BVY 03-114, Technical Specification Proposed Change No. 264 Safety Limit Minimum Critical Power Ratio (SLMCPR) Change: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Entergy Nuclear Vermont Yankee, LLC En tergy                                                                  Entergy Nuclear Operations, Inc.
{{#Wiki_filter:Entergy Nuclear Vermont Yankee, LLC Entergy Nuclear Operations, Inc.
185 Old Ferry Road Brattleboro, VT 05302-0500 December 5,.2003 BVY 03-114 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
E n tergy 185 Old Ferry Road Brattleboro, VT 05302-0500 December 5,.2003 BVY 03-114 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555


==Subject:==
==Subject:==
Vermont Yankee Nuclear Power Station License No. DPR-28 (Docket No. 50-271)
Vermont Yankee Nuclear Power Station License No. DPR-28 (Docket No. 50-271)
Technical Specification Proposed Change No. 264 Safety Limit Minimum Critical Power Ratio (SLMCPR) Change Pursuant to I0CFR50.90, Vermont Yankee, (VY) hereby proposes to amend its Facility Operating License, DPR-28, by incorporating the attached proposed change into the Technical Specifications (TS) of Vermont Yankee Nuclear Power Station. This proposed change provides revised values for the Safety Limit Minimum Critical Power Ratio (SLMCPR) for both single and dual recirculation loop operation. to this letter contains supporting information and the safety assessment of the proposed change. Attachment 2 contains the determination of no significant hazards consideration. Attachment 3 provides the marked-up version of the current Technical Specification pages. Attachment 4 contains the retyped Technical Specification pages. Attachment 5 of the enclosed information is a summary of the technical bases for the SLMCPR values and is considered proprietary information by Global Nuclear Fuels - Americas, LLC (GNF). In accordance with I OCFR2.790(b)(1), an affidavit attesting to the proprietary nature of the enclosed information and requesting withholding from public disclosure is included with Attachment 5. Attachment 6 is the same GNF summary with the proprietary information removed, and is provided for public disclosure.
Technical Specification Proposed Change No. 264 Safety Limit Minimum Critical Power Ratio (SLMCPR) Change Pursuant to I0CFR50.90, Vermont Yankee, (VY) hereby proposes to amend its Facility Operating License, DPR-28, by incorporating the attached proposed change into the Technical Specifications (TS) of Vermont Yankee Nuclear Power Station. This proposed change provides revised values for the Safety Limit Minimum Critical Power Ratio (SLMCPR) for both single and dual recirculation loop operation. to this letter contains supporting information and the safety assessment of the proposed change. Attachment 2 contains the determination of no significant hazards consideration. Attachment 3 provides the marked-up version of the current Technical Specification pages. Attachment 4 contains the retyped Technical Specification pages. Attachment 5 of the enclosed information is a summary of the technical bases for the SLMCPR values and is considered proprietary information by Global Nuclear Fuels - Americas, LLC (GNF).
In accordance with I OCFR2.790(b)(1), an affidavit attesting to the proprietary nature of the enclosed information and requesting withholding from public disclosure is included with Attachment 5. Attachment 6 is the same GNF summary with the proprietary information removed, and is provided for public disclosure.
VY has reviewed the proposed Technical Specification change in accordance with 10CFR50.92 and concludes that the proposed change does not involve a significant hazards consideration.
VY has reviewed the proposed Technical Specification change in accordance with 10CFR50.92 and concludes that the proposed change does not involve a significant hazards consideration.
VY has evaluated the proposed amendment against the criteria of 10CFR51.22 for environmental considerations and believes that the proposed change is eligible for categorical exclusion from the requirements for an environmental review in accordance with IOCFR51.22(c)(9).
VY has evaluated the proposed amendment against the criteria of 10CFR51.22 for environmental considerations and believes that the proposed change is eligible for categorical exclusion from the requirements for an environmental review in accordance with IOCFR51.22(c)(9).
Line 27: Line 28:


BVY 03-114 / Page 2 If you have any questions concerning this transmittal or require additional information, please contact Mr. Jeffrey T. Meyer at (802) 2584105.
BVY 03-114 / Page 2 If you have any questions concerning this transmittal or require additional information, please contact Mr. Jeffrey T. Meyer at (802) 2584105.
Sincerely, President STATE OF VERMONT
Sincerely, President STATE OF VERMONT WINDHAM COUNTY
                                      )ss WINDHAM COUNTY Then personally appeared before me, Jay K. Thayer, who, being duly sworn, did state that he is Site Vice President of the Vermont Yankee Nuclear Power Station, that he is duly authorized to execute and file the foregoing document, and that the statements therein are'true to the best of his knowledge and belief.
)ss Then personally appeared before me, Jay K. Thayer, who, being duly sworn, did state that he is Site Vice President of the Vermont Yankee Nuclear Power Station, that he is duly authorized to execute and file the foregoing document, and that the statements therein are'true to the best of his knowledge and belief.
iry Public;' ! .5:*,_
iry Public;' !.5: *,_
Februaty 10, 2007 a *,*       .      ,,. .-
Februaty 10, 2007 a *,*  
Attachments                                                                                                    -i. .. vir'*
-i... vir'*
cc:       USNRC Region 1 Administrator USNRC Resident Inspector - VYNPS USNRC Project Manager - VYNPS Vermont Department of Public Service (w/o proprietary information)
Attachments cc:
USNRC Region 1 Administrator USNRC Resident Inspector - VYNPS USNRC Project Manager - VYNPS Vermont Department of Public Service (w/o proprietary information)


Docket No. 50-271 BVY 03-114 Attachment 1 Vermont Yankee Nuclear Power Station Proposed Technical Specification Change No. 264 Safety Limit Minimum Critical Power Ratio (SLMCPR) Change Supporting Information and Safety Assessment of Proposed Change
Docket No. 50-271 BVY 03-114 Vermont Yankee Nuclear Power Station Proposed Technical Specification Change No. 264 Safety Limit Minimum Critical Power Ratio (SLMCPR) Change Supporting Information and Safety Assessment of Proposed Change


BVY 03-114 /Attachment I / Page I of I Description of the Proposed Change Pursuant to 10CFR50.90, Vermont Yankee proposes to amend Appendix A, Technical Specification (TS)
BVY 03-114 /Attachment I / Page I of I Description of the Proposed Change Pursuant to 10CFR50.90, Vermont Yankee proposes to amend Appendix A, Technical Specification (TS)
Section 1.1.A.1 of Facility Operating License DPR-28. The proposed changes to the Technical Specifications are as follows:
Section 1.1.A.1 of Facility Operating License DPR-28.
Page 6, Specification l.1.A.1 - Replace the -listed SLMCPR values .of 1.10 (1.12 for single loop operation) with new values of 1.07 (1.09 for single loop operation).
The proposed changes to the Technical Specifications are as follows:
Purpose of the Proposed Change Cycle specific calculations for Vermont Yankee by Global Nuclear Fuels (GNF) is summarized in . The current SLMCPR values for dual and single loop operation contained in the Technical Specifications (1.10 and 1.12 respectively) are not applicable for the upcoming fuel cycle due to core loading design and fuel type changes. Based upon the core loading and fuel design changes, the cycle specific SLMCPR values were determined to be 1.07 for dual loop and 1.09 for single loop operation.
Page 6, Specification l.1.A.1 - Replace the -listed SLMCPR values.of 1.10 (1.12 for single loop operation) with new values of 1.07 (1.09 for single loop operation).
Purpose of the Proposed Change Cycle specific calculations for Vermont Yankee by Global Nuclear Fuels (GNF) is summarized in. The current SLMCPR values for dual and single loop operation contained in the Technical Specifications (1.10 and 1.12 respectively) are not applicable for the upcoming fuel cycle due to core loading design and fuel type changes. Based upon the core loading and fuel design changes, the cycle specific SLMCPR values were determined to be 1.07 for dual loop and 1.09 for single loop operation.
Safety Assessment of Proposed Change The purpose of the SLMCPR is to provide high statistical probability (99.9%) that fuel rods in the operating core would not experience transition boiling during the most limiting Abnormal Operational Transient (AOT). The criteria of transition boiling for determination of the SLMCPR is a conservative approach since this phenomena by itself does not signal the onset of fuel cladding failure. The revised SLMCPR for Vermont Yankee was determined using plant and cycle-specific fuel and core parameters and NRC approved methodology, as discussed in Attachment 5 (GNF proprietary summary of technical basis for SLMCPR) and Attachment 6 (non-proprietary version of GNF summary). Analysis of the limiting AOT provides the allowed operating conditions, in terms of MCPR, of the core during the fuel cycle such that if the event were to occur, the transient MCPR would not be less than the SLMCPR. No plant hardware or operational changes are required with this proposed change.
Safety Assessment of Proposed Change The purpose of the SLMCPR is to provide high statistical probability (99.9%) that fuel rods in the operating core would not experience transition boiling during the most limiting Abnormal Operational Transient (AOT). The criteria of transition boiling for determination of the SLMCPR is a conservative approach since this phenomena by itself does not signal the onset of fuel cladding failure. The revised SLMCPR for Vermont Yankee was determined using plant and cycle-specific fuel and core parameters and NRC approved methodology, as discussed in Attachment 5 (GNF proprietary summary of technical basis for SLMCPR) and Attachment 6 (non-proprietary version of GNF summary). Analysis of the limiting AOT provides the allowed operating conditions, in terms of MCPR, of the core during the fuel cycle such that if the event were to occur, the transient MCPR would not be less than the SLMCPR. No plant hardware or operational changes are required with this proposed change.


Docket No. 50-271 BVY 03-1 14 Attachment 2 Vermont Yankee Nuclear Power Station Proposed Technical Specification Change No. 264 Safety Limit Minimum Critical Power Ratio (SLMCPR) Change Determination of No Significant Hazards Consideration
Docket No. 50-271 BVY 03-1 14 Vermont Yankee Nuclear Power Station Proposed Technical Specification Change No. 264 Safety Limit Minimum Critical Power Ratio (SLMCPR) Change Determination of No Significant Hazards Consideration


BVY 03-114./ Attachment 2/page 1 of 2 No Significant Hazard Determination Pursuant to I OCFR50.92, Vermont Yankee has reviewed the proposed change and concludes that the change does not involve a significant hazards consideration since the proposed change satisfies the criteria in IOCFR50.92(c). These criteria require that operation of the facility in accordance with the proposed amendment will not: (1) involve a significant increase in the probability or consequences of an accident previously evaluated, (2) create the possibility of a new or different kind of accident from any accident previously evaluated, or (3) involve a significant reduction in a margin of safety. The discussion below addresses each of these criteria and demonstrates that the proposed amendment does not constitute a significant hazard.
BVY 03-114./ Attachment 2/page 1 of 2 No Significant Hazard Determination Pursuant to I OCFR50.92, Vermont Yankee has reviewed the proposed change and concludes that the change does not involve a significant hazards consideration since the proposed change satisfies the criteria in IOCFR50.92(c). These criteria require that operation of the facility in accordance with the proposed amendment will not: (1) involve a significant increase in the probability or consequences of an accident previously evaluated, (2) create the possibility of a new or different kind of accident from any accident previously evaluated, or (3) involve a significant reduction in a margin of safety.
The discussion below addresses each of these criteria and demonstrates that the proposed amendment does not constitute a significant hazard.
The proposed change does not involve a significant hazards consideration because:
The proposed change does not involve a significant hazards consideration because:
: 1.       The operation of Vermont Yankee Nuclear Power Station in accordance with the proposed amendment, will not involve a significant increase in the probability or consequences of an accident previously evaluated.
: 1.
The basis of the Safety Limit Minimum Critical Power Ratio (SLMCPR) is to ensure no mechanistic fuel damage is calculated to occur if the limit is not violated. The new SLMCPR values preserve the existing margin to transition boiling and probability of fuel damage is not increased. The derivation of the revised SLMCPR for Vermont Yankee for incorporation into the Technical Specifications, and its use to determine plant and cycle-specific thermal limits, have been performed using NRC approved methods. These plant-specific calculations are performed each operating cycle and if necessary, will require future changes to these values based upon revised core designs. The revised SLMCPR values do not change the method of operating the plant and have no effect on the probability of an accident initiating event or transient.
The operation of Vermont Yankee Nuclear Power Station in accordance with the proposed amendment, will not involve a significant increase in the probability or consequences of an accident previously evaluated.
The basis of the Safety Limit Minimum Critical Power Ratio (SLMCPR) is to ensure no mechanistic fuel damage is calculated to occur if the limit is not violated. The new SLMCPR values preserve the existing margin to transition boiling and probability of fuel damage is not increased. The derivation of the revised SLMCPR for Vermont Yankee for incorporation into the Technical Specifications, and its use to determine plant and cycle-specific thermal limits, have been performed using NRC approved methods.
These plant-specific calculations are performed each operating cycle and if necessary, will require future changes to these values based upon revised core designs. The revised SLMCPR values do not change the method of operating the plant and have no effect on the probability of an accident initiating event or transient.
Based on the above, Vermont Yankee has concluded that the proposed change will not result in a significant increase in the probability or consequences of an accident previously evaluated.
Based on the above, Vermont Yankee has concluded that the proposed change will not result in a significant increase in the probability or consequences of an accident previously evaluated.
: 2.       The operation of Vermont Yankee Nuclear Power Station in accordance with the proposed amendment, will not create the possibility of a newv or different kind of accident from any accident previously evaluated.
: 2.
The operation of Vermont Yankee Nuclear Power Station in accordance with the proposed amendment, will not create the possibility of a newv or different kind of accident from any accident previously evaluated.
The proposed changes result only from a specific analysis for the Vermont Yankee core reload design. These changes do not involve any new or different methods for operating the facility.
The proposed changes result only from a specific analysis for the Vermont Yankee core reload design. These changes do not involve any new or different methods for operating the facility.
No new initiating events or transients result from these changes.
No new initiating events or transients result from these changes.
Based on the above, Vermont Yankee has concluded that the proposed change will not create the possibility of a new or different kind of accident from those previously evaluated.
Based on the above, Vermont Yankee has concluded that the proposed change will not create the possibility of a new or different kind of accident from those previously evaluated.
: 3.       The operation of Vermont Yankee Nuclear Power Station in accordance with the proposed amendment. will not involve a significant reduction in a margin of safety.
: 3.
The operation of Vermont Yankee Nuclear Power Station in accordance with the proposed amendment. will not involve a significant reduction in a margin of safety.
The new SLMCPR is calculated using NRC approved methods with plant and cycle specific parameters for the current core design. The SLMCPR value remains high enough to ensure that
The new SLMCPR is calculated using NRC approved methods with plant and cycle specific parameters for the current core design. The SLMCPR value remains high enough to ensure that


