 4 is optional and may be performed at any time  Locate and Open, EP-MW-114-100, MWROG Offsite Notifications, Section 4.1, to complete NARS form.      NOTE Provide the examinee with Wind Speed and Wind Direction cues after examinee has explained where to obtain the information from the computer or from the main control board.  *5. Fill out NARS form according to instructions, EP-MW-114-100, Section 4.1, Completing the NARS Form. Cue: The wind direction on AM004 is 286. Cue: The wind speed on AM001 is 16 meters/sec. Cue: An SRO has provided a peer check and signed the "Verified With:" section. Fill out NARS form according to instructions, EP-MW-114-100, Section 4.1 Completing the NARS Form. BLOCKS 2 thru 9 must be filled correctly to meet the critical portion of filling out the NARS form. (See attached KEY). o Block 10 should be filled in "None" o Verified with another SRO peer check      CUE: The JPM is complete. JPM STOP TIME:
UNSAT requires written comments on respective step.
Page 5 of 5 JPM SUMMARY Operator's Name:  Job Title:  EO  RO SRO  FS  STA/IA  SRO Cert JPM Title: Classify Event and Fill Out a NARS Form Earthquake JPM Number: SA-a Revision Number: 00 Task Number and Title: 8F.ZP-008 CLASSIFY/RECLASSIFY Emergency Action Levels K/A Number and Importance: 2.4.41  4.6 Suggested Testing Environment: Simulator Alternate Path:  Yes  No SRO Only:  Yes  No Time Critical:  Yes  No Reference(s): EP-MW-114-100 (Rev 16), Midwest Region Offsite Notifications EP-MW-114-100-F-01 (Rev. H) Nuclear Accident Reporting System (NARS) Form EP-AA-1002 Addendum 3 (Rev 0) Emergency Action Levels for Byron Station EP-AA-1002 (Rev 34) Exelon Nuclear Radiological Emergency Plan Annex for Byron Station CRITICAL STEPS (*) 2 & 5 Actual Testing Environment:  Simulator  Control Room  In-Plant  Other Testing Method:  Simulate  Perform Estimated Time to Complete: 20 minutes Actual Time Used:  minutes EVALUATION SUMMARY: Were all the Critical Elements performed satisfactorily?  Yes  No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:  Satisfactory  Unsatisfactory  Comments:                      Evaluator's Name:  (Print) Evaluator's Signature:  Date:
Exelon Nuclear  Job Performance Measure  Evaluate a Reactivity Change JPM Number: SA-a  Revision Number: 02  Date: 12/10/2015 Revised By: B. Peterson  12/10/2015  Instructor Date  Validated By: C. Berger  12/11/2015  SME or Instructor Date  Approved By: B. Lewin  12/11/2015  Operations Representative Date JOB PERFORMANCE MEASURE VALIDATION CHECKLIST  NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 and 12 below. __RFP__ 1. Task description and number, JPM description and number are identified. __RFP__ 2. Knowledge and Abilities (K/A) references are included. __RFP__ 3. Performance location specified. (in-plant, control room, simulator, or other) __RFP__ 4. Initial setup conditions are identified. __RFP__ 5. Initiating cue (and terminating cue if required) are properly identified. __RFP__ 6. Task standards identified and verified by SME review. __RFP__ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). __RFP__ 8. Verify the procedure(s) referenced by this JPM reflects the current revision: Procedure OP-AP-300-1004  Rev: 4  Procedure  Rev:  Procedure  Rev:  __RFP__ 9. Verify cues both verbal and visual are free of conflict. __RFP__ 10. Verify performance time is accurate __RFP__ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM. __RFP__ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:  B. Lewin/R. Peterson  12/11/2015  SME / Instructor Date        SME / Instructor Date        SME / Instructor Date Revision Record (Summary) Revision 00 Initial revision of JPM Comment Resolution    Revision 01 Revised JPM for modification of calculation Revision 02 Revised JPM for modification of calculation and time in core life.
INITIAL CONDITIONS:  1. Unit 2 is at 50% power, 9100 EFPH, 500 ppm boron, with CB D at 89 steps. 2. Tave is 0.5&deg; less than Tref. 3. The QNE has recommended that Control Bank D be withdrawn 4 steps to control PDMA02 on the desired target, then to perform a reactivity change to match Tave to Tref. 4. The NSO has calculated a reactivity change to move rods then to match Tave with Tref. INITIATING CUES: 1. Evaluate the reactivity change to restore PDMA02 to target and to match Tave to Tref. 2. Review the Reactivity Change Determination Form for approval. Provide completed copy of OP-AP-300-1004, attachment 1, Rev 4, Pwr Boration and Dilution Requirements Provide copy of Unit 2 Rema Thumbrules Information For Evaluator's Use: UNSAT requires written comments on respective step.
* Denotes critical steps 2 & 3 Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
* Denotes critical steps 2 & 3 Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. The timeclock starts when the candidate acknowledges the initiating cue. TASK STANDARDS: 1. Evaluate the reactivity change to match Tave to Tref. 2. Review the Reactivity Change Determination Form.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
MATERIALS: Completed OP-AP-300-1004, Rev 2, Pwr Boration and Dilution Requirements (Attachment 1 is attached) Unit 2 Rema Thumbrules at 8500-11000 EFPH RECORD START TIME:   EVALUATOR NOTE:  These steps may be performed in any order. STEP ELEMENT STANDARD SAT UNSAT CMT# CUE Provide completed copy of OP-AP-300-1004 and a copy of the Unit 2 Rema thumbrules 1 Refer to OP-AP-300-1004, Rev 2, Pwr Boration and Dilution Requirements Unit 2 Rema Thumbrules   In accordance with the provided: OP-AP-300-1004, Rev 2, Pwr Boration and Dilution Requirements Unit 2 Rema Thumbrules ___ ___ ___ *2 Part 1 Review Attachment 1 of OP-AP-300-1004 Determine wrong number of withdrawn rod steps calculated on form  Evaluate inaccurate calculation Should be 4 steps of Control Bank D at 50% power: Tave-Tref = 2&deg; rise in temperature NOTE: When examinee identifies the deficiency, inform them to review the rest of the calculations   Station: Byron Unit: 2  Desired change  Withdraw Rods 2 steps for PDMA02 control Reason for change PDMA02 control Temperature control What is the method & am't for the reactivity change? 2 steps withdrawal of CB D  Inputs  Rema thumbrules ___ ___ ___ *3 Part 2 Review Attachment 1 of OP-AP-300-1004 Determine incorrect reactivity addition calculated on form due to using 100% REMA thumbrules. (Calculation is not required for success)  +0.3&deg; - 0.5&deg; (current mismatch) = -0.2&deg;  465 gallons PW/1&deg; x 0.2&deg; =
The timeclock starts when the candidate acknowledges the initiating cue.
93 gallons dilution From inaccurate rod withdrawal, and 100% thumbrules, calculation is incorrect which yields an incorrect reactivity calculation Calculation has incorrect dilution value of 93 gallons. It should be a Boration of 37.5 gallons.  +2&deg; - 0.5&deg; (current mismatch) = +1.5&deg;  25 gallons BA/1&deg; x 1.5&deg; = 37.5 gallons boration Inputs  Rema thumbrules ___ ___ ___ CUE This JPM is complete. RECORD STOP TIME:
TASK STANDARDS:
JPM SUMMARY Operator's Name:  Job Title:  EO  RO SRO  FS  STA/IA  SRO Cert JPM Title: Evaluate a Reactivity Change JPM Number: SA-a Revision Number: 02 Task Number and Title: S-AM-151, Perform proper reactivity management on unit startup and during normal plant operations K/A Number and Importance: GEN 2.1.37  Imp Factor 4.6 Suggested Testing Environment: Classroom Alternate Path: Yes  No SRO Only: Yes  No Time Critical: Yes  No Reference(s):  OP-AP-300-1004, Rev 4, Pwr Boration and Dilution Requirements Unit 2 Rema Thumbrules Actual Testing Environment: Simulator Control Room In-Plant  Other Testing Method: Simulate  Perform Estimated Time to Complete: 15 minutes Actual Time Used:   minutes EVALUATION SUMMARY: Were all the Critical Elements performed satisfactorily? Yes  No The operator's performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:                          Evaluator's Name:  (Print)
: 1. Evaluate the reactivity change to match Tave to Tref.
Evaluator's Signature:  Date:
: 2. Review the Reactivity Change Determination Form.
JOB PERFORMANCE MEASURE   INITIAL CONDITIONS: 1. Unit 2 is at 50% power, 9100 EFPH, 500 ppm boron, with CB D at 89 steps. 2. Tave is 0.5&deg; less than Tref. 3. The QNE has recommended that Control Bank D be withdrawn 4 steps to control PDMA02 on the desired target, then to perform a reactivity change to match Tave to Tref. 4. The NSO has calculated a reactivity change to move rods then to match Tave with Tref. INITIATING CUES: 1. Evaluate the reactivity change to restore PDMA02 to target and to match Tave to Tref. 2. Review the Reactivity Change Determination Form for approval.
 
OP-AP-300-1004  Revision 4 Page 4 of 4 ATTACHMENT 1 REACTIVITY CHANGE DETERMINATION FORM Station: Byron  Unit: 1 2 Time: Now  Date: Today  Desired change: (Parameter, Magnitude, and Direction: Reactor Power, Rod Position, RCS Temp, Delta I, etc.) Withdraw Rods 2 steps for PDMA02 control Dilute to raise Tave (0.2&deg;F) to match Tref Reason for Change: (Temperature control, flux control, fuel burn up) PDMA02 control and temperature control  What is the method and amount required for the reactivity change? (Bleed Tank Volume, Gallons of Dilution/Boration/Blended Flow, Rod Insertion/Rod Withdrawal steps/percent) 2 steps withdrawal of CB D and 93 gallons Dilution  Inputs: (ReMA Thumbrules, ReMA maneuver guidance, Curve Book Figure/Table, Computer based trend plot, RCS Cb, EFPD - Preparer and Reviewer should use independent inputs when possible) Rema thumbrules for Unit 2 at 9100 EFPH  Calculation of change: (E.G. Bwd/Byr: ReMA Thumbrule identifies 20 gallons BA = 1.0&deg;F RCS temp reduction. Desired change = 0.5&deg;F drop. Calculation of change: (20 gal/1.0&deg;F)
MATERIALS:
* 0.5&deg;F = 10 gal., previously used borations and dilutions) (TMI: Procedure 1102-4 Power Operations Fig. 1, Volume of Deminerlized Water for 1% Rod Insertion)  Withdrawal of control rods 2 steps raises temp 0.3&deg;F. Then dilute to raise temperature by 0.2&deg;F: 465 gals/&deg;F x (0.2&deg;F) = 93 gals dilution. Joe Rowe    P Chech  ______________ Preparer Reviewer Approver  (RO) (RO/SRO) (SRO)  Shift Manager Notified:    Yes    No Exelon Nuclear Job Performance Measure   Minimum Shift Staffing JPM Number: SA-b  Revision Number: 2  Date: 7/20/2010 Revised By: R. F. Peterson 7/20/2010   Instructor Date  Validated By: S. Harvey 12/11/2015   SME or Instructor Date  Approved By: B. Lewin  12/11/2015   Operations Representative Date JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 and 12 below. __RFP__ 1. Task description and number, JPM description and number are identified. __RFP__ 2. Knowledge and Abilities (K/A) references are included. __RFP__ 3. Performance location specified. (in-plant, control room, simulator, or other) __RFP__ 4. Initial setup conditions are identified. __RFP__ 5. Initiating cue (and terminating cue if required) are properly identified. __RFP__ 6. Task standards identified and verified by SME review. __RFP__ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). __RFP__ 8. Verify the procedure(s) referenced by this JPM reflects the current revision: Procedure BAP 320-1  Rev: 22  Procedure BAP 320-1T1  Rev: 6  Procedure   Rev:  __RFP__ 9. Verify cues both verbal and visual are free of conflict. __RFP__ 10. Verify performance time is accurate __RFP__ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM. __RFP__ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:   Brian Lewin/Robert Peterson 10/6/2013   SME / Instructor Date  Brian Lewin/Robert Peterson 12/11/2015   SME / Instructor Date        SME / Instructor Date Revision Record (Summary) Revision 1  Put in current JPM Format Clarified the intent of the question and limited to asking for recommendations for desired staffing levels. Revision 2 Added requirement to validate TS manning and Administrative manning to JPM.
Completed OP
INITIAL CONDITIONS 1. You are the Shift Manager. 2. Unit 1 is in Mode 5 and Unit 2 is in Mode 1 at 100% power. 3. The following qualified people are inside the Protected Area as members of the oncoming shift operating crew: (Assume that AII LISTED personnel have the same shift rotation) Name Qual Position  Name Qual Position  Name Qual Position Joe  SRO/SM  Sam  NSO  Mary FB EO Bill FC SRO  Dave  NSO  Ted EC EO Tom FC SRO  Ron FB EO  Bob  RP Andy  SRO  Alan FB EO  Terry  Chem Arnie  SRO/STA  Sally FB EO  Karla EC Chem    Tim  EO      FC: Fire Chief qualified FB: Fire Brigade qualified EC: Emerg Comm qualified INITIATING CUES: DETERMINE if the crew meets the Desired staffing levels per BAP 320-1, and if not, do staffing levels meet Tech Spec Minimum staffing levels. If staffing levels are not met DETERMINE:  number of people in any given position needed to fill to the Tech Spec Minimum. number of people in any given position needed to fill to the Desired staffing levels. actions required to meet oncoming Shift Manning requirements. All Work Hour Rules have been determined to be in compliance. Fill in the JPM Start Time when the student acknowledges the Initiating Cue.  
-AP-300-1004, Rev 2, Pwr Boration and Dilution Requirements (Attachment 1 is attached)
Unit 2 Rema Thumbrules at 8500-11000 EFPH RECORD START TIME:
EVALUATOR NOTE:  These steps may be performed in any order.
STEP ELEMENT STANDARD SAT UNSAT CMT# CUE Provide completed copy of OP
-AP-300-1004 and a copy of the Unit 2 Rema thumbrules 1 Refer to OP-AP-300-1004, Rev 2, Pwr Boration and Dilution Requirements Unit 2 Rema Thumbrules In accordance with the provided:
OP-AP-300-1004, Rev 2, Pwr Boration and Dilution Requirements Unit 2 Rema Thumbrules
___ ___ ___ *2 Part 1 Review Attachment 1 of OP
-AP-300-1004 Determine wrong number of withdrawn rod steps calculated on form  Evaluate inaccurate calculation Should be 4 steps of Control Bank D at 50% power: Tave
-Tref = 2&deg; rise in temperature NOTE: When examinee identifies the deficiency, inform them to review the rest of the calculations Station: Byron Unit: 2  Desired change  Withdraw Rods 2 steps for PDMA02 control Reason for change PDMA02 control Temperature control What is the method & am't for the reactivity change?
2 steps withdrawal of CB D  Inputs  Rema thumbrules
___ ___ ___ *3 Part 2 Review Attachment 1 of OP
-AP-300-1004 Determine incorrect reactivity addition calculated on form due to using 100% REMA thumbrule
: s. (Calculation is not required for success)  +0.3&deg; - 0.5&deg; (current mismatch) =  
-0.2&deg;  465 gallons PW/1&deg; x 0.2&deg; =
93 gallons dilution From inaccurate rod  
 
withdrawal, and 100% thumbrules, calculation is incorrect which yields an incorrect reactivity calculation Calculation has incorrect dilution value of 93 gallons. It should be a Boration of 37.5 gallons.  +2&deg; - 0.5&deg; (current mismatch) = +1.5&deg;  25 gallons BA/1&deg; x 1.5&deg; = 37.5 gallons boration Inputs  Rema thumbrules
___ ___ ___ CUE This JPM is complete.
RECORD STOP TIME:
 
