05000445/FIN-2008003-05: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 1: | Line 1: | ||
{{finding | {{finding | ||
| title = Failure to Ensure a Flow Path for Containment Spray Pumps | | title = Failure to Ensure a Flow Path for Containment Spray Pumps | ||
| docket = 05000445, 05000446 | | docket = 05000445, 05000446 | ||
| inspection report = IR 05000445/2008003 | | inspection report = IR 05000445/2008003 |
Latest revision as of 22:05, 29 May 2018
Site: | Comanche Peak |
---|---|
Report | IR 05000445/2008003 Section 4OA2 |
Date counted | Jun 30, 2008 (2008Q2) |
Type: | NCV: Green |
cornerstone | Barrier Integrity |
Identified by: | NRC identified |
Inspection Procedure: | IP 71152 |
Inspectors (proximate) | D Allen B Tindell M Young S Makor P Goldberg L Ricketson P Elkmann C Johnson |
CCA | H.8, Procedure Adherence |
INPO aspect | WP.4 |
' | |