BVY 03-114 1Attachment 2 / page 2 of 2 greater than 99.9% of all fuel rods in the core will avoid transition boiling if the limit is not violated, thereby preserving the fuel cladding integrity. The operating MCPR limit is set appropriately above the safety limit value to ensure adequate margin when the cycle specific transients are evaluated. Accordingly, the margin of safety is maintained with the revised values.
BVY 03-114 1 Attachment 2 / page 2 of 2 greater than 99.9% of all fuel rods in the core will avoid transition boiling if the limit is not violated, thereby preserving the fuel cladding integrity.
The operating MCPR limit is set appropriately above the safety limit value to ensure adequate margin when the cycle specific transients are evaluated. Accordingly, the margin of safety is maintained with the revised values.
As a result, Vermont Yankee has determined that the proposed change will not result in a significant reduction in a margin of safety.
As a result, Vermont Yankee has determined that the proposed change will not result in a significant reduction in a margin of safety.
On the basis of the above, Vermont Yankee has determined that operation of the facility in accordance with the. proposed change does not involve a significant hazards consideration as defined in IOCFR50.92(c), in that it: (1) does not involve a significant increase in the probability or consequences of an accident previously evaluated; (2) does not create the possibility of a new or different kind of accident from any accident previously evaluated; and (3) does not involve a significant reduction in a margin of safety.
On the basis of the above, Vermont Yankee has determined that operation of the facility in accordance with the. proposed change does not involve a significant hazards consideration as defined in IOCFR50.92(c), in that it: (1) does not involve a significant increase in the probability or consequences of an accident previously evaluated; (2) does not create the possibility of a new or different kind of accident from any accident previously evaluated; and (3) does not involve a significant reduction in a margin of safety.


Docket No. 50-271 BVY 03-114 Attachment 3 Vermont Yankee Nuclear Power Station Proposed Technical Specification Change No. 264 Safety Limit Minimum Critical Power Ratio (SLMCPR) Change Marked-up Version of the Current Technical Specifications
Docket No. 50-271 BVY 03-114 Vermont Yankee Nuclear Power Station Proposed Technical Specification Change No. 264 Safety Limit Minimum Critical Power Ratio (SLMCPR) Change Marked-up Version of the Current Technical Specifications


VYNPS 1.1 SAFETY LIMIT                                   2.1 LIMITING SAFETY SYSTEM SETTING 1.1 FUEL CLADDING INTEGRITY                       2.1  FUEL CLADDING INTEGRITY Applicability:                                      Applicability:
VYNPS 1.1 SAFETY LIMIT 2.1 LIMITING SAFETY SYSTEM SETTING 1.1 FUEL CLADDING INTEGRITY Applicability:
Applies to the interrelated                         Applies to trip setting of the variable associated with fuel                       instruments and devices which are thermal behavior.                                  provided to prevent the nuclear system safety limits from being exceeded.
Applies to the interrelated variable associated with fuel thermal behavior.
Objective:                                          Objective:
Objective:
To establish limits below which                     To define the level of the process the integrity of the fuel cladding                 variable at which automatic is preserved.                                      protective action is initiated.
To establish limits below which the integrity of the fuel cladding is preserved.
Specification:
Specification:
A. Bundle Safety Limit (Reactor Pressure >800 psia and Core Flow >10% of Rated)
When the reactor pressure is
>800 psia and the core flow is greater than 10% of rated:
I I
I
: 1. A Minimum Critical Power Ratio PMPR) of less than a
.10 for Single Loop
/ Oerat ion) shall constitute violation the Fuel
/ Cladding In egrity Safety 2.1 FUEL CLADDING INTEGRITY Applicability:
Applies to trip setting of the instruments and devices which are provided to prevent the nuclear system safety limits from being exceeded.
Objective:
To define the level of the process variable at which automatic protective action is initiated.
Specification:
Specification:
A. Trip Settings A. Bundle Safety Limit (Reactor Pressure >800 psia and Core                        The limiting safety system Flow >10% of Rated)                                trip settings shall be as specified below:
A. Trip Settings The limiting safety system trip settings shall be as specified below:
When the reactor pressure is
: 1.
          >800 psia and the core flow is                      1. Neutron Flux Trip Settings greater than 10% of rated:
Neutron Flux Trip Settings
: a. APRM Flux Scram Trip
: a. APRM Flux Scram Trip Setting (Run Mode)
: 1. A Minimum Critical Power                                Setting (Run Mode)
When the mode switch is in the RUN position, the APRM flux scram trip setting shall be as shown on Figure 2.1.1 and shall be:
I          Ratio PMPR) of less than I        /a        .10for Single Loop Oerat ion) shall constitute violation    the Fuel When the mode switch is in the RUN position, the APRM
        /    Cladding In egrity Safety                              flux scram trip setting shall be as I                                                                  shown on Figure 2.1.1 and shall be:
S<0.66(W-AW)+54%
S<0.66(W-AW)+54%
where:
where:
S = setting in percent of rated thermal power (1593 MWt)
S = setting in percent of rated thermal power (1593 MWt)
W   percent rated two loop drive flow where 100%
W percent rated two loop drive flow where 100%
rated drive flow is that flow equivalent to 48 x 106 lbs/hr core flow Amendment No. 4-,   47, 64, 9G, .4, 44-9, 4-50, 4-59, 176                           6
rated drive flow is that flow equivalent to 48 x 106 lbs/hr core flow Amendment No. 4-,
47, 64, 9G,.4, 44-9, 4-50, 4-59, 176 6


Docket No. 50-271 BVY 03-114 Attachment 4 Vermont Yankee Nuclear Power Station Proposed Technical Specification Change No. 264 Safety Limit Minimum Critical Power Ratio. (SLMCPR) Change Retyped Technical Specification Pages
Docket No. 50-271 BVY 03-114 Vermont Yankee Nuclear Power Station Proposed Technical Specification Change No. 264 Safety Limit Minimum Critical Power Ratio. (SLMCPR) Change Retyped Technical Specification Pages


VYNPS 1.1 SAFETY LIMIT                             2.1   LIMITING SAFETY SYSTEM SETTING 1.1 FUEL CLADDING INTEGRITY                   2.1  FUEL CLADDING INTEGRITY Applicability:                                  Applicability:
VYNPS 1.1 SAFETY LIMIT 2.1 LIMITING SAFETY SYSTEM SETTING 1.1 FUEL CLADDING INTEGRITY Applicability:
Applies to the interrelated                     Applies to trip setting of the variable associated with fuel                   instruments and devices which are thermal behavior.                              provided to prevent the nuclear system safety limits from being exceeded.
Applies to the interrelated variable associated with fuel thermal behavior.
Objective:                                      Objective:
Objective:
To establish limits below which                 To define the level of the process the integrity of the fuel                       variable at which automatic cladding is preserved.                          protective -action is initiated.
To establish limits below which the integrity of the fuel cladding is preserved.
Specification:
Specification:
A. Bundle Safety Limit (Reactor Pressure >800 psia and Core Flow >10% of Rated)
When the reactor pressure is
>800 psia and the core flow is greater than 10% of rated:
I
: 1. A Minimum Critical Power Ratio (MCPR) of less than 1.07 (1.09 for Single Loop Operation) shall constitute violation of the Fuel Cladding Integrity Safety Limit (FCISL).
2.1 FUEL CLADDING INTEGRITY Applicability:
Applies to trip setting of the instruments and devices which are provided to prevent the nuclear system safety limits from being exceeded.
Objective:
To define the level of the process variable at which automatic protective -action is initiated.
Specification:
Specification:
A. Trip Settings A. Bundle Safety Limit (Reactor Pressure >800 psia and Core                    The limiting safety system Flow >10% of Rated)                            trip settings shall be as specified below:
A.
When the reactor pressure is
Trip Settings The limiting safety system trip settings shall be as specified below:
          >800 psia and the core flow is                  1. Neutron Flux Trip Settings greater than 10% of rated:
: 1.
: a. APRM Flux Scram Trip
Neutron Flux Trip Settings
: 1. A Minimum Critical Power                            Setting (Run Mode)
: a.
Ratio (MCPR) of less than 1.07 (1.09 for Single Loop                          When the mode switch I          Operation) shall constitute                        is in the RUN violation of the Fuel                                position, the APRM Cladding Integrity Safety                          flux scram trip Limit (FCISL).                                      setting shall be as shown on Figure 2.1.1 and shall be:
APRM Flux Scram Trip Setting (Run Mode)
When the mode switch is in the RUN position, the APRM flux scram trip setting shall be as shown on Figure 2.1.1 and shall be:
s<o.66(W-AW)+54%
s<o.66(W-AW)+54%
where:
where:
S   = setting in percent of rated thermal power (1593 MWt)
S  
= setting in percent of rated thermal power (1593 MWt)
W = percent rated two loop drive flow where 100%
W = percent rated two loop drive flow where 100%
rated drive flow is that flow equivalent to 48 x lol lbs/hr core flow Amendment No. 44, 4%   4, aO, 44, 1-,4, 1     -54, 4r64, 4u6                                 6
rated drive flow is that flow equivalent to 48 x lol lbs/hr core flow Amendment No. 44, 4%
4, aO, 44, 1-,4, 1  
-54, 4r64, 4u6 6


Docket No. 50-271 BVY 03-114 Attachment 6 Vermont Yankee Nuclear Power Station Proposed Technical Specification Change No. 264 GNF Summary of Technical Basis for SLMCPR Values (Non-Proprietary Version)
Docket No. 50-271 BVY 03-114 Vermont Yankee Nuclear Power Station Proposed Technical Specification Change No. 264 GNF Summary of Technical Basis for SLMCPR Values (Non-Proprietary Version)


I Attachment               Additional Information Regarding the                 3 November 2003 Cycle Specific SLMCPR for Vermont Yankee Cycle 24 References
I Attachment Additional Information Regarding the 3 November 2003 Cycle Specific SLMCPR for Vermont Yankee Cycle 24 References
[1]   Letter, Frank Akstulewicz (NRC) to Glen A. Watford (GE), "Acceptance for Referencing of Licensing Topical Reports NEDC-32601P, Methodology and Uncertaintiesfor Safety Limit MCPR Evaluations;NEDC-32694P, PowerDistribution Uncertaintiesfor Safety Limit MC-PR Evaluation; and Amendment 25 to NEDE-2401 1-P-A on Cycle Specific Safety Limit MCPR,"
[1]
Letter, Frank Akstulewicz (NRC) to Glen A. Watford (GE), "Acceptance for Referencing of Licensing Topical Reports NEDC-32601P, Methodology and Uncertainties for Safety Limit MCPR Evaluations; NEDC-32694P, Power Distribution Uncertainties for Safety Limit MC-PR Evaluation; and Amendment 25 to NEDE-2401 1-P-A on Cycle Specific Safety Limit MCPR,"
(TAC Nos. M97490, M99069 and M97491), March 11, 1999..
(TAC Nos. M97490, M99069 and M97491), March 11, 1999..
[2]   Letter, Thomas H. Essig (NRC) to Glen A. Watford (GE), "Acceptance for Referencing of Licensing Topical Report NEDC-32505P, Revision 1,R-FactorCalculationMethodfor GE 1, GE12 and GEJ3 Fuel," (TAC Nos. M99070 and M9508 1), January 11, 1999.
[2]
[3]   General Electric BWR Thermal Analysis Basis (GETAB): Data, Correlation and Design Application, NEDO-10958-A, January 1977.
Letter, Thomas H. Essig (NRC) to Glen A. Watford (GE), "Acceptance for Referencing of Licensing Topical Report NEDC-32505P, Revision 1, R-Factor Calculation Methodfor GE 1, GE12 and GEJ3 Fuel," (TAC Nos. M99070 and M9508 1), January 11, 1999.
[4I   Letter, Glen A. Watford (GNF-A) to U. S. Nuclear Regulatory Commission Document Control Desk with attention to R Pulsifer (NRC), "Confirmation of IOx1O Fuel Design Applicability to Improved SLMCPR, Power Distribution and R-Factor Methodologies", FLN-2001-016, September 24, 2001.
[3]
[5]   Letter, Glen A. Watford (GNF-A) to U. S. Nuclear Regulatory Commission Document Control Desk with attention to J. Donoghue (NRC), "Confirmation of the Applicability of the GEXL14 Correlation and Associated R-Factor Methodology for Calculating SLMCPR Values in Cores Containing GE14 Fuel", FLN-2001-017, October 1, 2001.
General Electric BWR Thermal Analysis Basis (GETAB): Data, Correlation and Design Application, NEDO-10958-A, January 1977.
[6]   Letter, Glen A. Watford (GNF-A) to U. S. Nuclear Regulatory Commission Document Control Desk with attention to J. Donoghue (NRC), "Final Presentation Material for GEXL Presentation - February 11, 2002", FLN-2002-004, February 12, 2002.
[4I Letter, Glen A. Watford (GNF-A) to U. S. Nuclear Regulatory Commission Document Control Desk with attention to R Pulsifer (NRC), "Confirmation of IOx1O Fuel Design Applicability to Improved SLMCPR, Power Distribution and R-Factor Methodologies", FLN-2001-016, September 24, 2001.
Comparison of Vermont Yankee Cycle 24 and 23 SLMCPR Values Table 1 summarizes the relevant input parameters and results of the SLMCPR determination for the Vermont Yankee Cycle 24 and 23 cores. The bases for the power distribution uncertainties are also indicated in Table 1. Table 2 provides a more detailed presentation of the bases and results for the Cycle 24 and Cycle 23 analyses. The affect on the calculated SLMCPR of the change from GETAB to Reduced power uncertainties is summarized in Table 2. The SLMCPR evaluations were performed using NRC approved methods and uncertainties"     1 . These evaluations yield different calculated SLMCPR values because different inputs were used. The quantities that have been shown to have some impact on the determination of the safety limit MCPR (SLMCPR) are provided.
[5]
Letter, Glen A. Watford (GNF-A) to U. S. Nuclear Regulatory Commission Document Control Desk with attention to J. Donoghue (NRC), "Confirmation of the Applicability of the GEXL14 Correlation and Associated R-Factor Methodology for Calculating SLMCPR Values in Cores Containing GE14 Fuel", FLN-2001-017, October 1, 2001.
[6]
Letter, Glen A. Watford (GNF-A) to U. S. Nuclear Regulatory Commission Document Control Desk with attention to J. Donoghue (NRC), "Final Presentation Material for GEXL Presentation - February 11, 2002", FLN-2002-004, February 12, 2002.
Comparison of Vermont Yankee Cycle 24 and 23 SLMCPR Values Table 1 summarizes the relevant input parameters and results of the SLMCPR determination for the Vermont Yankee Cycle 24 and 23 cores. The bases for the power distribution uncertainties are also indicated in Table 1. Table 2 provides a more detailed presentation of the bases and results for the Cycle 24 and Cycle 23 analyses. The affect on the calculated SLMCPR of the change from GETAB to Reduced power uncertainties is summarized in Table 2. The SLMCPR evaluations were performed using NRC approved methods and uncertainties"1.
These evaluations yield different calculated SLMCPR values because different inputs were used. The quantities that have been shown to have some impact on the determination of the safety limit MCPR (SLMCPR) are provided.
In comparing the Vermont Yankee Cycle 24 and 23 SLMCPR values it is important to note the impact of the differences in the core and bundle designs. These differences are summarized in Table
In comparing the Vermont Yankee Cycle 24 and 23 SLMCPR values it is important to note the impact of the differences in the core and bundle designs. These differences are summarized in Table
: 1. The GETAB and reduced power distribution uncertainty columns for Cycle 24 are both provided for comparison to the Cycle 23 GETAB power distribution uncertainty column.
: 1. The GETAB and reduced power distribution uncertainty columns for Cycle 24 are both provided for comparison to the Cycle 23 GETAB power distribution uncertainty column.
In general, the calculated safety limit is dominated by ((                     13))) (1) flatness of the core bundle-by-bundle MCPR distributions and (2) flatness of the bundle pin-by-pin power/R-factor page 1of 9 DRF #0000-0016-6425
In general, the calculated safety limit is dominated by ((
13))) (1) flatness of the core bundle-by-bundle MCPR distributions and (2) flatness of the bundle pin-by-pin power/R-factor page 1of 9 DRF #0000-0016-6425