JPM SUMMARY Operator's Name
:  Job Title
:  EO  RO SRO  FS  STA/IA  SRO Cert JPM Title:
Evaluate a Reactivity Change JPM Number:
SA-a Revision Number:
02 Task Number and Title:
S-AM-151, Perform proper reactivity management on unit startup and during normal plant operations K/A Number and Importance: GEN 2.1.37  Imp Factor 4.6 Suggested Testing Environment:
Classroom Alternate Path:
Yes  No SRO Only:
Yes  No Time Critical:
Yes  No Reference(s):  OP-AP-300-1004, Rev 4, Pwr Boration and Dilution Requirements Unit 2 Rema Thumbrules Actual Testing Environment:
Simulator Control Room In-Plant  Other Testing Method:
Simulate  Perform Estimated Time to Complete:
15 minutes Actual Time Used:
minutes EVALUATION SUMMARY:
Were all the Critical Elements performed satisfactorily?
Yes  No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Satisfactory Unsatisfactory Comments:                          Evaluator's Name
:  (Print)
Evaluator's Signature
:  Date:
JOB PERFORMANCE MEASURE INITIAL CONDITIONS:
: 1. Unit 2 is at 50% power, 9100 EFPH, 500 ppm boron, with CB D at 89 steps.
: 2. Tave is 0.
5&deg; less than Tref.
: 3. The QNE has recommended that Control Bank D be withdrawn 4 steps to control PDMA02 on the desired target, then to perform a reactivity change to match Tave to Tref.
: 4. The NSO has calculated a reactivity change to move rods then to match Tave with Tref.
INITIATING CUES:
: 1. Evaluate the reactivity change to restore PDMA02 to target and to match Tave to Tref.
: 2. Review the Reactivity Change Determination Form for approval.
 
OP-AP-300-1004  Revision 4 Page 4 of 4 ATTACHMENT 1 REACTIVITY CHANGE DETERMINATION FORM Station: Byron  Unit: 1 2 Time: Now  Date: Today  Desired change:
(Parameter, Magnitude, and Direction: Reactor Power, Rod Position, RCS Temp, Delta I, etc.)
Withdraw Rods 2 steps for PDMA02 control Dilute to raise Tave (0.2&deg;F) to match Tref Reason for Change:
(Temperature control, flux control, fuel burn up)
PDMA02 control and temperature control  What is the method and amount required for the reactivity change?
(Bleed Tank Volume, Gallons of Dilution/Boration/Blended Flow, Rod Insertion/Rod Withdrawal steps/percent) 2 steps withdrawal of CB D and 93 gallons Dilution  Inputs: (ReMA Thumbrules, ReMA maneuver guidance, Curve Book Figure/Table, Computer based trend plot, RCS Cb, EFPD  
- Preparer and Reviewer should use independent inputs when possible)
Rema thumbrules for Unit 2 at 9100 EFPH  Calculation of change:
(E.G. Bwd/Byr: ReMA Thumbrule identifies 20 gallons BA = 1.0&deg;F RCS temp reduction.
Desired change = 0.5&deg;F drop. Calculation of change: (20 gal/1.0&deg;F)
* 0.5&deg;F = 10 gal.,
previously used borations and dilutions)
(TMI: Procedure 1102
-4 Power Operations Fig. 1, Volume of Deminerlized Water for 1% Rod Insertion)  Withdrawal of control rods 2 steps raises temp 0.3&deg;F. Then dilute to raise temperature by 0.
2&deg;F: 465 gals/&deg;F x (0.2&deg;F) = 93 gals dilution. Joe Rowe    P Chech  ______________
Preparer Reviewer Approver  (RO) (RO/SRO) (SRO)  Shift Manager Notified:    Yes    No
 
Exelon Nuclear Job Performance Measure Minimum Shift Staffing JPM Number:
SA-b  Revision Number:
2  Date: 7/20/2010 Revised By:
R. F. Peterson 7/20/2010 Instructor Date  Validated By:
S. Harvey 12/11/2015 SME or Instructor Date  Approved By:
B. Lewin  12/11/2015 Operations Representative Date JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below. __RFP__ 1. Task description and number, JPM description and number are identified.
__RFP__ 2. Knowledge and Abilities (K/A) references are included.
__RFP__ 3. Performance location specified. (in
-plant, control room, simulator, or other)
__RFP__ 4. Initial setup conditions are identified.
__RFP__ 5. Initiating cue (and terminating cue if required) are properly identified.
__RFP__ 6. Task standards identified and verified by SME review.
__RFP__ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
__RFP__ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure BAP 320-1  Rev: 22  Procedure BAP 320-1T1  Rev: 6  Procedure Rev:  __RFP__ 9. Verify cues both verbal and visual are free of conflict.
__RFP__ 10. Verify performance time is accurate
__RFP__ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
__RFP__ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
Brian Lewin/Robert Peterson 10/6/2013 SME / Instructor Date  Brian Lewin/Robert Peterson 12/11/2015 SME / Instructor Date        SME / Instructor Date Revision Record (Summary)
Revision 1  Put in current JPM Format Clarified the intent of the question and limited to asking for recommendations for desired staffing levels.
Revision 2 Added requirement to validate TS manning and Administrative manning to JPM.
INITIAL CONDITIONS
: 1. You are the Shift Manager.
: 2. Unit 1 is in Mode 5 and Unit 2 is in Mode 1 at 100% power. 3. The following qualified people are inside the Protected Area as members of the oncoming shift operating crew: (Assume that AII LISTED personnel have the same shift rotation)
Name Qual Position  Name Qual Position  Name Qual Position Joe  SRO/SM  Sam  NSO  Mary FB EO Bill FC SRO  Dave  NSO  Ted EC EO Tom FC SRO  Ron FB EO  Bob  RP Andy  SRO  Alan FB EO  Terry  Chem Arnie  SRO/STA  Sally FB EO  Karla EC Chem    Tim  EO      FC: Fire Chief qualified FB: Fire Brigade qualified EC: Emerg Comm qualified INITIATING CUES:
DETERMINE if the crew meets the Desired staffing levels per BAP 320
-1, and if not, do staffing levels meet Tech Spec Mi nimum staffing levels.
If staffing levels are not met DETERMINE
:  number of people in any given position needed to fill to the Tech Spec Minimum
. number of people in any given position needed to fill to the Desired staffing levels.
actions required to meet oncoming Shift Manning requirements.
All Work Hour Rules have been determined to be in compliance.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
 
Information For Evaluator's Use:
UNSAT requires written comments on respective step.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages.
Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
RECORD START TIME:
ELEMENT STANDARD SAT UNSAT Comment Number 1. Refer to BAP 320
-1, Shift Staffing Cue:  Provide a copy of BAP 320
-1 and BAP 320
-1T1 after correct procedure has been determined.
The staffing determination can be determined in any order.
Determines that BAP 320
-1 is needed to make determination.
: 2. Review Desired Staffing requirement for Shift Manager.
Determine that minimum Desired Staffing and TS Staffing for Shift Manager IS satisfied
.   
: 3. Review Desired Staffing requirement for Unit Supervisor.
Determine that minimum Desired Staffing and TS Staffing for Unit Supervisor IS satisfied.


Information For Evaluator's Use: UNSAT requires written comments on respective step.
ELEMENT STANDARD SAT UNSAT Comment Number 4. Review Desired Staffing requirement for WEC.
* Denotes critical steps. Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system. Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. The timeclock starts when the candidate acknowledges the initiating cue. RECORD START TIME:  ELEMENT STANDARD SAT UNSAT Comment Number 1. Refer to BAP 320-1, Shift Staffing Cue:  Provide a copy of BAP 320-1 and BAP 320-1T1 after correct procedure has been determined. The staffing determination can be determined in any order. Determines that BAP 320-1 is needed to make determination.  
Note: The candidate should determine that the WEC SRO is not required for TS minimum manning and should be used to meet minimum NSO TS Manning.
: 2. Review Desired Staffing requirement for Shift Manager. Determine that minimum Desired Staffing and TS Staffing for Shift Manager IS satisfied.  
Determine that minimum Desired Staffing for WEC IS satisfied.
: 3. Review Desired Staffing requirement for Unit Supervisor. Determine that minimum Desired Staffing and TS Staffing for Unit Supervisor  IS satisfied.  
: 5. Review Desired Staffing requirement for FS/Fire Brigade Chief. Determine that minimum Desired Staffing for FS IS satisfied.


ELEMENT STANDARD SAT UNSAT Comment Number 4. Review Desired Staffing requirement for WEC. Note: The candidate should determine that the WEC SRO is not required for TS minimum manning and should be used to meet minimum NSO TS Manning. Determine that minimum Desired Staffing for WEC  IS satisfied.  
  *6. Review Desired Staffing requirement for NSO.
: 5. Review Desired Staffing requirement for FS/Fire Brigade Chief. Determine that minimum Desired Staffing for FS  IS satisfied
Determine that minimum Desired Staffing for NSO's IS NOT satisfied.
2 more are desired. Determine that minimum TS Staffing for NSO's IS satisfied (an SRO is used to fill TS staffing levels)


  *6. Review Desired Staffing requirement for NSO. Determine that minimum Desired Staffing for NSO's      IS NOT satisfied.      2 more are desired. Determine that minimum TS Staffing for NSO's IS satisfied (an SRO is used to fill TS staffing levels)
___   
___   


Line 110: Line 683:


___   
___   
: 7. Review Desired Staffing requirement for STA. Determine that minimum Desired Staffing for STA IS satisfied.       
: 7. Review Desired Staffing requirement for STA.
Determine that minimum Desired Staffing for STA IS satisfied.       
 
  *8. Review Desired Staffing requirement for EO (SSD/FB).
Determine that minimum Desired Staffing for EO's IS NOT satisfied.
2 more SSD EO's are desired. Determine that minimum TS Staffing for EO's IS satisfied (3 SSD EO's needed, with 0 FB needed)


  *8. Review Desired Staffing requirement for EO (SSD/FB). Determine that minimum Desired Staffing for EO's      IS NOT satisfied. 2 more SSD EO's are desired. Determine that minimum TS Staffing for EO's IS satisfied (3 SSD EO's needed, with 0 FB needed)
___   
___   


Line 119: Line 696:
___   
___   


ELEMENT STANDARD SAT UNSAT Comment Number *9. Review Desired Staffing requirement for RP. Determine that minimum Desired Staffing for RP IS NOT satisfied. 1 more is desired. Determine that minimum TS Staffing for RP IS satisfied (1 RP required)
ELEMENT STANDARD SAT UNSAT Comment Number *9. Review Desired Staffing requirement for RP.
Determine that minimum Desired Staffing for RP IS NOT satisfied.
1 more is desired.
Determine that minimum TS Staffing for RP IS satisfied (1 RP required)
 
___   
___   


Line 125: Line 706:


___   
___   
: 10. Review Desired Staffing requirement for Chemistry. Determine that minimum Desired Staffing for Chemistry IS satisfied.         11. Review Desired Staffing requirement for Emergency Communicator. Determine that minimum Desired Staffing for Emergency Communicator IS satisfied - the extra Chemistry person (or any qualified station staff person)  
: 10. Review Desired Staffing requirement for Chemistry.
: 12. Determine need to fill positions with offgoing shift. Cue:  Ask candidate on what actions are needed to meet immediate manning requirements for the oncoming shift? Determine that the oncoming crew will not be able to fill all of the positions of BAP 320-1T1 with qualified individuals -AND- Determine that personnel from the current shift will be held over to fill all required positions until callout relief is in the Protected Area   ___
Determine that minimum Desired Staffing for Chemistry  
 
