ENS 58035: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 23: Line 23:
The following additional information was obtained from the licensee in accordance with Headquarters Operations Officers Report Guidance:
The following additional information was obtained from the licensee in accordance with Headquarters Operations Officers Report Guidance:
Decay heat is being removed via steam dump valves to the main condenser.
Decay heat is being removed via steam dump valves to the main condenser.
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2025/20251113en.html#en58035
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2025/20251114en.html#en58035
}}{{unit info
}}{{unit info
| Unit = 1
| Unit = 1

Revision as of 07:20, 14 November 2025

ENS 58035 +/-
Where
Callaway Ameren icon.png
Missouri (NRC Region 4)
Reporting
10 CFR 50.72(b)(3)(iv)(A), System Actuation
Time - Person (Reporting Time:+2.23 h0.0929 days <br />0.0133 weeks <br />0.00305 months <br />)
Opened: Daniel Mueller
16:02 Nov 12, 2025
NRC Officer: Ian Howard
Last Updated: Nov 12, 2025
58035 - NRC Website
Loading map...