Attachment                 Additional Information Regarding the               3 November 2003 Cycle Specific SLMCPR for Vermont Yankee Cycle 24 distributions. Greater flatness in either parameter yields more rods susceptible to boiling transition and thus a higher calculated SLMCPR
Attachment Additional Information Regarding the 3 November 2003 Cycle Specific SLMCPR for Vermont Yankee Cycle 24 distributions. Greater flatness in either parameter yields more rods susceptible to boiling transition and thus a higher calculated SLMCPR
[1 The uncontrolled bundle pin-by-pin power distributions were compared between the Vermont Yankee Cycle 24 bundles and the Cycle 23 bundles. Pin-by-pin power distributions are characterized in terms of R-factors using the NRC approved methodologyi 2 l. For the Vermont Yankee Cycle 24 limiting case analyzed at EOR-1.OK, (('
[1 The uncontrolled bundle pin-by-pin power distributions were compared between the Vermont Yankee Cycle 24 bundles and the Cycle 23 bundles. Pin-by-pin power distributions are characterized in terms of R-factors using the NRC approved methodologyi2 l. For the Vermont Yankee Cycle 24 limiting case analyzed at EOR-1.OK, (('
                *3)
*3)  
                )) the Vermont Yankee Cycle 24 bundles are flatter than the bundles used for the Cycle 23 SLMCPR analysis.
)) the Vermont Yankee Cycle 24 bundles are flatter than the bundles used for the Cycle 23 SLMCPR analysis.
As indicated in Table 1,the NRC approved!' revised non-power distribution uncertainties have been assumed for the Vermont Yankee Cycle 24 analyses.
As indicated in Table 1, the NRC approved!' revised non-power distribution uncertainties have been assumed for the Vermont Yankee Cycle 24 analyses.
With a flatter core MCPR distribution in Cycle 24 than in Cycle 23, and a flatter bundle R-factor distribution in Cycle 24 relative to the Cycle 23 bundles, it would be expected that the Cycle 24 SLMCPR result would be greater than the Cycle 23 result. Table 1 shows that when using the same uncertainties the Cycle 24 SLMCPR is greater than the Cycle 23 SLMCPR. Table 2, which shows these same values to greater precision, confirms that the Cycle 24 result is greater than the Cycle 23 value.
With a flatter core MCPR distribution in Cycle 24 than in Cycle 23, and a flatter bundle R-factor distribution in Cycle 24 relative to the Cycle 23 bundles, it would be expected that the Cycle 24 SLMCPR result would be greater than the Cycle 23 result. Table 1 shows that when using the same uncertainties the Cycle 24 SLMCPR is greater than the Cycle 23 SLMCPR. Table 2, which shows these same values to greater precision, confirms that the Cycle 24 result is greater than the Cycle 23 value.
As indicated in Table 1, the NRC approved!1 standard GETAB and reduced power distribution uncertainties have both been assumed for the Vermont Yankee Cycle 24 analyses. For the Cycle 23 case, the standard GETAB power distribution uncertainties were used. Use of the reduced power distribution uncertainties results in a reduction of the SLMCPR by approximately 0.04.
As indicated in Table 1, the NRC approved!1 standard GETAB and reduced power distribution uncertainties have both been assumed for the Vermont Yankee Cycle 24 analyses. For the Cycle 23 case, the standard GETAB power distribution uncertainties were used. Use of the reduced power distribution uncertainties results in a reduction of the SLMCPR by approximately 0.04.
Comparison of the GETAB and Reduced Uncertainties The power distribution and other uncertainties that are the bases for the proposed TS safety limit for Vermont Yankee Cycle 24 are identified in Table 2. Column 2 of Table 2 shows the power distribution and other uncertainties that are the bases for the current TS safety limit for Vermont Yankee Cycle 23. The revised bases to support the proposed change in TS safety limit for Vermont Yankee Cycle 24 are identified in column 3b of Table 2. The GETAB bases and values for Cycle 24 are provided for comparison purposes in column 3a. By comparing the values from column 2 for Cycle 23 and column 3a for Cycle 24, one may see that the calculated SLMCPR for Cycle 24 is higher ((           {3))) than the value for Cycle 23 when using the same GETAB model and uncertainties for both calculations. Thus, the focus for Table 2 is on how the revised model and reduced power distribution uncertainties affect the calculated SLMCPR for Vermont Yankee, Cycle 24 (only).
Comparison of the GETAB and Reduced Uncertainties The power distribution and other uncertainties that are the bases for the proposed TS safety limit for Vermont Yankee Cycle 24 are identified in Table 2.
Column 2 of Table 2 shows the power distribution and other uncertainties that are the bases for the current TS safety limit for Vermont Yankee Cycle 23. The revised bases to support the proposed change in TS safety limit for Vermont Yankee Cycle 24 are identified in column 3b of Table 2. The GETAB bases and values for Cycle 24 are provided for comparison purposes in column 3a. By comparing the values from column 2 for Cycle 23 and column 3a for Cycle 24, one may see that the calculated SLMCPR for Cycle 24 is higher ((
{3))) than the value for Cycle 23 when using the same GETAB model and uncertainties for both calculations. Thus, the focus for Table 2 is on how the revised model and reduced power distribution uncertainties affect the calculated SLMCPR for Vermont Yankee, Cycle 24 (only).
The revised model and reduced power distribution uncertainties affect the calculated SLMCPR for Vermont Yankee Cycle 24 as indicated in Table 2. Bases that have not changed are not reported in either table except where it is important to indicate that the bases have not changed. For these page 2 of 9 DRF #0000-0016-6425
The revised model and reduced power distribution uncertainties affect the calculated SLMCPR for Vermont Yankee Cycle 24 as indicated in Table 2. Bases that have not changed are not reported in either table except where it is important to indicate that the bases have not changed. For these page 2 of 9 DRF #0000-0016-6425


Attachment                     Additional Information Regarding the                   3 November 2003 Cycle Specific SLMCPR for Vermont Yankee Cycle 24 exceptions, the impact on the SLMPCR is indicated as "None" in the rightmost column of Table 2.
Attachment Additional Information Regarding the 3 November 2003 Cycle Specific SLMCPR for Vermont Yankee Cycle 24 exceptions, the impact on the SLMPCR is indicated as "None" in the rightmost column of Table 2.
For the other items where a change in basis is indicated, the calculated impact that each item has on the calculated SLMCPR is indicated.
For the other items where a change in basis is indicated, the calculated impact that each item has on the calculated SLMCPR is indicated.
The impacts from the changes in bases have been grouped into three categories. In each category the shaded cells contain values that sum to produce the total impact for that category indicated in the cell immediately below the shaded cells.
The impacts from the changes in bases have been grouped into three categories. In each category the shaded cells contain values that sum to produce the total impact for that category indicated in the cell immediately below the shaded cells.
In Section 1 of Table 2 the impact of using the "revised uncertainties not related to power distribution" is indicated as "None" since the same revised uncertainties were used for both the GETAB calculation (Column 3a) and the revised calculation (Column 3b).
In Section 1 of Table 2 the impact of using the "revised uncertainties not related to power distribution" is indicated as "None" since the same revised uncertainties were used for both the GETAB calculation (Column 3a) and the revised calculation (Column 3b).
The largest change in the calculated SLMCPR is the reduction that is due to use of the NRC-approved revised power distribution model and its associated reduced uncertainties as described in NEDC-32694P-A. The increase in the R-factor uncertainty resulted in an SLMCPR increase of [1                     ))
The largest change in the calculated SLMCPR is the reduction that is due to use of the NRC-approved revised power distribution model and its associated reduced uncertainties as described in NEDC-32694P-A. The increase in the R-factor uncertainty resulted in an SLMCPR increase of [1  
For Vermont Yankee Cycle 24 the calculated SLMCPR was reduced by 113)))                         as indicated in Section 2 of Table 2.
))
For Vermont Yankee Cycle 24, both the GETAB calculation and the revised calculation use the same limiting rod patterns, [1                                                                     (3)jj Therefore, in Section 3 of Table 2 the "Secondary impact on SLMCPR because reduced SLMCPR causes a lower OLMCPR" is indicated as [                     3)jj*
For Vermont Yankee Cycle 24 the calculated SLMCPR was reduced by 113)))
The total impact is that the SLMCPR as calculated using NRC-approved methods, inputs and procedures decreases by ((                 131)). This amount of improvement is consistent with the expected improvements as presented to the NRC in Table 4.3 of NEDC-32694P-A. Of this improvement, about ((                 (3)j] is attributed to the reduced uncertainties themselves and the remaining ((
as indicated in Section 2 of Table 2.
J3)J is attributed to the methodology improvements described in NEDC-32694P-A.
For Vermont Yankee Cycle 24, both the GETAB calculation and the revised calculation use the same limiting rod patterns, [1 (3)jj Therefore, in Section 3 of Table 2 the "Secondary impact on SLMCPR because reduced SLMCPR causes a lower OLMCPR" is indicated as [
Reduction in the Tech Spec SLMCPRs by these calculated amounts is warranted since the old GETAB value is overly conservative. The excessive conservatism in the GETAB model and inputs is primarily due to the higher ((                   13 )1 J uncertainty ((
3)jj*
                                                      .3)) These limitations are not applicable to the 3D-MONICORE (3DM) monitoring system. The revised power distribution model and reduced uncertainties associated with 3DM have been justified, reviewed and approved by the NRC (reference NEDC-32601P-A and NEDC-32694P-A). The conservatism that remains even when applying the revised model and reduced uncertainties to calculate a lower SLMCPR was documented as part of the NRC review and approval. It was noted on page A-24 of NEDC-32601P-A ((
The total impact is that the SLMCPR as calculated using NRC-approved methods, inputs and procedures decreases by ((
Summary 1[                 (3) )) have been used to compare quantities that impact the calculated SLMCPR value.
131)). This amount of improvement is consistent with the expected improvements as presented to the NRC in Table 4.3 of NEDC-32694P-A. Of this improvement, about ((
(3)j] is attributed to the reduced uncertainties themselves and the remaining ((
J3) J is attributed to the methodology improvements described in NEDC-32694P-A.
Reduction in the Tech Spec SLMCPRs by these calculated amounts is warranted since the old GETAB value is overly conservative. The excessive conservatism in the GETAB model and inputs is primarily due to the higher ((
13)1J uncertainty ((
.3)) These limitations are not applicable to the 3D-MONICORE (3DM) monitoring system.
The revised power distribution model and reduced uncertainties associated with 3DM have been justified, reviewed and approved by the NRC (reference NEDC-32601P-A and NEDC-32694P-A). The conservatism that remains even when applying the revised model and reduced uncertainties to calculate a lower SLMCPR was documented as part of the NRC review and approval. It was noted on page A-24 of NEDC-32601P-A ((
Summary 1[
(3) )) have been used to compare quantities that impact the calculated SLMCPR value.
Based on these comparisons, the conclusion is reached that the Vermont Yankee Cycle 24 core/cycle page 3 of 9 DRF #0000-0016-6425
Based on these comparisons, the conclusion is reached that the Vermont Yankee Cycle 24 core/cycle page 3 of 9 DRF #0000-0016-6425


