{{#Wiki_filter:J e.( No. fdff 3               3 -MB-- SYS                               CM- LCM PRIORITY:  6 WO #:   2719090                                                     SEQUENCE:  3 LEAD WORK CENTER: EMS           LEAD DISCP: PR&C                     DUE:
{{#Wiki_filter:J e.( No. fdff 3
COMPONENT: 3EMBNC01**CKTBRK COMP DESC: VOLTAGE REGULATOR CABINET LOCATION:   ZJ3A PROBLEM DESC:
3 -MB-- SYS CM-LCM WO #:
Following the U3 trip of 6-14-2004, it was discovered through evaluation that the MEl/Fix Field circuits did not response correctly. Troubleshoot the casue of this problem, WORK DESC:
2719090 LEAD WORK CENTER:
        ..              END WORK DESC TECH SPEC:   N       WX QR: N             SAFETY REQD: N               MATLS REQD: -BLANK-SEISMIC CAT:3           SPECIAL CONCERNS:N                               V CAT: N RCS PERT:             SCFD REQD: N         INSL REQD:N                 EQ MODE:
EMS LEAD DISCP: PR&C COMPONENT:
COATING:               CRDL #:
3EMBNC01**CKTBRK COMP DESC:
VOLTAGE REGULATOR CABINET PRIORITY:
6 SEQUENCE: 3 DUE:
LOCATION:
ZJ3A PROBLEM DESC:
Following the U3 trip of 6-14-2004, it was discovered through evaluation that the MEl/Fix Field circuits did not response correctly. Troubleshoot the casue of this
: problem, WORK DESC:
END WORK DESC TECH SPEC:
N WX QR:
N SAFETY REQD: N MATLS REQD: -BLANK-SEISMIC CAT:3 SPECIAL CONCERNS:N V CAT: N RCS PERT:
SCFD REQD: N INSL REQD:N EQ MODE:
COATING:
CRDL #:
PERMIT #:
PERMIT #:
POSTED PERMITS REP REQD: N   REP #:
POSTED PERMITS REP REQD: N REP #:
OTHER LEADS (DISCP):
OTHER LEADS (DISCP):
OTHER SUPPORT (DISCP):
OTHER SUPPORT (DISCP):
PREPARER                           DATE         TECHNICAL APPROVAL               DATE NOT REQUIRED TEAM LEADER                     DATE           RELEASING ORGANIZATION           DATE PLANNER BACKEND REVIEW REQUIRED []
PREPARER DATE TECHNICAL APPROVAL DATE NOT REQUIRED TEAM LEADER DATE RELEASING ORGANIZATION DATE PLANNER BACKEND REVIEW REQUIRED []
U Page I of 2                                                             Report Date: 01-JUL-2004
U
Page I of 2 Report Date: 01-JUL-2004


(WORK ORDER CLOSING INFORMATION) 3                 3 -MB -SYS                                 CM - LCM PRIORITY: 6 WO #: 2719090                                                         SEQUENCE: 3 LEAD WORK CENTER   EMS           LEAD DISCP:  PR&C                  DUE:
(WORK ORDER CLOSING INFORMATION) 3 3 -MB -SYS CM - LCM PRIORITY: 6 SEQUENCE: 3 DUE:
COMPONENT: 3EMBNC01**CKTBRK COMP DESC: VOLTAGE REGULATOR CABINET LOCATION:   ZJ3A
WO #: 2719090 LEAD WORK CENTER EMS LEAD DISCP:
                        . END WORK DESC WORK STARTDATE/TIME:                        WORK COMPLETE DATE/TIME:
COMPONENT:
3EMBNC01**CKTBRK COMP DESC: VOLTAGE REGULATOR CABINET PR&C LOCATION:
ZJ3A
. END WORK DESC WORK STARTDATE/TIME:
JOB SUMATION:
JOB SUMATION:
BADGE #             EMPLOYEE NAME                                 TOTAL ACTUAL HOURS MATERIAL REQUESTS # S TEAM LEADER   /       DATE:
WORK COMPLETE DATE/TIME:
BADGE #
EMPLOYEE NAME TOTAL ACTUAL HOURS MATERIAL REQUESTS # S TEAM LEADER  
/
DATE:
RETEST REFERENCE DOCUMENT:
RETEST REFERENCE DOCUMENT:
Page 2 of 2                                                               Report Date:   01-JUL-2004}}
Page 2 of 2 Report Date: 01-JUL-2004}}

Latest revision as of 00:31, 16 January 2025

Report Regarding Voltage Regulator Cabinet
ML042960360
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 07/01/2004
From:
- No Known Affiliation
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0307
Download: ML042960360 (2)


Text

J e.( No. fdff 3

3 -MB-- SYS CM-LCM WO #:

2719090 LEAD WORK CENTER:

EMS LEAD DISCP: PR&C COMPONENT:

3EMBNC01**CKTBRK COMP DESC:

VOLTAGE REGULATOR CABINET PRIORITY:

6 SEQUENCE: 3 DUE:

LOCATION:

ZJ3A PROBLEM DESC:

Following the U3 trip of 6-14-2004, it was discovered through evaluation that the MEl/Fix Field circuits did not response correctly. Troubleshoot the casue of this

problem, WORK DESC:

END WORK DESC TECH SPEC:

N WX QR:

N SAFETY REQD: N MATLS REQD: -BLANK-SEISMIC CAT:3 SPECIAL CONCERNS:N V CAT: N RCS PERT:

SCFD REQD: N INSL REQD:N EQ MODE:

COATING:

CRDL #:

PERMIT #:

POSTED PERMITS REP REQD: N REP #:

OTHER LEADS (DISCP):

OTHER SUPPORT (DISCP):

PREPARER DATE TECHNICAL APPROVAL DATE NOT REQUIRED TEAM LEADER DATE RELEASING ORGANIZATION DATE PLANNER BACKEND REVIEW REQUIRED []

U

Page I of 2 Report Date: 01-JUL-2004

(WORK ORDER CLOSING INFORMATION) 3 3 -MB -SYS CM - LCM PRIORITY: 6 SEQUENCE: 3 DUE:

WO #: 2719090 LEAD WORK CENTER EMS LEAD DISCP:

COMPONENT:

3EMBNC01**CKTBRK COMP DESC: VOLTAGE REGULATOR CABINET PR&C LOCATION:

ZJ3A

. END WORK DESC WORK STARTDATE/TIME:

JOB SUMATION:

WORK COMPLETE DATE/TIME:

BADGE #

EMPLOYEE NAME TOTAL ACTUAL HOURS MATERIAL REQUESTS # S TEAM LEADER

/

DATE:

RETEST REFERENCE DOCUMENT:

Page 2 of 2 Report Date: 01-JUL-2004