{{#Wiki_filter: | {{#Wiki_filter:Thomas Alexion - Status of 1 R18 RV Head/Alloy 600 Inspections Page 1 I ThornasAlexion - Statusof 1R18 RV Head/Alloy6OO Inspections Page 1.1 From: | ||
To: | "BENNETT, STEVE A" <SBENNE2@entergy.com> | ||
To: | |||
Tom Alexion <twa@nrc.gov>, 'Jeff Clark (jac nrc.gov)" <jac nrc.gov>, "SWAIN, RONALD VANCE <RSWAIN1 @entergy.com>, "BICE, DAVID B" <DBICE@entergy.com>, "BURFORD, FRANCIS G" <FBURFOR@entergy.com>, "CAMPBELL, BILL - NUCLEAR" <WCAMPB3@entergy.com>, | |||
"COMPTON, LESLIE" <LCOMPTO@entergy.com>, "DAIBER, BRYAN J" <BDAIBER@entergy.com>, | |||
'DAVANT, GUY H" <GDAVANT@entergy.com>, "DEESE, RICHARD W" <rdees90entergy.com>, | |||
'EATON, WILLIAM A" <WEATON@entergy.com>, "EDGELL, DOUGLAS Wm | |||
<DEDGELL@entergy.com>, "EHREN, TERRY G" <TEHREN @entergy.com>, "EUBANKS, CLIFFORD" | |||
<CEUBANK@entergy.com>, "FORBES, JEFFREY" <JFORBE1 @ entergy.com>, 'FORREST, FREDDIE" | |||
<FFORRES@entergy.com>, "GOBELL, JAMIE N" <JGOBELL@ entergy.com>, "GORDON, ROBERT Am | |||
<RGORDON@?entergy.com>, "HOUGHTALING, JOHN B <JHOUGHT@entergy.com>, "JAMES, DALE En <DJAMES@entergy.com>, "JAMES, WILLIAM" <WJAMES1 @entergy.com>, "KOWALEWSKI, JOSEPH A" <JKOWALE@entergy.com>, 'LEWIS, RAYMOND S <RLEWIS1 @entergy.com>, "MEANS, BRACY E" <BMEANS@entergy.com>, "MITCHELL, TIMOTHY G" <TMITCH1 @entergy.com>, | |||
"PANTHER, KENNETH C" <KPANTHE@entergy.com>, "PARKS, GLENN A" <GPARKS@entergy.com>, | |||
Date: | "PAYNE, GARY - WF3" <GPAYNElentergy.com>, "SIMS, WILLIAM D" <WSIMS~entergy.com>, | ||
"SMITH, JAMES A" <JSMITH@entergy.com> | |||
Date: | |||
5/4/04 10:05AM | |||
==Subject:== | ==Subject:== | ||
Status of 1R18 RV Head/Alloy 600 Inspections Attached is the Status of the ANO-1 | Status of 1R18 RV Head/Alloy 600 Inspections Attached is the Status of the ANO-1 1 Ri 8 RV Head/Alloy 600 inspections for May 4, 2004. | ||
I CAW1ND0WS\TEMP\GW)00001.TMP | I CAW1ND0WS\\TEMP\\GW)00001.TMP Page 1 I C:\\W INDOWS\\TEMP\\GW}00001.TMP Page 1 I Mail Envelope Properties (4097A2FA.719: 21: 22297) | ||
==Subject:== | ==Subject:== | ||
Status of IR18 RV Head/Alloy 600 Inspections Creation Date: | Status of IR18 RV Head/Alloy 600 Inspections Creation Date: | ||
Created By: | 5/4/04 9:58AM From: | ||
"BENNETT, STEVE A" <SBENNE2@entergy.com> | |||
Created By: | |||
SBENNE2@entergy.com Recipients nrc.gov owf4_po.OWFNDO TWA (Thomas Alexion) nrc.gov ARLPO.ARLDO JAC (Jeffrey Clark) entergy.com JSMITH (SMITH, JAMES A) | |||
WSIMS (SIMS, WILLIAM D) | WSIMS (SIMS, WILLIAM D) | ||
GPAYNE (PAYNE, GARY - WF3) | GPAYNE (PAYNE, GARY - WF3) | ||
| Line 64: | Line 70: | ||
DBICE (BICE, DAVID B) | DBICE (BICE, DAVID B) | ||
I C:AW1ND0WS\TEMP\GW)00001.TMP | I C:AW1ND0WS\\TEMP\\GW)00001.TMP Page 2 I C:\\WINDOWS\\TEMP\\GWIOOQO1.TMP Page 2 RSWAIN1 (SWAIN, RONALD VANCE) | ||