Attachment                 Additional Information Regarding the                     3 November 2003 Cycle Specific SLMCPR for Vermont Yankee Cycle 24 has a flatter core MCPR distribution ((                               13))) and flatter in-bundle power distributions ((                       3)] than what was used to perform the Cycle 23 SLMCPR evaluation.
Attachment Additional Information Regarding the 3 November 2003 Cycle Specific SLMCPR for Vermont Yankee Cycle 24 has a flatter core MCPR distribution ((
Utilizing the same bases used for Cycle 23, the calculated ((           '3))) Monte Carlo SLMCPR for Vermont Yankee Cycle 24 is consistent with what one would expect ((
13))) and flatter in-bundle power distributions ((
{3}] the ((       (3n)) SLMCPR value is appropriate.
3)] than what was used to perform the Cycle 23 SLMCPR evaluation.
Utilizing the same bases used for Cycle 23, the calculated ((  
'3))) Monte Carlo SLMCPR for Vermont Yankee Cycle 24 is consistent with what one would expect ((
{3 }] the ((
(3n)) SLMCPR value is appropriate.
The reduction in SLMCPR to 1.07 associated with the change in basis to the reduced power distribution uncertainties for Vermont Yankee Cycle 24 is consistent with what one would expect for a change to this basis.
The reduction in SLMCPR to 1.07 associated with the change in basis to the reduced power distribution uncertainties for Vermont Yankee Cycle 24 is consistent with what one would expect for a change to this basis.
Based on all of the facts, observations and arguments presented above, it is concluded that the calculated SLMCPR value of 1.07 for the Vermont Yankee Cycle 24 core is appropriate. It is reasonable that this value is 0.02 lower than the 1.09 value calculated for the previous cycle.
Based on all of the facts, observations and arguments presented above, it is concluded that the calculated SLMCPR value of 1.07 for the Vermont Yankee Cycle 24 core is appropriate. It is reasonable that this value is 0.02 lower than the 1.09 value calculated for the previous cycle.
Line 151: Line 205:
page 4 of 9 DRF #0000-0016-6425
page 4 of 9 DRF #0000-0016-6425


Attachment               Additional Information Regarding the         3 November 2003 Cycle Specific SLMCPR for Vermont Yankee Cycle 24 Prepared by:                                Verified by:
Attachment Additional Information Regarding the 3 November 2003 Cycle Specific SLMCPR for Vermont Yankee Cycle 24 Prepared by:
R"A. Butrovich                               E. W. Gibbs F~el Engineering Services                  . Fuel Engineering Services page 5 of 9 DRF #0000-0016-6425
R"A. Butrovich F~el Engineering Services Verified by:
E. W. Gibbs
. Fuel Engineering Services page 5 of 9 DRF #0000-0016-6425


Attachment               Additional Information Regarding the           3 November 2003 Cycle Specific SLMCPR for Vermont Yankee Cycle 24 Table 1 Comparison of the Verrnont Yankee Cycle 24 and Cycle 23 SLMCPR QUANTITY, DESCRIPTION                     Vermont Yankee               Vermont Yankee
Attachment Additional Information Regarding the 3 November 2003 Cycle Specific SLMCPR for Vermont Yankee Cycle 24 Table 1 Comparison of the Verrnont Yankee Cycle 24 and Cycle 23 SLMCPR QUANTITY, DESCRIPTION Vermont Yankee Vermont Yankee Cycle 23 C cle 24 Number of Bundles in Core 368 368 368 Limiting Cycle Exposure Point E0R-1K EOR-1K EOR-lK Cycle Exposure at Limiting Point 10425 11150 11150
_                        Cycle 23                     C cle 24 Number of Bundles in Core                       368               368               368 Limiting Cycle Exposure Point                 E0R-1K           EOR-1K             EOR-lK Cycle Exposure at Limiting Point               10425               11150             11150
[MWd/STUj Reload Fuel Type GE14 GE14 GE14 Latest Reload Batch Fraction [/ol 34.8 31.5 31.5 Latest Reload Average Batch Weight %
[MWd/STUj                                         .            .
3.94 3.99 3.99 Enrichment Batch Fraction for GE14fl 34.8 66.3 66.3 Batch Fraction forGE13[%l 58.7 28.3 28.3 Batch Fraction for GE9B[%1 6.5 5.4 5.4 Core Average Weight % Enrichment  
Reload Fuel Type                               GE14               GE14               GE14 Latest Reload Batch Fraction [/ol               34.8               31.5               31.5 Latest Reload Average Batch Weight %           3.94               3.99               3.99 Enrichment Batch Fraction for GE14fl                       34.8               66.3               66.3 Batch Fraction forGE13[%l                       58.7               28.3               28.3 Batch Fraction for GE9B[%1                       6.5               5.4               5.4 Core Average Weight % Enrichment               .3.76               3.83               3.83 Core MCPR (for limiting rod pattern)           1.46               1.47               1.47 Power distribution methodology               GETAB             GETAB             Revised NEDO-10958-A       NEDO-10958-A     NEDC-32601P-A Power distribution uncertainty               GETAB             GETAB               Reduced NEDO-10958-A       NEDO-10958-A     NEDC-32694P-A Non-power distribution uncertainty           Revised           Revised           Revised NEDC-32601P-A     NEDC-32601P-A NEDC-32601P-A Calculated Safety Limit MCPR                   1.09             (( "I))             1.07 page 6 of 9 DRF #0000-0016-6425
.3.76 3.83 3.83 Core MCPR (for limiting rod pattern) 1.46 1.47 1.47 Power distribution methodology GETAB GETAB Revised NEDO-10958-A NEDO-10958-A NEDC-32601P-A Power distribution uncertainty GETAB GETAB Reduced NEDO-10958-A NEDO-10958-A NEDC-32694P-A Non-power distribution uncertainty Revised Revised Revised NEDC-32601P-A NEDC-32601P-A NEDC-32601P-A Calculated Safety Limit MCPR 1.09
((  
"I))
1.07 page 6 of 9 DRF #0000-0016-6425


Attachment                 Additional Information Regarding the                         3 November 2003 Cycle Specific SLMCPR for Vermont Yankee Cycle 24 Table 2 Vermont     Yankee   Cycles   23   and 24 SLMCPR Results Assessment 1                             2                       3a                     3b                       4 Quantity                                 Cycle 23                 Cycle 24                 Cycle 24             Impact on GETAB                     GETAB                   Revised           SLMCPR for Value                     Bases                 Bases                 Cycle 24 Tech Specs                                   1.09                 Used for                   1.07                   0.02
Attachment Additional Information Regarding the 3 November 2003 Cycle Specific SLMCPR for Vermont Yankee Cycle 24 Table 2 Vermont Yankee Cycles 23 and 24 SLMCPR Results Assessment 1
_      __        __    comparison only           .
2 3a 3b 4
: 1. Impact of Revised Uncertainties Not Related to Power Distribution l Reference Document                 NEDC-32601P-A           NEDC-32601P-A             NEDC-32601P-A             Approved August 1999       .      August 1999             August 1999             byNRC Feedwater flow uncertainty 'Auus       A          1999                    1e Reactor pressure uncertaintyr             [31L3                                                         a d Channel flow area uncertainty           J1           L                                                 f   dii Friction multiplier uncertainty             [r                       13
Quantity Cycle 23 Cycle 24 Cycle 24 Impact on GETAB GETAB Revised SLMCPR for Value Bases Bases Cycle 24 Tech Specs 1.09 Used for 1.07 0.02 comparison only
_                r[-   i31       -
: 1. Impact of Revised Uncertainties Not Related to Power Distribution l Reference Document NEDC-32601P-A NEDC-32601P-A NEDC-32601P-A Approved August 1999 August 1999 August 1999 byNRC Feedwater flow uncertainty A
: 2. Impact of Reduced Power Distribution Uncertainties and Revised Modelin Reference Document                   NEDO-10958-A           NEDO-10958-A             NEDC-32694P-A         Both approved
1999
                          .          January 1977             January 1977             August 1999             byNRC R-factor uncertainty                     IJI0111                                                             V -1ZZE Critical power uncertainty                                                                             31J None TIP random uncertainty                                                                           13[))     None component                                                   _r______
'Auus 1e Reactor pressure uncertaintyr
Adaptive mode for Safety Limit           Absolute                 Absolute                 Shape           Both approved analysis                                                                                                   byNRC Effective total bundle power             ((                                                     v.       Part of overall uncertainty                                                                                                 TIPSYS Effective non-random TIPSYS                                     ((.                                 13     Part of overall
[31L3 a d Channel flow area uncertainty J1 L
_TIPSYS 3
f dii Friction multiplier uncertainty
Effective overall TIPSYS uncertainty as modeled
[r 13 r[- i31
: 2. Impact of Reduced Power Distribution Uncertainties and Revised Modelin Reference Document NEDO-10958-A NEDO-10958-A NEDC-32694P-A Both approved January 1977 January 1977 August 1999 byNRC R-factor uncertainty IJI0111 V -1ZZE Critical power uncertainty 31J None TIP random uncertainty 13[))
None component
_r______
Adaptive mode for Safety Limit Absolute Absolute Shape Both approved analysis byNRC Effective total bundle power
((
: v.
Part of overall uncertainty TIPSYS Effective non-random TIPSYS
((.
13 Part of overall
_TIPSYS Effective overall TIPSYS
[
[
: 3. Secondary Impact on SLMCPR because Reduced SLMCPR causes a Lower OLMCPR
3)j]
                                                                                                    )j]
((1j]
T_ ((1j]
uncertainty as modeled T_
Target OLMCPR                               1.46                     1.47                   1.47         See below.
: 3. Secondary Impact on SLMCPR because Reduced SLMCPR causes a Lower OLMCPR Target OLMCPR 1.46 1.47 1.47 See below.
rr.3)11                                                                                       _1.31       rr Total Impact on SLMCPR
rr.3)11 rr
                                                                    .                                          (col. 3b-3a)
_1.31 Total Impact on SLMCPR (col. 3b-3a)
Calculated SLMCPR - DLO               J[                                 _3_11 Calculated SLMCPR - SLO                                   _          _          _    _3__         _
Calculated SLMCPR - DLO J[
TS SLMCPR - DLO                             1.09                                             1.07         IL..3f TS SLMCPR -SLO                               1.11                                             1.9 1.09II                        .3.1 page 7 of 9 DRF #0000-0016-6425
_3_11 Calculated SLMCPR - SLO
_3__
TS SLMCPR - DLO 1.09 1.07 IL..3f TS SLMCPR -SLO 1.11
: 1. 09II 1.9
.3.1 page 7 of 9 DRF #0000-0016-6425