IS satisfied.
: 11. Review Desired Staffing requirement for Emergency Communicator.
Determine that minimum Desired Staffing for Emergency Communicator IS satisfied  
- the extra Chemistry person (or any qualified station staff person)
: 12. Determine need to fill positions with offgoing shift.
Cue:  Ask candidate on what actions are needed to meet immediate manning requirements for the oncoming shift?
Determine that the oncoming crew will not be able to fill all of the positions of BAP 320
-1T1 with qualified individuals
-AND- Determine that personnel from the current shift will be held over to fill all required positions until callout relief is in the Protected Area
___
___
___
___
CUE: The JPM is complete. RECORD STOP TIME:
___
JPM SUMMARY Operator's Name:  Job Title:  EO  RO SRO  FS  STA/IA  SRO Cert JPM Title: Minimum Shift Staffing JPM Number: SA-b Revision Number: 1 Task Number and Title: S-AM-029 Ensure Minimum Shift Staffing and Authorize Additional Shift Staffing as Necessary K/A Number and Importance: 2.1.5  3.9 Suggested Testing Environment: Classroom Alternate Path: Yes  No SRO Only: Yes  No Time Critical: Yes  No Reference(s):   BAP 320-1, Rev 19, Shift Staffing BAP 320-1T1 CRITICAL STEPS (*) 6, 8 & 9 Actual Testing Environment: Simulator Control Room In-Plant  Other Testing Method: Simulate  Perform Estimated Time to Complete: 20 minutes Actual Time Used:   minutes EVALUATION SUMMARY: Were all the Critical Elements performed satisfactorily? Yes  No The operator's performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:                        Evaluator's Name:  (Print) Evaluator's Signature:  Date:
CUE: The JPM is complete.
INITIAL CONDITIONS 1. You are the Shift Manager. 2. Unit 1 is in Mode 5 and Unit 2 is in Mode 1 at 100% power. 3. The following qualified people are inside the Protected Area as members of the oncoming shift operating crew: (Assume that AII LISTED personnel have the same shift rotation) Name Qual Position  Name Qual Position  Name Qual Position Joe  SRO/SM  Sam  NSO  Mary FB EO Bill FC SRO  Dave  NSO  Ted EC EO Tom FC SRO  Ron FB EO  Bob  RP Andy  SRO  Alan FB EO  Terry  Chem Arnie  SRO/STA  Sally FB EO  Karla EC Chem    Tim  EO      FC: Fire Chief qualified FB: Fire Brigade qualified EC: Emerg Comm qualified INITIATING CUES: DETERMINE if the crew meets the Desired staffing levels per BAP 320-1, and if not, do staffing levels meet Tech Spec Minimum staffing levels. If staffing levels are not met DETERMINE:  number of people in any given position needed to fill to the Tech Spec Minimum. number of people in any given position needed to fill to the Desired staffing levels. actions required to meet oncoming Shift Manning requirements. All Work Hour Rules have been determined to be in compliance.
RECORD STOP TIME
Exelon Nuclear Job Performance Measure   Initiate a LCOAR JPM Number: SA-c  Revision Number: 0  Date: 11/30/2015 Revised By: Robert Peterson 11/30/2015 Instructor Date  Validated By: Shane Harvey 12/11/2015 SME or Instructor Date  Approved By: Brian Lewin  12/11//2015  Facility Representative Date JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 and 12 below. See File Copy 1. Task description and number, JPM description and number are identified. 2. Knowledge and Abilities (K/A) references are included. 3. Performance location specified. (in-plant, control room, simulator, or other) 4. Initial setup conditions are identified. 5. Initiating cue (and terminating cue if required) are properly identified. 6. Task standards identified and verified by SME review. 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). 8. Verify the procedure(s) referenced by this JPM reflects the current revision: Procedure BAP 1400-6  Rev: 33  Procedure 1BOL 7.2  Rev: 6  Procedure BAR 1-1-E5  Rev:  5  Procedure 1BOSR MS-W1  Rev:  11  Procedure BOP MS-5  Rev:  19  9. Verify cues both verbal and visual are free of conflict. 10. Verify performance time is accurate 11. If the JPM cannot be performed as written with proper responses, then revise the JPM. 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:       SME / Instructor Date          SME / Instructor Date        SME / Instructor Date Revision Record (Summary) Revision 0  Comment Resolution Modified SA3 Rev. 0 Changed component that is in LCOAR INITIAL CONDITIONS 1. You are the Unit 1 Unit Supervisor. 2. Unit 1 is in MODE 1 3. MSIV 1D Hyd/Pneu Press Hi/Lo Alarm (1-1-E5) is LIT. 4. 5 minutes ago that the TR Operator reports that 1D MSIV Standby Nitrogen Pressure is 4750 psig. 5. IR 1234567 has been written to document the issue. 6. No other LCOARs or DELs exist on Unit 1. INITIATING CUE Evaluate condition and Initiate the LCOAR paperwork as necessary. Fill in the JPM Start Time when the student acknowledges the Initiating Cue. Information For Evaluator's Use: UNSAT requires written comments on respective step.
:
JPM SUMMARY Operator's Name
:  Job Title
:  EO  RO SRO  FS  STA/IA  SRO Cert JPM Title:
Minimum Shift Staffing JPM Number:
SA-b Revision Number:
1 Task Number and Title:
S-AM-029 Ensure Minimum Shift Staffing and Authorize Additional Shift Staffing as Necessary K/A Number and Importance:
2.1.5  3.9 Suggested Testing Environment:
Classroom Alternate Path:
Yes  No SRO Only:
Yes  No Time Critical:
Yes  No Reference(s):
BAP 320-1, Rev 19, Shift Staffing BAP 320-1T1 CRITICAL STEPS
(*) 6, 8 & 9 Actual Testing Environment:
Simulator Control Room In-Plant  Other Testing Method:
Simulate  Perform Estimated Time to Complete:
20 minutes Actual Time Used:
minutes EVALUATION SUMMARY:
Were all the Critical Elements performed satisfactorily?
Yes  No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Satisfactory Unsatisfactory Comments:                        Evaluator's Name
:  (Print) Evaluator's Signature:  Date:
INITIAL CONDITIONS
: 1. You are the Shift Manager.
: 2. Unit 1 is in Mode 5 and Unit 2 is in Mode 1 at 100% power.
: 3. The following qualified people are inside the Protected Area as members of the oncoming shift operating crew: (Assume that AII LISTED personnel have the same shift rotation)
Name Qual Position  Name Qual Position  Name Qual Position Joe  SRO/SM  Sam  NSO  Mary FB EO Bill FC SRO  Dave  NSO  Ted EC EO Tom FC SRO  Ron FB EO  Bob  RP Andy  SRO  Alan FB EO  Terry  Chem Arnie  SRO/STA  Sally FB EO  Karla EC Chem    Tim  EO      FC: Fire Chief qualified FB: Fire Brigade qualified EC: Emerg Comm qualified INITIATING CUES:
DETERMINE if the crew meets the Desired staffing levels per BAP 320
-1, and if not, do staffing levels meet Tech Spec Minimum staffing levels
. If staffing levels are not met DETERMINE
:  number of people in any given position needed to fill to the Tech Spec Minimum
. number of people in any given position needed to fill to the Desired staffing levels.
actions required to meet oncoming Shift Manning requirements.
All Work Hour Rules have been determined to be in compliance.
 
Exelon Nuclear Job Performance Measure Initiate a LCOAR JPM Number:
SA-c  Revision Number:
0  Date: 11/30/2015
 
Revised By: Robert Peterson 11/30/2015 Instructor Date  Validated By:
Shane Harvey 12/11/2015 SME or Instructor Date  Approved By:
Brian Lewin  12/11//2015  Facility Representative Date JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
See File Copy 1. Task description and number, JPM description and number are identified.
: 2. Knowledge and Abilities (K/A) references are included.
: 3. Performance location specified. (in
-plant, control room, simulator, or other)
: 4. Initial setup conditions are identified
. 5. Initiating cue (and terminating cue if required) are properly identified.
: 6. Task standards identified and verified by SME review.
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure BAP 1400-6  Rev: 33  Procedure 1BOL 7.2  Rev: 6  Procedure BAR 1-1-E5  Rev:  5  Procedure 1BOSR MS-W1  Rev:  11  Procedure BOP MS-5  Rev:  19  9. Verify cues both verbal and visual are free of conflict. 10. Verify performance time is accurate
: 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date          SME / Instructor Date        SME / Instructor Date Revision Record (Summary)
Revision 0  Comment Resolution Modified SA3 Rev. 0 Changed component that is in LCOAR
 
INITIAL CONDITIONS
: 1. You are the Unit 1 Unit Superviso
: r. 2. Unit 1 is in MODE 1 3. MSIV 1D Hyd/Pneu Press Hi/Lo Alarm (1 E5) is LIT.
: 4. 5 minutes ago that the TR Operator reports that 1D MSIV Standby Nitrogen Pressure is 4750 psig.
: 5. IR 1234567 has been written to document the issue.
: 6. No other LCOARs or DELs exist on Unit 1. INITIATING CUE Evaluate condition and Initiate the LCOAR paperwork as necessary.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
UNSAT requires written comments on respective step.
* Denotes critical steps 1a, 3, 4, 10 Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
* Denotes critical steps 1a, 3, 4, 10 Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system. Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. The timeclock starts when the candidate acknowledges the initiating cue.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
RECORD START TIME:   ELEMENT STANDARD SAT UNSAT Comment Number NOTE Once the student demonstrates the ability to locate referenced procedure provide the student with a copy of the procedure. 1. Refer to BAP 1400-6, Technical Specification Limiting Conditions for Operation Action Requirements (LCOAR)   LOCATE and OPEN BAP 1400-6      *1.a  Evaluate required LCOAR entry T.S 3.7.2 and/or Bases 1BOL 7.2  BAR 1-1-E5  1BOSR MS-W1  BOP MS-5  Identify that 1BOL 7.2 LCOAR entry is required. Utilize references as required      2. Refer to 1BOL 7.2, LCOAR Main Steam Isolation Valves (MSIVs) - Tech Spec LCO # 3.7.2  LOCATE and OPEN 1BOL 7.2      *3. Section A of 1BOL 7.2  Note: Notification occurred 5 minutes ago per initiating Cue. ENTER into Section A:   Time/Date: Today/5 minutes ago   By: Candidate's name Title: Unit Supervisor   Present mode: 1 Initiating event: Initiating event: 1MS001D Standby Pneumatic Pressure <4800 psig. Condition: A ELEMENT STANDARD SAT UNSAT Comment Number *4. Safety function determination Cue: All other MSIVs pass operability. PERFORM SFD Indicate No in Section C Sign Coversheet Indicate NO on coversheet for invalidating current SFD        4.a  LCO 3.0.6 Evaluation Note:  Acceptable if left Blank or may be placekept. Placekeep OR Leave Blank   5. Update DEL o Check "N/A" box       6. Determine Planned or Unplanned o Mark UNPLANNED on coversheet         NOTE Examinee may inform SM of entry at this time, however, the SM Notified and time/date is typically completed after Peer Check received by another SRO. 7. Related WR/WO block Note: IR # will be recorded here   List IR # 1234567      8. Fill in Related Clearance Orders Note:  Acceptable if left Blank o N/A OR Leave Blank       9. Was an IR written? o Check "Yes" box ELEMENT STANDARD SAT UNSAT Comment Number *10. LCOAR TABLE of 1BOL 7.2   
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
 
RECORD START TIME:
ELEMENT STANDARD SAT UNSAT Comment Number NOTE Once the student demonstrates the ability to locate referenced procedure provide the student with a copy of the procedure.
: 1. Refer to BAP 1400
-6, Technical Specification Limiting Conditions for Operation Action Requirements (LCOAR)
LOCATE and OPEN BAP 1400-6      *1.a  Evaluate required LCOAR entry T.S 3.7.2 and/or Bases 1BOL 7.2  BAR 1-1-E5  1BOSR MS-W1  BOP MS-5  Identify that 1BOL 7.2 LCOAR entry is required.
Utilize references as required      2. Refer to 1BOL 7.2, LCOAR Main Steam Isolation Valves (MSIVs)
- Tech Spec LCO  
# 3.7.2  LOCATE and OPEN 1BOL 7.2      *3. Section A of 1BOL 7.2  Note: Notification occurred 5 minutes ago per initiating Cue. ENTER into Section A:
Time/Date: Today/5 minutes ago By: Candidate's name
 
Title: Unit Supervisor Present mode
: 1 Initiating event
: Initiating event: 1MS001D Standby Pneumatic Pressure <4800 psig. Condition
: A ELEMENT STANDARD SAT UNSAT Comment Number *4. Safety function determination Cue: All other MSIVs pass operability.
PERFORM SFD Indicate No in Section C Sign Coversheet Indicate NO on coversheet for invalidating current SFD        4.a  LCO 3.0.6 Evaluation
 
Note:  Acceptable if left Blank or may be placekept.
Placekeep OR Leave Blank
: 5. Update DEL o Check "N/A" box
: 6. Determine Planned or Unplanned o Mark UNPLANNED on coversheet NOTE Examinee may inform SM of entry at this time, however, the SM Notified and time/date is typically completed after Peer Check received by another SRO.
: 7. Related WR/WO block
 
Note: IR # will be recorded here List IR #
1234567      8. Fill in Related Clearance Order s
Note:  Acceptable if left Blank o N/A OR Leave Blank
: 9. Was an IR written?
o Check "Yes" box  
 
ELEMENT STANDARD SAT UNSAT Comment Number *10. LCOAR TABLE of 1BOL 7.2   
 
Cue:  This JPM is completed. COMPLETE LCOAR Table:
CIRCLE Condition A  ENTER notification Time/Date AND sign Condition A        RECORD STOP TIME
:
JPM SUMMARY Operator's Name
:  Job Title
:  EO  RO SRO  FS  STA/IA  SRO Cert JPM Title:
Initiate a LCOAR. (SRO)
JPM Number:
SA-c (Mod from S A3) Revision Number:
0 Task Number and Title:
8E.TS-007  ENSURE compliance with all applicable Tech Spec Action Statements.
K/A Number and Importance:
2.2.23  4.6 Suggested Testing Environment:
Simulator Alternate Path:
Yes  No SRO Only:
Yes  No Time Critical:
Yes  No Reference(s):
BAP 1400-6, Technical Specification Limiting Conditions for Operation Action Requirements (LCOAR) (Rev
: 33)  1BOL 7.2, LCOAR Main Steam Isolation Valves (MSIVs) Tech Spec LCO # 3.7.2 (Rev 6)  BAR 1-1-E5, MSIV 1D HYD/PNEU Press High/Low (Rev 5) 1BOSR MS-W1, Unit One MSIV Checks Weekly Surveillance (Rev 11)
BOP MS-5, MSIV Accumulator Operability Check (Rev 19) CRITICAL STEPS
(*) 1a, 3, 4, 10 Actual Testing Environment:
Simulator Control Room In-Plant  Other Testing Method:
Simulate  Perform Estimated Time to Complete:
15 minutes Actual Time Used:
minutes EVALUATION SUMMARY:
Were all the Critical Elements performed satisfactorily?
Yes  No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Satisfactory Unsatisfactory Comments:                  Evaluator's Name
:  (Print)  Evaluator's Signature
:  Date:
INITIAL CONDITIONS
: 1. You are the Unit 1 Unit Supervisor.
: 2. Unit 1 is in MODE
: 1. 3. MSIV 1D Hyd/Pneu Press Hi/Lo Alarm (1 E5) is LIT.
: 4. 5 minutes ago that the TR Operator reports that 1D MSIV Standby Nitrogen Pressure is 4750 psig.
: 5. IR 1234567 has been written to document the issue.
: 6. No other LCOARs or DELs exist on Unit 1
. INITIATING CUE Evaluate condition and Initiate the LCOAR paperwork as necessary.
 
Exelon Nuclear Job Performance Measure Review Liquid Release Package JPM Number:
SA d  Revision Number:
02  Date: 10/18/2013 Developed By:
Robert Peterson 10/18/2013 Instructor Date  Validated By:
S. Harvey 12/11/2015 SME or Instructor Date  Approved By:
B. Lewin  12/11/2015 Operations Representative Date INITIAL CONDITIONS You are the Unit Supervisor
. A Liquid Radwaste Release Form BCP 400
-TWX01 is currently being processed.
 
You have the Liquid Release Package and it is completed up to step 7.5 for your approval
. INITIATING CUES You are to review BCP 400
-TWX01 and ensure it has been completed properly to authorize the liquid release.
TASK STANDARDS:
: 1. Determine that section 6.8.5 Rad Monitor Setpoints were incorrectly chosen.
: 2. Determine that the signature is missing for the Radiation Protection Supervisor in section 5.9 . 3. Determine that section 6.16.1 is incorrectly indicating the wrong release path (0WX001 is recorded instead of 0WX630).
: 4. Determine that step 6.16.10 is missing a verification initial.
 
