ENS 58035: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 23: | Line 23: | ||
The following additional information was obtained from the licensee in accordance with Headquarters Operations Officers Report Guidance: | The following additional information was obtained from the licensee in accordance with Headquarters Operations Officers Report Guidance: | ||
Decay heat is being removed via steam dump valves to the main condenser. | Decay heat is being removed via steam dump valves to the main condenser. | ||
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2025/ | | URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2025/20251114en.html#en58035 | ||
}}{{unit info | }}{{unit info | ||
| Unit = 1 | | Unit = 1 | ||
Revision as of 07:20, 14 November 2025
| Where | |
|---|---|
| Callaway Missouri (NRC Region 4) | |
| Reporting | |
| 10 CFR 50.72(b)(3)(iv)(A), System Actuation | |
| Time - Person (Reporting Time:+2.23 h0.0929 days <br />0.0133 weeks <br />0.00305 months <br />) | |
| Opened: | Daniel Mueller 16:02 Nov 12, 2025 |
| NRC Officer: | Ian Howard |
| Last Updated: | Nov 12, 2025 |
| 58035 - NRC Website
| |