Attachment                   Additional Information Regarding the                             3 November 2003 Cycle Specific SLMCPR for Vermont Yankee Cycle 24 Figure 1 - Cycle 23 Reference Core Loading Pattern 1   2   3   4     5   6   7   8   9   10 1t 12 13         14 i5     16 17 18 19 20 21 22 1                                         9 113112112111 91                                                  44 2          Bundle IAT                 9 12 l 16116 16       16   12   9                                   42 3                        9   12 112 l 12 119 116 1 18 18 116         19 .12 12121 9                           40
Attachment Additional Information Regarding the 3 November 2003 Cycle Specific SLMCPR for Vermont Yankee Cycle 24 Figure 1 - Cycle 23 Reference Core Loading Pattern 1 2 3
                        -+     4-     -4     41       4-     -4     _        l   l   l     _
4 5
4                13 113   16 1 1681 201 16 118 112 112 118         161 201616113 113                         38 5            9   13 118     16 20     16 18   16   18 18 116     18   16   20   16 18     13 9           36 6          12   1616 18         1218 112 118 12         12   18 12118        12 118   16 116 112             34 7          12j 16 1201 12-1 20 116 181161 191 19 116               18 116 120 112 1201 16       12           32 8        9 112 120 116 118 116 118113 118 117 117             18 13 118 116 118 116 120 112           9       30
6 7
.9     9    12 19 16       18   12 18   13 18   13 18   18   13   18   13   18 12     18   16 19   12   9   28 10  13   16 16   18   16   18 16   18 13   18 17   17   18   13   18   16 18     16   18 16   16 13 26 11  12 16   18   12   18   12 19   17 18 17     13 13   17   18   17 19     12 18     12 18 16   12 24 12 12  16   18 12     18   12 19   17 18 17     13 13   17   18   17   19   12   18   12 18 16   12 22 13 .13 16   16 18     16   18 16   18 13     18   17 17   18   13   18 16     18   16 18   16   16 13 20 14  9   12   19   16   18   12 18   13 18     13   18 18   13   18   13   18   12   18 16   19   12   9   18 15      9   12 120 116 118 116 18 113 18117 117 118 113                 18 16 j18     16 201 12             16 16            12 116   I 20   12 20   16 118   16 119 I19 116 118     16 20 12120           16112           14 17            12   16   16 118112118      12   18   12112   18 112 18       12 18 11616 12                   12 18            9   13 186       6 20J 16   181 16 118     18 16 18 16120 16 18113 _                             10 19                  113 1 161 16 120 16118 112 112 118 116               20 116 116 113 113                     08 20                      9   12 112 112 119 116       18 1 8 116 119 112 112 112         _                     06 21                                      9 112 1616 1 161612              9                                     04 22                                          9 113 112 112 1131 9                                               02 01 03 05 07 09 11             13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43
8 9
                                                                                  #In                      Cycle Bundle Name                                                     IAT Core        Fresh        Loaded GE9B-P8DWB335-10GZ-80M-150-T                                     9          24            0          18 GE13-P9HTB380-12GZ-1O0T-146-T                                   12          72            0          20 GE13-P9HTB379-13GZ-1 OOT-146-T                                   13          40            0        I 20 GE13-P9DTB386-1 1G4.011G3.0-IOOT-146-T-2425                     16          88            0          22 GE13-P9DT8225-NOG-10OT-146-T-2570                               17          16            0        22B GE14-P1 ODNAB394-7G5.016G4.0-10OT-150-T-2538                     18          92            92          23 GE14-P1ODNAB394-8G5.0/6G4.0-1 OOT-1 50-T-2589                   19          16            16          23 GEl 4-P1 ODNAB394-12G5.0-1 OOT-1 50-T-2590                       20           20           20         23 Total        368          128 page 8 of 9 DRF #0000-0016-6425
10 1t 12 13 14 9 113112112111 91 i5 16 17 18 19 20 21 22 1
2 3
4 5
6 7
8
.9 10 11 12 13 14 15 16 17 18 19 20 21 22 Bundle IAT 9
12 l 16116 16 16 12 9
9 12 112 l 12 119 116 1 18 18 116 19  
.12 12121 9
-+
4-  
-4 41 4-  
-4 l
l l
13 113 16 1 1681 201 16 118 112 112 118 161 201616113 113 9
13 118 16 20 16 18 16 18 18 116 18 16 20 16 18 13 9
12 1616 18 1218 112 118 12 12 18 12 118 12 118 16 116 112 12j 16 1201 12-1 20 116 18 1161 191 19 116 18 116 120 112 1201 16 12 9 112 120 116 118 116 118 113 118 117 117 18 13 118 116 118 116 120 112 9
9 12 19 16 18 12 18 13 18 13 18 18 13 18 13 18 12 18 16 19 12 9
13 16 16 18 16 18 16 18 13 18 17 17 18 13 18 16 18 16 18 16 16 13 12 16 18 12 18 12 19 17 18 17 13 13 17 18 17 19 12 18 12 18 16 12 12 16 18 12 18 12 19 17 18 17 13 13 17 18 17 19 12 18 12 18 16 12
.13 16 16 18 16 18 16 18 13 18 17 17 18 13 18 16 18 16 18 16 16 13 9
12 19 16 18 12 18 13 18 13 18 18 13 18 13 18 12 18 16 19 12 9
44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 08 06 04 02 9
12 120 116 118 116 18 113 18 117 117 118 113 18 16 j18 16 201 12 12 116 I 20 12 20 16 118 16 119 I19 116 118 16 20 12120 16112 12 16 16 1 18112118 12 18 12112 18 112 18 12 18 11616 12 9
13 186 6 20J 16 181 16 118 18 16 18 161 20 16 18113 _
113 1 161 16 120 16 118 112 112 118 116 20 116 116 113 113 9
12 112 112 119 116 18 1 8 116 119 112 112 112 _
9 112 1616 1 16 1612 9
9 113 112 112 1131 9 01 03 05 07 09 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 Bundle Name GE9B-P8DWB335-10GZ-80M-150-T GE13-P9HTB380-12GZ-1O0T-146-T GE13-P9HTB379-13GZ-1 OOT-146-T GE13-P9DTB386-1 1G4.011G3.0-IOOT-146-T-2425 GE13-P9DT8225-NOG-10OT-146-T-2570 GE14-P1 ODNAB394-7G5.016G4.0-10OT-150-T-2538 GE14-P1ODNAB394-8G5.0/6G4.0-1 OOT-1 50-T-2589 GEl 4-P1 ODNAB394-12G5.0-1 OOT-1 50-T-2590 IAT 9
12 13 16 17 18 19 20 Total
#In Core 24 72 40 88 16 92 16 20 368 Fresh 0
0 0
0 0
92 16 20 128 Cycle Loaded 18 20 I 20 22 22B 23 23 23 page 8 of 9 DRF #0000-0016-6425


Attachment                 Additional Information Regarding the                                           3 November 2003 Cycle Specific SLMCPR for Vermont Yankee Cycle 24 Figure 2 - Cycle 24 Reference Core Loading Pattern 1 2 3 4 5               6       7 8     9     10 11 12 13 14 15 16 17 18 19 20 21 22 1                                             711616 1161 7                                                       44 2        Bundle IAT                   161181 18116116118118116 -                                                42 3                    8 I1 6T 16 1I6 11-8                I1  l 1 l18l       1   1161161161       8               40 8 11           1-             1     1 -1 1- 86                           - 8 4                8 11611811811 1201 5 1181181 5 1201 1 118118116 8                                                 38 5            8 116 2 118 1 118 5 i20117                  5 517 1201 5 118 1                     1 16  a821      36 18162118118121181        8   5181 ~ 20151511201518151181                         2116181 6                  -      -        9.                       -    -                              - -            34 7          ,
Attachment Additional Information Regarding the 3 November 2003 Cycle Specific SLMCPR for Vermont Yankee Cycle 24 Figure 2 - Cycle 24 Reference Core Loading Pattern 1 2 3
16118 1 1201 5 1181 21191 21 2 1191 2 1181 5 120 118116                                       _
4 5 6
32 8    1161 16 1181 5 1181 2 1161161171171161161 2 1181 5 1.8                                         1   61.1616 30 9 7     18 1 20 5 18 2 16 16 19 2 2 19 16 16 2 18 5 20 1 18 7 28 10 16   18 18 5 20 2 19 16 19 5 18 18 5 19 16 19 2 20 5 18 18 16 26 11 16   16 1 18 5 17 2 17 2 18 16 16 18 2 17 2 17 5 18 1 16 16 24 12 16   16 1 18 5 17 2 17 2 18 16 16 18 2 17 2 17 5 18 1 16 16 22 13 16   18 18 5 20 2 19 16 19 5 18 18 5 19 16 19 2 20 5 18 18 16 20 14 7   18 1 20 5 18 2 16 16 19 2 2 19 1616                                               2 18 5 20 1 18 7 18 15      161161 11181 5 1181 2 16161171171 161161                                   2-_
7 8
118     5 18 116116         16
9 10 11 12 13 14 15 16 17 18 19 20 21 22 1
                                                    -~~~~~~~~               -----.                                -
2 3
16            16118 1 201 5 118 2 191 2 12 1191 21181 5 20 1 18116                                                 14 17            16 18118 2 118 5 181 2 171171 2 1181 5 1181 211                                         18 16         12 18            8 16 2 18 1181 5 1201 515 1201 5 1181 1 1181 2 1161 8                                               10 I . .
4 5
t.-       -.-        .-.
6 7
19                8 116118118 1 201 5 181181 5 120 1181181 1618                                                     08 20                    8 1161161161 1 1181 1 1 1181 1 1161161161 8                                                 06
8 9
                                                .    . ~ . . _
10 11 12 13 14 15 16 17 18 19 20 21 22 711616 1161 7 Bundle IAT 161181 18116116118118116 8 I1 6T 16 1I6 11-8I1 l 1 l18l 1 1161161161 8 8 11 1-1 1 1
21                                      161181181161161181181161                                                   04 22                                            7- 1161161161161 7                                                   02 01 03 05 07 09 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 Bundle Name                                                                                             Cycle IAT                                                                            in Core         Fresh     Loaded 1 GE14-P1 ODNAB426-16G6.0-1ODT-1 50-T6-2682                                     32              32        24 2 GE14-P1 ODNAB390-14GZ-1 OOT-150-T6-2683                                       44              44        24 5 GE14-PIODNAB388-17GZ-1 OOT-150-T6-2684                                         40              40        24 7 GE9B-P8DWB335-10GZ-80U-150-T6                                                   8                         17 8  GE9B-P8DWB335-1 I GZ-80U-1 50-T6                                               12                        17 16 GEl 3-P9DTB386-1 1G4.0/1 G3.0-1 DOT-146-T6-3958                               88                        22.
-1 86 8
17 GE 13-P9DTB225-NOG-1OOT-146-T6-2571                                           16                        22B 18 GE14-PIODNAB394-7G5.0/6G4.0-100T-150-T6-2566                                   92                        23 19 GE14-P10DNAB394-8G5.0/6G4.0-1OOT-150-T6-2595                                   16                        23 20 GE14-P1 ODNAB394-12G5.0-1OOT-150-T6-2596                                       20                         23 Total              368            116 page 9 of 9 DRF #0000-0016-6425
8 11611811811 1201 5 1181181 5 1201 1 118118116 8
8 116 2 118 1 118 5 i201 5 5 1201 5 118 1
a821 1
8 18 17 17 1
6 1
8162118118121181 5 1 20151511201518151181 2116181
: 9.  
~
16118 1 1201 5 1181 21191 21 2 1191 2 1181 5 120 118116 1161 16 1181 5 1181 2 1161161171171161161 2 1181 5 1.8 1 61.1616 7
18 1 20 5 18 2 16 16 19 2 2 19 16 16 2 18 5 20 1 18 7 16 18 18 5 20 2 19 16 19 5 18 18 5
19 16 19 2 20 5 18 18 16 16 16 1 18 5 17 2 17 2 18 16 16 18 2 17 2 17 5 18 1 16 16 16 16 1 18 5 17 2 17 2 18 16 16 18 2 17 2 17 5 18 1 16 16 16 18 18 5 20 2 19 16 19 5 18 18 5 19 16 19 2 20 5 18 18 16 7 18 1 20 5 18 2 16 16 19 2 2
19 1616 2
18 5 20 1 18 7
44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 08 06 04 02 161161 11181 5 1181 2 16161171171 161161 2 118 5 18 116116
-~~~~~~~~
16118 1 201 5 118 2 191 2 12 1191 2 1181 5 20 1 18116 16 18118 2 118 5 181 2 171171 2 1181 5 1181 211 18 16 8
16 2 18 1181 5 1201 515 1201 5 1181 1 1181 2 1161 8 I  
.-t.-
8 116118118 1 201 5 181181 5 120 1181181 1618 8 1161161161 1 1181 1 1 1181 1 1161161161 8
~
161181181161161181181161 7-1161161161161 7 01 03 05 07 09 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 Bundle Name Cycle in Core Fresh Loaded IAT 1 GE14-P1 ODNAB426-16G6.0-1ODT-1 50-T6-2682 2 GE14-P1 ODNAB390-14GZ-1 OOT-150-T6-2683 5 GE14-PIODNAB388-17GZ-1 OOT-150-T6-2684 7 GE9B-P8DWB335-10GZ-80U-150-T6 8 GE9B-P8DWB335-1 I GZ-80U-1 50-T6 16 GEl 3-P9DTB386-1 1 G4.0/1 G3.0-1 DOT-146-T6-3958 17 GE 13-P9DTB225-NOG-1OOT-146-T6-2571 18 GE14-PIODNAB394-7G5.0/6G4.0-100T-150-T6-2566 19 GE14-P10DNAB394-8G5.0/6G4.0-1OOT-150-T6-2595 20 GE14-P1 ODNAB394-12G5.0-1OOT-150-T6-2596 Total 32 44 40 8
12 88 16 92 16 20 32 24 44 24 40 24 17 17 22.
22B 23 23 23 116 page 9 of 9 DRF #0000-0016-6425 368


Docket No. 50-271 BVY 03-114 Attachment 5 Vermont Yankee Nuclear Power Station Proposed Technical Specification Change No. 264 GNF Summary of Technical Basis for SLMCPR Values (Proprietary Information)
Docket No. 50-271 BVY 03-114 Vermont Yankee Nuclear Power Station Proposed Technical Specification Change No. 264 GNF Summary of Technical Basis for SLMCPR Values (Proprietary Information)


