05000336/LER-1999-001, Forwards LER 99-001-00 Re Thermal Reactor Power Limit That Was Exceeded.Commitments Made by Util Encl: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot change |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 1: | Line 1: | ||
{{Adams | |||
| number = ML20212E762 | |||
| issue date = 09/20/1999 | |||
| title = Forwards LER 99-001-00 Re Thermal Reactor Power Limit That Was Exceeded.Commitments Made by Util Encl | |||
| author name = Schwarz C | |||
| author affiliation = NORTHEAST NUCLEAR ENERGY CO. | |||
| addressee name = | |||
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) | |||
| docket = 05000336 | |||
| license number = | |||
| contact person = | |||
| document report number = B17875, NUDOCS 9909270140 | |||
| package number = ML20212E765 | |||
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE | |||
| page count = 5 | |||
}} | |||
{{LER | |||
| Title = Forwards LER 99-001-00 Re Thermal Reactor Power Limit That Was Exceeded.Commitments Made by Util Encl | |||
| Plant = | |||
| Reporting criterion = 10 CFR 50.73(a)(2)(i) | |||
| Power level = | |||
| Mode = | |||
| Docket = 05000336 | |||
| LER year = 1999 | |||
| LER number = 1 | |||
| LER revision = 0 | |||
| Event date = | |||
| Report date = | |||
| ENS = | |||
| abstract = | |||
}} | |||
=text= | |||
{{#Wiki_filter:r Northeast Rose Feny Rd. (Rouw 15, Waford, CM6385 Nuclear Energy wiii. tone Nociear po.er siatio. | |||
g Northeast Nuclear Energy Company P.O. Box 128 | |||
* ~. | |||
,,.~ | |||
Taterford, CT 06385-0128 z | |||
(860) 447 1791 Faz (860) 444-4277 The Northeast Utilities System SEP 2 01999 Docket No 50-336 B17875 Re: 10 CFR 50.73(a)(2)(i) | |||
U.S. Nuclear Regulatory Commission Attn: Document Control Desk' Washington, DC 20555 Millstone Nuclear Power Station, Unit No. 2 Licensee Event Report 99-011-00 Exceedness of Thermal Reactor Power Limit This letter forwards Licensee' Event Report (LER) 99-011-00, documenting an event that occurred at Millstone Nuclear Power Station, Unit No. 2, on August 23,1999. This LER is being submitted pursuant to 10 CFR 50.73(a)(2)(i). | |||
:- The Northeast Nuclear Energy Company's (NNECO's) commitments made within this letter are included in Attachment 1. | |||
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY l | |||
ban CJ. Schwarz Q 4tation Director Qy ' | |||
cc: see page 2 9909270140 990920 ADOCK 0 Q POR S | |||
05i34224 RIT. t2-05 | |||
U.S. Nuclear Regulatory Commission'' | |||
B17875\\Page 2 Attachments: | |||
: 1. List of Regulatory Commitments | |||
: 2. LER 99-011-00 cc: | |||
H. J. Miller, Region 1 Administrator R. B. Eaton, NRC Senior Project Manager, Millstone Unit No. 2 D. P. Beaulieu, Senior Resident inspector, Millstone Unit No. 2 i | |||
i l | |||
Docket No. 50-336 B17875 Millstone Nuclear Power Station, Unit No. 2 | |||
==Commitments== | |||
September 1999 l | |||
l | |||
.l | |||
1 4 | |||
U.S. Nuclear Reguictory Commission B17875%ttachment 1\\Page 1 Regulatory Commitment Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document. | |||
REGULATORY COMMITMENT COMMITTED DATE OR OUTAGE B17875.01: Guidance to the licensed operators Complete for maintaining the reactor thermal power below the licensed limit has been provided. | |||
B17875.02: Operating procedures shall be October 29,1999 revised to incorporate new guidance on maintaining reactor thermal power below allowable limits. | |||
B17875.03: Revised alarm setpoints for the October 1, '999 calorimetric calculated values on the plant process computer shall be investigated and appropriate corrective actions shall be implemented. | |||
B17875.04: Training shall be provided to plant November 1,1999 operators on the changes made to procedures and alarm setpoints. | |||
'g i | |||
Docket No. 50-336 B17675 i | |||
l Millstone Nuclear Power Station, Unit No. 2 LER 99-011-00 | |||
= | |||
i I | |||
i l | |||
September 1999 | |||
}} | |||
{{LER-Nav}} | |||
Revision as of 12:17, 23 May 2025
| ML20212E762 | |
| Person / Time | |
|---|---|
| Site: | |
| Issue date: | 09/20/1999 |
| From: | Schwarz C NORTHEAST NUCLEAR ENERGY CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20212E765 | List: |
| References | |
| B17875, NUDOCS 9909270140 | |
| Download: ML20212E762 (5) | |
| Event date: | |
|---|---|
| Report date: | |
| Reporting criterion: | 10 CFR 50.73(a)(2)(i) |
| 3361999001R00 - NRC Website | |
text
r Northeast Rose Feny Rd. (Rouw 15, Waford, CM6385 Nuclear Energy wiii. tone Nociear po.er siatio.
g Northeast Nuclear Energy Company P.O. Box 128
- ~.
,,.~
Taterford, CT 06385-0128 z
(860) 447 1791 Faz (860) 444-4277 The Northeast Utilities System SEP 2 01999 Docket No 50-336 B17875 Re: 10 CFR 50.73(a)(2)(i)
U.S. Nuclear Regulatory Commission Attn: Document Control Desk' Washington, DC 20555 Millstone Nuclear Power Station, Unit No. 2 Licensee Event Report 99-011-00 Exceedness of Thermal Reactor Power Limit This letter forwards Licensee' Event Report (LER) 99-011-00, documenting an event that occurred at Millstone Nuclear Power Station, Unit No. 2, on August 23,1999. This LER is being submitted pursuant to 10 CFR 50.73(a)(2)(i).
- - The Northeast Nuclear Energy Company's (NNECO's) commitments made within this letter are included in Attachment 1.
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY l
ban CJ. Schwarz Q 4tation Director Qy '
cc: see page 2 9909270140 990920 ADOCK 0 Q POR S
05i34224 RIT. t2-05
U.S. Nuclear Regulatory Commission
B17875\\Page 2 Attachments:
- 1. List of Regulatory Commitments
- 2. LER 99-011-00 cc:
H. J. Miller, Region 1 Administrator R. B. Eaton, NRC Senior Project Manager, Millstone Unit No. 2 D. P. Beaulieu, Senior Resident inspector, Millstone Unit No. 2 i
i l
Docket No. 50-336 B17875 Millstone Nuclear Power Station, Unit No. 2
Commitments
September 1999 l
l
.l
1 4
U.S. Nuclear Reguictory Commission B17875%ttachment 1\\Page 1 Regulatory Commitment Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document.
REGULATORY COMMITMENT COMMITTED DATE OR OUTAGE B17875.01: Guidance to the licensed operators Complete for maintaining the reactor thermal power below the licensed limit has been provided.
B17875.02: Operating procedures shall be October 29,1999 revised to incorporate new guidance on maintaining reactor thermal power below allowable limits.
B17875.03: Revised alarm setpoints for the October 1, '999 calorimetric calculated values on the plant process computer shall be investigated and appropriate corrective actions shall be implemented.
B17875.04: Training shall be provided to plant November 1,1999 operators on the changes made to procedures and alarm setpoints.
'g i
Docket No. 50-336 B17675 i
l Millstone Nuclear Power Station, Unit No. 2 LER 99-011-00
=
i I
i l
September 1999