Post Office | Post Office owf4_po.OWFNDO ARL_PO.ARL_DO Files Size MESSAGE 90 Part.O01 997 1R18 RVH Inspection Results 5-4.doc Mime.822 78575 Route nrc.gov nrc.gov entergy.com Date & Time 05/04/04 09:58AM 54272 Options Expiration Date: | ||
Priority: | |||
Reply Requested: | |||
Return Notification: | |||
Concealed | |||
==Subject:== | ==Subject:== | ||
Security: | |||
None Standard No None No Standard | |||
May 4, 2004 - 8:00 AM | May 4, 2004 - 8:00 AM 1 R18 Alloy 600 Status Inspection Inspection Method Extent of Inspection 1R18 Status/ Findings BMV of RV BMV exam inside Service 100% of the RPV head surface (including 3600 CRDM nozzle BMV was performed and Review Head Structure around each head penetration). (OP 2311.009) | ||
Team review of videos complete. Inspection I__ | |||
CRDM/ | I__ | ||
I__ | |||
C o m p lete. | |||
CRDM/ | |||
UT of 60 CRDM nozzles UT of the RPV nozzle from 2" above the highest UT scans of CRDM nozzles being finalized RADCAL (no known defects) point of the root of the J-weld to the blind zone. | |||
60 of 60 nozzles inspected Nozzles 60 of 60 analyzed by Entergy (Note 1) | |||
Boring and welding of nozzle 61 complete. Currently in 48 hour hold period. | Boring and welding of nozzle 61 complete. Currently in 48 hour hold period. | ||
NRC call on nozzle 61 today at 1:00 CDT. | NRC call on nozzle 61 today at 1:00 CDT. | ||
UT of six FTI repaired | UT of six FTI repaired UT the weld and at least 1-inch above the weld in UT scans of FTI repaired CRDM nozzles complete CRDM nozzles (Nozzles the nozzle base material. | ||
6 of 6 FTI repairs inspected 3, 6,15,17, 33, & 56) 6 of 6 analyzed by Entergy No indications identified. | |||
UTWS of two W repaired UT of the RPV nozzle from 2" above the highest UT scans of W/ repaired CRDM nozzles complete. | |||
UTWS of two W repaired | CRDM nozzles (Nozzles point of the root of the J-weld to the blind zone 2 of 2 nozzle UTs inspected 54 & 68) and wetted surface exam of weld overlay. | ||
CRDM nozzles (Nozzles | 2 of 2 nozzle UTs analyzed 2 of 2 PT exams performed and analyzed No indications identified. | ||
UT of RADCAL UT of the RPV nozzle from 2" above the highest Nozzle 1 inspected and analyzed by Entergy (Note 1) | |||
(Nozzle 1) point of the root of the J-weld to the blind zone. | |||
No indications identified UT of nozzle Annulus Interrogate interference fit in all 69 nozzle annuli No leak path identified on any nozzles analyzed | |||
UT of RADCAL | [Leak Path Assessment] | ||
(Nozzle 1) | above J-weld for leakage path including nozzle 61. | ||
[Leak Path Assessment] | Inspect 100% of the circumference of each penetration as it enters the RPV lower head. | ||
Inspect 100% of the circumference of each | (OP 2311.009) | ||
BMI nozzles being visually reinspected with enhanced place-keeping and procedure controls. | |||
To be performed as early as May 5, 2004. | |||