RECORD START TIME:
EVALUATOR NOTE:  These steps may be performed in any order.
STEP ELEMENT STANDARD SAT UNSAT CMT# 1 Refer to BCP 400
-TWX01, Liquid Radwaste Release Form. Determine procedure is completed up to step 8.5 where the Field Supervisor is to review Release Package to ensure it is completed properly.
___ ___ ___ *2. Determine that the Rad Protection Supervisor did not sign step 5.9.
STEP 5.9 The Rad Protection Supervisor signature is missing. ___ ___ ___ *3 Determine that the Rad Monitor Setpoints are incorrect.
STEP 6.8.5 Alert and Hig h Alarm Setpoints are reversed
. ___ ___ ___ *4 Determine that the NSO recorded the wrong release flow path in step 6.16.1.
STEP 6.16.1 NSO recorded the incorrect flow path. Should
 
be 0WX001 NOT 0WX630. ___ ___ ___ *5 Determine the verification blank for step 6.16.10 is not initialed.
STEP 6.16.10 The Verification Blank is not initialed for the Rad Monitor setpoints.
___ ___ ___ CUE This JPM is complete.
RECORD STOP TIME:
 
JPM SUMMARY Operator's Name
:  Job Title
:  EO  RO SRO  FS  STA/IA  SRO Cert JPM Title:
Review Liquid Release Packa ge JPM Number:
SA d Revision Number:
01 Task Number and Title:
S-HP-001 Authorize Liquid Rad Waste Release K/A Number and Importance:
GEN 2.3.6, Imp Factor 2.0/3.8 Suggested Testing Environment:
Classroom Alternate Path:
Yes  No SRO Only:
Yes  No Time Critical:
Yes  No Reference(s):
BCP 400-TWX01 Rev 65  Chemistry Sample results from 0WX01T Radiation Protection analysis for a Liquid Release Package Actual Testing Environment:
Simulator Control Room In-Plant  Other Testing Method:
Simulate  Perform Estimated Time to Complete:
20 minutes Actual Time Use d:  minutes EVALUATION SUMMARY:
Were all the Critical Elements performed satisfactorily?
Yes  No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Satisfactory Unsatisfactory Comments:                          Evaluator's Name
:  (Print)
Evaluator's Signature
:  Date:
Exelon Nuclear Job Performance Measure Classify Event and Fill Out a NARS Form (Loss of Required Vital DC in Mode 5
)  JPM Number:
SA-e  Revision Number: 00  Date: 11/30/2015 Revised By:
R. F. Peterson 11/30/2015 Instructor Date  Validated By:
S. Harvey  12/11/2015 SME or Instructor Date  Approved By:
B. Lewin  12/11/2015 Operations Representative Date Page 2 of 5  INITIAL CONDITIONS
: 1. You are the Shift Emergency Director.
: 2. The Unit 1 Supervisor has provided you with information related to a Unit 1 event and informed you to perform an Emergency Plan evaluation.
PLANT CONDITIONS:
: 1. Unit 1 is shutdown in MODE 5 preparing for refueling.
: 2. DC bus 111 is currently Out of Service (De
-Energized) for a Planned Bus Outage.
: 3. DC Bus 112 just experienc ed a loss of Vital DC Power, indicated by voltage readings of 0VDC at DC112.
: 4. DC112 Feed Breaker is tripped and cannot be reclosed.
: 5. Electrical Maintenance Technicians and Engineering are currently in the EM Shop reviewing prints and developing a Troubleshooting plan.
INITIATING CUE
: 1. Perform an Emergency Plan evaluation and fill out the NARS form for transmittal for the plant conditions provided
: 2. This is a time critical JPM
.
Page 3 of 5 JPM START TIME:
ELEMENT STANDARD SAT UNSAT Comment Number NOTE The completion of Step 2 fulfills the critical time portion of this JPM.
: 1. Refer to Exelon Nuclear
- Radiological Emergency Plan Annex for Byron Station.
Note:  This step may be performed at any ti me  Locate and Open, EP
-AA-1002 Addendum 3, Classification of Emergencies
      *2. Classify the Event utilizing Section 3, Classification of Emergencies.
Critical portion stop time ______
Classify event as Unusual Event, from CU3 Loss of Required DC power for 15 Minutes or Longer (<108VDC on unit 125VDC batter busses 111 and 112)
Time from start to Classification =
________ minutes
&#xa2; < 15 minutes
: 3. Obtain NARS form, EP-MW-114-100-F-01, Nuclear Accident Reporting System (NARS).
Note:  Step 3 may be performed at any time  Obtain NARS form.
NOTE Provide the examinee with a copy of the NARS form.


Cue:  This JPM is completed. COMPLETE LCOAR Table:  CIRCLE Condition A  ENTER notification Time/Date AND sign Condition A        RECORD STOP TIME:
Page 4 of 5 ELEMENT STANDARD SAT UNSAT Comment Number 4. Refer to EP
JPM SUMMARY Operator's Name:  Job Title:  EO  RO SRO  FS  STA/IA  SRO Cert JPM Title: Initiate a LCOAR. (SRO) JPM Number: SA-c (Mod from SA3) Revision Number: 0 Task Number and Title: 8E.TS-007  ENSURE compliance with all applicable Tech Spec Action Statements. K/A Number and Importance: 2.2.23  4.6 Suggested Testing Environment: Simulator Alternate Path:  Yes  No SRO Only:  Yes  No Time Critical:  Yes  No Reference(s):  BAP 1400-6, Technical Specification Limiting Conditions for Operation Action Requirements (LCOAR) (Rev 33)  1BOL 7.2, LCOAR Main Steam Isolation Valves (MSIVs) Tech Spec LCO # 3.7.2 (Rev 6)  BAR 1-1-E5, MSIV 1D HYD/PNEU Press High/Low (Rev 5)  1BOSR MS-W1, Unit One MSIV Checks Weekly Surveillance (Rev 11)  BOP MS-5, MSIV Accumulator Operability Check (Rev 19) CRITICAL STEPS (*) 1a, 3, 4, 10 Actual Testing Environment:  Simulator  Control Room  In-Plant  Other Testing Method:  Simulate  Perform Estimated Time to Complete: 15 minutes Actual Time Used:  minutes EVALUATION SUMMARY: Were all the Critical Elements performed satisfactorily?  Yes  No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:  Satisfactory  Unsatisfactory  Comments:                  Evaluator's Name:  (Print)  Evaluator's Signature:  Date:
-MW-114-100, MWROG Offsite Notifications, to complete NARS form.
INITIAL CONDITIONS 1. You are the Unit 1 Unit Supervisor. 2. Unit 1 is in MODE 1. 3. MSIV 1D Hyd/Pneu Press Hi/Lo Alarm (1-1-E5) is LIT. 4. 5 minutes ago that the TR Operator reports that 1D MSIV Standby Nitrogen Pressure is 4750 psig. 5. IR 1234567 has been written to document the issue. 6. No other LCOARs or DELs exist on Unit 1. INITIATING CUE Evaluate condition and Initiate the LCOAR paperwork as necessary.
Note:  Step 4 is optional and may be performed at any time Locate and Open, EP
Exelon Nuclear  Job Performance Measure  Review Liquid Release Package  JPM Number: SA d  Revision Number: 02  Date: 10/18/2013  Developed By: Robert Peterson  10/18/2013  Instructor Date  Validated By: S. Harvey  12/11/2015  SME or Instructor Date  Approved By: B. Lewin  12/11/2015  Operations Representative Date INITIAL CONDITIONS  You are the Unit Supervisor. A Liquid Radwaste Release Form BCP 400-TWX01 is currently being processed.
-MW-114-100, MWROG Offsite Notifications, Section 4.1, to complete NARS form.
You have the Liquid Release Package and it is completed up to step 7.5 for your approval. INITIATING CUES  You are to review BCP 400-TWX01 and ensure it has been completed properly to authorize the liquid release. TASK STANDARDS: 1. Determine that section 6.8.5 Rad Monitor Setpoints were incorrectly chosen. 2. Determine that the signature is missing for the Radiation Protection Supervisor in section 5.9 . 3. Determine that section 6.16.1 is incorrectly indicating the wrong release path (0WX001 is recorded instead of 0WX630). 4. Determine that step 6.16.10 is missing a verification initial.
NOTE Provide the examinee with Wind Speed and Wind Direction cues after examinee has explained where to obtain the information from the computer or from the main control board.
RECORD START TIME:  EVALUATOR NOTE:  These steps may be performed in any order. STEP ELEMENT STANDARD SAT UNSAT CMT# 1 Refer to BCP 400-TWX01, Liquid Radwaste Release Form. Determine procedure is completed up to step 8.5 where the Field Supervisor is to review Release Package to ensure it is completed properly. ___ ___ ___ *2. Determine that the Rad Protection Supervisor did not sign step 5.9. STEP 5.9 The Rad Protection Supervisor signature is missing. ___ ___ ___ *3 Determine that the Rad Monitor Setpoints are incorrect. STEP 6.8.5 Alert and High Alarm Setpoints are reversed. ___ ___ ___ *4 Determine that the NSO recorded the wrong release flow path in step 6.16.1. STEP 6.16.1 NSO recorded the incorrect flow path. Should be 0WX001 NOT 0WX630. ___ ___ ___ *5 Determine the verification blank for step 6.16.10 is not initialed. STEP 6.16.10 The Verification Blank is not initialed for the Rad Monitor setpoints. ___ ___ ___ CUE This JPM is complete. RECORD STOP TIME:
  *5. Fill out NARS form according to instructions, EP-MW-114-100, Section 4.1, Completing the NARS Form.
JPM SUMMARY Operator's Name:  Job Title:  EO  RO SRO  FS  STA/IA  SRO Cert JPM Title: Review Liquid Release Package JPM Number: SA d Revision Number: 01 Task Number and Title: S-HP-001 Authorize Liquid Rad Waste Release K/A Number and Importance: GEN 2.3.6, Imp Factor 2.0/3.8 Suggested Testing Environment: Classroom Alternate Path:  Yes  No SRO Only:  Yes  No Time Critical:  Yes  No Reference(s):  BCP 400-TWX01 Rev 65  Chemistry Sample results from 0WX01T  Radiation Protection analysis for a Liquid Release Package  Actual Testing Environment:  Simulator  Control Room  In-Plant  Other Testing Method:  Simulate  Perform Estimated Time to Complete: 20 minutes Actual Time Used:  minutes EVALUATION SUMMARY: Were all the Critical Elements performed satisfactorily?  Yes  No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:  Satisfactory  Unsatisfactory  Comments:                          Evaluator's Name:  (Print)
Cue: The wind direction on AM004 is 286. Cue: The wind speed on AM001 is 16 meters/sec.
Evaluator's Signature:  Date:
Cue: An SRO has provided a peer check and signed the "Verified With:" section.
Exelon Nuclear  Job Performance Measure  Classify Event and Fill Out a NARS Form  (Loss of Required Vital DC in Mode 5)  JPM Number: SA-e  Revision Number: 00  Date: 11/30/2015  Revised By: R. F. Peterson  11/30/2015  Instructor Date  Validated By: S. Harvey  12/11/2015  SME or Instructor Date  Approved By: B. Lewin  12/11/2015  Operations Representative Date Page 2 of 5  INITIAL CONDITIONS 1. You are the Shift Emergency Director. 2. The Unit 1 Supervisor has provided you with information related to a Unit 1 event and informed you to perform an Emergency Plan evaluation. PLANT CONDITIONS: 1. Unit 1 is shutdown in MODE 5 preparing for refueling. 2. DC bus 111 is currently Out of Service (De-Energized) for a Planned Bus Outage. 3. DC Bus 112 just experienced a loss of Vital DC Power, indicated by voltage readings of 0VDC at DC112. 4. DC112 Feed Breaker is tripped and cannot be reclosed. 5. Electrical Maintenance Technicians and Engineering are currently in the EM Shop reviewing prints and developing a Troubleshooting plan. INITIATING CUE 1. Perform an Emergency Plan evaluation and fill out the NARS form for transmittal for the plant conditions provided  2. This is a time critical JPM.
Fill out NARS form according to instructions, EP-MW-114-100, Section 4.1 Completing the NARS Form. BLOCKS 2 thru 9 must be filled correctly to meet the critical portion of filling out the NARS form. (See attached KEY). o Block 10 should be filled in "None" o Verified with another SRO peer check CUE: The JPM is complete.
Page 3 of 5 JPM START TIME:  ELEMENT STANDARD SAT UNSAT Comment Number NOTE The completion of Step 2 fulfills the critical time portion of this JPM. 1. Refer to Exelon Nuclear - Radiological Emergency Plan Annex for Byron Station. Note:  This step may be performed at any time  Locate and Open, EP-AA-1002 Addendum 3, Classification of Emergencies      *2. Classify the Event utilizing Section 3, Classification of Emergencies. Critical portion stop time ______  Classify event as Unusual Event, from CU3 Loss of Required DC power for 15 Minutes or Longer (<108VDC on unit 125VDC batter busses 111 and 112)      Time from start to Classification =  ________ minutes &#xa2; < 15 minutes      3. Obtain NARS form, EP-MW-114-100-F-01, Nuclear Accident Reporting System (NARS). Note:  Step 3 may be performed at any time  Obtain NARS form.      NOTE Provide the examinee with a copy of the NARS form.
JPM STOP TIME
Page 4 of 5 ELEMENT STANDARD SAT UNSAT Comment Number 4. Refer to EP-MW-114-100, MWROG Offsite Notifications, to complete NARS form. Note:  Step 4 is optional and may be performed at any time Locate and Open, EP-MW-114-100, MWROG Offsite Notifications, Section 4.1, to complete NARS form.       NOTE Provide the examinee with Wind Speed and Wind Direction cues after examinee has explained where to obtain the information from the computer or from the main control board. *5. Fill out NARS form according to instructions, EP-MW-114-100, Section 4.1, Completing the NARS Form. Cue: The wind direction on AM004 is 286. Cue: The wind speed on AM001 is 16 meters/sec. Cue: An SRO has provided a peer check and signed the "Verified With:" section. Fill out NARS form according to instructions, EP-MW-114-100, Section 4.1 Completing the NARS Form. BLOCKS 2 thru 9 must be filled correctly to meet the critical portion of filling out the NARS form. (See attached KEY). o Block 10 should be filled in "None" o Verified with another SRO peer check       CUE: The JPM is complete. JPM STOP TIME:
:
Page 5 of 5 JPM SUMMARY Operator's Name:  Job Title:  EO  RO SRO  FS  STA/IA  SRO Cert JPM Title: Classify Event and Fill Out a NARS Form Earthquake JPM Number: SA-a Revision Number: 00 Task Number and Title: 8F.ZP-008 CLASSIFY/RECLASSIFY Emergency Action Levels K/A Number and Importance: 2.4.41  4.6 Suggested Testing Environment: Simulator Alternate Path: Yes  No SRO Only: Yes  No Time Critical: Yes  No Reference(s): EP-MW-114-100 (Rev 16), Midwest Region Offsite Notifications EP-MW-114-100-F-01 (Rev. H) Nuclear Accident Reporting System (NARS) Form EP-AA-1002 Addendum 3 (Rev 0) Emergency Action Levels for Byron Station EP-AA-1002 (Rev 34) Exelon Nuclear Radiological Emergency Plan Annex for Byron Station CRITICAL STEPS (*) 2 & 5 Actual Testing Environment: Simulator Control Room In-Plant  Other Testing Method: Simulate  Perform Estimated Time to Complete: 20 minutes Actual Time Used:   minutes EVALUATION SUMMARY: Were all the Critical Elements performed satisfactorily? Yes  No The operator's performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:                      Evaluator's Name:  (Print) Evaluator's Signature:  Date:}}
Page 5 of 5 JPM SUMMARY Operator's Name
:  Job Title
:  EO  RO SRO  FS  STA/IA  SRO Cert JPM Title:
Classify Event and Fill Out a NARS Form Earthquake JPM Number:
SA-a Revision Number
: 00 Task Number and Title:
8F.ZP-008 CLASSIFY/RECLASSIFY Emergency Action Levels K/A Number and Importance: 2.4.41  4.6 Suggested Testing Environment:
Simulator Alternate Path:
Yes  No SRO Only:
Yes  No Time Critical:
Yes  No Reference(s):
EP-MW-114-100 (Rev 16), Midwest Region Offsite Notifications EP-MW-114-100-F-01 (Rev. H) Nuclear Accident Reporting System (NARS) Form EP-AA-1002 Addendum 3 (Rev 0) Emergency Action Levels for Byron Station EP-AA-1002 (Rev 34) Exelon Nuclear Radiological Emergency Plan Annex for Byron Station CRITICAL STEPS
(*) 2 & 5 Actual Testing Environment:
Simulator Control Room In-Plant  Other Testing Method:
Simulate  Perform Estimated Time to Complete:
20 minutes Actual Time Used:
minutes EVALUATION SUMMARY:
Were all the Critical Elements performed satisfactorily?
Yes  No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Satisfactory Unsatisfactory Comments:                      Evaluator's Name
:  (Print) Evaluator's Signature
:  Date:}}