Affidavit Affidavit I, Margaret E. Harding, state as follows:
Affidavit Affidavit I, Margaret E. Harding, state as follows:
(1) I am Manager, Fuel Engineering Services, Global Nuclear Fuel - Americas, L.L.C. ("GNF-A") and have been delegated the function of reviewing the information described in paragraph (2) which is sought to be withheld, and have been authorized to apply for its withholding.
(1) I am Manager, Fuel Engineering Services, Global Nuclear Fuel - Americas, L.L.C. ("GNF-A") and have been delegated the function of reviewing the information described in paragraph (2) which is sought to be withheld, and have been authorized to apply for its withholding.
(2) The information sought to be withheld is contained in the attachment, "Additional Information Regarding the Cycle Specific SLMCPR for Vermont Yankee Cycle 24," November 3, 2003. GNF proprietary information is indicated by enclosing it in double brackets. In each case, the superscript notation 13 ) refers to Paragraph (3) of this affidavit, which provides the basis for the proprietary determination.
(2) The information sought to be withheld is contained in the attachment, "Additional Information Regarding the Cycle Specific SLMCPR for Vermont Yankee Cycle 24," November 3, 2003. GNF proprietary information is indicated by enclosing it in double brackets. In each case, the superscript notation 13) refers to Paragraph (3) of this affidavit, which provides the basis for the proprietary determination.
(3) In making this application for withholding of proprietary information of which it is the owner or licensee, GNF-A relies upon the exemption from disclosure set forth in the Freedom of Information Act ("FOIA"), 5 USC Sec. 552(b)(4), and the Trade Secrets Act, 18 USC Sec. 1905, and NRC regulations 10 CFR 9.17(a)(4) and 2.790(a)(4) for "trade secrets and commercial or financial information obtained from a person and privileged or confidential" (Exemption 4). The material for which exemption from disclosure is here sought is all "confidential commercial information," and some portions also qualify under the narrower definition of "trade secret," within the meanings assigned to those terms for purposes of FOIA Exemption 4 in, respectively, Critical Mass Energy Project v. Nuclear Regulatory Commission. 975F2d871 (DC Cir. 1992), and Public Citizen Health Research Group v. FDA, 704F2d1280 (DC Cir. 1983).
(3) In making this application for withholding of proprietary information of which it is the owner or licensee, GNF-A relies upon the exemption from disclosure set forth in the Freedom of Information Act ("FOIA"), 5 USC Sec. 552(b)(4), and the Trade Secrets Act, 18 USC Sec. 1905, and NRC regulations 10 CFR 9.17(a)(4) and 2.790(a)(4) for "trade secrets and commercial or financial information obtained from a person and privileged or confidential" (Exemption 4). The material for which exemption from disclosure is here sought is all "confidential commercial information," and some portions also qualify under the narrower definition of "trade secret," within the meanings assigned to those terms for purposes of FOIA Exemption 4 in, respectively, Critical Mass Energy Project v. Nuclear Regulatory Commission. 975F2d871 (DC Cir. 1992), and Public Citizen Health Research Group v. FDA, 704F2d1280 (DC Cir. 1983).
(4) Some examples of categories of information which fit into the definition of proprietary information are:
(4) Some examples of categories of information which fit into the definition of proprietary information are:
Line 223: Line 350:
The value of this information to GNF-A would be lost if the information were disclosed to the public. Making such information available to competitors without their having been required to undertake a similar expenditure of resources would unfairly provide competitors with a windfall, and deprive GNF-A of the opportunity to exercise its competitive advantage to seek an adequate return on its large investment in developing and obtaining these very valuable analytical tools.
The value of this information to GNF-A would be lost if the information were disclosed to the public. Making such information available to competitors without their having been required to undertake a similar expenditure of resources would unfairly provide competitors with a windfall, and deprive GNF-A of the opportunity to exercise its competitive advantage to seek an adequate return on its large investment in developing and obtaining these very valuable analytical tools.
I declare under penalty of perjury that the foregoing affidavit and the matters stated therein are true and correct to the best of my knowledge, information, and belief.
I declare under penalty of perjury that the foregoing affidavit and the matters stated therein are true and correct to the best of my knowledge, information, and belief.
Executed at Wilmington, North Carolina, this     5th     day of       November, 2003.
Executed at Wilmington, North Carolina, this 5th day of November, 2003.
Margaret E. Harding '
Margaret E. Harding '
Global Nuclear Fuel - Americas, hLLC}}
Global Nuclear Fuel - Americas, hLLC}}

Latest revision as of 04:38, 16 January 2025

Technical Specification Proposed Change No. 264 Safety Limit Minimum Critical Power Ratio (SLMCPR) Change
ML040630945
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 12/05/2003
From: Thayer J
Entergy Nuclear Operations, Entergy Nuclear Vermont Yankee
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BVY 03-114
Download: ML040630945 (25)


Text

Entergy Nuclear Vermont Yankee, LLC Entergy Nuclear Operations, Inc.

E n tergy 185 Old Ferry Road Brattleboro, VT 05302-0500 December 5,.2003 BVY 03-114 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Subject:

Vermont Yankee Nuclear Power Station License No. DPR-28 (Docket No. 50-271)

Technical Specification Proposed Change No. 264 Safety Limit Minimum Critical Power Ratio (SLMCPR) Change Pursuant to I0CFR50.90, Vermont Yankee, (VY) hereby proposes to amend its Facility Operating License, DPR-28, by incorporating the attached proposed change into the Technical Specifications (TS) of Vermont Yankee Nuclear Power Station. This proposed change provides revised values for the Safety Limit Minimum Critical Power Ratio (SLMCPR) for both single and dual recirculation loop operation. to this letter contains supporting information and the safety assessment of the proposed change. Attachment 2 contains the determination of no significant hazards consideration. Attachment 3 provides the marked-up version of the current Technical Specification pages. Attachment 4 contains the retyped Technical Specification pages. Attachment 5 of the enclosed information is a summary of the technical bases for the SLMCPR values and is considered proprietary information by Global Nuclear Fuels - Americas, LLC (GNF).

In accordance with I OCFR2.790(b)(1), an affidavit attesting to the proprietary nature of the enclosed information and requesting withholding from public disclosure is included with Attachment 5. Attachment 6 is the same GNF summary with the proprietary information removed, and is provided for public disclosure.

VY has reviewed the proposed Technical Specification change in accordance with 10CFR50.92 and concludes that the proposed change does not involve a significant hazards consideration.

VY has evaluated the proposed amendment against the criteria of 10CFR51.22 for environmental considerations and believes that the proposed change is eligible for categorical exclusion from the requirements for an environmental review in accordance with IOCFR51.22(c)(9).

Regarding our proposed schedule for this amendment, we request your review and approval of the revised SLMCPR by March 2004 with a 60-day implementation period, to coincide with our refueling outage.

BVY 03-114 / Page 2 If you have any questions concerning this transmittal or require additional information, please contact Mr. Jeffrey T. Meyer at (802) 2584105.

Sincerely, President STATE OF VERMONT WINDHAM COUNTY

)ss Then personally appeared before me, Jay K. Thayer, who, being duly sworn, did state that he is Site Vice President of the Vermont Yankee Nuclear Power Station, that he is duly authorized to execute and file the foregoing document, and that the statements therein are'true to the best of his knowledge and belief.

iry Public;' !.5: *,_

Februaty 10, 2007 a *,*

-i... vir'*

Attachments cc:

USNRC Region 1 Administrator USNRC Resident Inspector - VYNPS USNRC Project Manager - VYNPS Vermont Department of Public Service (w/o proprietary information)

Docket No. 50-271 BVY 03-114 Vermont Yankee Nuclear Power Station Proposed Technical Specification Change No. 264 Safety Limit Minimum Critical Power Ratio (SLMCPR) Change Supporting Information and Safety Assessment of Proposed Change

BVY 03-114 /Attachment I / Page I of I Description of the Proposed Change Pursuant to 10CFR50.90, Vermont Yankee proposes to amend Appendix A, Technical Specification (TS)

Section 1.1.A.1 of Facility Operating License DPR-28.

The proposed changes to the Technical Specifications are as follows:

Page 6, Specification l.1.A.1 - Replace the -listed SLMCPR values.of 1.10 (1.12 for single loop operation) with new values of 1.07 (1.09 for single loop operation).

Purpose of the Proposed Change Cycle specific calculations for Vermont Yankee by Global Nuclear Fuels (GNF) is summarized in. The current SLMCPR values for dual and single loop operation contained in the Technical Specifications (1.10 and 1.12 respectively) are not applicable for the upcoming fuel cycle due to core loading design and fuel type changes. Based upon the core loading and fuel design changes, the cycle specific SLMCPR values were determined to be 1.07 for dual loop and 1.09 for single loop operation.

Safety Assessment of Proposed Change The purpose of the SLMCPR is to provide high statistical probability (99.9%) that fuel rods in the operating core would not experience transition boiling during the most limiting Abnormal Operational Transient (AOT). The criteria of transition boiling for determination of the SLMCPR is a conservative approach since this phenomena by itself does not signal the onset of fuel cladding failure. The revised SLMCPR for Vermont Yankee was determined using plant and cycle-specific fuel and core parameters and NRC approved methodology, as discussed in Attachment 5 (GNF proprietary summary of technical basis for SLMCPR) and Attachment 6 (non-proprietary version of GNF summary). Analysis of the limiting AOT provides the allowed operating conditions, in terms of MCPR, of the core during the fuel cycle such that if the event were to occur, the transient MCPR would not be less than the SLMCPR. No plant hardware or operational changes are required with this proposed change.

Docket No. 50-271 BVY 03-1 14 Vermont Yankee Nuclear Power Station Proposed Technical Specification Change No. 264 Safety Limit Minimum Critical Power Ratio (SLMCPR) Change Determination of No Significant Hazards Consideration

BVY 03-114./ Attachment 2/page 1 of 2 No Significant Hazard Determination Pursuant to I OCFR50.92, Vermont Yankee has reviewed the proposed change and concludes that the change does not involve a significant hazards consideration since the proposed change satisfies the criteria in IOCFR50.92(c). These criteria require that operation of the facility in accordance with the proposed amendment will not: (1) involve a significant increase in the probability or consequences of an accident previously evaluated, (2) create the possibility of a new or different kind of accident from any accident previously evaluated, or (3) involve a significant reduction in a margin of safety.

The discussion below addresses each of these criteria and demonstrates that the proposed amendment does not constitute a significant hazard.

The proposed change does not involve a significant hazards consideration because:

1.

The operation of Vermont Yankee Nuclear Power Station in accordance with the proposed amendment, will not involve a significant increase in the probability or consequences of an accident previously evaluated.

The basis of the Safety Limit Minimum Critical Power Ratio (SLMCPR) is to ensure no mechanistic fuel damage is calculated to occur if the limit is not violated. The new SLMCPR values preserve the existing margin to transition boiling and probability of fuel damage is not increased. The derivation of the revised SLMCPR for Vermont Yankee for incorporation into the Technical Specifications, and its use to determine plant and cycle-specific thermal limits, have been performed using NRC approved methods.

These plant-specific calculations are performed each operating cycle and if necessary, will require future changes to these values based upon revised core designs. The revised SLMCPR values do not change the method of operating the plant and have no effect on the probability of an accident initiating event or transient.

Based on the above, Vermont Yankee has concluded that the proposed change will not result in a significant increase in the probability or consequences of an accident previously evaluated.

2.

The operation of Vermont Yankee Nuclear Power Station in accordance with the proposed amendment, will not create the possibility of a newv or different kind of accident from any accident previously evaluated.

The proposed changes result only from a specific analysis for the Vermont Yankee core reload design. These changes do not involve any new or different methods for operating the facility.

No new initiating events or transients result from these changes.

Based on the above, Vermont Yankee has concluded that the proposed change will not create the possibility of a new or different kind of accident from those previously evaluated.

3.

The operation of Vermont Yankee Nuclear Power Station in accordance with the proposed amendment. will not involve a significant reduction in a margin of safety.

The new SLMCPR is calculated using NRC approved methods with plant and cycle specific parameters for the current core design. The SLMCPR value remains high enough to ensure that

BVY 03-114 1 Attachment 2 / page 2 of 2 greater than 99.9% of all fuel rods in the core will avoid transition boiling if the limit is not violated, thereby preserving the fuel cladding integrity.

The operating MCPR limit is set appropriately above the safety limit value to ensure adequate margin when the cycle specific transients are evaluated. Accordingly, the margin of safety is maintained with the revised values.

As a result, Vermont Yankee has determined that the proposed change will not result in a significant reduction in a margin of safety.

On the basis of the above, Vermont Yankee has determined that operation of the facility in accordance with the. proposed change does not involve a significant hazards consideration as defined in IOCFR50.92(c), in that it: (1) does not involve a significant increase in the probability or consequences of an accident previously evaluated; (2) does not create the possibility of a new or different kind of accident from any accident previously evaluated; and (3) does not involve a significant reduction in a margin of safety.

Docket No. 50-271 BVY 03-114 Vermont Yankee Nuclear Power Station Proposed Technical Specification Change No. 264 Safety Limit Minimum Critical Power Ratio (SLMCPR) Change Marked-up Version of the Current Technical Specifications

VYNPS 1.1 SAFETY LIMIT 2.1 LIMITING SAFETY SYSTEM SETTING 1.1 FUEL CLADDING INTEGRITY Applicability:

Applies to the interrelated variable associated with fuel thermal behavior.

Objective:

To establish limits below which the integrity of the fuel cladding is preserved.

Specification:

A. Bundle Safety Limit (Reactor Pressure >800 psia and Core Flow >10% of Rated)

When the reactor pressure is

>800 psia and the core flow is greater than 10% of rated:

I I

I

1. A Minimum Critical Power Ratio PMPR) of less than a

.10 for Single Loop

/ Oerat ion) shall constitute violation the Fuel

/ Cladding In egrity Safety 2.1 FUEL CLADDING INTEGRITY Applicability:

Applies to trip setting of the instruments and devices which are provided to prevent the nuclear system safety limits from being exceeded.

Objective:

To define the level of the process variable at which automatic protective action is initiated.

Specification:

A. Trip Settings The limiting safety system trip settings shall be as specified below:

1.

Neutron Flux Trip Settings

a. APRM Flux Scram Trip Setting (Run Mode)

When the mode switch is in the RUN position, the APRM flux scram trip setting shall be as shown on Figure 2.1.1 and shall be:

S<0.66(W-AW)+54%

where:

S = setting in percent of rated thermal power (1593 MWt)

W percent rated two loop drive flow where 100%

rated drive flow is that flow equivalent to 48 x 106 lbs/hr core flow Amendment No. 4-,

47, 64, 9G,.4, 44-9, 4-50, 4-59, 176 6

Docket No. 50-271 BVY 03-114 Vermont Yankee Nuclear Power Station Proposed Technical Specification Change No. 264 Safety Limit Minimum Critical Power Ratio. (SLMCPR) Change Retyped Technical Specification Pages

VYNPS 1.1 SAFETY LIMIT 2.1 LIMITING SAFETY SYSTEM SETTING 1.1 FUEL CLADDING INTEGRITY Applicability:

Applies to the interrelated variable associated with fuel thermal behavior.

Objective:

To establish limits below which the integrity of the fuel cladding is preserved.

Specification:

A. Bundle Safety Limit (Reactor Pressure >800 psia and Core Flow >10% of Rated)

When the reactor pressure is

>800 psia and the core flow is greater than 10% of rated:

I

1. A Minimum Critical Power Ratio (MCPR) of less than 1.07 (1.09 for Single Loop Operation) shall constitute violation of the Fuel Cladding Integrity Safety Limit (FCISL).

2.1 FUEL CLADDING INTEGRITY Applicability:

Applies to trip setting of the instruments and devices which are provided to prevent the nuclear system safety limits from being exceeded.

Objective:

To define the level of the process variable at which automatic protective -action is initiated.

Specification:

A.

Trip Settings The limiting safety system trip settings shall be as specified below:

1.