May 4, 2004 - 8:00 AM RCS | May 4, 2004 - 8:00 AM RCS Visually Inspect RCS for Visually inspect above the RPV head for potential A600 small bore nozzles (complete) | ||
Walkdowns | Walkdowns RCS leaks boric acid leaks from pressure-retaining 18 of 18 pressurizer/CFT nozzles inspected components. Inspect other A600 RCS small bore 14 o14 hot leg nozzles inspected locations (OP 2311.009). | ||
13 of 13 Cold Leg nozzles inspected No indications identified Final boric acid inspection above the service structure to be performed as early as May 4, 2004. | |||
Note 1: The freespan length below the weld has been confirmed to meet Entergy's Order Relaxation request of February 11, 2004 (CNRO-2004-0008).}} | Note 1: The freespan length below the weld has been confirmed to meet Entergy's Order Relaxation request of February 11, 2004 (CNRO-2004-0008).}} | ||
Latest revision as of 22:22, 15 January 2025
| ML050450585 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 05/04/2004 |
| From: | Sharon Bennett Entergy Operations |
| To: | Alexion T, Clark J NRC/NRR/DLPM/LPD4 |
| Alexion T W, NRR/DLPM, 415-1326 | |
| Shared Package | |
| ML050610499 | List: |
| References | |
| Download: ML050450585 (5) | |
Text
Thomas Alexion - Status of 1 R18 RV Head/Alloy 600 Inspections Page 1 I ThornasAlexion - Statusof 1R18 RV Head/Alloy6OO Inspections Page 1.1 From:
"BENNETT, STEVE A" <SBENNE2@entergy.com>
To:
Tom Alexion <twa@nrc.gov>, 'Jeff Clark (jac nrc.gov)" <jac nrc.gov>, "SWAIN, RONALD VANCE <RSWAIN1 @entergy.com>, "BICE, DAVID B" <DBICE@entergy.com>, "BURFORD, FRANCIS G" <FBURFOR@entergy.com>, "CAMPBELL, BILL - NUCLEAR" <WCAMPB3@entergy.com>,
"COMPTON, LESLIE" <LCOMPTO@entergy.com>, "DAIBER, BRYAN J" <BDAIBER@entergy.com>,
'DAVANT, GUY H" <GDAVANT@entergy.com>, "DEESE, RICHARD W" <rdees90entergy.com>,
'EATON, WILLIAM A" <WEATON@entergy.com>, "EDGELL, DOUGLAS Wm
<DEDGELL@entergy.com>, "EHREN, TERRY G" <TEHREN @entergy.com>, "EUBANKS, CLIFFORD"
<CEUBANK@entergy.com>, "FORBES, JEFFREY" <JFORBE1 @ entergy.com>, 'FORREST, FREDDIE"
<FFORRES@entergy.com>, "GOBELL, JAMIE N" <JGOBELL@ entergy.com>, "GORDON, ROBERT Am
<RGORDON@?entergy.com>, "HOUGHTALING, JOHN B <JHOUGHT@entergy.com>, "JAMES, DALE En <DJAMES@entergy.com>, "JAMES, WILLIAM" <WJAMES1 @entergy.com>, "KOWALEWSKI, JOSEPH A" <JKOWALE@entergy.com>, 'LEWIS, RAYMOND S <RLEWIS1 @entergy.com>, "MEANS, BRACY E" <BMEANS@entergy.com>, "MITCHELL, TIMOTHY G" <TMITCH1 @entergy.com>,
"PANTHER, KENNETH C" <KPANTHE@entergy.com>, "PARKS, GLENN A" <GPARKS@entergy.com>,
"PAYNE, GARY - WF3" <GPAYNElentergy.com>, "SIMS, WILLIAM D" <WSIMS~entergy.com>,
"SMITH, JAMES A" <JSMITH@entergy.com>
Date:
5/4/04 10:05AM
Subject:
Status of 1R18 RV Head/Alloy 600 Inspections Attached is the Status of the ANO-1 1 Ri 8 RV Head/Alloy 600 inspections for May 4, 2004.