Revision as of 09:54, 30 June 2018

2016 Byron Nuclear Station Initial License Examination Administered SRO Admin JPMs
ML16109A092
Person / Time
Site: Byron  Constellation icon.png
Issue date: 03/23/2016
From: Bielby M E
Operations Branch III
To:
Exelon Nuclear
References
Download: ML16109A092 (35)


Text

Exelon Nuclear Job Performance Measure Evaluate a Reactivity Change

JPM Number:

SA-a Revision Number:

02 Date: 12/10/2015 Revised By: B. Peterson 12/10/2015 Instructor Date Validated By:

C. Berger 12/11/2015 SME or Instructor Date Approved By: B. Lewin 12/11/2015 Operations Representative Date JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

__RFP__ 1. Task description and number, JPM description and number are identified.

__RFP__ 2. Knowledge and Abilities (K/A) references are included.

__RFP__ 3. Performance location specified. (in

-plant, control room, simulator, or other)

__RFP__ 4. Initial setup conditions are identified.

__RFP__ 5. Initiating cue (and terminating cue if required) are properly identified.

__RFP__ 6. Task standards identified and verified by SME review.

__RFP__ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

__RFP__ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure OP-AP-300-1004 Rev: 4 Procedure Rev: Procedure Rev: __RFP__ 9. Verify cues both verbal and visual are free of conflict.

__RFP__ 10. Verify performance time is accurate

__RFP__ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM. __RFP__ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

B. Lewin/R. Peterson 12/11/2015 SME / Instructor Date SME / Instructor Date SME / Instructor Date Revision Record (Summary)

Revision 00 Initial revision of JPM Comment Resolution Revision 0 1 Revised JPM for modification of calculation Revision 02 Revised JPM for modification of calculation and time in core life.

INITIAL CONDITIONS:

1. Unit 2 is at 50% power, 9100 EFPH, 500 ppm boron, with CB D at 89 steps. 2. Tave is 0.

5° less than Tref.

3. The QNE has recommended that Control Bank D be withdrawn 4 steps to control PDMA02 on the desired target, then to perform a reactivity change to match Tave to Tref.
4. The NSO has calculated a reactivity change to move rods then to match Tave with Tref.

INITIATING CUES:

1. Evaluate the reactivity change to restore PDMA02 to target and to match Tave to Tref.
2. Review the Reactivity Change Determination Form for approval

. Provide completed copy of OP

-AP-300-1004, attachment 1, Rev 4, Pwr Boration and Dilution Requirements Provide copy of Unit 2 Rema Thumbrules Information For Evaluator's Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps 2 & 3 Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

TASK STANDARDS:

1. Evaluate the reactivity change to match Tave to Tref.
2. Review the Reactivity Change Determination Form.

MATERIALS:

Completed OP

-AP-300-1004, Rev 2, Pwr Boration and Dilution Requirements (Attachment 1 is attached)

Unit 2 Rema Thumbrules at 8500-11000 EFPH RECORD START TIME:

EVALUATOR NOTE: These steps may be performed in any order.

STEP ELEMENT STANDARD SAT UNSAT CMT# CUE Provide completed copy of OP

-AP-300-1004 and a copy of the Unit 2 Rema thumbrules 1 Refer to OP-AP-300-1004, Rev 2, Pwr Boration and Dilution Requirements Unit 2 Rema Thumbrules In accordance with the provided:

OP-AP-300-1004, Rev 2, Pwr Boration and Dilution Requirements Unit 2 Rema Thumbrules

___ ___ ___ *2 Part 1 Review Attachment 1 of OP

-AP-300-1004 Determine wrong number of withdrawn rod steps calculated on form Evaluate inaccurate calculation Should be 4 steps of Control Bank D at 50% power: Tave

-Tref = 2° rise in temperature NOTE: When examinee identifies the deficiency, inform them to review the rest of the calculations Station: Byron Unit: 2 Desired change Withdraw Rods 2 steps for PDMA02 control Reason for change PDMA02 control Temperature control What is the method & am't for the reactivity change?

2 steps withdrawal of CB D Inputs Rema thumbrules

___ ___ ___ *3 Part 2 Review Attachment 1 of OP

-AP-300-1004 Determine incorrect reactivity addition calculated on form due to using 100% REMA thumbrule

s. (Calculation is not required for success) +0.3° - 0.5° (current mismatch) =

-0.2° 465 gallons PW/1° x 0.2° =

93 gallons dilution From inaccurate rod

withdrawal, and 100% thumbrules, calculation is incorrect which yields an incorrect reactivity calculation Calculation has incorrect dilution value of 93 gallons. It should be a Boration of 37.5 gallons. +2° - 0.5° (current mismatch) = +1.5° 25 gallons BA/1° x 1.5° = 37.5 gallons boration Inputs Rema thumbrules

___ ___ ___ CUE This JPM is complete.

RECORD STOP TIME:

JPM SUMMARY Operator's Name

Job Title
EO RO SRO FS STA/IA SRO Cert JPM Title:

Evaluate a Reactivity Change JPM Number:

SA-a Revision Number:

02 Task Number and Title:

S-AM-151, Perform proper reactivity management on unit startup and during normal plant operations K/A Number and Importance: GEN 2.1.37 Imp Factor 4.6 Suggested Testing Environment:

Classroom Alternate Path:

Yes No SRO Only:

Yes No Time Critical:

Yes No Reference(s): OP-AP-300-1004, Rev 4, Pwr Boration and Dilution Requirements Unit 2 Rema Thumbrules Actual Testing Environment:

Simulator Control Room In-Plant Other Testing Method:

Simulate Perform Estimated Time to Complete:

15 minutes Actual Time Used:

minutes EVALUATION SUMMARY:

Were all the Critical Elements performed satisfactorily?

Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:

Satisfactory Unsatisfactory Comments: Evaluator's Name

(Print)

Evaluator's Signature

Date:

JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

1. Unit 2 is at 50% power, 9100 EFPH, 500 ppm boron, with CB D at 89 steps.
2. Tave is 0.

5° less than Tref.

3. The QNE has recommended that Control Bank D be withdrawn 4 steps to control PDMA02 on the desired target, then to perform a reactivity change to match Tave to Tref.
4. The NSO has calculated a reactivity change to move rods then to match Tave with Tref.

INITIATING CUES:

1. Evaluate the reactivity change to restore PDMA02 to target and to match Tave to Tref.
2. Review the Reactivity Change Determination Form for approval.

OP-AP-300-1004 Revision 4 Page 4 of 4 ATTACHMENT 1 REACTIVITY CHANGE DETERMINATION FORM Station: Byron Unit: 1 2 Time: Now Date: Today Desired change:

(Parameter, Magnitude, and Direction: Reactor Power, Rod Position, RCS Temp, Delta I, etc.)

Withdraw Rods 2 steps for PDMA02 control Dilute to raise Tave (0.2°F) to match Tref Reason for Change:

(Temperature control, flux control, fuel burn up)

PDMA02 control and temperature control What is the method and amount required for the reactivity change?

(Bleed Tank Volume, Gallons of Dilution/Boration/Blended Flow, Rod Insertion/Rod Withdrawal steps/percent) 2 steps withdrawal of CB D and 93 gallons Dilution Inputs: (ReMA Thumbrules, ReMA maneuver guidance, Curve Book Figure/Table, Computer based trend plot, RCS Cb, EFPD

- Preparer and Reviewer should use independent inputs when possible)

Rema thumbrules for Unit 2 at 9100 EFPH Calculation of change:

(E.G. Bwd/Byr: ReMA Thumbrule identifies 20 gallons BA = 1.0°F RCS temp reduction.

Desired change = 0.5°F drop. Calculation of change: (20 gal/1.0°F)

  • 0.5°F = 10 gal.,

previously used borations and dilutions)

(TMI: Procedure 1102

-4 Power Operations Fig. 1, Volume of Deminerlized Water for 1% Rod Insertion) Withdrawal of control rods 2 steps raises temp 0.3°F. Then dilute to raise temperature by 0.

2°F: 465 gals/°F x (0.2°F) = 93 gals dilution. Joe Rowe P Chech ______________

Preparer Reviewer Approver (RO) (RO/SRO) (SRO) Shift Manager Notified: Yes No

Exelon Nuclear Job Performance Measure Minimum Shift Staffing JPM Number:

SA-b Revision Number:

2 Date: 7/20/2010 Revised By:

R. F. Peterson 7/20/2010 Instructor Date Validated By:

S. Harvey 12/11/2015 SME or Instructor Date Approved By:

B. Lewin 12/11/2015 Operations Representative Date JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below. __RFP__ 1. Task description and number, JPM description and number are identified.

__RFP__ 2. Knowledge and Abilities (K/A) references are included.

__RFP__ 3. Performance location specified. (in

-plant, control room, simulator, or other)

__RFP__ 4. Initial setup conditions are identified.

__RFP__ 5. Initiating cue (and terminating cue if required) are properly identified.

__RFP__ 6. Task standards identified and verified by SME review.

__RFP__ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

__RFP__ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure BAP 320-1 Rev: 22 Procedure BAP 320-1T1 Rev: 6 Procedure Rev: __RFP__ 9. Verify cues both verbal and visual are free of conflict.

__RFP__ 10. Verify performance time is accurate

__RFP__ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

__RFP__ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

Brian Lewin/Robert Peterson 10/6/2013 SME / Instructor Date Brian Lewin/Robert Peterson 12/11/2015 SME / Instructor Date SME / Instructor Date Revision Record (Summary)

Revision 1 Put in current JPM Format Clarified the intent of the question and limited to asking for recommendations for desired staffing levels.

Revision 2 Added requirement to validate TS manning and Administrative manning to JPM.

INITIAL CONDITIONS

1. You are the Shift Manager.
2. Unit 1 is in Mode 5 and Unit 2 is in Mode 1 at 100% power. 3. The following qualified people are inside the Protected Area as members of the oncoming shift operating crew: (Assume that AII LISTED personnel have the same shift rotation)

Name Qual Position Name Qual Position Name Qual Position Joe SRO/SM Sam NSO Mary FB EO Bill FC SRO Dave NSO Ted EC EO Tom FC SRO Ron FB EO Bob RP Andy SRO Alan FB EO Terry Chem Arnie SRO/STA Sally FB EO Karla EC Chem Tim EO FC: Fire Chief qualified FB: Fire Brigade qualified EC: Emerg Comm qualified INITIATING CUES:

DETERMINE if the crew meets the Desired staffing levels per BAP 320

-1, and if not, do staffing levels meet Tech Spec Mi nimum staffing levels.

If staffing levels are not met DETERMINE

number of people in any given position needed to fill to the Tech Spec Minimum

. number of people in any given position needed to fill to the Desired staffing levels.

actions required to meet oncoming Shift Manning requirements.

All Work Hour Rules have been determined to be in compliance.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluator's Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the "Comment Number" column on the following pages.

Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

RECORD START TIME:

ELEMENT STANDARD SAT UNSAT Comment Number 1. Refer to BAP 320

-1, Shift Staffing Cue: Provide a copy of BAP 320

-1 and BAP 320

-1T1 after correct procedure has been determined.

The staffing determination can be determined in any order.

Determines that BAP 320

-1 is needed to make determination.

2. Review Desired Staffing requirement for Shift Manager.

Determine that minimum Desired Staffing and TS Staffing for Shift Manager IS satisfied

.

3. Review Desired Staffing requirement for Unit Supervisor.

Determine that minimum Desired Staffing and TS Staffing for Unit Supervisor IS satisfied.

ELEMENT STANDARD SAT UNSAT Comment Number 4. Review Desired Staffing requirement for WEC.

Note: The candidate should determine that the WEC SRO is not required for TS minimum manning and should be used to meet minimum NSO TS Manning.

Determine that minimum Desired Staffing for WEC IS satisfied.

5. Review Desired Staffing requirement for FS/Fire Brigade Chief. Determine that minimum Desired Staffing for FS IS satisfied.
  • 6. Review Desired Staffing requirement for NSO.

Determine that minimum Desired Staffing for NSO's IS NOT satisfied.

2 more are desired. Determine that minimum TS Staffing for NSO's IS satisfied (an SRO is used to fill TS staffing levels)

___

___

___

7. Review Desired Staffing requirement for STA.

Determine that minimum Desired Staffing for STA IS satisfied.

  • 8. Review Desired Staffing requirement for EO (SSD/FB).

Determine that minimum Desired Staffing for EO's IS NOT satisfied.

2 more SSD EO's are desired. Determine that minimum TS Staffing for EO's IS satisfied (3 SSD EO's needed, with 0 FB needed)

___

___

___

ELEMENT STANDARD SAT UNSAT Comment Number *9. Review Desired Staffing requirement for RP.

Determine that minimum Desired Staffing for RP IS NOT satisfied.

1 more is desired.

Determine that minimum TS Staffing for RP IS satisfied (1 RP required)

___

___

___

10. Review Desired Staffing requirement for Chemistry.

Determine that minimum Desired Staffing for Chemistry

IS satisfied.

11. Review Desired Staffing requirement for Emergency Communicator.

Determine that minimum Desired Staffing for Emergency Communicator IS satisfied

- the extra Chemistry person (or any qualified station staff person)

12. Determine need to fill positions with offgoing shift.

Cue: Ask candidate on what actions are needed to meet immediate manning requirements for the oncoming shift?

Determine that the oncoming crew will not be able to fill all of the positions of BAP 320

-1T1 with qualified individuals

-AND- Determine that personnel from the current shift will be held over to fill all required positions until callout relief is in the Protected Area

___

___

___

CUE: The JPM is complete.

