IR 05000254/1998024: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 1: Line 1:
{{Adams
{{Adams
| number = ML20199E943
| number = ML20207J947
| issue date = 01/14/1999
| issue date = 03/10/1999
| title = Partially Withheld Security Insp Repts 50-254/98-24 & 50-265/98-24.Violations Noted.Major Areas Inspected:Plant Support Activities Re Physical Protection of Quad Cities Facility.Details Withheld (Ref 10CFR2.790)
| title = Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Security Insp Repts 50-254/98-24 & 50-265/98-24
| author name =  
| author name = Reynolds S
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
| addressee name =  
| addressee name = Kingsley O
| addressee affiliation =  
| addressee affiliation = COMMONWEALTH EDISON CO.
| docket = 05000254, 05000265
| docket = 05000254, 05000265
| license number =  
| license number =  
| contact person =  
| contact person =  
| document report number = 50-254-98-24, 50-265-98-24, NUDOCS 9901210141
| document report number = 50-254-98-24, 50-265-98-24, NUDOCS 9903160444
| package number = ML20199E935
| title reference date = 02-12-1999
| document type = INSPECTION REPORT, NRC-GENERATED, TEXT-INSPECTION & AUDIT & I&E CIRCULARS
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| page count = 2
| page count = 2
}}
}}
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:.
{{#Wiki_filter:March 10, 1999
..
.
-
. - -.. -
.-..-,
.
.
.
.
_ _ _ - -
-.-...
..
.
U. S. NUCLEAR REGULATORY COMMISSION REGION 111 Docket Nos:
50-254;50-265
,
l License Nos:
DPR-29; DPR-30
;
I I
Report Nos:
50-254/98024(DRS); 50-265/98024(DRS)
l Licensee:
Commonwealth Edison Company (Comed)
Facility:
Quad Cities Nuclear Power Station, Units 1 and 2 Location:
22710 206'" Avenue North Cordova,IL 61242 l
l Dates:
December 14-18,1998 l
l Inspector:
Terry J. Madeda, Physical Security Inspector l
l l
Approved by:
James R. Creed, Chief, Plant Support Branch 1 l
Division of Reactor Safety i
l i
I
<
Ehclosure Cent


i
==SUBJECT:==
.
NRC QUAD CITIES SECURITY INSPECTION REPORTS 50-254/98024(DRS);
Is Decontrollod 9901210141 990114 PDR ADOCK 05000254 G
50-265/98024(DRS)
PDR
!


.
==Dear Mr. Kingsley:==
.
This acknowledges receipt of a letter dated February 12,1999, signed by Mr. Joel Dimmette, Jr. of your staff which clarified the corrective action for the violation identified in NRC Quad Cities Security inspection 50-254/98024(DRS); 50-265/98024(DRS).


_
As stated in Mr. Dimmette's letter, we had reviewed the details of the clarification to the corrective action taken for the violation with the Station Security Administrator on February 9, 1999. We have no further questions at this time.
_
_
_
_
_
_
.
.
.
s
'
EXECUTIVE SUMMARY i
j Quad Cities Nuclear Power Station, Units 1 and 2 NRC Inspection Reports 50-254/98024; 50-265/98024 This inspection reviewed plant support activities relating to the physical protection of the Quad Cities facility. The report evaluated security activities related to security plan changes, security


training and qualifications, security training records, management effectiveness and controls, audit and self assessment activities, problem analysis and corrective actions, and follow up to a previous inspection finding.
Sincerely,
 
-
.
The inspector determined that two security plan changes that were implemented by the e
licensee since December 1997 did not decrease the effectiveness of the security plan.
 
(Section S3)
Security training activities were accurately documented and conducted in an e
appropriate and sound manner. (Section SS)
Licensee audit and self-assessment activities regarding the security program were e
properly implemented. The licensee's plant wide problem identification and corrective
,
,
action tracking program was generally effective. However, discrepancies were identified in the security area regarding the documentation of security equipment failures. Licensee action was initiated to address this issue. The licensee's security department's intemal corrective action tracking system was effective. (Section S7)
Original Signed by John A. Grobe (for)
The inspector identified a violation in which armed response force personnel were e
Steven A. Reynolds, Deputy Director Division of Reactor Safety Docket Nos.: 50-254;50-265 License Nos.: DPR-29; DPR-30 Enclosure:
routinely assigned fire watch duties that prevented them from immediately responding to security events. Licensee security management's effectiveness and controls were not effective in this case because they did not recognize that response capabilities had been reduced. Effective and timely corrective action was implemented. (Section S8.1)
Ltr dtd 2/12/99
 
*" O*"
,.
~ c s.
 
e y g C',% t
')
-
}}
}}

Latest revision as of 17:31, 23 May 2025

Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Security Insp Repts 50-254/98-24 & 50-265/98-24
ML20207J947
Person / Time
Site: Quad Cities  
Issue date: 03/10/1999
From: Reynolds S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kingsley O
COMMONWEALTH EDISON CO.
References
50-254-98-24, 50-265-98-24, NUDOCS 9903160444
Download: ML20207J947 (2)


Text

March 10, 1999

SUBJECT:

NRC QUAD CITIES SECURITY INSPECTION REPORTS 50-254/98024(DRS);

50-265/98024(DRS)

!

Dear Mr. Kingsley:

This acknowledges receipt of a letter dated February 12,1999, signed by Mr. Joel Dimmette, Jr. of your staff which clarified the corrective action for the violation identified in NRC Quad Cities Security inspection 50-254/98024(DRS); 50-265/98024(DRS).

As stated in Mr. Dimmette's letter, we had reviewed the details of the clarification to the corrective action taken for the violation with the Station Security Administrator on February 9, 1999. We have no further questions at this time.

Sincerely,

-

,

Original Signed by John A. Grobe (for)

Steven A. Reynolds, Deputy Director Division of Reactor Safety Docket Nos.: 50-254;50-265 License Nos.: DPR-29; DPR-30 Enclosure:

Ltr dtd 2/12/99