I CAW1ND0WS\\TEMP\\GW)00001.TMP Page 1 I C:\\W INDOWS\\TEMP\\GW}00001.TMP Page 1 I Mail Envelope Properties (4097A2FA.719: 21: 22297)
Subject:
Status of IR18 RV Head/Alloy 600 Inspections Creation Date:
5/4/04 9:58AM From:
"BENNETT, STEVE A" <SBENNE2@entergy.com>
Created By:
SBENNE2@entergy.com Recipients nrc.gov owf4_po.OWFNDO TWA (Thomas Alexion) nrc.gov ARLPO.ARLDO JAC (Jeffrey Clark) entergy.com JSMITH (SMITH, JAMES A)
WSIMS (SIMS, WILLIAM D)
GPAYNE (PAYNE, GARY - WF3)
GPARKS (PARKS, GLENN A)
KPANTHE (PANTHER, KENNETH C)
TMITCH1 (MITCHELL, TIMOTHY G)
BMEANS (MEANS, BRACY E)
RLEWIS 1 (LEWIS, RAYMOND S)
JKOWALE (KOWALEWSKI, JOSEPH A)
WIAMES I (JAMES, WILLIAM)
DJAMES (JAMES, DALE E)
JHOUGHT (HOUGHTALING, JOHN B)
RGORDON (GORDON, ROBERT A)
JGOBELL (GOBELL, JAMIE N)
FFORRES (FORREST, FREDDIE)
JFORBE1 (FORBES, JEFFREY)
CEUBANK (EUBANKS, CLIFFORD)
TEHREN (EHREN, TERRY G)
DEDGELL (EDGELL, DOUGLAS W)
WEATON (EATON, WILLIAM A) rdees9O (DEESE, RICHARD W)
GDAVANT (DAVANT, GUY H)
BDAIBER (DAIBER, BRYAN J)
LCOMPTO (COMPTON, LESLIE)
WCAMPB3 (CAMPBELL, BILL - NUCLEAR)
FBURFOR (BURFORD, FRANCIS G)
DBICE (BICE, DAVID B)
I C:AW1ND0WS\\TEMP\\GW)00001.TMP Page 2 I C:\\WINDOWS\\TEMP\\GWIOOQO1.TMP Page 2 RSWAIN1 (SWAIN, RONALD VANCE)
Post Office owf4_po.OWFNDO ARL_PO.ARL_DO Files Size MESSAGE 90 Part.O01 997 1R18 RVH Inspection Results 5-4.doc Mime.822 78575 Route nrc.gov nrc.gov entergy.com Date & Time 05/04/04 09:58AM 54272 Options Expiration Date:
Priority:
Reply Requested:
Return Notification:
Concealed
Subject:
Security:
None Standard No None No Standard
May 4, 2004 - 8:00 AM 1 R18 Alloy 600 Status Inspection Inspection Method Extent of Inspection 1R18 Status/ Findings BMV of RV BMV exam inside Service 100% of the RPV head surface (including 3600 CRDM nozzle BMV was performed and Review Head Structure around each head penetration). (OP 2311.009)
Team review of videos complete. Inspection I__
I__
I__
C o m p lete.
CRDM/
UT of 60 CRDM nozzles UT of the RPV nozzle from 2" above the highest UT scans of CRDM nozzles being finalized RADCAL (no known defects) point of the root of the J-weld to the blind zone.
60 of 60 nozzles inspected Nozzles 60 of 60 analyzed by Entergy (Note 1)
Boring and welding of nozzle 61 complete. Currently in 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> hold period.
NRC call on nozzle 61 today at 1:00 CDT.
UT of six FTI repaired UT the weld and at least 1-inch above the weld in UT scans of FTI repaired CRDM nozzles complete CRDM nozzles (Nozzles the nozzle base material.
6 of 6 FTI repairs inspected 3, 6,15,17, 33, & 56) 6 of 6 analyzed by Entergy No indications identified.
UTWS of two W repaired UT of the RPV nozzle from 2" above the highest UT scans of W/ repaired CRDM nozzles complete.
CRDM nozzles (Nozzles point of the root of the J-weld to the blind zone 2 of 2 nozzle UTs inspected 54 & 68) and wetted surface exam of weld overlay.
2 of 2 nozzle UTs analyzed 2 of 2 PT exams performed and analyzed No indications identified.
UT of RADCAL UT of the RPV nozzle from 2" above the highest Nozzle 1 inspected and analyzed by Entergy (Note 1)
(Nozzle 1) point of the root of the J-weld to the blind zone.
No indications identified UT of nozzle Annulus Interrogate interference fit in all 69 nozzle annuli No leak path identified on any nozzles analyzed
[Leak Path Assessment]
above J-weld for leakage path including nozzle 61.
Inspect 100% of the circumference of each penetration as it enters the RPV lower head.
(OP 2311.009)
BMI nozzles being visually reinspected with enhanced place-keeping and procedure controls.
To be performed as early as May 5, 2004.
May 4, 2004 - 8:00 AM RCS Visually Inspect RCS for Visually inspect above the RPV head for potential A600 small bore nozzles (complete)
Walkdowns RCS leaks boric acid leaks from pressure-retaining 18 of 18 pressurizer/CFT nozzles inspected components. Inspect other A600 RCS small bore 14 o14 hot leg nozzles inspected locations (OP 2311.009).
13 of 13 Cold Leg nozzles inspected No indications identified Final boric acid inspection above the service structure to be performed as early as May 4, 2004.
Note 1: The freespan length below the weld has been confirmed to meet Entergy's Order Relaxation request of February 11, 2004 (CNRO-2004-0008).