Following the U3 trip of 6-14-2004, it was discovered through evaluation that the MEl/Fix Field circuits did not response correctly. Troubleshoot the casue of this problem, WORK DESC: | 2719090 LEAD WORK CENTER: | ||
EMS LEAD DISCP: PR&C COMPONENT: | |||
COATING: | 3EMBNC01**CKTBRK COMP DESC: | ||
VOLTAGE REGULATOR CABINET PRIORITY: | |||
6 SEQUENCE: 3 DUE: | |||
LOCATION: | |||
ZJ3A PROBLEM DESC: | |||
Following the U3 trip of 6-14-2004, it was discovered through evaluation that the MEl/Fix Field circuits did not response correctly. Troubleshoot the casue of this | |||
: problem, WORK DESC: | |||
END WORK DESC TECH SPEC: | |||
N WX QR: | |||
N SAFETY REQD: N MATLS REQD: -BLANK-SEISMIC CAT:3 SPECIAL CONCERNS:N V CAT: N RCS PERT: | |||
SCFD REQD: N INSL REQD:N EQ MODE: | |||
COATING: | |||
CRDL #: | |||
PERMIT #: | PERMIT #: | ||
POSTED PERMITS REP REQD: N | POSTED PERMITS REP REQD: N REP #: | ||
OTHER LEADS (DISCP): | OTHER LEADS (DISCP): | ||
OTHER SUPPORT (DISCP): | OTHER SUPPORT (DISCP): | ||
PREPARER | PREPARER DATE TECHNICAL APPROVAL DATE NOT REQUIRED TEAM LEADER DATE RELEASING ORGANIZATION DATE PLANNER BACKEND REVIEW REQUIRED [] | ||
U Page I of 2 | U | ||
Page I of 2 Report Date: 01-JUL-2004 | |||
(WORK ORDER CLOSING INFORMATION) 3 | (WORK ORDER CLOSING INFORMATION) 3 3 -MB -SYS CM - LCM PRIORITY: 6 SEQUENCE: 3 DUE: | ||
COMPONENT: 3EMBNC01**CKTBRK COMP DESC: VOLTAGE REGULATOR CABINET LOCATION: | WO #: 2719090 LEAD WORK CENTER EMS LEAD DISCP: | ||
COMPONENT: | |||
3EMBNC01**CKTBRK COMP DESC: VOLTAGE REGULATOR CABINET PR&C LOCATION: | |||
ZJ3A | |||
. END WORK DESC WORK STARTDATE/TIME: | |||
JOB SUMATION: | JOB SUMATION: | ||
BADGE # | WORK COMPLETE DATE/TIME: | ||
BADGE # | |||
EMPLOYEE NAME TOTAL ACTUAL HOURS MATERIAL REQUESTS # S TEAM LEADER | |||
/ | |||
DATE: | |||
RETEST REFERENCE DOCUMENT: | RETEST REFERENCE DOCUMENT: | ||
Page 2 of 2 | Page 2 of 2 Report Date: 01-JUL-2004}} | ||
Latest revision as of 00:31, 16 January 2025
| ML042960360 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 07/01/2004 |
| From: | - No Known Affiliation |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| FOIA/PA-2004-0307 | |
| Download: ML042960360 (2) | |
Text
J e.( No. fdff 3
3 -MB-- SYS CM-LCM WO #:
2719090 LEAD WORK CENTER:
EMS LEAD DISCP: PR&C COMPONENT:
3EMBNC01**CKTBRK COMP DESC:
VOLTAGE REGULATOR CABINET PRIORITY:
6 SEQUENCE: 3 DUE:
LOCATION:
ZJ3A PROBLEM DESC:
Following the U3 trip of 6-14-2004, it was discovered through evaluation that the MEl/Fix Field circuits did not response correctly. Troubleshoot the casue of this
- problem, WORK DESC:
END WORK DESC TECH SPEC:
N WX QR:
N SAFETY REQD: N MATLS REQD: -BLANK-SEISMIC CAT:3 SPECIAL CONCERNS:N V CAT: N RCS PERT:
SCFD REQD: N INSL REQD:N EQ MODE:
COATING:
CRDL #:
PERMIT #:
POSTED PERMITS REP REQD: N REP #:
OTHER LEADS (DISCP):
OTHER SUPPORT (DISCP):
PREPARER DATE TECHNICAL APPROVAL DATE NOT REQUIRED TEAM LEADER DATE RELEASING ORGANIZATION DATE PLANNER BACKEND REVIEW REQUIRED []
U
Page I of 2 Report Date: 01-JUL-2004
(WORK ORDER CLOSING INFORMATION) 3 3 -MB -SYS CM - LCM PRIORITY: 6 SEQUENCE: 3 DUE:
WO #: 2719090 LEAD WORK CENTER EMS LEAD DISCP:
COMPONENT:
3EMBNC01**CKTBRK COMP DESC: VOLTAGE REGULATOR CABINET PR&C LOCATION:
ZJ3A
. END WORK DESC WORK STARTDATE/TIME:
JOB SUMATION:
WORK COMPLETE DATE/TIME:
BADGE #
EMPLOYEE NAME TOTAL ACTUAL HOURS MATERIAL REQUESTS # S TEAM LEADER
/
DATE:
RETEST REFERENCE DOCUMENT:
Page 2 of 2 Report Date: 01-JUL-2004