Neutron Flux Trip Settings

a.

APRM Flux Scram Trip Setting (Run Mode)

When the mode switch is in the RUN position, the APRM flux scram trip setting shall be as shown on Figure 2.1.1 and shall be:

s<o.66(W-AW)+54%

where:

S

= setting in percent of rated thermal power (1593 MWt)

W = percent rated two loop drive flow where 100%

rated drive flow is that flow equivalent to 48 x lol lbs/hr core flow Amendment No. 44, 4%

4, aO, 44, 1-,4, 1

-54, 4r64, 4u6 6

Docket No. 50-271 BVY 03-114 Vermont Yankee Nuclear Power Station Proposed Technical Specification Change No. 264 GNF Summary of Technical Basis for SLMCPR Values (Non-Proprietary Version)

I Attachment Additional Information Regarding the 3 November 2003 Cycle Specific SLMCPR for Vermont Yankee Cycle 24 References

[1]

Letter, Frank Akstulewicz (NRC) to Glen A. Watford (GE), "Acceptance for Referencing of Licensing Topical Reports NEDC-32601P, Methodology and Uncertainties for Safety Limit MCPR Evaluations; NEDC-32694P, Power Distribution Uncertainties for Safety Limit MC-PR Evaluation; and Amendment 25 to NEDE-2401 1-P-A on Cycle Specific Safety Limit MCPR,"

(TAC Nos. M97490, M99069 and M97491), March 11, 1999..

[2]

Letter, Thomas H. Essig (NRC) to Glen A. Watford (GE), "Acceptance for Referencing of Licensing Topical Report NEDC-32505P, Revision 1, R-Factor Calculation Methodfor GE 1, GE12 and GEJ3 Fuel," (TAC Nos. M99070 and M9508 1), January 11, 1999.

[3]

General Electric BWR Thermal Analysis Basis (GETAB): Data, Correlation and Design Application, NEDO-10958-A, January 1977.

[4I Letter, Glen A. Watford (GNF-A) to U. S. Nuclear Regulatory Commission Document Control Desk with attention to R Pulsifer (NRC), "Confirmation of IOx1O Fuel Design Applicability to Improved SLMCPR, Power Distribution and R-Factor Methodologies", FLN-2001-016, September 24, 2001.

[5]

Letter, Glen A. Watford (GNF-A) to U. S. Nuclear Regulatory Commission Document Control Desk with attention to J. Donoghue (NRC), "Confirmation of the Applicability of the GEXL14 Correlation and Associated R-Factor Methodology for Calculating SLMCPR Values in Cores Containing GE14 Fuel", FLN-2001-017, October 1, 2001.

[6]

Letter, Glen A. Watford (GNF-A) to U. S. Nuclear Regulatory Commission Document Control Desk with attention to J. Donoghue (NRC), "Final Presentation Material for GEXL Presentation - February 11, 2002", FLN-2002-004, February 12, 2002.

Comparison of Vermont Yankee Cycle 24 and 23 SLMCPR Values Table 1 summarizes the relevant input parameters and results of the SLMCPR determination for the Vermont Yankee Cycle 24 and 23 cores. The bases for the power distribution uncertainties are also indicated in Table 1. Table 2 provides a more detailed presentation of the bases and results for the Cycle 24 and Cycle 23 analyses. The affect on the calculated SLMCPR of the change from GETAB to Reduced power uncertainties is summarized in Table 2. The SLMCPR evaluations were performed using NRC approved methods and uncertainties"1.

These evaluations yield different calculated SLMCPR values because different inputs were used. The quantities that have been shown to have some impact on the determination of the safety limit MCPR (SLMCPR) are provided.

In comparing the Vermont Yankee Cycle 24 and 23 SLMCPR values it is important to note the impact of the differences in the core and bundle designs. These differences are summarized in Table

1. The GETAB and reduced power distribution uncertainty columns for Cycle 24 are both provided for comparison to the Cycle 23 GETAB power distribution uncertainty column.

In general, the calculated safety limit is dominated by ((

13))) (1) flatness of the core bundle-by-bundle MCPR distributions and (2) flatness of the bundle pin-by-pin power/R-factor page 1of 9 DRF #0000-0016-6425

Attachment Additional Information Regarding the 3 November 2003 Cycle Specific SLMCPR for Vermont Yankee Cycle 24 distributions. Greater flatness in either parameter yields more rods susceptible to boiling transition and thus a higher calculated SLMCPR

[1 The uncontrolled bundle pin-by-pin power distributions were compared between the Vermont Yankee Cycle 24 bundles and the Cycle 23 bundles. Pin-by-pin power distributions are characterized in terms of R-factors using the NRC approved methodologyi2 l. For the Vermont Yankee Cycle 24 limiting case analyzed at EOR-1.OK, (('

  • 3)

)) the Vermont Yankee Cycle 24 bundles are flatter than the bundles used for the Cycle 23 SLMCPR analysis.

As indicated in Table 1, the NRC approved!' revised non-power distribution uncertainties have been assumed for the Vermont Yankee Cycle 24 analyses.

With a flatter core MCPR distribution in Cycle 24 than in Cycle 23, and a flatter bundle R-factor distribution in Cycle 24 relative to the Cycle 23 bundles, it would be expected that the Cycle 24 SLMCPR result would be greater than the Cycle 23 result. Table 1 shows that when using the same uncertainties the Cycle 24 SLMCPR is greater than the Cycle 23 SLMCPR. Table 2, which shows these same values to greater precision, confirms that the Cycle 24 result is greater than the Cycle 23 value.

As indicated in Table 1, the NRC approved!1 standard GETAB and reduced power distribution uncertainties have both been assumed for the Vermont Yankee Cycle 24 analyses. For the Cycle 23 case, the standard GETAB power distribution uncertainties were used. Use of the reduced power distribution uncertainties results in a reduction of the SLMCPR by approximately 0.04.

Comparison of the GETAB and Reduced Uncertainties The power distribution and other uncertainties that are the bases for the proposed TS safety limit for Vermont Yankee Cycle 24 are identified in Table 2.

Column 2 of Table 2 shows the power distribution and other uncertainties that are the bases for the current TS safety limit for Vermont Yankee Cycle 23. The revised bases to support the proposed change in TS safety limit for Vermont Yankee Cycle 24 are identified in column 3b of Table 2. The GETAB bases and values for Cycle 24 are provided for comparison purposes in column 3a. By comparing the values from column 2 for Cycle 23 and column 3a for Cycle 24, one may see that the calculated SLMCPR for Cycle 24 is higher ((

{3))) than the value for Cycle 23 when using the same GETAB model and uncertainties for both calculations. Thus, the focus for Table 2 is on how the revised model and reduced power distribution uncertainties affect the calculated SLMCPR for Vermont Yankee, Cycle 24 (only).

The revised model and reduced power distribution uncertainties affect the calculated SLMCPR for Vermont Yankee Cycle 24 as indicated in Table 2. Bases that have not changed are not reported in either table except where it is important to indicate that the bases have not changed. For these page 2 of 9 DRF #0000-0016-6425

Attachment Additional Information Regarding the 3 November 2003 Cycle Specific SLMCPR for Vermont Yankee Cycle 24 exceptions, the impact on the SLMPCR is indicated as "None" in the rightmost column of Table 2.

For the other items where a change in basis is indicated, the calculated impact that each item has on the calculated SLMCPR is indicated.

The impacts from the changes in bases have been grouped into three categories. In each category the shaded cells contain values that sum to produce the total impact for that category indicated in the cell immediately below the shaded cells.

In Section 1 of Table 2 the impact of using the "revised uncertainties not related to power distribution" is indicated as "None" since the same revised uncertainties were used for both the GETAB calculation (Column 3a) and the revised calculation (Column 3b).

The largest change in the calculated SLMCPR is the reduction that is due to use of the NRC-approved revised power distribution model and its associated reduced uncertainties as described in NEDC-32694P-A. The increase in the R-factor uncertainty resulted in an SLMCPR increase of [1

))

For Vermont Yankee Cycle 24 the calculated SLMCPR was reduced by 113)))

as indicated in Section 2 of Table 2.

For Vermont Yankee Cycle 24, both the GETAB calculation and the revised calculation use the same limiting rod patterns, [1 (3)jj Therefore, in Section 3 of Table 2 the "Secondary impact on SLMCPR because reduced SLMCPR causes a lower OLMCPR" is indicated as [

3)jj*

The total impact is that the SLMCPR as calculated using NRC-approved methods, inputs and procedures decreases by ((

131)). This amount of improvement is consistent with the expected improvements as presented to the NRC in Table 4.3 of NEDC-32694P-A. Of this improvement, about ((

(3)j] is attributed to the reduced uncertainties themselves and the remaining ((

J3) J is attributed to the methodology improvements described in NEDC-32694P-A.

Reduction in the Tech Spec SLMCPRs by these calculated amounts is warranted since the old GETAB value is overly conservative. The excessive conservatism in the GETAB model and inputs is primarily due to the higher ((

13)1J uncertainty ((

.3)) These limitations are not applicable to the 3D-MONICORE (3DM) monitoring system.

The revised power distribution model and reduced uncertainties associated with 3DM have been justified, reviewed and approved by the NRC (reference NEDC-32601P-A and NEDC-32694P-A). The conservatism that remains even when applying the revised model and reduced uncertainties to calculate a lower SLMCPR was documented as part of the NRC review and approval. It was noted on page A-24 of NEDC-32601P-A ((

Summary 1[

(3) )) have been used to compare quantities that impact the calculated SLMCPR value.

Based on these comparisons, the conclusion is reached that the Vermont Yankee Cycle 24 core/cycle page 3 of 9 DRF #0000-0016-6425

Attachment Additional Information Regarding the 3 November 2003 Cycle Specific SLMCPR for Vermont Yankee Cycle 24 has a flatter core MCPR distribution ((

13))) and flatter in-bundle power distributions ((

3)] than what was used to perform the Cycle 23 SLMCPR evaluation.

Utilizing the same bases used for Cycle 23, the calculated ((

'3))) Monte Carlo SLMCPR for Vermont Yankee Cycle 24 is consistent with what one would expect ((

{3 }] the ((

(3n)) SLMCPR value is appropriate.

The reduction in SLMCPR to 1.07 associated with the change in basis to the reduced power distribution uncertainties for Vermont Yankee Cycle 24 is consistent with what one would expect for a change to this basis.

Based on all of the facts, observations and arguments presented above, it is concluded that the calculated SLMCPR value of 1.07 for the Vermont Yankee Cycle 24 core is appropriate. It is reasonable that this value is 0.02 lower than the 1.09 value calculated for the previous cycle.

For SLO the calculated safety limit MCPR for the limiting case is 1.09 as determined by specific calculations for Vermont Yankee Cycle 24.

((i (3)j Supporting Information The following information is provided in response to NRC questions on similar submittals regarding changes in Technical Specification values of SLMCPR. NRC questions pertaining to how GE14 applications satisfy the conditions of the NRC SER [1] have been addressed in Reference [4]. Other generically applicable questions related to application of the GEXL14 correlation and the applicable range for the R-factor methodology are addressed in Reference [5]. Only those items that require a plant/cycle specific response are presented below since all the others are contained in the references that have already been provided to the NRC..

The core loading information for Vermont Yankee Cycle 23 is provided in Figure 1. For comparison the core loading information for Vermont Yankee Cycle 24 is provided in Figure 2. The impact of the fuel loading pattern differences on the calculated SLMCPR is correlated to the values of ((

The power and non-power distribution uncertainties that are used in the analyses are indicated in Table 1. The referenced document numbers have previously been reviewed and approved by the NRC.

page 4 of 9 DRF #0000-0016-6425

Attachment Additional Information Regarding the 3 November 2003 Cycle Specific SLMCPR for Vermont Yankee Cycle 24 Prepared by:

R"A. Butrovich F~el Engineering Services Verified by:

E. W. Gibbs

. Fuel Engineering Services page 5 of 9 DRF #0000-0016-6425

Attachment Additional Information Regarding the 3 November 2003 Cycle Specific SLMCPR for Vermont Yankee Cycle 24 Table 1 Comparison of the Verrnont Yankee Cycle 24 and Cycle 23 SLMCPR QUANTITY, DESCRIPTION Vermont Yankee Vermont Yankee Cycle 23 C cle 24 Number of Bundles in Core 368 368 368 Limiting Cycle Exposure Point E0R-1K EOR-1K EOR-lK Cycle Exposure at Limiting Point 10425 11150 11150

[MWd/STUj Reload Fuel Type GE14 GE14 GE14 Latest Reload Batch Fraction [/ol 34.8 31.5 31.5 Latest Reload Average Batch Weight %

3.94 3.99 3.99 Enrichment Batch Fraction for GE14fl 34.8 66.3 66.3 Batch Fraction forGE13[%l 58.7 28.3 28.3 Batch Fraction for GE9B[%1 6.5 5.4 5.4 Core Average Weight % Enrichment

.3.76 3.83 3.83 Core MCPR (for limiting rod pattern) 1.46 1.47 1.47 Power distribution methodology GETAB GETAB Revised NEDO-10958-A NEDO-10958-A NEDC-32601P-A Power distribution uncertainty GETAB GETAB Reduced NEDO-10958-A NEDO-10958-A NEDC-32694P-A Non-power distribution uncertainty Revised Revised Revised NEDC-32601P-A NEDC-32601P-A NEDC-32601P-A Calculated Safety Limit MCPR 1.09

((

"I))

1.07 page 6 of 9 DRF #0000-0016-6425

Attachment Additional Information Regarding the 3 November 2003 Cycle Specific SLMCPR for Vermont Yankee Cycle 24 Table 2 Vermont Yankee Cycles 23 and 24 SLMCPR Results Assessment 1

2 3a 3b 4

Quantity Cycle 23 Cycle 24 Cycle 24 Impact on GETAB GETAB Revised SLMCPR for Value Bases Bases Cycle 24 Tech Specs 1.09 Used for 1.07 0.02 comparison only

1. Impact of Revised Uncertainties Not Related to Power Distribution l Reference Document NEDC-32601P-A NEDC-32601P-A NEDC-32601P-A Approved August 1999 August 1999 August 1999 byNRC Feedwater flow uncertainty A

1999

'Auus 1e Reactor pressure uncertaintyr

[31L3 a d Channel flow area uncertainty J1 L

f dii Friction multiplier uncertainty

[r 13 r[- i31

2. Impact of Reduced Power Distribution Uncertainties and Revised Modelin Reference Document NEDO-10958-A NEDO-10958-A NEDC-32694P-A Both approved January 1977 January 1977 August 1999 byNRC R-factor uncertainty IJI0111 V -1ZZE Critical power uncertainty 31J None TIP random uncertainty 13[))

None component

_r______

Adaptive mode for Safety Limit Absolute Absolute Shape Both approved analysis byNRC Effective total bundle power

((

v.

Part of overall uncertainty TIPSYS Effective non-random TIPSYS

((.

13 Part of overall

_TIPSYS Effective overall TIPSYS

[

3)j]

((1j]

uncertainty as modeled T_

3. Secondary Impact on SLMCPR because Reduced SLMCPR causes a Lower OLMCPR Target OLMCPR 1.46 1.47 1.47 See below.

rr.3)11 rr

_1.31 Total Impact on SLMCPR (col. 3b-3a)

Calculated SLMCPR - DLO J[

_3_11 Calculated SLMCPR - SLO

_3__

TS SLMCPR - DLO 1.09 1.07 IL..3f TS SLMCPR -SLO 1.11

1. 09II 1.9

.3.1 page 7 of 9 DRF #0000-0016-6425

Attachment Additional Information Regarding the 3 November 2003 Cycle Specific SLMCPR for Vermont Yankee Cycle 24 Figure 1 - Cycle 23 Reference Core Loading Pattern 1 2 3

4 5

6 7

8 9

10 1t 12 13 14 9 113112112111 91 i5 16 17 18 19 20 21 22 1

2 3

4 5

6 7

8

.9 10 11 12 13 14 15 16 17 18 19 20 21 22 Bundle IAT 9

12 l 16116 16 16 12 9

9 12 112 l 12 119 116 1 18 18 116 19

.12 12121 9

-+

4-

-4 41 4-

-4 l

l l

13 113 16 1 1681 201 16 118 112 112 118 161 201616113 113 9

13 118 16 20 16 18 16 18 18 116 18 16 20 16 18 13 9

12 1616 18 1218 112 118 12 12 18 12 118 12 118 16 116 112 12j 16 1201 12-1 20 116 18 1161 191 19 116 18 116 120 112 1201 16 12 9 112 120 116 118 116 118 113 118 117 117 18 13 118 116 118 116 120 112 9

9 12 19 16 18 12 18 13 18 13 18 18 13 18 13 18 12 18 16 19 12 9

13 16 16 18 16 18 16 18 13 18 17 17 18 13 18 16 18 16 18 16 16 13 12 16 18 12 18 12 19 17 18 17 13 13 17 18 17 19 12 18 12 18 16 12 12 16 18 12 18 12 19 17 18 17 13 13 17 18 17 19 12 18 12 18 16 12

.13 16 16 18 16 18 16 18 13 18 17 17 18 13 18 16 18 16 18 16 16 13 9

12 19 16 18 12 18 13 18 13 18 18 13 18 13 18 12 18 16 19 12 9

44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 08 06 04 02 9

12 120 116 118 116 18 113 18 117 117 118 113 18 16 j18 16 201 12 12 116 I 20 12 20 16 118 16 119 I19 116 118 16 20 12120 16112 12 16 16 1 18112118 12 18 12112 18 112 18 12 18 11616 12 9

13 186 6 20J 16 181 16 118 18 16 18 161 20 16 18113 _

113 1 161 16 120 16 118 112 112 118 116 20 116 116 113 113 9

12 112 112 119 116 18 1 8 116 119 112 112 112 _

9 112 1616 1 16 1612 9

9 113 112 112 1131 9 01 03 05 07 09 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 Bundle Name GE9B-P8DWB335-10GZ-80M-150-T GE13-P9HTB380-12GZ-1O0T-146-T GE13-P9HTB379-13GZ-1 OOT-146-T GE13-P9DTB386-1 1G4.011G3.0-IOOT-146-T-2425 GE13-P9DT8225-NOG-10OT-146-T-2570 GE14-P1 ODNAB394-7G5.016G4.0-10OT-150-T-2538 GE14-P1ODNAB394-8G5.0/6G4.0-1 OOT-1 50-T-2589 GEl 4-P1 ODNAB394-12G5.0-1 OOT-1 50-T-2590 IAT 9

12 13 16 17 18 19 20 Total

  1. In Core 24 72 40 88 16 92 16 20 368 Fresh 0

0 0

0 0

92 16 20 128 Cycle Loaded 18 20 I 20 22 22B 23 23 23 page 8 of 9 DRF #0000-0016-6425

Attachment Additional Information Regarding the 3 November 2003 Cycle Specific SLMCPR for Vermont Yankee Cycle 24 Figure 2 - Cycle 24 Reference Core Loading Pattern 1 2 3

4 5 6

7 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 17 18 19 20 21 22 711616 1161 7 Bundle IAT 161181 18116116118118116 8 I1 6T 16 1I6 11-8I1 l 1 l18l 1 1161161161 8 8 11 1-1 1 1

-1 86 8

8 11611811811 1201 5 1181181 5 1201 1 118118116 8

8 116 2 118 1 118 5 i201 5 5 1201 5 118 1

a821 1

8 18 17 17 1

6 1

8162118118121181 5 1 20151511201518151181 2116181

9.

~

16118 1 1201 5 1181 21191 21 2 1191 2 1181 5 120 118116 1161 16 1181 5 1181 2 1161161171171161161 2 1181 5 1.8 1 61.1616 7

18 1 20 5 18 2 16 16 19 2 2 19 16 16 2 18 5 20 1 18 7 16 18 18 5 20 2 19 16 19 5 18 18 5

19 16 19 2 20 5 18 18 16 16 16 1 18 5 17 2 17 2 18 16 16 18 2 17 2 17 5 18 1 16 16 16 16 1 18 5 17 2 17 2 18 16 16 18 2 17 2 17 5 18 1 16 16 16 18 18 5 20 2 19 16 19 5 18 18 5 19 16 19 2 20 5 18 18 16 7 18 1 20 5 18 2 16 16 19 2 2

19 1616 2

18 5 20 1 18 7

44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 08 06 04 02 161161 11181 5 1181 2 16161171171 161161 2 118 5 18 116116

-~~~~~~~~

16118 1 201 5 118 2 191 2 12 1191 2 1181 5 20 1 18116 16 18118 2 118 5 181 2 171171 2 1181 5 1181 211 18 16 8

16 2 18 1181 5 1201 515 1201 5 1181 1 1181 2 1161 8 I

.-t.-

8 116118118 1 201 5 181181 5 120 1181181 1618 8 1161161161 1 1181 1 1 1181 1 1161161161 8

~

161181181161161181181161 7-1161161161161 7 01 03 05 07 09 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 Bundle Name Cycle in Core Fresh Loaded IAT 1 GE14-P1 ODNAB426-16G6.0-1ODT-1 50-T6-2682 2 GE14-P1 ODNAB390-14GZ-1 OOT-150-T6-2683 5 GE14-PIODNAB388-17GZ-1 OOT-150-T6-2684 7 GE9B-P8DWB335-10GZ-80U-150-T6 8 GE9B-P8DWB335-1 I GZ-80U-1 50-T6 16 GEl 3-P9DTB386-1 1 G4.0/1 G3.0-1 DOT-146-T6-3958 17 GE 13-P9DTB225-NOG-1OOT-146-T6-2571 18 GE14-PIODNAB394-7G5.0/6G4.0-100T-150-T6-2566 19 GE14-P10DNAB394-8G5.0/6G4.0-1OOT-150-T6-2595 20 GE14-P1 ODNAB394-12G5.0-1OOT-150-T6-2596 Total 32 44 40 8

12 88 16 92 16 20 32 24 44 24 40 24 17 17 22.

22B 23 23 23 116 page 9 of 9 DRF #0000-0016-6425 368

Docket No. 50-271 BVY 03-114 Vermont Yankee Nuclear Power Station Proposed Technical Specification Change No. 264 GNF Summary of Technical Basis for SLMCPR Values (Proprietary Information)

Affidavit Affidavit I, Margaret E. Harding, state as follows:

(1) I am Manager, Fuel Engineering Services, Global Nuclear Fuel - Americas, L.L.C. ("GNF-A") and have been delegated the function of reviewing the information described in paragraph (2) which is sought to be withheld, and have been authorized to apply for its withholding.

(2) The information sought to be withheld is contained in the attachment, "Additional Information Regarding the Cycle Specific SLMCPR for Vermont Yankee Cycle 24," November 3, 2003. GNF proprietary information is indicated by enclosing it in double brackets. In each case, the superscript notation 13) refers to Paragraph (3) of this affidavit, which provides the basis for the proprietary determination.

(3) In making this application for withholding of proprietary information of which it is the owner or licensee, GNF-A relies upon the exemption from disclosure set forth in the Freedom of Information Act ("FOIA"), 5 USC Sec. 552(b)(4), and the Trade Secrets Act, 18 USC Sec. 1905, and NRC regulations 10 CFR 9.17(a)(4) and 2.790(a)(4) for "trade secrets and commercial or financial information obtained from a person and privileged or confidential" (Exemption 4). The material for which exemption from disclosure is here sought is all "confidential commercial information," and some portions also qualify under the narrower definition of "trade secret," within the meanings assigned to those terms for purposes of FOIA Exemption 4 in, respectively, Critical Mass Energy Project v. Nuclear Regulatory Commission. 975F2d871 (DC Cir. 1992), and Public Citizen Health Research Group v. FDA, 704F2d1280 (DC Cir. 1983).

(4) Some examples of categories of information which fit into the definition of proprietary information are:

a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GNF-A's competitors without license from GNF-A constitutes a competitive economic advantage over other companies;
b. Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product;
c. Information which reveals cost or price information, production capacities, budget levels, or commercial strategies of GNF-A, its customers, or its suppliers;
d. Information which reveals aspects of past, present, or future GNF-A customer-funded development plans and programs, of potential commercial value to GNF-A;
e. Information which discloses patentable subject matter for which it may be desirable to obtain patent protection.

Affidavit The information sought to be withheld is considered to be proprietary for the reasons set forth in paragraphs (4)a. and (4)b., above.

(5) To address the 10 CFR 2.790 (b) (4), the information sought to be withheld is being submitted to NRC in confidence. The information is of a sort customarily held in confidence by GNF-A, and is in fact so held. Its initial designation as proprietary information, and the subsequent steps taken to prevent its unauthorized disclosure, are as set forth in (6) and (7) following. The information sought to be withheld has, to the best of my knowledge and belief, consistently been held in confidence by GNF-A, no public disclosure has been made, and it is not available in public sources. All disclosures to third parties including any required transmittals to NRC, have been made, or must be made, pursuant to regulatory provisions or proprietary agreements which provide for maintenance of the information in confidence.

(6) Initial approval of proprietary treatment of a document is made by the manager of the originating component, the person most likely to be acquainted with the value and sensitivity of the information in relation to industry knowledge, or subject to the terms under which it was licensed to GNF-A. Access to such documents within GNF-A is limited on a "need to know" basis.

(7) The procedure for approval of external release of such a document typically requires review by the staff manager, project manager, principal scientist or other equivalent authority, by the manager of the cognizant marketing function (or his delegate), and by the Legal Operation, for technical content, competitive effect, and determination of the accuracy of the proprietary designation. Disclosures outside GNF-A are limited to regulatory bodies, customers, and potential customers, and their agents, suppliers, and licensees, and others with a legitimate need for the information, and then only in accordance with appropriate regulatory provisions or proprietary agreements.

(8) The information identified in paragraph (2) is classified as proprietary because it contains details of GNF-A's fuel design and licensing methodology.

The development of the methods used in these analyses, along with the testing, development and approval of the supporting methodology was achieved at a significant cost, on the order of several million dollars, to GNF-A or its licensor.

(9) Public disclosure of the information sought to be withheld is likely to cause substantial harm to GNF-A's competitive position and foreclose or reduce the availability of profit-making opportunities. The fuel design and licensing methodology is part of GNF-A's comprehensive BWR safety and technology base, and its commercial value extends beyond the original development cost.

The value of the technology base goes beyond the extensive physical database and analytical methodology and includes development of the expertise to determine and apply the appropriate evaluation process. In addition, the technology base includes the value derived from providing analyses done with NRC-approved methods.

The research, development, engineering, analytical, and NRC review costs comprise a substantial investment of time and money by GNF-A or its licensor.

Affidavit The precise value of the expertise to devise an evaluation process and apply the correct analytical methodology is difficult to quantify, but it clearly is substantial.

GNF-A's competitive advantage will be lost if its competitors are able to use the results of the GNF-A experience to normalize or verify their own process or if they are able to claim an equivalent understanding by demonstrating that they can arrive at the same or similar conclusions.

The value of this information to GNF-A would be lost if the information were disclosed to the public. Making such information available to competitors without their having been required to undertake a similar expenditure of resources would unfairly provide competitors with a windfall, and deprive GNF-A of the opportunity to exercise its competitive advantage to seek an adequate return on its large investment in developing and obtaining these very valuable analytical tools.

I declare under penalty of perjury that the foregoing affidavit and the matters stated therein are true and correct to the best of my knowledge, information, and belief.

Executed at Wilmington, North Carolina, this 5th day of November, 2003.

Margaret E. Harding '

Global Nuclear Fuel - Americas, hLLC