RECORD STOP TIME

JPM SUMMARY Operator's Name

Job Title
EO RO SRO FS STA/IA SRO Cert JPM Title:

Minimum Shift Staffing JPM Number:

SA-b Revision Number:

1 Task Number and Title:

S-AM-029 Ensure Minimum Shift Staffing and Authorize Additional Shift Staffing as Necessary K/A Number and Importance:

2.1.5 3.9 Suggested Testing Environment:

Classroom Alternate Path:

Yes No SRO Only:

Yes No Time Critical:

Yes No Reference(s):

BAP 320-1, Rev 19, Shift Staffing BAP 320-1T1 CRITICAL STEPS

(*) 6, 8 & 9 Actual Testing Environment:

Simulator Control Room In-Plant Other Testing Method:

Simulate Perform Estimated Time to Complete:

20 minutes Actual Time Used:

minutes EVALUATION SUMMARY:

Were all the Critical Elements performed satisfactorily?

Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:

Satisfactory Unsatisfactory Comments: Evaluator's Name

(Print) Evaluator's Signature: Date:

INITIAL CONDITIONS

1. You are the Shift Manager.
2. Unit 1 is in Mode 5 and Unit 2 is in Mode 1 at 100% power.
3. The following qualified people are inside the Protected Area as members of the oncoming shift operating crew: (Assume that AII LISTED personnel have the same shift rotation)

Name Qual Position Name Qual Position Name Qual Position Joe SRO/SM Sam NSO Mary FB EO Bill FC SRO Dave NSO Ted EC EO Tom FC SRO Ron FB EO Bob RP Andy SRO Alan FB EO Terry Chem Arnie SRO/STA Sally FB EO Karla EC Chem Tim EO FC: Fire Chief qualified FB: Fire Brigade qualified EC: Emerg Comm qualified INITIATING CUES:

DETERMINE if the crew meets the Desired staffing levels per BAP 320

-1, and if not, do staffing levels meet Tech Spec Minimum staffing levels

. If staffing levels are not met DETERMINE

number of people in any given position needed to fill to the Tech Spec Minimum

. number of people in any given position needed to fill to the Desired staffing levels.

actions required to meet oncoming Shift Manning requirements.

All Work Hour Rules have been determined to be in compliance.

Exelon Nuclear Job Performance Measure Initiate a LCOAR JPM Number:

SA-c Revision Number:

0 Date: 11/30/2015

Revised By: Robert Peterson 11/30/2015 Instructor Date Validated By:

Shane Harvey 12/11/2015 SME or Instructor Date Approved By:

Brian Lewin 12/11//2015 Facility Representative Date JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

See File Copy 1. Task description and number, JPM description and number are identified.

2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in

-plant, control room, simulator, or other)

4. Initial setup conditions are identified

. 5. Initiating cue (and terminating cue if required) are properly identified.

6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure BAP 1400-6 Rev: 33 Procedure 1BOL 7.2 Rev: 6 Procedure BAR 1-1-E5 Rev: 5 Procedure 1BOSR MS-W1 Rev: 11 Procedure BOP MS-5 Rev: 19 9. Verify cues both verbal and visual are free of conflict. 10. Verify performance time is accurate

11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Revision Record (Summary)

Revision 0 Comment Resolution Modified SA3 Rev. 0 Changed component that is in LCOAR

INITIAL CONDITIONS

1. You are the Unit 1 Unit Superviso
r. 2. Unit 1 is in MODE 1 3. MSIV 1D Hyd/Pneu Press Hi/Lo Alarm (1 E5) is LIT.
4. 5 minutes ago that the TR Operator reports that 1D MSIV Standby Nitrogen Pressure is 4750 psig.
5. IR 1234567 has been written to document the issue.
6. No other LCOARs or DELs exist on Unit 1. INITIATING CUE Evaluate condition and Initiate the LCOAR paperwork as necessary.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluator's Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps 1a, 3, 4, 10 Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

RECORD START TIME:

ELEMENT STANDARD SAT UNSAT Comment Number NOTE Once the student demonstrates the ability to locate referenced procedure provide the student with a copy of the procedure.

1. Refer to BAP 1400

-6, Technical Specification Limiting Conditions for Operation Action Requirements (LCOAR)

LOCATE and OPEN BAP 1400-6 *1.a Evaluate required LCOAR entry T.S 3.7.2 and/or Bases 1BOL 7.2 BAR 1-1-E5 1BOSR MS-W1 BOP MS-5 Identify that 1BOL 7.2 LCOAR entry is required.

Utilize references as required 2. Refer to 1BOL 7.2, LCOAR Main Steam Isolation Valves (MSIVs)

- Tech Spec LCO

  1. 3.7.2 LOCATE and OPEN 1BOL 7.2 *3. Section A of 1BOL 7.2 Note: Notification occurred 5 minutes ago per initiating Cue. ENTER into Section A:

Time/Date: Today/5 minutes ago By: Candidate's name

Title: Unit Supervisor Present mode

1 Initiating event
Initiating event: 1MS001D Standby Pneumatic Pressure <4800 psig. Condition
A ELEMENT STANDARD SAT UNSAT Comment Number *4. Safety function determination Cue: All other MSIVs pass operability.

PERFORM SFD Indicate No in Section C Sign Coversheet Indicate NO on coversheet for invalidating current SFD 4.a LCO 3.0.6 Evaluation

Note: Acceptable if left Blank or may be placekept.

Placekeep OR Leave Blank

5. Update DEL o Check "N/A" box
6. Determine Planned or Unplanned o Mark UNPLANNED on coversheet NOTE Examinee may inform SM of entry at this time, however, the SM Notified and time/date is typically completed after Peer Check received by another SRO.
7. Related WR/WO block

Note: IR # will be recorded here List IR #

1234567 8. Fill in Related Clearance Order s

Note: Acceptable if left Blank o N/A OR Leave Blank

9. Was an IR written?

o Check "Yes" box

ELEMENT STANDARD SAT UNSAT Comment Number *10. LCOAR TABLE of 1BOL 7.2

Cue: This JPM is completed. COMPLETE LCOAR Table:

CIRCLE Condition A ENTER notification Time/Date AND sign Condition A RECORD STOP TIME

JPM SUMMARY Operator's Name

Job Title
EO RO SRO FS STA/IA SRO Cert JPM Title:

Initiate a LCOAR. (SRO)

JPM Number:

SA-c (Mod from S A3) Revision Number:

0 Task Number and Title:

8E.TS-007 ENSURE compliance with all applicable Tech Spec Action Statements.

K/A Number and Importance:

2.2.23 4.6 Suggested Testing Environment:

Simulator Alternate Path:

Yes No SRO Only:

Yes No Time Critical:

Yes No Reference(s):

BAP 1400-6, Technical Specification Limiting Conditions for Operation Action Requirements (LCOAR) (Rev

33) 1BOL 7.2, LCOAR Main Steam Isolation Valves (MSIVs) Tech Spec LCO # 3.7.2 (Rev 6) BAR 1-1-E5, MSIV 1D HYD/PNEU Press High/Low (Rev 5) 1BOSR MS-W1, Unit One MSIV Checks Weekly Surveillance (Rev 11)

BOP MS-5, MSIV Accumulator Operability Check (Rev 19) CRITICAL STEPS

(*) 1a, 3, 4, 10 Actual Testing Environment:

Simulator Control Room In-Plant Other Testing Method:

Simulate Perform Estimated Time to Complete:

15 minutes Actual Time Used:

minutes EVALUATION SUMMARY:

Were all the Critical Elements performed satisfactorily?

Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:

Satisfactory Unsatisfactory Comments: Evaluator's Name

(Print) Evaluator's Signature
Date:

INITIAL CONDITIONS

1. You are the Unit 1 Unit Supervisor.
2. Unit 1 is in MODE
1. 3. MSIV 1D Hyd/Pneu Press Hi/Lo Alarm (1 E5) is LIT.
4. 5 minutes ago that the TR Operator reports that 1D MSIV Standby Nitrogen Pressure is 4750 psig.
5. IR 1234567 has been written to document the issue.
6. No other LCOARs or DELs exist on Unit 1

. INITIATING CUE Evaluate condition and Initiate the LCOAR paperwork as necessary.

Exelon Nuclear Job Performance Measure Review Liquid Release Package JPM Number:

SA d Revision Number:

02 Date: 10/18/2013 Developed By:

Robert Peterson 10/18/2013 Instructor Date Validated By:

S. Harvey 12/11/2015 SME or Instructor Date Approved By:

B. Lewin 12/11/2015 Operations Representative Date INITIAL CONDITIONS You are the Unit Supervisor

. A Liquid Radwaste Release Form BCP 400

-TWX01 is currently being processed.

You have the Liquid Release Package and it is completed up to step 7.5 for your approval

. INITIATING CUES You are to review BCP 400

-TWX01 and ensure it has been completed properly to authorize the liquid release.

TASK STANDARDS:

1. Determine that section 6.8.5 Rad Monitor Setpoints were incorrectly chosen.
2. Determine that the signature is missing for the Radiation Protection Supervisor in section 5.9 . 3. Determine that section 6.16.1 is incorrectly indicating the wrong release path (0WX001 is recorded instead of 0WX630).
4. Determine that step 6.16.10 is missing a verification initial.

RECORD START TIME:

EVALUATOR NOTE: These steps may be performed in any order.

STEP ELEMENT STANDARD SAT UNSAT CMT# 1 Refer to BCP 400

-TWX01, Liquid Radwaste Release Form. Determine procedure is completed up to step 8.5 where the Field Supervisor is to review Release Package to ensure it is completed properly.

___ ___ ___ *2. Determine that the Rad Protection Supervisor did not sign step 5.9.

STEP 5.9 The Rad Protection Supervisor signature is missing. ___ ___ ___ *3 Determine that the Rad Monitor Setpoints are incorrect.

STEP 6.8.5 Alert and Hig h Alarm Setpoints are reversed

. ___ ___ ___ *4 Determine that the NSO recorded the wrong release flow path in step 6.16.1.

STEP 6.16.1 NSO recorded the incorrect flow path. Should

be 0WX001 NOT 0WX630. ___ ___ ___ *5 Determine the verification blank for step 6.16.10 is not initialed.

STEP 6.16.10 The Verification Blank is not initialed for the Rad Monitor setpoints.

___ ___ ___ CUE This JPM is complete.

RECORD STOP TIME:

JPM SUMMARY Operator's Name

Job Title
EO RO SRO FS STA/IA SRO Cert JPM Title:

Review Liquid Release Packa ge JPM Number:

SA d Revision Number:

01 Task Number and Title:

S-HP-001 Authorize Liquid Rad Waste Release K/A Number and Importance:

GEN 2.3.6, Imp Factor 2.0/3.8 Suggested Testing Environment:

Classroom Alternate Path:

Yes No SRO Only:

Yes No Time Critical:

Yes No Reference(s):

BCP 400-TWX01 Rev 65 Chemistry Sample results from 0WX01T Radiation Protection analysis for a Liquid Release Package Actual Testing Environment:

Simulator Control Room In-Plant Other Testing Method:

Simulate Perform Estimated Time to Complete:

20 minutes Actual Time Use d: minutes EVALUATION SUMMARY:

Were all the Critical Elements performed satisfactorily?

Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:

Satisfactory Unsatisfactory Comments: Evaluator's Name

(Print)

Evaluator's Signature

Date:

Exelon Nuclear Job Performance Measure Classify Event and Fill Out a NARS Form (Loss of Required Vital DC in Mode 5

) JPM Number:

SA-e Revision Number: 00 Date: 11/30/2015 Revised By:

R. F. Peterson 11/30/2015 Instructor Date Validated By:

S. Harvey 12/11/2015 SME or Instructor Date Approved By:

B. Lewin 12/11/2015 Operations Representative Date Page 2 of 5 INITIAL CONDITIONS

1. You are the Shift Emergency Director.
2. The Unit 1 Supervisor has provided you with information related to a Unit 1 event and informed you to perform an Emergency Plan evaluation.

PLANT CONDITIONS:

1. Unit 1 is shutdown in MODE 5 preparing for refueling.
2. DC bus 111 is currently Out of Service (De

-Energized) for a Planned Bus Outage.

3. DC Bus 112 just experienc ed a loss of Vital DC Power, indicated by voltage readings of 0VDC at DC112.
4. DC112 Feed Breaker is tripped and cannot be reclosed.
5. Electrical Maintenance Technicians and Engineering are currently in the EM Shop reviewing prints and developing a Troubleshooting plan.

INITIATING CUE

1. Perform an Emergency Plan evaluation and fill out the NARS form for transmittal for the plant conditions provided
2. This is a time critical JPM

.

Page 3 of 5 JPM START TIME:

ELEMENT STANDARD SAT UNSAT Comment Number NOTE The completion of Step 2 fulfills the critical time portion of this JPM.

1. Refer to Exelon Nuclear

- Radiological Emergency Plan Annex for Byron Station.

Note: This step may be performed at any ti me Locate and Open, EP

-AA-1002 Addendum 3, Classification of Emergencies

  • 2. Classify the Event utilizing Section 3, Classification of Emergencies.

Critical portion stop time ______

Classify event as Unusual Event, from CU3 Loss of Required DC power for 15 Minutes or Longer (<108VDC on unit 125VDC batter busses 111 and 112)

Time from start to Classification =

________ minutes

¢ < 15 minutes

3. Obtain NARS form, EP-MW-114-100-F-01, Nuclear Accident Reporting System (NARS).

Note: Step 3 may be performed at any time Obtain NARS form.

NOTE Provide the examinee with a copy of the NARS form.

Page 4 of 5 ELEMENT STANDARD SAT UNSAT Comment Number 4. Refer to EP

-MW-114-100, MWROG Offsite Notifications, to complete NARS form.

Note: Step 4 is optional and may be performed at any time Locate and Open, EP

-MW-114-100, MWROG Offsite Notifications, Section 4.1, to complete NARS form.

NOTE Provide the examinee with Wind Speed and Wind Direction cues after examinee has explained where to obtain the information from the computer or from the main control board.

Cue: The wind direction on AM004 is 286. Cue: The wind speed on AM001 is 16 meters/sec.

Cue: An SRO has provided a peer check and signed the "Verified With:" section.

Fill out NARS form according to instructions, EP-MW-114-100, Section 4.1 Completing the NARS Form. BLOCKS 2 thru 9 must be filled correctly to meet the critical portion of filling out the NARS form. (See attached KEY). o Block 10 should be filled in "None" o Verified with another SRO peer check CUE: The JPM is complete.

JPM STOP TIME

Page 5 of 5 JPM SUMMARY Operator's Name

Job Title
EO RO SRO FS STA/IA SRO Cert JPM Title:

Classify Event and Fill Out a NARS Form Earthquake JPM Number:

SA-a Revision Number

00 Task Number and Title:

8F.ZP-008 CLASSIFY/RECLASSIFY Emergency Action Levels K/A Number and Importance: 2.4.41 4.6 Suggested Testing Environment:

Simulator Alternate Path:

Yes No SRO Only:

Yes No Time Critical:

Yes No Reference(s):

EP-MW-114-100 (Rev 16), Midwest Region Offsite Notifications EP-MW-114-100-F-01 (Rev. H) Nuclear Accident Reporting System (NARS) Form EP-AA-1002 Addendum 3 (Rev 0) Emergency Action Levels for Byron Station EP-AA-1002 (Rev 34) Exelon Nuclear Radiological Emergency Plan Annex for Byron Station CRITICAL STEPS

(*) 2 & 5 Actual Testing Environment:

Simulator Control Room In-Plant Other Testing Method:

Simulate Perform Estimated Time to Complete:

20 minutes Actual Time Used:

minutes EVALUATION SUMMARY:

Were all the Critical Elements performed satisfactorily?

Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:

Satisfactory Unsatisfactory Comments: Evaluator's Name

(Print) Evaluator's Signature
Date:

Exelon Nuclear Job Performance Measure Evaluate a Reactivity Change

JPM Number:

SA-a Revision Number:

02 Date: 12/10/2015 Revised By: B. Peterson 12/10/2015 Instructor Date Validated By:

C. Berger 12/11/2015 SME or Instructor Date Approved By: B. Lewin 12/11/2015 Operations Representative Date JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

__RFP__ 1. Task description and number, JPM description and number are identified.

__RFP__ 2. Knowledge and Abilities (K/A) references are included.

__RFP__ 3. Performance location specified. (in

-plant, control room, simulator, or other)

__RFP__ 4. Initial setup conditions are identified.

__RFP__ 5. Initiating cue (and terminating cue if required) are properly identified.

__RFP__ 6. Task standards identified and verified by SME review.

__RFP__ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

__RFP__ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure OP-AP-300-1004 Rev: 4 Procedure Rev: Procedure Rev: __RFP__ 9. Verify cues both verbal and visual are free of conflict.

__RFP__ 10. Verify performance time is accurate

__RFP__ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM. __RFP__ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

B. Lewin/R. Peterson 12/11/2015 SME / Instructor Date SME / Instructor Date SME / Instructor Date Revision Record (Summary)

Revision 00 Initial revision of JPM Comment Resolution Revision 0 1 Revised JPM for modification of calculation Revision 02 Revised JPM for modification of calculation and time in core life.

INITIAL CONDITIONS:

1. Unit 2 is at 50% power, 9100 EFPH, 500 ppm boron, with CB D at 89 steps. 2. Tave is 0.

5° less than Tref.

3. The QNE has recommended that Control Bank D be withdrawn 4 steps to control PDMA02 on the desired target, then to perform a reactivity change to match Tave to Tref.
4. The NSO has calculated a reactivity change to move rods then to match Tave with Tref.

INITIATING CUES:

1. Evaluate the reactivity change to restore PDMA02 to target and to match Tave to Tref.
2. Review the Reactivity Change Determination Form for approval

. Provide completed copy of OP

-AP-300-1004, attachment 1, Rev 4, Pwr Boration and Dilution Requirements Provide copy of Unit 2 Rema Thumbrules Information For Evaluator's Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps 2 & 3 Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

TASK STANDARDS:

1. Evaluate the reactivity change to match Tave to Tref.
2. Review the Reactivity Change Determination Form.

MATERIALS:

Completed OP

-AP-300-1004, Rev 2, Pwr Boration and Dilution Requirements (Attachment 1 is attached)

Unit 2 Rema Thumbrules at 8500-11000 EFPH RECORD START TIME:

EVALUATOR NOTE: These steps may be performed in any order.

STEP ELEMENT STANDARD SAT UNSAT CMT# CUE Provide completed copy of OP

-AP-300-1004 and a copy of the Unit 2 Rema thumbrules 1 Refer to OP-AP-300-1004, Rev 2, Pwr Boration and Dilution Requirements Unit 2 Rema Thumbrules In accordance with the provided:

OP-AP-300-1004, Rev 2, Pwr Boration and Dilution Requirements Unit 2 Rema Thumbrules

___ ___ ___ *2 Part 1 Review Attachment 1 of OP

-AP-300-1004 Determine wrong number of withdrawn rod steps calculated on form Evaluate inaccurate calculation Should be 4 steps of Control Bank D at 50% power: Tave

-Tref = 2° rise in temperature NOTE: When examinee identifies the deficiency, inform them to review the rest of the calculations Station: Byron Unit: 2 Desired change Withdraw Rods 2 steps for PDMA02 control Reason for change PDMA02 control Temperature control What is the method & am't for the reactivity change?

2 steps withdrawal of CB D Inputs Rema thumbrules

___ ___ ___ *3 Part 2 Review Attachment 1 of OP

-AP-300-1004 Determine incorrect reactivity addition calculated on form due to using 100% REMA thumbrule

s. (Calculation is not required for success) +0.3° - 0.5° (current mismatch) =

-0.2° 465 gallons PW/1° x 0.2° =

93 gallons dilution From inaccurate rod

withdrawal, and 100% thumbrules, calculation is incorrect which yields an incorrect reactivity calculation Calculation has incorrect dilution value of 93 gallons. It should be a Boration of 37.5 gallons. +2° - 0.5° (current mismatch) = +1.5° 25 gallons BA/1° x 1.5° = 37.5 gallons boration Inputs Rema thumbrules

___ ___ ___ CUE This JPM is complete.

RECORD STOP TIME:

JPM SUMMARY Operator's Name

Job Title
EO RO SRO FS STA/IA SRO Cert JPM Title:

Evaluate a Reactivity Change JPM Number:

SA-a Revision Number:

02 Task Number and Title:

S-AM-151, Perform proper reactivity management on unit startup and during normal plant operations K/A Number and Importance: GEN 2.1.37 Imp Factor 4.6 Suggested Testing Environment:

Classroom Alternate Path:

Yes No SRO Only:

Yes No Time Critical:

Yes No Reference(s): OP-AP-300-1004, Rev 4, Pwr Boration and Dilution Requirements Unit 2 Rema Thumbrules Actual Testing Environment:

Simulator Control Room In-Plant Other Testing Method:

Simulate Perform Estimated Time to Complete:

15 minutes Actual Time Used:

minutes EVALUATION SUMMARY:

Were all the Critical Elements performed satisfactorily?

Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:

Satisfactory Unsatisfactory Comments: Evaluator's Name

(Print)

Evaluator's Signature

Date:

JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

1. Unit 2 is at 50% power, 9100 EFPH, 500 ppm boron, with CB D at 89 steps.
2. Tave is 0.

5° less than Tref.

3. The QNE has recommended that Control Bank D be withdrawn 4 steps to control PDMA02 on the desired target, then to perform a reactivity change to match Tave to Tref.
4. The NSO has calculated a reactivity change to move rods then to match Tave with Tref.

INITIATING CUES:

1. Evaluate the reactivity change to restore PDMA02 to target and to match Tave to Tref.
2. Review the Reactivity Change Determination Form for approval.

OP-AP-300-1004 Revision 4 Page 4 of 4 ATTACHMENT 1 REACTIVITY CHANGE DETERMINATION FORM Station: Byron Unit: 1 2 Time: Now Date: Today Desired change:

(Parameter, Magnitude, and Direction: Reactor Power, Rod Position, RCS Temp, Delta I, etc.)

Withdraw Rods 2 steps for PDMA02 control Dilute to raise Tave (0.2°F) to match Tref Reason for Change:

(Temperature control, flux control, fuel burn up)

PDMA02 control and temperature control What is the method and amount required for the reactivity change?

(Bleed Tank Volume, Gallons of Dilution/Boration/Blended Flow, Rod Insertion/Rod Withdrawal steps/percent) 2 steps withdrawal of CB D and 93 gallons Dilution Inputs: (ReMA Thumbrules, ReMA maneuver guidance, Curve Book Figure/Table, Computer based trend plot, RCS Cb, EFPD

- Preparer and Reviewer should use independent inputs when possible)

Rema thumbrules for Unit 2 at 9100 EFPH Calculation of change:

(E.G. Bwd/Byr: ReMA Thumbrule identifies 20 gallons BA = 1.0°F RCS temp reduction.

Desired change = 0.5°F drop. Calculation of change: (20 gal/1.0°F)

  • 0.5°F = 10 gal.,

previously used borations and dilutions)

(TMI: Procedure 1102

-4 Power Operations Fig. 1, Volume of Deminerlized Water for 1% Rod Insertion) Withdrawal of control rods 2 steps raises temp 0.3°F. Then dilute to raise temperature by 0.

2°F: 465 gals/°F x (0.2°F) = 93 gals dilution. Joe Rowe P Chech ______________

Preparer Reviewer Approver (RO) (RO/SRO) (SRO) Shift Manager Notified: Yes No

Exelon Nuclear Job Performance Measure Minimum Shift Staffing JPM Number:

SA-b Revision Number:

2 Date: 7/20/2010 Revised By:

R. F. Peterson 7/20/2010 Instructor Date Validated By:

S. Harvey 12/11/2015 SME or Instructor Date Approved By:

B. Lewin 12/11/2015 Operations Representative Date JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below. __RFP__ 1. Task description and number, JPM description and number are identified.

__RFP__ 2. Knowledge and Abilities (K/A) references are included.

__RFP__ 3. Performance location specified. (in

-plant, control room, simulator, or other)

__RFP__ 4. Initial setup conditions are identified.

__RFP__ 5. Initiating cue (and terminating cue if required) are properly identified.

__RFP__ 6. Task standards identified and verified by SME review.

__RFP__ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

__RFP__ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure BAP 320-1 Rev: 22 Procedure BAP 320-1T1 Rev: 6 Procedure Rev: __RFP__ 9. Verify cues both verbal and visual are free of conflict.

__RFP__ 10. Verify performance time is accurate

__RFP__ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

__RFP__ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

Brian Lewin/Robert Peterson 10/6/2013 SME / Instructor Date Brian Lewin/Robert Peterson 12/11/2015 SME / Instructor Date SME / Instructor Date Revision Record (Summary)

Revision 1 Put in current JPM Format Clarified the intent of the question and limited to asking for recommendations for desired staffing levels.

Revision 2 Added requirement to validate TS manning and Administrative manning to JPM.

INITIAL CONDITIONS

1. You are the Shift Manager.
2. Unit 1 is in Mode 5 and Unit 2 is in Mode 1 at 100% power. 3. The following qualified people are inside the Protected Area as members of the oncoming shift operating crew: (Assume that AII LISTED personnel have the same shift rotation)

Name Qual Position Name Qual Position Name Qual Position Joe SRO/SM Sam NSO Mary FB EO Bill FC SRO Dave NSO Ted EC EO Tom FC SRO Ron FB EO Bob RP Andy SRO Alan FB EO Terry Chem Arnie SRO/STA Sally FB EO Karla EC Chem Tim EO FC: Fire Chief qualified FB: Fire Brigade qualified EC: Emerg Comm qualified INITIATING CUES:

DETERMINE if the crew meets the Desired staffing levels per BAP 320

-1, and if not, do staffing levels meet Tech Spec Mi nimum staffing levels.

If staffing levels are not met DETERMINE

number of people in any given position needed to fill to the Tech Spec Minimum

. number of people in any given position needed to fill to the Desired staffing levels.

actions required to meet oncoming Shift Manning requirements.

All Work Hour Rules have been determined to be in compliance.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluator's Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the "Comment Number" column on the following pages.

Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

RECORD START TIME:

ELEMENT STANDARD SAT UNSAT Comment Number 1. Refer to BAP 320

-1, Shift Staffing Cue: Provide a copy of BAP 320

-1 and BAP 320

-1T1 after correct procedure has been determined.

The staffing determination can be determined in any order.

Determines that BAP 320

-1 is needed to make determination.

2. Review Desired Staffing requirement for Shift Manager.

Determine that minimum Desired Staffing and TS Staffing for Shift Manager IS satisfied

.

3. Review Desired Staffing requirement for Unit Supervisor.

Determine that minimum Desired Staffing and TS Staffing for Unit Supervisor IS satisfied.

ELEMENT STANDARD SAT UNSAT Comment Number 4. Review Desired Staffing requirement for WEC.

Note: The candidate should determine that the WEC SRO is not required for TS minimum manning and should be used to meet minimum NSO TS Manning.

Determine that minimum Desired Staffing for WEC IS satisfied.

5. Review Desired Staffing requirement for FS/Fire Brigade Chief. Determine that minimum Desired Staffing for FS IS satisfied.
  • 6. Review Desired Staffing requirement for NSO.

Determine that minimum Desired Staffing for NSO's IS NOT satisfied.

2 more are desired. Determine that minimum TS Staffing for NSO's IS satisfied (an SRO is used to fill TS staffing levels)

___

___

___

7. Review Desired Staffing requirement for STA.

Determine that minimum Desired Staffing for STA IS satisfied.

  • 8. Review Desired Staffing requirement for EO (SSD/FB).

Determine that minimum Desired Staffing for EO's IS NOT satisfied.

2 more SSD EO's are desired. Determine that minimum TS Staffing for EO's IS satisfied (3 SSD EO's needed, with 0 FB needed)

___

___

___

ELEMENT STANDARD SAT UNSAT Comment Number *9. Review Desired Staffing requirement for RP.

Determine that minimum Desired Staffing for RP IS NOT satisfied.

1 more is desired.

Determine that minimum TS Staffing for RP IS satisfied (1 RP required)

___

___

___

10. Review Desired Staffing requirement for Chemistry.

Determine that minimum Desired Staffing for Chemistry

IS satisfied.

11. Review Desired Staffing requirement for Emergency Communicator.

Determine that minimum Desired Staffing for Emergency Communicator IS satisfied

- the extra Chemistry person (or any qualified station staff person)

12. Determine need to fill positions with offgoing shift.

Cue: Ask candidate on what actions are needed to meet immediate manning requirements for the oncoming shift?

Determine that the oncoming crew will not be able to fill all of the positions of BAP 320

-1T1 with qualified individuals

-AND- Determine that personnel from the current shift will be held over to fill all required positions until callout relief is in the Protected Area

___

___

___

CUE: The JPM is complete.

RECORD STOP TIME

JPM SUMMARY Operator's Name

Job Title
EO RO SRO FS STA/IA SRO Cert JPM Title:

Minimum Shift Staffing JPM Number:

SA-b Revision Number:

1 Task Number and Title:

S-AM-029 Ensure Minimum Shift Staffing and Authorize Additional Shift Staffing as Necessary K/A Number and Importance:

2.1.5 3.9 Suggested Testing Environment:

Classroom Alternate Path:

Yes No SRO Only:

Yes No Time Critical:

Yes No Reference(s):

BAP 320-1, Rev 19, Shift Staffing BAP 320-1T1 CRITICAL STEPS

(*) 6, 8 & 9 Actual Testing Environment:

Simulator Control Room In-Plant Other Testing Method:

Simulate Perform Estimated Time to Complete:

20 minutes Actual Time Used:

minutes EVALUATION SUMMARY:

Were all the Critical Elements performed satisfactorily?

Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:

Satisfactory Unsatisfactory Comments: Evaluator's Name

(Print) Evaluator's Signature: Date:

INITIAL CONDITIONS

1. You are the Shift Manager.
2. Unit 1 is in Mode 5 and Unit 2 is in Mode 1 at 100% power.
3. The following qualified people are inside the Protected Area as members of the oncoming shift operating crew: (Assume that AII LISTED personnel have the same shift rotation)

Name Qual Position Name Qual Position Name Qual Position Joe SRO/SM Sam NSO Mary FB EO Bill FC SRO Dave NSO Ted EC EO Tom FC SRO Ron FB EO Bob RP Andy SRO Alan FB EO Terry Chem Arnie SRO/STA Sally FB EO Karla EC Chem Tim EO FC: Fire Chief qualified FB: Fire Brigade qualified EC: Emerg Comm qualified INITIATING CUES:

DETERMINE if the crew meets the Desired staffing levels per BAP 320

-1, and if not, do staffing levels meet Tech Spec Minimum staffing levels

. If staffing levels are not met DETERMINE

number of people in any given position needed to fill to the Tech Spec Minimum

. number of people in any given position needed to fill to the Desired staffing levels.

actions required to meet oncoming Shift Manning requirements.

All Work Hour Rules have been determined to be in compliance.

Exelon Nuclear Job Performance Measure Initiate a LCOAR JPM Number:

SA-c Revision Number:

0 Date: 11/30/2015

Revised By: Robert Peterson 11/30/2015 Instructor Date Validated By:

Shane Harvey 12/11/2015 SME or Instructor Date Approved By:

Brian Lewin 12/11//2015 Facility Representative Date JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

See File Copy 1. Task description and number, JPM description and number are identified.

2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in

-plant, control room, simulator, or other)

4. Initial setup conditions are identified

. 5. Initiating cue (and terminating cue if required) are properly identified.

6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure BAP 1400-6 Rev: 33 Procedure 1BOL 7.2 Rev: 6 Procedure BAR 1-1-E5 Rev: 5 Procedure 1BOSR MS-W1 Rev: 11 Procedure BOP MS-5 Rev: 19 9. Verify cues both verbal and visual are free of conflict. 10. Verify performance time is accurate

11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Revision Record (Summary)

Revision 0 Comment Resolution Modified SA3 Rev. 0 Changed component that is in LCOAR

INITIAL CONDITIONS

1. You are the Unit 1 Unit Superviso
r. 2. Unit 1 is in MODE 1 3. MSIV 1D Hyd/Pneu Press Hi/Lo Alarm (1 E5) is LIT.
4. 5 minutes ago that the TR Operator reports that 1D MSIV Standby Nitrogen Pressure is 4750 psig.
5. IR 1234567 has been written to document the issue.
6. No other LCOARs or DELs exist on Unit 1. INITIATING CUE Evaluate condition and Initiate the LCOAR paperwork as necessary.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluator's Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps 1a, 3, 4, 10 Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

RECORD START TIME:

ELEMENT STANDARD SAT UNSAT Comment Number NOTE Once the student demonstrates the ability to locate referenced procedure provide the student with a copy of the procedure.

1. Refer to BAP 1400

-6, Technical Specification Limiting Conditions for Operation Action Requirements (LCOAR)

LOCATE and OPEN BAP 1400-6 *1.a Evaluate required LCOAR entry T.S 3.7.2 and/or Bases 1BOL 7.2 BAR 1-1-E5 1BOSR MS-W1 BOP MS-5 Identify that 1BOL 7.2 LCOAR entry is required.

Utilize references as required 2. Refer to 1BOL 7.2, LCOAR Main Steam Isolation Valves (MSIVs)

- Tech Spec LCO

  1. 3.7.2 LOCATE and OPEN 1BOL 7.2 *3. Section A of 1BOL 7.2 Note: Notification occurred 5 minutes ago per initiating Cue. ENTER into Section A:

Time/Date: Today/5 minutes ago By: Candidate's name

Title: Unit Supervisor Present mode

1 Initiating event
Initiating event: 1MS001D Standby Pneumatic Pressure <4800 psig. Condition
A ELEMENT STANDARD SAT UNSAT Comment Number *4. Safety function determination Cue: All other MSIVs pass operability.

PERFORM SFD Indicate No in Section C Sign Coversheet Indicate NO on coversheet for invalidating current SFD 4.a LCO 3.0.6 Evaluation

Note: Acceptable if left Blank or may be placekept.

Placekeep OR Leave Blank

5. Update DEL o Check "N/A" box
6. Determine Planned or Unplanned o Mark UNPLANNED on coversheet NOTE Examinee may inform SM of entry at this time, however, the SM Notified and time/date is typically completed after Peer Check received by another SRO.
7. Related WR/WO block

Note: IR # will be recorded here List IR #

1234567 8. Fill in Related Clearance Order s

Note: Acceptable if left Blank o N/A OR Leave Blank

9. Was an IR written?

o Check "Yes" box

ELEMENT STANDARD SAT UNSAT Comment Number *10. LCOAR TABLE of 1BOL 7.2

Cue: This JPM is completed. COMPLETE LCOAR Table:

CIRCLE Condition A ENTER notification Time/Date AND sign Condition A RECORD STOP TIME

JPM SUMMARY Operator's Name

Job Title
EO RO SRO FS STA/IA SRO Cert JPM Title:

Initiate a LCOAR. (SRO)

JPM Number:

SA-c (Mod from S A3) Revision Number:

0 Task Number and Title:

8E.TS-007 ENSURE compliance with all applicable Tech Spec Action Statements.

K/A Number and Importance:

2.2.23 4.6 Suggested Testing Environment:

Simulator Alternate Path:

Yes No SRO Only:

Yes No Time Critical:

Yes No Reference(s):

BAP 1400-6, Technical Specification Limiting Conditions for Operation Action Requirements (LCOAR) (Rev

33) 1BOL 7.2, LCOAR Main Steam Isolation Valves (MSIVs) Tech Spec LCO # 3.7.2 (Rev 6) BAR 1-1-E5, MSIV 1D HYD/PNEU Press High/Low (Rev 5) 1BOSR MS-W1, Unit One MSIV Checks Weekly Surveillance (Rev 11)

BOP MS-5, MSIV Accumulator Operability Check (Rev 19) CRITICAL STEPS

(*) 1a, 3, 4, 10 Actual Testing Environment:

Simulator Control Room In-Plant Other Testing Method:

Simulate Perform Estimated Time to Complete:

15 minutes Actual Time Used:

minutes EVALUATION SUMMARY:

Were all the Critical Elements performed satisfactorily?

Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:

Satisfactory Unsatisfactory Comments: Evaluator's Name

(Print) Evaluator's Signature
Date:

INITIAL CONDITIONS

1. You are the Unit 1 Unit Supervisor.
2. Unit 1 is in MODE
1. 3. MSIV 1D Hyd/Pneu Press Hi/Lo Alarm (1 E5) is LIT.
4. 5 minutes ago that the TR Operator reports that 1D MSIV Standby Nitrogen Pressure is 4750 psig.
5. IR 1234567 has been written to document the issue.
6. No other LCOARs or DELs exist on Unit 1

. INITIATING CUE Evaluate condition and Initiate the LCOAR paperwork as necessary.

Exelon Nuclear Job Performance Measure Review Liquid Release Package JPM Number:

SA d Revision Number:

02 Date: 10/18/2013 Developed By:

Robert Peterson 10/18/2013 Instructor Date Validated By:

S. Harvey 12/11/2015 SME or Instructor Date Approved By:

B. Lewin 12/11/2015 Operations Representative Date INITIAL CONDITIONS You are the Unit Supervisor

. A Liquid Radwaste Release Form BCP 400

-TWX01 is currently being processed.

You have the Liquid Release Package and it is completed up to step 7.5 for your approval

. INITIATING CUES You are to review BCP 400

-TWX01 and ensure it has been completed properly to authorize the liquid release.

TASK STANDARDS:

1. Determine that section 6.8.5 Rad Monitor Setpoints were incorrectly chosen.
2. Determine that the signature is missing for the Radiation Protection Supervisor in section 5.9 . 3. Determine that section 6.16.1 is incorrectly indicating the wrong release path (0WX001 is recorded instead of 0WX630).
4. Determine that step 6.16.10 is missing a verification initial.

RECORD START TIME:

EVALUATOR NOTE: These steps may be performed in any order.

STEP ELEMENT STANDARD SAT UNSAT CMT# 1 Refer to BCP 400

-TWX01, Liquid Radwaste Release Form. Determine procedure is completed up to step 8.5 where the Field Supervisor is to review Release Package to ensure it is completed properly.

___ ___ ___ *2. Determine that the Rad Protection Supervisor did not sign step 5.9.

STEP 5.9 The Rad Protection Supervisor signature is missing. ___ ___ ___ *3 Determine that the Rad Monitor Setpoints are incorrect.

STEP 6.8.5 Alert and Hig h Alarm Setpoints are reversed

. ___ ___ ___ *4 Determine that the NSO recorded the wrong release flow path in step 6.16.1.

STEP 6.16.1 NSO recorded the incorrect flow path. Should

be 0WX001 NOT 0WX630. ___ ___ ___ *5 Determine the verification blank for step 6.16.10 is not initialed.

STEP 6.16.10 The Verification Blank is not initialed for the Rad Monitor setpoints.

___ ___ ___ CUE This JPM is complete.

RECORD STOP TIME:

JPM SUMMARY Operator's Name

Job Title
EO RO SRO FS STA/IA SRO Cert JPM Title:

Review Liquid Release Packa ge JPM Number:

SA d Revision Number:

01 Task Number and Title:

S-HP-001 Authorize Liquid Rad Waste Release K/A Number and Importance:

GEN 2.3.6, Imp Factor 2.0/3.8 Suggested Testing Environment:

Classroom Alternate Path:

Yes No SRO Only:

Yes No Time Critical:

Yes No Reference(s):

BCP 400-TWX01 Rev 65 Chemistry Sample results from 0WX01T Radiation Protection analysis for a Liquid Release Package Actual Testing Environment:

Simulator Control Room In-Plant Other Testing Method:

Simulate Perform Estimated Time to Complete:

20 minutes Actual Time Use d: minutes EVALUATION SUMMARY:

Were all the Critical Elements performed satisfactorily?

Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:

Satisfactory Unsatisfactory Comments: Evaluator's Name

(Print)

Evaluator's Signature

Date:

Exelon Nuclear Job Performance Measure Classify Event and Fill Out a NARS Form (Loss of Required Vital DC in Mode 5

) JPM Number:

SA-e Revision Number: 00 Date: 11/30/2015 Revised By:

R. F. Peterson 11/30/2015 Instructor Date Validated By:

S. Harvey 12/11/2015 SME or Instructor Date Approved By:

B. Lewin 12/11/2015 Operations Representative Date Page 2 of 5 INITIAL CONDITIONS

1. You are the Shift Emergency Director.
2. The Unit 1 Supervisor has provided you with information related to a Unit 1 event and informed you to perform an Emergency Plan evaluation.

PLANT CONDITIONS:

1. Unit 1 is shutdown in MODE 5 preparing for refueling.
2. DC bus 111 is currently Out of Service (De

-Energized) for a Planned Bus Outage.

3. DC Bus 112 just experienc ed a loss of Vital DC Power, indicated by voltage readings of 0VDC at DC112.
4. DC112 Feed Breaker is tripped and cannot be reclosed.
5. Electrical Maintenance Technicians and Engineering are currently in the EM Shop reviewing prints and developing a Troubleshooting plan.

INITIATING CUE

1. Perform an Emergency Plan evaluation and fill out the NARS form for transmittal for the plant conditions provided
2. This is a time critical JPM

.

Page 3 of 5 JPM START TIME:

ELEMENT STANDARD SAT UNSAT Comment Number NOTE The completion of Step 2 fulfills the critical time portion of this JPM.

1. Refer to Exelon Nuclear

- Radiological Emergency Plan Annex for Byron Station.

Note: This step may be performed at any ti me Locate and Open, EP

-AA-1002 Addendum 3, Classification of Emergencies

  • 2. Classify the Event utilizing Section 3, Classification of Emergencies.

Critical portion stop time ______

Classify event as Unusual Event, from CU3 Loss of Required DC power for 15 Minutes or Longer (<108VDC on unit 125VDC batter busses 111 and 112)

Time from start to Classification =

________ minutes

¢ < 15 minutes

3. Obtain NARS form, EP-MW-114-100-F-01, Nuclear Accident Reporting System (NARS).

Note: Step 3 may be performed at any time Obtain NARS form.

NOTE Provide the examinee with a copy of the NARS form.

Page 4 of 5 ELEMENT STANDARD SAT UNSAT Comment Number 4. Refer to EP

-MW-114-100, MWROG Offsite Notifications, to complete NARS form.

Note: Step 4 is optional and may be performed at any time Locate and Open, EP

-MW-114-100, MWROG Offsite Notifications, Section 4.1, to complete NARS form.

NOTE Provide the examinee with Wind Speed and Wind Direction cues after examinee has explained where to obtain the information from the computer or from the main control board.

Cue: The wind direction on AM004 is 286. Cue: The wind speed on AM001 is 16 meters/sec.

Cue: An SRO has provided a peer check and signed the "Verified With:" section.

Fill out NARS form according to instructions, EP-MW-114-100, Section 4.1 Completing the NARS Form. BLOCKS 2 thru 9 must be filled correctly to meet the critical portion of filling out the NARS form. (See attached KEY). o Block 10 should be filled in "None" o Verified with another SRO peer check CUE: The JPM is complete.

JPM STOP TIME

Page 5 of 5 JPM SUMMARY Operator's Name

Job Title
EO RO SRO FS STA/IA SRO Cert JPM Title:

Classify Event and Fill Out a NARS Form Earthquake JPM Number:

SA-a Revision Number

00 Task Number and Title:

8F.ZP-008 CLASSIFY/RECLASSIFY Emergency Action Levels K/A Number and Importance: 2.4.41 4.6 Suggested Testing Environment:

Simulator Alternate Path:

Yes No SRO Only:

Yes No Time Critical:

Yes No Reference(s):

EP-MW-114-100 (Rev 16), Midwest Region Offsite Notifications EP-MW-114-100-F-01 (Rev. H) Nuclear Accident Reporting System (NARS) Form EP-AA-1002 Addendum 3 (Rev 0) Emergency Action Levels for Byron Station EP-AA-1002 (Rev 34) Exelon Nuclear Radiological Emergency Plan Annex for Byron Station CRITICAL STEPS

(*) 2 & 5 Actual Testing Environment:

Simulator Control Room In-Plant Other Testing Method:

Simulate Perform Estimated Time to Complete:

20 minutes Actual Time Used:

minutes EVALUATION SUMMARY:

Were all the Critical Elements performed satisfactorily?

Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:

Satisfactory Unsatisfactory Comments: Evaluator's Name

(Print) Evaluator's Signature
Date: