E-mail Discharge Test
ML050450595
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 05/27/2004
From: Scheide R
Entergy Operations
To: Holland D
NRC/NRR/DLPM/LPD4
Holland D, NRR/DLPM, 415-1436
Shared Package
ML050610499 List:
References
Download: ML050450595 (50)


Text

i CAW1ND0WS\TEMP\GW100001.TMP Page 1 1 sz c,_C,\,,,NDWS,,EM, G,,}OOOO, .TM 1..,,,,....

Page,,,,, Al... .

Mail Envelope Properties (40B631ED.C59: 4: 48217)

Subject:

Discharge Test Creation Date: 5/27/04 2:17PM From: "SCHEIDE, RICHARD H" <RSCHEID@entergy.com>

Created By: RSCHEID@entergy.com Recipients nrc.gov owf4_po.OWFNDO DGH1 (Drew Holland)

Post Office Route owf4.po.0WFNDO nrc.gov Files Size Date & Time MESSAGE 3 05/27/04 02:17PM Part.001 279 perf test.pdf 695794 Mime.822 954146 Options Expiration Date: None Priority: Standard Reply Requested: No Return Notification: None Concealed

Subject:

No Security: Standard docker Alo

i Drew Holland - Discharge Test Page 1 l From: "SCHEIDE, RICHARD H" <RSCHEID@entergy.com>

To: "'Drew Holland (dghl @nrc.gov)"' <dghl @nrc.gov>

Date: 5/27/04 2:22PM

Subject:

Discharge Test

Date: May 28, 2004 NOTE TO FILE ON DOCKET 50-368 LICENSEE RESPONSES TO QUESTIONS FROM NRR TO ANO-2 MANAGEMENT REGARDING TIA-2004-01 REQUIREMENTS INTENDED TO CONTROL THE DEGRADATION OF CLASS 1E BATTERIES DURING MAY 2004, Management at ANO-2 responded to a number of questions that Project Manager, Drew Holland asked the licensee on behalf of Matthew McConnell and Saba Saba of EEIB in the Division of Engineering. A partial response to the questions by the licensee is provided by the attachment to this note to file.

The questions asked were as follows:

1) When did the initial equalizing charge take place for the cell that replaced cell 41 in2D1?
2) When did the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> float charge begin?
3) Provide a copy of the procedure used for discharge testing.
4) Does the procedure of 3) above cover pre-installation discharge testing?
5) Provide a copy of CR-ANO-2-2003-1882.
6) How were the four cells selected from 2D1 2 ? What was the acceptance criteria for the four cells?
7) Why were replacement cells not taken from the spare cell bank?

Docket No. 50-368

ENTERGY OPERATIONS INCORPORATED iaf ARKANSAS NUCLEAR ONE Paae 1 TITLE:UNIT II 2D11 PERFORMANCE TEST ELECTRICAL l DOCUMENT NO. CHANGE NO.

MAINTENANCE I 2403_e07 O0 009-01.0 AFFECTED UNIT: l 0 PROCEDURE E1 ELECTRONIC DOCUMENT I SAFETY-RELATED 0 UNIT 1 0 UNIT2 E 0 WORKPLAN, EXP. DATE I 0 YES a NO TYPE OF CHANGE:

a NEW 0 PC El TC E DELETION Ea REVISION El EZ EXP. DATE:_

DOES THIS DOCUMENT:

1. Supersede or replace another procedure? D YES 0 NO (If YES, complete 1000.006B for deleted procedure.)
2. Alter or delete an existing regulatory commitment? D YES ED NO (If YES, coordinate with Ucensing before Implementing.)
3. Require a 50.59 review per LI-101? (See also 1000.006, Attachment 15) 0 YES 1 NO (If 50.59 evaluation, OSRC review required.)
4. Cause the MTCL to be untrue? (See Step 7.5 for details.) D YES O NO (If YES, complete 1000.009A)
5. Create an Intent Change? E YES O NO (If YES, Standard Approval Process required.)
6. Implement or change IPTE requirements? D YES ONO (If YES, complete 1000.143A OSRC review required.)
7. Implement or change a Temporary Alteration? D YES CD NO (If YES, then OSRC review required.)

Was the Master Electronic File used as the source document? ID YES O NO INTERIM APPROVAL PROCESS STANDARD APPROVAL PROCESS ORIGINATOR SIGNATURE: (Includes review of AtL 13) DATE GITOR SI TORE fudes review of Att 13) DA7/E X t)

Print and Sign name: PHO #: Pm J N PH07E#: 73 SUPERVISOR APPROVAL: E: I DEND TR ER: DATE:

SRO UNIT ONE :* DATE: E#7 P-RING: DATE:

SRO UNIT TWO:" DATE: QUaLITY: DATE:

Interim approval allowed for non- tent changes requiring no UVNT URVEILLANCE COORDINATOFR DATE:

50.59 evaluation that are stoprg work In progress. 4/}

SE Standard Approval require r intent changes or changes SECT:AD 9ATE: I requiring a 50.59 evalua' n. _ 7p

  • Ifchange not require o support work in progress. 0 I ASSURANCE: DATE:

Department Head st sign.

    • If both units ar ifected by change, both SRO signatures OTHER SECTION LEADERS: DATE:

are required. ( 0 signature required for safety related procedures ly.) OTHER SECTION LEADERS: ATE:

OTHER SECTION LEADERS: l DATE:

OTHER SECTION LEADERS: DATE:

OSF CHAI ATECHNICAL REVIEWER: DATE: OTHER SECTION LEAD  : DATE:

>H 6[X 7 /O Fl ROV:< DATE: OTHER SECT LEADERS: DATE:

RE IRED EF7,ECTIVE DATE: #E/ 7 0 SECTION LEADERS: DATE:

FORM TITLE: FORM NO. CHANGE NO.

PROCEDURE/WORK PLAN APPROVAL REQUEST 1000.006B 052-00-0

ENTERGY OPERATIONS INCORPORATED ARKANSAS NUCLEAR ONE TITLE: UNIT II 2D11 PERFORMANCE TEST DOCUMENT NO. CHANGE NO.

ELECTRICAL MAINTENANCE 2403.001 009-01-0 WORK PLAN EXP. DATE TC EXP. DATE N/A N/A SET# SAFETY-RELATED IPTE MYES ONO DYES ZNO TEMP ALT

..... JOYES _NO When you see these TRAPS Get these TOOLS Time Pressure Effective Communication Distraction/lnterruption Questioning Attitude Multiple Tasks Placekeeping Overconfidence Self Check Vague or Interpretive Guidance Peer Check First ShiftlLast Shift Knowledge Peer Pressure Procedures Change/Off Normal Job Briefing Physical Environment Coaching Mental Stress (Home or Work) Turnover VERIFIED BY DATE TIME A_

FORM TITLE: FORM NO. ICHANGE NO.

VERIFICATION COVER SHEET 1000.006A I 050-00-0

ENTERGY OPERATIONS INCORPORATE D ARKANSAS NUCLEAR ONE TITLE:UNIT II 2D11I PERFORMANCE TEST DOCUMENT NO. CHANGE NO.

ELECTRICAL MAINTENANCE 2403.001 l 009-01-0 OPROCEDURE OWORK PLAN, EXP. DATE PAGE 1 OF I El ELECTRONIC DOCUMENT TYPE OF CHANGE:

El NEW 3 PC a TC El DELETION 0 REVISION a EZ EXP. DATE:_

AFFECTED SECTION: DESCRIPTION OF CHANGE: (For each change made, include sutfficient detail to describe (Include step # if reason for the change.)

applicable)

Per CR-ANO-2-2003-00703 Action 19 the following changes were implemented to this procedure.

REFERENCES:

Added CR-ANO-2-2003-00703 Action 19 Added a Step to LIMITS AND PRECAUTIONS: During the performance of this procedure if any equipment/component Is found to be non-functioning or out of specified tolerance, notify the Electrical Supervisor or Engineering for resolution and write a condition report. Required Signoff step in procedure.

Added two Steps to RESTORATION AND CHECKOUT:

Step 1: IF any condition required contacting the Shift Manager, Maintenance Supervisor or System Engineer for resolution of the condition, THEN, document this condition and actions taken to correct the condition on a condition report. IF NOT, THEN, mark this step N/A.

Step 2: IF any Condition Reports were issued during the perform ance of this procedure, THEN attach a copy of the Condition Report to this procedure. IF none, THEN, mark this step N/A.

No 50.59 required per procedure 1000.006 Procedure Control Attachment 15 Step 3:

Modification of text to improve clarity without changing process, sequence or Intent.

FORM TITLE: FORM NO. CHANGE NO.

DESCRIPTION OF CHANGE 1000.006C 050-00-0

PROCJWORK PLAN NO. PROCEDUREJWORK PLAN TITLE: PAGE: 1 of 44 2403.001 UNIT II 2D11 PERFORMANCE TEST ELECTRICAL MAINTENANCE CHANGE: 009-01-0 TABLE OF CONTENTS SECTIO] PAGE 1.0 PURPOSE....................................... ................... 2 2.0 SCOPE............................................. ................... 2

3.0 DESCRIPTION

...................................... ................... 2

4.0 REFERENCES

...................................... ................... 2 5.0 TEST EQUIPMENT, SPECIAL TOOLS AND SUPPLIES........ ................... 3 6.0 LIMITS AND PRECAUTIONS............................ ................... 4 7.0 PREREQUISITES..................................... ................... 5 8.0 INSTRUCTIONS...................................... ................... 6 9.0 RESTORATION AND CHECKOUT.......................... ................... 22 10.0 ATTACHMENTS AND FORMS............................. ................... 24 10.1 Attachments 10.1.1 Attachment 1 - Discharge Currenlt Correction K Factor For Temperature......... ................... 25 10.1.2 Attachment 2 - Jumping Low Voltiage Cells......... 26 10.1.3 Attachment 3 - Calculation for 'Total Down Time... 31 10.1.4 Data Sheet 1 - Performance Disc]Charge Test Battery Bank Voltage........... .................. 32 10.1.5 Data Sheet 2 - "As Left" Resistiance .............. 38 10.2 Forms 10.2.1 None

PROCJWORK PLAN NO. PROCEDURE/NORK PLAN TITLE: PAGE: 2 of 44 2403.001 UNIT II 2D11 PERFORMANCE TEST ELECTRICAL MAINTENANCE CHANGE: 009-01-0 1.0 PURPOSE 1.1 The purpose of this procedure is to provide instructions for the Performance Discharge Test per IEEE 450-1980 on Unit 2, 2D11 battery.

This test is normally performed every 60 months during shut down in lieu of the battery service test.

2.0 SCOPE 2.1 This procedure will provide instructions for the disassembly and cleaning of the battery connection links, micro-ohm checks and the torquing requirements of battery connections, discharge test and voltage readings, and restoration of the battery bank.

2.2 This procedure contains monitoring requirements for assessing conformance with the Limiting Conditions for Operation (LCO) section 3.8.2.3.

2.3 This procedure satisfies the requirements of Technical Specification Surveillance 4.8.2;3.E.

2.4 This procedure may be used as a partial procedure in conjunction with an approved corrective action Work Document. When using this procedure in a partial performance, the sections and steps to be performed shall be listed below as designated by the Cognizant Supervisor.

=/

Cognizant Supervisor Date

3.0 DESCRIPTION

3.1 The 2D11 is a Class 1E, seismic qualified battery bank consisting of 58 cells assembled in heat and shock resistant, non-combustible jars.

The cells are the lead-acid type with lead calcium grid construction.

The bank is rated at 2064 amp-hours for an 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> discharge rate.

4.0 REFERENCES

4.1 REFERENCES

USED IN THE PREPARATION OF THIS PROCEDURE.

4.1.1 ANO Unit 2 Technical Specifications 3.8.2.3 and 4.8.2.3.E.

4.1.2 C&D Manual 12-800, TM C 173.0010 4.1.3 IEEE 450-1980 4.1.4 ANO-2 SAR Table 8.3.5 4.1.5 C&D Battery Procedure for Terminal Contact Resistances 4.1.6 EE-84-181 4.1.7 Calc 86-E-0020-01 4.1. 8 Albers Battery Test Set Tech Manual, (TE A 341.0010).

PROCJWORK PLAN NO. PROCEDURENWORK PLAN TITLE: PAGE: 3 of 44 2403.001 UNIT II 2011 PERFORMANCE TEST ELECTRICAL MAINTENANCE CHANGE: 009-01-0 4.1.9 PEAR 94-0074 4.1.10 PEAR 93-0014 4.1.11 ER-980665 R202 4.1.12 CR-ANO-1999-0169 CA-002 for OE9603.

4.1.13 OE-10978 4.1.14 CR-ANO-2-2000-0604 4.1.15 CR-ANO-C-2001-0589 4.1.16 CR-ANO-2-2001-0028 Action 5 4.1.17 CR-ANO-2-2003-0703 Action 19

4.2 REFERENCES

REQUIRED TO BE USED IN CONJUNCTION WITH THIS PROCEDURE.

4.2.1 OP 2403.024 - 2D11 Quarterly Surveillance 4.2.2 Electrical Industrial Safety Rule Book 4.3 CORRESPONDENCE CONTAINING REGULATORY COMMITMENTS WHICH HAVE BEEN INCORPORATED IN THIS PROCEDURE.

4.3.1 None 5.0 TEST EQUIPMENT, SPECIAL TOOLS AND SUPPLIES 5.1 TEST EQUIPMENT NOTE When using the Fluke model 51 DT to take temperature measurements, the DT and probe to be used must have a pre cal performed by the Met Lab before use and a post cal after use in the temperature range it is going to be used in.

5.1.1 Thermocouple digital thermometer - series 396, Fluke 51 or Model 2100A 5.1.2 Digital Multimeter - Fluke Model 8060 or 8062 or equivalent.

5.1.3 Alber Battery Capacity Tester or equivalent.

5.1.4 Biddle DLRO ( Digital Low Resistance Ohmmeter ) or equivalent.

5.1.5 Torque wrench up to 165 in/lbs 5.1.6 Torque wrench up to 27 ft/lbs 5.1.7 Data Logging Voltmeter I DLV Series 30 or Equivalent 5.1.8 RTD Digital Thermometer ( Fluke 2180A or Equivalent

PROCJNORK PLAN NO. PROCEDUREIWORK PLAN TITLE: PAGE: 4 of 44 2403.001 UNIT II 2D1 I PERFORMANCE TEST ELECTRICAL MAINTENANCE CHANGE: 009-01-0 5.2 SPECIAL TOOLS NOTE Items listed in Sections 5.2 and 5.3 need not be pre-staged for use. These items are listed as an indicator that they may be needed at some time during this test.

5.2.1 Variable speed Micro pump and tubing 5.2.2 Insulated handle tools 5.2.3 Protective aprons or acid suits 5.2.4 Acid proof gloves 5.2.5 Goggles and plastic face shield 5.3 SUPPLIES 5.3.1 Battery Terminal Grease 5.3.2 Water for rinsing in case of acid spills 5.3.3 Bicarbonate of Soda or other acid neutralizing agent 6.0 LIMITS AND PRECAUTIONS 6.1 LIMITS 6.1.1 The overall battery terminal voltage durinq, and at the completion of the Performance Test should be no less than 105 VDC, unless a cell is bypassed during the discharge due to low voltage.

6.1.2 Immediately notify the Cognizant Supervisor and/or Shift Manager IF procedural tolerances are not met to ensure compliance with LCO and Tech Spec.

6.2 PRECAUTIONS 6.2.1 No smoking, open flames, open lights, or creating an arc can be permitted in the vicinity of the battery.

6.2.2 The battery area should be well ventilated.

6.2.3 The handles of all the tools used to tighten or torque the connectors should be insulated.

6.2.4 D12 battery bank must be operable prior to starting this test.

6.2.5 Fire dampers or fire doors shall not be breached and left unattended.

PROCJWORK PLAN NO. PROCEDURE/VORK PLAN TITLE: PAGE: 5 of 44 2403.001 UNIT II 2D11 PERFORMANCE TEST ELECTRICAL MAINTENANCE CHANGE: 009-01-0 6.2.6 The requirements of Housekeeping Level II per Procedure 1000.018 shall apply to 2Dll battery room.

6.2.7 For the requirements of Minimum Safety Apparel for Battery Maintenance, use the Electrical Industrial Safety Rule Book.

6.2.8 During the performance of this procedure if any equipment/component is found to be non-functioning or out of specified tolerance, notify the Electrical Supervisor or Engineering for resolution and write a Condition report.

7.0 PREREQUISITES AND INITIAL CONDITIONS 7.1 Verify that the measuring and test equipment calibration dates are current.

7.2 Verify that battery banks 2D11, 2D12, and their charging /

systems are in operation prior to performing maintenance on the system.

7.3 Verify that the battery area exhaust fans are in operation /

in the rooms that affect 2D11.

7.4 Refer to Attachment 4 to determine proper safety equipment required.

7.5 Verify procedure 2403.024 has been performed within the last 7 days prior to performance of this procedure and attach a copy of that procedure.

7.6 Verify that battery 2D11 is on normal float charge and has been on an equalize charge for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> within the last 3 to 7 days prior to performing this surveillance.

7.7 Verify that Unit 2 Operations Shift Manager is aware that during this test energizing the off-line inverter while the inservice battery charger is on equalize or the battery bank is disconnected from the bus, will blow fuses on the inservice inverters (This caution does not apply to 2Y25 or 2Y26 inverters) 7.8 Verify that the Unit 2 Operations Shift Manager has been notified that the work is ready to start and that his authorization has been given.

7.9 Perform pre-test check of torque wrenches on Torque Tester and record the following:

Equip. No. Cal. Due Date / /

Equip. No. Cal. Due Date / /

PROC.IWORK PLAN NO. PROCEDUREIWORK PLAN TITLE: PAGE: 6 of 44 2403.001 UNIT II 2D11 PERFORMANCE TEST ELECTRICAL MAINTENANCE CHANGE: 009-01-0 8.0 INSTRUCTIONS 8.31 PERFORMANCE DISCHARGE TEST SET UP.

8.1.1 Removal of 2D11 from service:

A. Verify Charger 2D31 or alternate is powered /

up and supplying power for Bus 2D01.

B. Obtain assistance from Operations to aid with the removal of 2D11 from service.

C. Open the battery disconnect switch, 2D51 l WWARNING The 2D01 side of the fuse connections are energized. Avoid contact when lremoving the fuses.

8.1.2 Remove the 1800 amp fuses.

I- .I WIRNING The Battery side of the fuse connections are energized. Avoid contact when removing the fuses.

c 8.1.3 Remove the pin indicating fuses from 2D41. 1 8.1.4 Verify that Handswitch AS1 on 2D41 is in the

'NORMAL" position.

WARNING The 2D01 side of the fuse connections are energized. Avoid contact when bolting cables from test load device.

SECOND PERSON VERIFIER A Second Person Verifier shall verify the correct polarity of the test load cables in step 8.1.5.

/

Second Person Verifier Date 8.1.5 Bolt the cables from the test load device to the battery side of the 1800 amp fuse connector.

-I--

8.1.6 Install nonconductive cover over the terminals at the discharge unit load bank.

-I--

PROCJWORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 7 of 44 2403.001 UNIT II 2D11 PERFORMANCE TEST ELECTRICAL MAINTENANCE CHANGE: 009-01-0 8.2 MEASURING CELL TEMPERATURE NOTE When using the Fluke model 51 DT to take temperature measurements, the DT and probe to be used must have a pre cal performed by the Met Lab before use and a post cal after use in the temperature range it is going to be used in.

A DSG (Digital Specific Gravity Meter) may be used.

8.2.1 Measure the cell temperature of each individual cell as listed on Attachment 1.

NOTE IF the front sample tube is bent or broken, THEN the thermometer may be placed in the rear sample tube.

NOTE A second person shall observe, sign and verify after completion, that steps A through C have been completed for all cells listed on Attachment 1 and this value recorded.

NOTE Repeat steps 8.2.1.A through 8.2.1.C until all of the cells listed on Attachment 1 been measured.

A. Place the thermometer in the sample tube of the individual cell being measured. Thermometer should rest on the upper sample tube housing.

B. Leaving the thermometer in the cell being measured for 15 seconds will allow the reading to stabilize.

C. Record the temperature to the nearest 1/10 'F for each cell on Attachment 1.

SECOND PERSON VERIFIER A Second Person Verifier shall verify here and on Attachment 1 that temperature values were properly recorded in step 8.2.1.C for all cells.

/

Second Person Verifier Date D. IF any of the monitored cells have bent or broken sample tubes, or broken thermometer parts in the cell, THEN record the cell number in the space provided below, and notify the Electrical Maintenance Supervisor; IF NOT, THEN mark this step N/A.

Supervisor Remarks:

PROCJWORK PLAN NO. PROCEDUREINORK PLAN TITLE: PAGE: 8 of 44 2403.001 UNIT II 2011 PERFORMANCE TEST ELECTRICAL MAINTENANCE CHANGE: 009-01-0 E. IF any cell temperature deviates more than TFC (50 F) from the other cells during inspection, THEN notify the Electrical Maintenance Supervisor; IF NOT, THEN mark this step N/A.

Supervisor Remarks:

F. Calculate and record on Attachment 1 the average cell temperature of the monitored 1

cells listed on Attachment 1.

8.3 BATTERY PERFORMANCE DISCHARGE TEST 8.3.1 Connect any remaining battery load test set control wiring needed for load monitoring or control.

8.3.2 Determine and record below the discharge current correction factor (K Factor) based upon the average cell temperature obtained in Step 8.2.1 and the Table on Attachment 1.

(K Factor) Discharge Current Correction Factor:

SECOND PERSON VERIFIER A Second Person Verifier shall determine and record below the discharge current correction factor (K Factor) based upon the average cell temperature obtained in Step 8.2.1 and the Table on Attachment 1.

(K Factor) Discharge Current Correction Factor:

Second Person Verifier Date 8.3.3 Calculate the actual discharge current by dividing 258 by the K Factor from Step 8.3.2.

258 amps Rated discharge K Factor Actual discharge current current 258 Amps = Amps (K)

PROCJNORK PLAN NO. PROCEDUREIWORK PLANTITLE: PAGE: 9 of 44 2403.001 UNIT II 2D11 PERFORMANCE TEST ELECTRICAL MAINTENANCE CHANGE: 009-01-0 SECOND PERSON VERIFIER A Second Person Verifier is to calculate the actual discharge current by dividing 258 by the K Factor from Step 8.3.2 and record below.

258 amps Rated discharge K Factor Actual discharge current current 258 Amps = Amps (K) /

Second Person Verifier Date 8.3.4 Set up the load tester to amps calculated in Steps 8.3.3 and 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> of discharge with a shutdown setting of .75 VDC cell voltage or 105 VDC bank voltage.

SECOND PERSON VERIFIER A Second Person Verifier shall verify that the load tester is set up correctly for a 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> discharge at the current value calculated in Step 8.3.3 and a shutdown of .75 VDC or 105 VDC bank voltage.

/

Second Person Verifier Date 8.3.5 Cognizant Supervisor shall verify calculations are correct and has granted permission to start the test.

Cognizant Supervisor Date 8.3.6 Close 2D51 disconnect switch.

8.3.7 Start the discharge test.

8.3.8 Record the Start time on Data Sheet 1 and Attachment 3.

8.3.9 Adjust and maintain current throughout the test to the calculated value + 1% of setpoint, + 1 Amp. (i.e., Displayed Value may vary from setpoint by + 1%, then an additional + 1 Amp.)

NOTE Extra data may be taken and attached for the following test. The discharge rate and the battery voltage should be monitored from start to stop.

NOTE The print out from the Albers unit may be attached to this procedure to accompany the following steps.

PROCJWORK PLAN NO. PROCEDUREIWORK PLAN TITLE: PAGE: 10 of 44 2403.001 UNIT II 2D11 PERFORMANCE TEST ELECTRICAL MAINTENANCE CHANGE: 009-01-0 8.3.10 Monitor and record the discharge rate and the battery voltage at intervals established in Data Sheet 1 or use data from the Albers print out.

A. Send a copy of the Albers print out to the System Engineer.

8.3.11 IF the discharge is stopped for any reason other than a low voltage cell, THEN record the stop and restart times below; IF NOT, -I-THEN mark this step N/A.

Stop time Restart time_

Reason for discharge stop 8.3.12 IF an individual cell or cells are approaching 1.0 volts, THEN record the cell(s) number below and notify the Cognizant Supervisor immediately, continue the test closely monitoring the cell voltage to verify that no cell goes to 0.75 VDC; IF NOT, THEN mark this step N/A:

Cell number: : _ Volts:

Cell number: : _ Volts:

Cell number: Volts:

8.3.13 IF at any time during the test a cell(s) voltage drops to 0.75 VDC, THEN stop the discharge immediately, contact the Cognizant Supervisor and record the stop time below and on Attachment 3, and go to Attachment 2;

If NOT, THEN mark this step N/A:

Discharge Stop Time:

NOTE The final readings need to be rapidly taken as the decaying overall battery voltage approaches and goes below the 105 VDC voltage level.

8.3.14 Read the individual cell voltages and battery terminal voltage (rapidly) when the battery approaches 105 VDC, and record below and in the last column of Data Sheet 1 or use data from the Albers print out.

Final Battery readings recorded: /

PROCJNORK PLAN NO. PROCEDUREIWORK PLAN TITLE: PAGE: 11 of 44 2403.001 UNIT 11 2011 PERFORMANCE TEST ELECTRICAL MAINTENANCE CHANGE: 009-01-0 A. Send a copy of the Albers print out to the System Engineer.

8.3.15 Decrease the test load to "0" when the overall battery voltage is 105 VDC.

8.3.16 Turn off test load.

8.3.17 Record the Stop Time above the last column on Data Sheet 1, and on Attachment 3.

8.3.18 Open 2D51 disconnect switch.

8.3.19 De-energize load tester.

WARNING 2D01 side of fuse connections are energized. Contact should be avoided when disconnecting cables.

8.3.20 Unbolt and remove the load test cables from the fuse cabinet.

8.3.21 Disconnect any remaining battery load test set control or monitoring cables connected to the battery.

8.4 EQUALIZE CHARGE AND BATTERY RESTORATION 8.4.1 Place the battery on equalize charge by one of the following methods as directed by Cognizant Supervision. Supervision to record below the method to be used.

Method 1 _ Method 2 Supervisor "Method 1" A. Install the pin indicating fuses in 2D41.

B. Install the 1800 Amp fuses.

C. Check tightness of all connections inside 2D-51, tighten snug tight as necessary.

D. Close the 2D51 Disconnect Switch.

PROCJWORK PLAN NO. PROCEDUREIWORK PLAN TITLE: PAGE: 12 of 44 2403.001 UNIT It 2D11 PERFORMANCE TEST ELECTRICAL MAINTENANCE CHANGE: 009-01-0 E. Verify that the electrical lineup is restored and the charger is working properly.

F. Record below the charger being used.

Charger used:

G. Place the battery on an equalize charge.

(Charger set point is 135.2 to 137.5 volts)

Record below the equalizing start time and voltage.

Start time Date Voltage NOTE Step 8.5 may be performed at any time after Step 8.4.1.G has been accomplished.

H. Record below the equalize voltage at the battery after 15 hours1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br /> from the start of equalization.

Battery Terminal Voltage: VDC MT&E used: Cal. Due:

I. WHEN the equalize charge current reaches less than 2 amps (end of charge current),

THEN place the battery on float charge.

Record below the equalizing stop time, date, and voltage.

/

Stop time Date Voltage "Method 2" NOTE A Temp. Mod. may be required to power the spare battery charger.

A. Install the pin indication fuses in 2D41.

B. Bolt 2-2/C 2/0 AWG cables or greater from the spare 200 Amp battery charger (SCI Model RCS200 or equal) to the battery side of the 1800 Amp fuse connector.

C. Close the 2D51 Disconnect Switch.

PROCJWORK PLAN N

O. PROCEDURE

/WORK PLAN TITLE: PAGE: 13 of 44 2403.001 UNIT II 2D11I PERFORMANCE TEST ELECTRICAL MAINTENANCE CHANGE: 009-01-0 NOTE Charging at the higher equalize voltage of 144 min. - 145 max. will create more gas and heat than at the normal equalize charge of 135.2 to 137.5 volts D. Place the battery bank on a high level equalize charge of 144 min. - 145 max.

volts and perform the following.

NOTE Banana jacks and wiring will be installed across the shunt and mounted on the charger to facilitate the voltage measurements.

1. Record below the equalizing start time and voltage.

Start time Date Voltage NOTE Step 8.5 may be performed at any time after the battery has been placed on equalize charge (or at the same time the battery is being placed on equalize charge).

2. Monitor the current supplied by the spare battery charger.
3. Maintain charger voltage at 144 min -

145 max.

4. Monitor electrolyte temperature to ensure it does not exceed 1200 F.

during the high level equalize charge.

NOTE When using the Fluke model 51 DT to take temperature measurements, the DT and probe to be used must have a pre cal performed by the Met Lab before use and a post cal after use in the temperature range it is going to be used in.

A DSG (Digital Specific Gravity Meter) may be used.

5. When the equalize charge current reaches the range of 20 amps or below, "open" Disconnect switch 2D51 and measure the current by using a Fluke Digital Multimeter 8842A or equivalent across Jl and J2 of 2D41. (lOOmv = 20 amps)

PROCJWORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 14 of 44 2403.001 UNIT I12D11 PERFORMANCE TEST ELECTRICAL MAINTENANCE CHANGE: 009-01-0

6. Stop the equalize charge (by deenergizing the spare battery charger) when the current reaches less than 2 amps as measured in 2D41.

Record below the equalizing stop time, date and final measurement reading.

Stop time Date Mv Amps E. Verify 2D51 Disconnect switch is open.

F. Verify that the spare battery charger is disconnected and determinate the cables 1

from the charger and 2D41.

G. Install the 1800 amp fuses.

H. Check tightness of all connections inside 2D-51, tighten snug tight as necessary.

I. Close the 2D51 Disconnect switch.

J. Place the battery on float charge.

NOTE 124.7 VDC is the Tech Spec value (lower limit) for a 58 cell bank's float voltage. However, the as left float voltage should be 127.6 to 130.5 when measured at the battery terminal.

8.4.2 Record the float voltage measured at the battery below:

Voltage ACCEPTANCE IF the float voltage "is not" within 127.6 to CRITERION I70.5 volts, THEN notify the Electrical Supervisor and/or Shift Manager for an evaluation of the problem.

IF the float voltage is below 124.7 VDC, THEN "immediately" notify the Electrical Supervisor and Shift Manager that a possible Tech Spec violation exists.

8.5 BATTERY CAPACITY CALCULATION 8.5.1 IF Attachment 2 was used, THEN use the new calculated TA from step 15 of Attachment 2; IF NOT, THEN obtain TA from Data Sheet 2, (Start Time - Stop Time) 8.5.2 IF the discharge was stopped in step 8.2.11, THEN the time that the discharge was stopped (from data in 8.2.11) must be subtracted from the TA to obtain the actual length of the test (TA) for step 8.5.3; IF NOT, THEN mark this step N/A.

PROCJWORK PLAN NO. PROCEDUREIWORK PLAN TITLE: PAGE: 15 of 44 2403.001 UNIT II 2D11 PERFORMANCE TEST ELECTRICAL MAINTENANCE CHANGE: 009-01-0 NOTE The following calculations is required to comply with Tech Spec step 4.8.2.3 E.

8.5.3 Determine the capacity of the battery by completing the following equation:

% capacity at 77°F = (TA / Ts) x 100 TA = Actual time of the test in minutes.

Ts = Rated time to specified terminal voltage in minutes (8hrs. or 480 minutes)

TA (minutes) x 100 =  % capacity 480 minutes SECOND PERSON VERIFIER A Second Person Verifier shall repeat the calculations for determining the capacity of the battery.

TA (minutes) x 100 =  % capacity 480 minutes Second Person Verifier Date NOTE Per Tech Spec 4.8.2.3.e and f, battery capacity must be >80%. However, if capacity is <90%, then the 60 month Performance Discharge Test must be performed every 18 months.

8.5.4 Notify Engineering to evaluate the calculated capacity to determine compliance with Tech Spec.

4.8.2.3.E and 4.8.2.3.F.

8.6 BATTERY MAINTENANCE 8.6.1 Verify that all battery connections are tight by torquing each intercell/intertier connection to 125 in/lbs.

PROCJNORK PLAN NO. PROCEDURENWORK PLANnTLE: PAGE: 16 of 44 2403.001 UNIT II 2D11 PERFORMANCE TEST ELECTRICAL MAINTENANCE CHANGE: 009-01-0 8.6.2 Record below the torque wrench used, calibration due date and the torque values:

Torque wrench number:

Calibration due date:

Torque value:_ _

NOTE The micro-ohm limit is for the intercell straps and cable connections. The cable connections need to be measured from the battery post to terminal lug.

8.6.3 Perform an "As Left" micro-ohm check and record the reading in the "As Left" section of Data Sheet 2.

8.6.4 Verify if any intercell micro-ohm reading is greater than 150 micro-ohms and check the appropriate space below:

Yes NO IF the answer is "yes",

THEN proceed to step 8.6.5.

IF the answer is "no",

THEN mark steps 8.6.5 through 8.6.7 "N/A" and proceed to step 8.6.8.

8.6.5 IF the answer to 8.6.4 was "Yes",

THEN perform the following; IF NOT, THEN mark the following steps N/A.

A. Open disconnect switch 2D51.

B. Disassemble the affected connection(s).

C. Clean and neutralize the affected connections using baking soda and water, then coat the connections per C&D Manual (TM C 173.0010) and reassemble.

D. Torque the affected connections to 165 in/lbs.

E. Micro-ohm the affected connections.

PROC.IWORK PLAN NO. PROCEDUREIWORK PLAN TITLE: PAGE: 17 of 44 2403.001 UNIT II 2D11 PERFORMANCE TEST ELECTRICAL MAINTENANCE CHANGE: 009-01-0 F. Record the micro-ohm readings of the affected connections on Data Sheet flagging them as the second "As Left" reading.

IF the second "As Left" reading IS acceptable, THEN proceed to step 8.6.7.

IF the second "As Left" reading is NOT acceptable, THEN proceed to step 8.6.6.

8.6.6 IF the reading is still unacceptable, THEN perform the following.

IF the reading is acceptable, THEN mark steps A through F "N/A" and proceed to step 8.6.7.

A. Verify Disconnect Switch 2D51 is open.

B. Replace the affected parts.

C. Clean and neutralize replacement parts and coat connections per C&D Manual (TM C 173.0010) and reassemble.

D. Torque connections to 165 in/lbs.

E. Obtain an "As Left" resistance reading.

F. Record action taken and readings on the "As Left" comments section of Data Sheet 2.

8.6.7 Close Disconnect Switch 2D51.

8.6.8 Place the battery bank on Float charge and record the time, date and float voltage below:

Time and Date Float Voltage VDC 8.6.9 Perform 3 random specific gravity readings on the 2D11 battery bank, at the direction of the Responsible Engineer or the Cognizant Supervisor, to determine if stratification of the cells exists.

A. IF stratification of the tested cells electrolyte exists, THEN contact System Engineer for evaluation and corrective actions.

IF NOT, THEN mark this N/A Comments:

System Engineer / -

PROC.MWORK PLAN NO. PROCEDUREINORK PLAN TITLE: PAGE: 18 of 44 2403.001 UNIT II 2D11 PERFORMANCE TEST ELECTRICAL MAINTENANCE CHANGE: 009-01-0 NOTE Items 8.6.10.A thru 8.6.10.E are quick checks after the battery reaches a charging current of less than 2-amps. The battery is considered OPERABLE after satisfactory checks of steps 8.6.10.A thru 8.6.10.E are complete and remains operable provided that 2403.024, 2D11 Quarterly Surveillance test is completed within 7-days.

8.6.10 To verify operability of the battery bank, perform the following:

A. Verify an average electrolyte temperature of 12 random connected cells is above 60'F.

Cell Number Electrolyte Selected Temperature Avg > 60 F (i)

Avg Temperature Verified By Date

PROCJWORK PLAN N

O. PROCEDURE

IWORK PLAN TITLE: PAGE: 19 of 44 2403.001 UNIT 11 2011 PERFORMANCE TEST ELECTRICAL MAINTENANCE CHANGE: 009-01-0 B. Verify total battery terminal voltage greater than or equal to 124.7 volts on float charge for a 58 cell battery bank.

Total battery > 124.7 volts?

terminal voltage (4)

/

C. Verify electrolyte level above top of plates AND not overflowing.

Electrolyte Above top of NOT level plates? overflowing?

(4) (4)

ALL 58 cells /

D. Verify float voltage of all cells greater than or equal to 2.07 volts.

Cell # Float Voltage > 2.07 volts?

(4) 1 2

3 4

5 6

7 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

PROC.MORK PLAN N

O. PROCEDURE

/WORK PLAN TITLE: PAGE: 20 of 44 2403.001 UNIT II 2D11 PERFORMANCE TEST ELECTRICAL MAINTENANCE CHANGE: 009-01-0 Cell # Float Voltage > 2.07 volts?

26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 Verified by/Date E. Verify battery bank charging current less than 2 amps when on float charge.

Charging Current < 2 Amps? Check if correct (4)

Verified by/Date

PROCJWORK PLAN NO. PROCEDURE1WORK PLAN TITLE: PAGE: 21 of 44 2403.001 UNIT II 2D1 I PERFORMANCE TEST ELECTRICAL MAINTENANCE CHANGE: 009-01-0 F. Craft to record time/date that steps 8.6.10.A thru 8.6.10.E are completed satisfactorily in table below AND in step 8.6.11.

IF NOT, satisfactory got to Step G.

Time Date Verified by/Date

1. Engineer signature required that steps 8.6.10 A thru 8.6.10 E are completed satisfactorily Engineer Date G. IF step 8.6.10.A through step 8.6.10.E results are within specifications described, THEN continue with this section.

IF NOT, discontinue procedure and consult Cognizant Supervisor and Engineering for corrective actions.

8.6.11 Notify Operations to perform the following Station Log/Status Board Entry:

Unit II Station Battery Bank 2D11 is Operable according to procedure 2403.001 Unit II 2D11 Performance Test Electrical Maintenance.

Procedure 2403.024, 2D11 Quarterly Surveillance SH1RLL be performed within 7 days to demonstrate continued operability.

A. Engineering has declared operable per Step 8.6.10.F.1 Time Date_

NOTE DUE Date on Step 8.6.11 B must be (7) Seven days later than Step 8.6.11 A B. Craft to record Quarterly Surveillance Due Time Due Date_ _

8.6.12 Verify that 2403.024, 2D11 Quarterly Surveillance except the micro-ohm readings is scheduled to be performed before due date of step 8.6.11 B.

8.6.13 Attach a copy of completed 2403.024 procedure to this procedure. /

PROC.NVORK PLAN NO. PROCEDUREMWORK PLAN TITLE: PAGE: 22 of 44 2403.001 UNIT II 2D11 PERFORMANCE TEST ELECTRICAL MAINTENANCE CHANGE: 009-01-0 9.0 RESTORATION AND CHECKOUT 9.1 IF any condition required contacting the Shift Manager, Maintenance Supervisor or System Engineer for resolution of the condition, THEN, document this condition and actions taken to correct the condition on a condition report.

IF NOT, THEN mark this step N/A.

[ III Condition Report Number 9.2 IF any Condition Reports were issued during the performance of this procedure, THEN attach a copy of the Condition Report to this procedure.

IF none, THEN mark this step N/A.

9.3 Verify that the requirements of Housekeeping Level II have been met.

9.4 Verify that the measuring and test equipment have no known deficiency.

9.5 Verify with operations that 2D11 has been returned to its normal operation/lineup.

1 NOTE 124.7 VDC is the Tech Spec value (lower limit) for a 58 cell bank's float voltage. However, the as left float voltage should be 127.6 to 130.5 when measured at the battery terminal.

9.6 Verify that the battery bank float voltage is between 127.6 and 130.5 VDC when on normal float charge.

9.7 Verify that all cell-to-cell and terminal connections are less than or equal to 150 mocro-ohms.

9.8 Verify that the battery log book has been updated to include the following:

9.8.1 Date this procedure was performed.

9.8.2 Time this procedure was started.

9.8.3 Time this procedure was completed.

9.8.4 Any problems encountered and corrective action taken.

9.8.5 Performer of this procedure.

9.9 Notify the Unit 2 Operations Shift Manager that the 2D11 Performance Discharge Test is complete and the battery

PROCJWORK PLAN NO. PROCEDUREMWORK PLAN TITLE: PAGE: 23 of 44 2403.001 UNIT II 2D11 PERFORMANCE TEST ELECTRICAL MAINTENANCE CHANGE: 009-01-0 charger is not on equalize or battery disconnected from the bus.

PROCJWORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 24 of 44 2403.001 UNIT II 2D11 PERFORMANCE TEST ELECTRICAL MAINTENANCE CHANGE: 009-01-0 9.10 Perform post test check of torque wrenches on Torque Tester and record the following:

Equip. No. Cal. Due Date / /

Equip. No. Cal. Due Date / /

9.11 All setpoints and tolerances in this procedure have been checked and are verified to be within the limits herein specified and any exceptions are noted.

Comments/Actions taken:

/

Maintenance Supervisor Date NOTE Per Tech Spec 4.8.2.3.f, this discharge test must be accomplished every 18 months instead of 60 months IF the battery shows signs of degradation, or has reached 85% of the service life (year 2003 for 2D11). Degradation is indicated when the battery capacity drops more than 10% of rated capacity from its average on previous performance tests, or is below 90% of the manufacturer's rating. 2D-11 has had one test performed prior to 10/12/99.

The capacity at that time was recorded to be 116.25% (JO-873102, microfilm

  1. 64101381) and 106.5566% recalculated under CR-2-97-0444(JO-956320 on IDEAS). The measured capacity of the test being performed must be compared to the average of the tests previously accomplished. Should the measured capacity fall MORE THAN 10% below the 111.4033%, then the 2403.001 surveillance must be rescheduled to be accomplished every refueling outage 9.12 Battery capacity as measured during this test have been compared with the measured capacity observed during previous tests The capacity average or battery condition does warrant the performance of this test every refueling outage in the future.

The capacity average or battery condition does not warrant the performance of this test every refueling outage in the future.

Responsible Engineer 9.13 A PIF has been submitted to include this latest test data in this procedure for use next performance.

9.14 A copy of these test results has been forwarded to the responsible engineer.

PROCJWORK PLAN NO. PROCEDURENWORK PLAN TITLE: PAGE: 25 of 44 2403.001 UNIT II 2D11 PERFORMANCE TEST ELECTRICAL MAINTENANCE CHANGE: 009-01-0 10.0 ATTACHMENTS AND FORMS 10.1 ATTACHMENTS 10.1.1 Attachment 1 - Discharge Current Correction K Factor For Temperature 10.1.2 Attachment 2 - Jumpering Low Voltage Cells 10.1.3 Attachment 3 - Calculation for Total Down Time 10.1.4 Data Sheet 1 - Performance Discharge Test Battery Bank Voltage 10.1.5 Data Sheet 2 - "As Left" Resistance 10.2 FORMS 10.2.1 None

PROCJWORK PLAN NO. PROCEDUREIWORK PLAN TITLE: PAGE: 26 of 44 2403.001 UNIT II 2D11 PERFORMANCE TEST ELECTRICAL MAINTENANCE CHANGE: 009-01-0 ATTACHMENT 1 DISCHARGE CURRENT CORRECTION FACTOR K FOR TEMPERATURE NOTE When using the Fluke model 51 DT to take temperature measurements, the DT and probe to be used must have a pre cal performed by the Met Lab before use and a post cal after use in the temperature range it is going to be used in.

A DSG (Digital Specific Gravity Meter) may be used.

Average Cell No. Temp. (F) Temp. (F) Factor K (nearest 1/10 OF) (nearest 1/10 °F) 1 62 1.098 6 63 1.092 12 64 1.086 18 65 1.080 24 66 1.072 30 67 1.064 36 68 1.056 43 69 1.048 48 70 1.040 54 71 1.034 72 1.029 Temp. 73 1.023 Total for 74 1.017 10 cells = 75 1.011 76 1.006 77 1.000 78 0.994 Temp. Total for 10 cells

= Avg. Temp. 79 0.987 10 80 0.980 81 0.976 Average Temp. = °F 82 0.972 83 0.968 Req. Factor K = 84 0.964 85 0.960 86 0.956 87 0.952 88 0.948 89 0.944 90 0.940 91 0.938 92 0.936 Test Equip. # Cal. Due:

/ /

Performed By Date

/ /

Second Person Verifier Date

PROC.IWORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 27 of 44 2403.001 UNIT 11 2011 PERFORMANCE TEST ELECTRICAL MAINTENANCE CHANGE: 009-01-0 ATTACHMENT 2 Page 1 of 5 Performance Test Cell Jumpering Procedure NOTE This Attachment provides a method to BY-PASS a low voltage cell. 1 NOTE Responsible Engineer shall review Attachment 2 if attachment is required for procedure completion.

NOTE Two - 250 mcm cables with 3/8 - 1/2 lug, cables approximate length is 10 feet will be needed for the cell jumpering. These are available in the Maintenance Facility Battery Storage Room.

1. Record the number of the cell(s) at or below 0.75 VDC, the Stop Time, the Cell voltage and the Bank Voltage below and on Attachment 3.

Cell Number: Cell Voltage: Stop Time: Bank Voltage:

Cell Number: Cell Voltage: Stop Time: Bank Voltage:

Cell Number: Cell Voltage: Stop Time: Bank Voltage:

Cell Number: Cell Voltaqe: Stop Time: Bank Voltaqe:

NOTE At this time the Cognizant Supervisor shall make the judgement to determine if the cell(s) should be jumpered or to continue the test with the cell(s) installed. This judgement should be based on Total Test Time, overall Bank Voltage, and the number of cells at or below 0.75 volts.

2. IF the Cognizant Supervisor's judgment is to continue the test with the cell(s) installed, THEN restart the discharge at the calculated current and record the restart time below and on Attachment 3. Continue recording data on Data Sheet 1 and discharge the bank until the bank voltage approaches 105 VDC, N/A Steps 3 through 11 of this Attachment and continue with Step 12.

IF the Cognizant Supervisor's judgement is to jumper the cell(s),

THEN mark "Restart Time" below N/A and continue with Step 3.

Restart Time: /

Cognizant Supervisor Date

PROCJWORK PLAN NO. PROCEDUREINORK PLANTITLE: PAGE: 28 of 44 2403.001 UNIT II 2D11 PERFORMANCE TEST ELECTRICAL MAINTENANCE CHANGE: 009-01-0 ATTACHMENT 2 Page 2 of 5

3. Open 2D51 Disconnect Switch.

Figure 1

[WI t siRNING Jumpering, shorting or connecting the positive and negative lugs of a single cell may cause equipment damage or personnel injury.

NOTE Jumpering of end cell may be accomplished by using the inter-tier or inter-bank cables.

4. Using Figure 1 as a guide only and presuming "B" is the affected cell then remove bolts and intercell connection straps from the low voltage cell and its adjacent cell terminals.

NOTE Based on which is the low cell you may be jumpering the negative of A to the positive of C. As shown below in figure 2.

Figure 2

PROCJWORK PLAN NO. PROCEDUREIWORK PLAN TITLE: PAGE: 29 of 44 2403.001 UNIT II 2D11 PERFORMANCE TEST ELECTRICAL MAINTENANCE CHANGE: 009.01-0 ATTACHMENT 2 Page 3 of 5

5. Bolt a (250 mcm) jumper from the left negative Battery "A" terminal to the left positive Battery C terminal, using the same stainless bolts as used in the intercell connection straps.
6. Bolt another (250 mcm) jumper from the right negative Battery "A" terminal to the right positive Battery C terminal, using the same stainless bolts as used in the intercell connection straps.
7. Torque terminal bolts to 165 in/lbs and record below the torque value and the recal date:

Torque wrench number:

Torque value:

Recal Date:

8. Discharge the battery to a new voltage of 105 - (1.81 x # of Cells Jumpered) - new voltage Example:

105 - (1.81 x 1 cell ) = 103.19 VDC 105 - (1.81 x 2 cells) = 101.38 VDC 105 - (1.81 x ) - New Discharge Voltage SECOND PERSON VERIFIER A Second Person Verifier shall verify the "New Discharge Voltage" in step 8 is correct.

Second Person Verifier Date

9. Close 2D51 Disconnect Switch.
10. Restart discharge at the calculated current.

PROCJWORK PLAN NO. PROCEDURENWORK PLAN TITLE: PAGE: 30 of 44 2403.001 UNIT II 2D11 PERFORMANCE TEST ELECTRICAL MAINTENANCE CHANGE: 009-01-0 ATTACHMENT 2 Page 4 of 5

11. Record the restart time (below and on Attachment 3), and battery terminal voltage after the load is applied:

Discharge started at Amps Time restarted:

Overall battery terminal voltage VDC SECOND PERSON VERIFIER A Second Person Verifier shall verify step 11 was correctly completed.

Second Person Verifier Date

12. Read and record in the last column of Data Sheet 1, the discharge battery overall bank voltage and cell voltages in the final moments before the minimum calculated voltage is reached.
13. Stop the test and de-energize the test equipment. Record the Stop Time on Attachment 3, on Data Sheet 1 and below:

Stop Time:m:

14. Open 2D51 disconnect switch.
15. Find the Down Time and old TA from Attachment 3 and use below to figure the New TA:

Old TA - Down Time = /

New TA SECOND PERSON VERIFIER A Second Person Verifier shall verify the "New TA" in step 15 is correct.

Second Person Verifier Date

PROC.IWORK PLAN NO. PROCEDUREJWORK PLAN TITLE: PAGE: 31 of 44 2403.001 UNIT II 2D11 PERFORMANCE TEST ELECTRICAL MAINTENANCE CHANGE: 009-01-0 ATTACHMENT 2 Page 5 of 5

16. IF cells were jumpered due to low voltage, THEN Engineering and the Cognizant Supervisor must be notified and an evaluation made of cell condition prior to re-assembly of battery connections.
17. IF cells were jumpered, THEN restore battery connections as follows:

A. Clean and neutralize the affected connections using baking soda and water.

B. Coat the connections per C&D Manual (TM C 173.0010) and reassemble.

18. IF cells were jumpered, THEN torque the connections to 165 in/lbs and record below the torque value used and the recal date of the torque wrench used.

Torque wrench number:_

Torque value:........

Calibration due date:

19. IF cells were jumpered, THEN micro-ohm the affected connections and record the affected connections on Data Sheet, flagging them as the second "As Left" reading.
20. Mark Steps 8.3.14 through 8.3.19 N/A and proceed with Step 8.3.20 NOTE Responsible Engineer's signature is not needed to continue the work.
21. Responsible Engineer has reviewed data of Attachment 2.

/

Responsible Engineer Date

PROCJWORK PLAN NO. PROCEDURENWORK PLAN TITLE: PAGE: 32 of 44 2403.001 UNIT It 2011 PERFORMANCE TEST ELECTRICAL MAINTENANCE CHANGE: 009-01-0 i

ATTACHMENT 3 CALCULATION FOR TOTAL DOWN TIME

1. Start Time, Stop Time (A) Start Time: (B) Stop Time:

(C) Start Time: (D) Stop Time:

(E) Start Time: (F) Stop Time:

(G) Start Time: (H) Stop Time:

SECOND PERSON VERIFIER A Second Person Verifier shall verify the "Start, Stop" time in step 1 is correct.

Second Person Verifier Date NOTE The Total Down Time Calculation is for the Total Time the test is stopped for jumpering cell(s), broken test equipment etc. The Final Stop Time (last stop time from above) shall not be used in the calculation.

2. Total Down Time Total Down Time (in minutes) = (C - B) + (E - D) + (G - F)

Total Down Time (in minutes) =( _ - )+( - )+( -

SECOND PERSON VERIFIER A Second Person Verifier shall verify the "Start, Stop" time in step 1 is correct.

Second Person Verifier Date

3. Old TA Calculation Old TA = (A) - (Final Stop Time)

Old TA =

1 SECOND PERSON VERIFIER A Second Person Verifier shall verify calculations are correct in step 3.

/

Second Person Verifier Date

PROC.IWORK PLAN NO. PROCEDUREIWORK PLAN TTLE: PAGE: 33 of 44 2403.001 UNIT 11 2011 PERFORMANCE TEST ELECTRICAL MAINTENANCE CHANGE: 009-01-0 DATA SHEET 1 Page 1 of 6 Performance Discharge Test Battery Bank and Cell Voltages Battery Bank 2D11 Start Time I Cell I I 1 1 Hour I 12 Hoursl 13 Hours 14 Hoursl I No. 130 Min.ll Hour 130 Hoursl30 Min.l3 HoursJ30 Min. Hoursl30 Min.1 1, 11 Mi.1 1 I I I I I 1 2 I I _I I I 3 I I I I I 1 41 I

) 1 I I 1 51 I II 1

1 6 1 I lI I I1 I I 71 I 1 1 I II 8 1 I 1 I I II I

I 9 I I I II 1

1 10 1 I I I I

1 II 1 11 1 I I _ I 112 1 1 13 1 =

=II I

1 1 I

I I

I I

I _

I I

1 14 1 I I I I 15 1 I I i 1 1

1 16 1 1 1 I I I 1 17 1 I II 1

1 18 1 I lI I 1 1 19 1 1 I

I 1 20 = I I

I 1 21 i I I I I I 1 22 -

1 I I I I 1 23 1 II I I 1 24 1 I I I 1 25 1 I I I I I

i 26 1 I I I I _ _ _ I 1 27 1 = I I II _ _ _ I 1 28 1 I _ _ _ I 1 29 I I _ _ _ I 1 30 I I I I _ _ _ I 1 31 1 I I 1 32 1 I I I Bank I Voltsl Performed by /

Signature Date

PROCJWORK PLAN NO. PROCEDUREIWORK PLAN TITLE: PAGE: 34 of 44 2403.001 UNIT II 2D11 PERFORMANCE TEST ELECTRICAL MAINTENANCE CHANGE: 009-01-0 DATA SHEET 1 Page 2 of 6 Performance Discharge Test Battery Bank and Cell Voltages Battery Bank 2D11 I Cell I I 1 Hourl 12 Hoursl 13 Hoursl 14 Hoursl I No. 130 Min.I1 HourI30 Min.12 HoursI30 Min.13 HoursI30 Min.i4 HoursI30 Min.1 I 33 I I I i I I I I I I I 34 I I I I I I I I I I I 35 I - I I_ I I I I I I I 36 I I I _ I I I I I _I I 37 IIIIIIIII I 38 I _ I I I I I I I I I I 39 IIIIIIIIII I 40 I I I I I I I I_

I 41 I I I I I _ I I I I I I 42 IIIIIIIIII 443 45 IIIIIIIIII I 46 IIIIIIIII I 47 IIIiIIIIII I 48 IIIIIIIIII I 49 II III I 50 IIIIIIIII I 52 IIIIIIIIII I 53 IIIIIIIIII I 54 IIIIIIIIII I 55 IIIIIIIIII I 56 II IIIIlI I 57 I IIIIIII I 58 IIIIIIIII I Dischl I I I I I I I Rate I I I I I I _ 1 I 1 I(Amps)l II I I I I I I Performed by /

Signature Date Test Equip:_ Cal. Due:

PROCJWORK PLAN NO. PROCEDUREIWORK PLAN TITLE: PAGE: 35 of 44 2403.001 UNIT II 2D11 PERFORMANCE TEST ELECTRICAL MAINTENANCE CHANGE: 009-01-0 DATA SHEET 1 Page 3 of 6 Performance Discharge Test Battery Bank and Cell Voltages Battery Bank 2D1_

I Cell 1 15 Hours I 16 Hoursl 17 Hoursl 18 Hoursl I I No. 15 HoursI30 Min. 16 Hoursl30 Min.l7 HoursI30 Min.18 Hoursl30 Min.l9 Hoursl 1 3 1 1 1 1 1 1 1 1 1 1 4 1 1 1 1 1 1 1 1 1 1 5 4 1 1 _ I _ 1 _ I 1 66 1 1 1 1 1 1 1 1 1 1 77 1 1 1 1 1 1 1 1 1 1 91 1 1 1 1 l I _ I _ I I 10 I I I 13 111 I 1 1 2 1 1 _ _ _ _ 1 _ _ _ _ _ 1 _ _ _ _ _ 1 _ _ _ _ 1 _ _ _ _ _ 1 _ _ _ _ _ 1 _ _ _ _ _ 1 _ 1__

1 1 3 1 _ _ _ _ _ 1 _ _ _ _ 1 _ _ I1___ _ _ _ 1 _ _ _ _ _ 1 _ _ _ _ 1 _ _ _ _ _ 1 _ _ _ _ _ 1 _ _ 1__

18 1 I 19 I 1 1 1 1 1 1 1 1 l 20 1 1 21 1 1 1 1 1_1_1_1_1_1 122 1 1 1_I_ _ _ _ _ _ _ _ _ __I 1 23 1 1 1 1 1 1 1 1 1 1 1 24 11 I 1 26 1 1 1 1 1 1 1 1 1 1 I 27 1 1 1 1 1 1 1 1 1 1 28 1 1 1 1 1 1 1 1_ 1 1 27 1 1 1 1 1 1 1 1 1 1 l 30 1 _ _ _ _ _ _ _ _ _ _ _ _ 1 _ _ 1 _ _ I _ _ _ _ _ _ _ _ _ _ _ _ _ _ I I Bank I I I I I I I I I I I Voltsl I I I I I I Performed by /

Signature Date NOTE Terminal voltage of 105 volts may be reached before a hour or 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> reading can be taken. Indicate the number of minutes past the hour or half hour above the column where the last reading was taken at test completion.

PROC.IWORK PLAN NO. PROCEDUREINORK PLAN TITLE: PAGE: 36 of 44 2403.001 UNIT II 2D11 PERFORMANCE TEST ELECTRICAL MAINTENANCE CHANGE: 009-01-0 DATA SHEET 1 Page 4 of 6 Performance Discharge Test Battery Bank and Cell Voltages Bank Voltage:

Battery Bank 2D11 Start Time:

Stop Time:

I Cell I 15 Hours I 16 Hoursl 17 Hoursl 18 Hoursl I I No. 15 Hoursl30 Min. 16 Hoursl30 Min.17 Hoursl30 Min.18 Hours!30 Min.19 Hoursl 1 31 1 1 1 1 1 1_ 1 _

323 34 1 1 1 1 1 1 1 I 1 35 1 11 1 1 1 1 1 1 I 36 1 1 1 1 1 1 1 1 1 1 37:

1 39 1 1 1 1 1 1 1 1 1 1 40 1 1 1 1 1 1 1 I 41 I _ I _ _ I _ _

1 43 _ 1 1 1 1 1 1 1 I 1 44 1 1 1 I 'I 1 45 11lI I 1 46 1 i 48 1 1 1 i I _ I _ 1 I 1 49 1 1 1 1 1 1 1 1 1 1 1 50 1111111111 51:

I 56 1 1 1 1 I _ _ _ I 1 57 1 1 1 l 1 l I l_ l I _ I I Dischl I I I I I l l I l I Rate I l(AmPs)lI l l I I I I I I Performed by/

Signature Time NOTE Terminal voltage of 105 volts may be reached before an hour or 1i hour reading can be taken. Indicate the number of minutes past the hour or half hour above the column where the last reading was taken at test completion.

PROCJWORK PLAN NO. PROCEDUREIWORK PLAN TITLE: PAGE: 37 of 44 2403.001 UNIT II 2D11 PERFORMANCE TEST ELECTRICAL MAINTENANCE CHANGE: 009-01-0 DATA SHEET 1 Page 5 of 6 Performance Discharge Test Battery Bank and Cell Voltages Bank Voltage:

Battery Bank 2D11 Start Time:

Stop Time:

Cell 19 Hours I 110 Hours I11 Hours I. No. 130 Min. 110 Hours30 Min. 11 HoursI30 Min. 12 I IHours I

I. 1!1 I I. 2 ! I I.

I 1 I I. 3 1 I I _

1 4 I I I. I-5 1 I ________ _ I _I_ _ __ _ _ __ _ __ _

I. 1 6 I I I I

7 I I I- ill 11 I. I- 1 I.

8 9

I 1

I I I- I 1 1

I:

Ig I. 10 I I I _________ _ I _ ___ _ __ ___ ___ _

1 I. 11 1 I I-I _________ _ I _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

I. 12 I I -I- I 1 1 I. 14 13 I I

I I 1 I-I _I I. 15 I I I

I___

I-

-I 1 I. 16 I I I ________ _ I._ _ _ _ _ _ _ _ _ _ _ _ _ _

1 I

I- 17 I____________________

______________ 1 I. 18 I I I- I1 I I. I I I I1.. _ _ __ _ __ _ __ _ _ _

1 I. '19 1 I I- I 1 I- 20 I I I _ _ _ _ _ _ _ _

I._ _ _ _ _ _ _ _ _ _ _ _ _ _

1 I- ______ _ I-_ __ _ _ __ _ __ _ __

21 I I I- 22 I I

______ _ I._ __ _ _ __ _ __ _ __

1 I. 23 I I I-I- 24 I I

______ _ I-_ _ __ _ __ _ __ _ _ _

1 I-I _ _ __ _ __ _ _ __ _ _

25 I I I 26 I I _ _ __ _ __ _ __ _ _ _ 1 I

I- 27 I I

~1t 28 I I 29 I I 30 I I Dischl I Rate I I (Amp~s)

- I I Performed by /

Signature Time NOTE Terminal voltage of 105 volts may be reached before a hour or 1i hour reading can be taken. Indicate the number of minutes past the hour or half hour above the column where the last reading was taken at test completion.

I

PROCAWORK PLAN NO. PROCEDUREJWORK PLAN TITLE: PAGE: 38 of 44 2403.001 UNIT II 2D11 PERFORMANCE TEST ELECTRICAL MAINTENANCE CHANGE: 009-01-0 DATA SHEET 1 Page 6 of 6 Performance Discharge Test Battery Bank and Cell Voltages Bank Voltage:

Battery Bank 2D11 Start Time:

Stop Time:

I Cell 19 Hours I 110 Hours I Ill Hours I I I No. 130 Min. 110 Hours 130 Min. Ill Hours 130 Min. 112 Hours I 31 1111111 I 32 1 1 1 1 1 1 1 1 33 1 1 1 1 1 1 1

-35 1 36 1 1 1 1 1 l I 1 37 1 1 1 1 1 1 1 1 38 1 1 1 i I l I 1 39 1 1 1 1 1 1 1 1 40 1 1 1 1 1 1 1 1 41 1 1 1 1 1 1 1 1 42 1 1 1 1 1 1 1 43 11lIllI 44 111111l 1 45 1 1 1 1 1 1 1 l 46 1 1 1 11 1 1 1 1 47 l = _8_ _

1 1 _ _ _ _ 1 1_ _ _ _ _ 11 _ _ _ _ _

1 _ _ _ 1__

1 1 1_ _ _ _ _ _ _ _ 1__

1 I 49 1 1 1 1 1 1 1 1 50 1 1 1 1 1 1 1 l 51 1 1 1 1 1 1 52 111111l 1 53 1111111 1 54 1 1 1 I l I 1 55 1 1 1 I l l

_ 56 1 1 1 l I l I 1 57 1 1 I l l I 1 58 1 1 1 1 1 l I I Dischl I I I I I I Rate I I l I I I I I(Amps)l I I l l l l Performed by /

Signature Time NOTE Terminal voltage of 105 volts may be reached before a hour or i hour reading can be taken. Indicate the number of minutes past the hour or half hour above the column where the last reading was taken at test completion.

PROCJWORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 39 of 44 2403.001 UNIT II 2D11 PERFORMANCE TEST ELECTRICAL MAINTENANCE CHANGE: 009-01-0 DATA SHEET 2 Page 1 of 6 "AS LEFT" BATTERY BANK 2D11 IBATTERY RACKI RECORD RESISTANCE I IBATTERY RACKI RECORD RESISTANCE I ICELL TO CELLI IN MICRO-OHMS FOR I ICELL TO CELLI IN MICRO-OHMS FOR I I CONNECTIONSI LISTED CONNECTIONS I I CONNECTIONSI LISTED CONNECTIONS I lN1-2Pl I lN2-2P2 1 I 15N1-16P1 15N2-16P21 I 1 - 2 1 1 1 15 - 16 1 1 1 I 2Nl-3P1 2N2-3P2 1 I I 16N1-17P11 16N2-17P21 1 2 - 3 1 1 16 - 17 1 1 I 3Nl-4P1 1 3N2-4P2 1 i I 17Nl-l8Pll 17N2-18P21 3 -4 1 1 1 17 - 18 I I 4Nl-5P1 4N2-5P2 1 1 18NI-19P11 18N2-19P21 1 4 - 5 1 1 1 18 - 19 1 1 I 5N1-6P1 I 5N2-6P2 I I 20N1-21P1I 20N2-21P21 5 - 6 1 1 1 1 20 - 21 1 1 I _ _ _ _ i _ _ _ _ i _ _ _ _ I I 6Nl-7P1 I 6N2-7P2 1 I 21Nl-22P11 21N2-22P21 1 6 - 7 1 1 1 21 - 22 1 1 7Nl-8P1 7N2-8P2 1 I 22N1-23P11 22N2-23P21 I 7 - 8 I 1 22 - 23 1

_ _ _ . _ _ _ _ _ _ I _ _ _ I I I 8Nl-9P1 I 8N2-9P2 1 123Nl-24P11 23N2-24P21 8 - 9 1 1 1 1 23 - 24 1 1 1 I 9Nl-10P11 9N2-lOP21 I I 24N1-25P1I 24N2-25P21 I 9- 10 I 1 1 24 - 25 1 1 1

_ _ I _

I l0Nl-llP1I 10N2-11P21 I I 25Nl-26P1l 25N2-26P21 10 -11 1 1 1 1 25 - 26 1 1 1 I 11NI-12P11 llN2-12P21 1 126Nl-27Pll 26N2-27P21 I 11 - 12 1 1 1 1 26 - 27 1 1 1 1 _ _ I 1, 1 I I 12N1-13P11 12N2-13P21 I i 27Nl-28P11 27N2-28P21 1 12 - 13 1 I I 1 27 - 28 1 1 1 I 1 1, 1 I 13N1-14P11 13N2-14P21 I 28Nl-29P11 28N2-29P21 1 13 - 14 1 1 1 28 - 29 1 1 1 1 _ I _

I 14N1-15P11 14N2-15P21 1 14 - 15 1 1 1

_ _ _ _ _ I _ _ _ _ I _ _ _

PROCJWORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 40 of 44 2403.001 UNIT II 2D11 PERFORMANCE TEST ELECTRICAL MAINTENANCE CHANGE: 009-01-0 DATA SHEET 2 Page 2 of 6 "AS LEFT" BATTERY BANK 2D11 IBATTERY RACKI RECORD RESISTANCE I IBATTERY RACKI RECORD RESISTANCE l ICELL TO CELLI IN MICRO-OHMS FOR I ICELL TO CELLI IN MICRO-OHMS FOR l I CONNECTIONSI LISTED CONNECTIONS I I CONNECTIONSI LISTED CONNECTIONS l I 29Nl-30Pll 29N2-30P21 I I 44N1-45P11 44N2-45P21 l 29 - 30 l l l l 44 - 45 l l l I l 30N1-31P11 30N2-31P21 I I 45Nl-46P1l 45N2-46P21 1 30 - 31 1 l I l 45 - 46 l l l I I 31NI-32P11 31N2-32P21 l 1 46Nl-47Pll 46N2-47P21 l 31 - 32 I 1 46 - 47 I 1 -

l _ _ _ _ l _ _ _ I _ l__ l _ _ _ _ I _ l__ _ _ _ l l 32Nl-33P11 32N2-33P21 l 47N1-48Pll 47N2-48P21 l 32 - 33 l l l I 47 - 48 l I I I _ _ l__ _ _ _ I _ _ _ _ i 1 133Nl-34P11 33N2-34P21 l l 48Nl-49Pll 48N2-49P21 l 33 - 34 l I l 1 48 - 49 l I l 1 134Nl-35P1l 34N2-35P21 l 1 49Nl-50Pll 49N2-50P21 I 34 - 35 l l l 49 - 50 1 l l I _ _ _ _ _ I _ l__ _ _ _ l l _ _ _ _ I _ l__ _ _ _ l I I 35NI-36P1l 35N2-36P21 l I 50N1-51P1I 50N2-51P21 l 35 - 36 l I I l 50 - 51 l I l l l36N1-37P11 36N2-37P21 I I 51Nl-52P1l 51N2-52P21 l 36 - 37 l I l l 51 - 52 l I l _ _ l__ _ _ _ I _ _ _ _ I 1 37Nl-38P11 37N2-38P21 l l 52N1-53P11 52N2-53P21 1 37 - 38 1 l l 1 52 - 53 l I I I l l l l l38Nl-39P1l 38N2-39P21 l l 53Nl-54Pll 53N2-54P21 I 38 - 39 l I l l 53 - 54 l l l I _ _ _ _ _ i _ _ _ _ I _ l__ I I 140N1-41P11 40N2-41P21 l l 54Nl-55P1l 54N2-55P21 l 40 - 41 I 1 l 54 - 55 l l l l _ _ _ _ l _ _ _ _ i _ _ _ _ I l l l l l 41N1-42P1I 41N2-42P21 l 1 55N1-56P11 55N2-56P21 l 41 - 42 l l l l 55 - 56 I l I I I I I l 42Nl-43P1l 42N2-43P21 I I 56Nl-57P11 56N2-57P21 I 42 - 43 I l l 1 56 - 57 l I l I l I I I 43Nl-44P1l 43N2-44P21 l l 57Nl-58P11 57N2-58P21 1 43 - 44 1 l l I 57 - 58 l l l l __ I I I l l I l

PROCJWORK PLAN NO. PROCEDUREINORK PLAN TITLE: PAGE: 41 of 44 2403.001 UNIT 11 2011 PERFORMANCE TEST ELECTRICAL MAINTENANCE CHANGE: 009-01-0 DATA SHEET 2 Page 3 of 6 "AS LEFT" BATTERY BANK 2D11 IBATTERY RACK CELL TO TERMINAL IRECORD RESISTANCE IN I PLATE AND TERMINAL PLATE TO IMICRO OHMS FOR LISTED I ICABLE CONNECTIONS ICONNECTIONS I 1lPI-TERM. PLT. I I

ITERMINAL PLATE TO ICELL # 1 I iP2-TERM. PLT. I I

I TERM. PLT.-LUG#1 1 I

ITERMINAL PLATE TO I TERM. PLT.-LUG#2 I IINCOMING 250 MCM ICABLE LUGS CELL # 1 I I TERM. PLT.-LUG#3 I I

I 19N1-TERM. PLT. I ITERMINAL PLATE TO ICELL # 19 1l9N2-TERM. PLT. I TERM. PLT.-LUG# I I TERM. PLT.-LUG#2 I I TERM. PLT.-LUG#3 I I ITERM. PLT.-LUG#4 I

I I I TERM. PLT.-LUG#5 I I TERM. PLT.-LUG#6 I

PROC.HWORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 42 of 44 2403.001 UNIT II 2D11 PERFORMANCE TEST ELECTRICAL MAINTENANCE CHANGE: 009-01-0 DATA SHEET 2 Page 4 of 6 "AS LEFT" BATTERY BANK 2D11 IBATTERY RACK CELL TO TERMINAL IRECORD RESISTANCE IN I PLATE AND TERMINAL PLATE TO IMICRO OHMS FOR LISTED I ICABLE CONNECTIONS ICONNECTIONS I 20P1-TERM. PLT. I ITERMINAL PLATE TO ICELL # 20 I 20P2-TERM. PLT.

TR P I TERM. PLT.-LUG#1 I ITERM. PLT.-LUG#

I TERM. PLT.-LUG#2 I ITERMINAL PLATE ON CELL # 20 ITO INTERTIER 4/0 CABLE LUGS I TERM. PLT.-LUG#3 I I TERM. PLT.-LUG#5 I I TERN. PLT.-LUG#6 I I 39N1-TERM. PLT. I ITERMINAL PLATE TO ICELL # 39 I 39N2-TERM. PLT. I TERM. PLT.-LUG#1 ITERMINAL PLATE ON CELL # 39 I TERM. PLT.-LUG#2 I ITO INTERTIER 4/0 CABLE LUGS I TERM. PLT.-LUG#3

PROC.IWORK PLAN NO. PROCEDUREIWORK PLAN TITLE: PAGE: 43 of 44 2403.001 UNIT II 2D11 PERFORMANCE TEST ELECTRICAL MAINTENANCE CHANGE: 009-01-0 DATA SHEET 2 Page 5 of 6 "AS LEFT" BATTERY BANK 2D11 IBATTERY RACK CELL TO TERMINAL IRECORD RESISTANCE IN IPLATE AND TERMINAL PLATE TO IMICRO OHMS FOR LISTED ICABLE CONNECTIONS ICONNECTIONS TERM. PLT.-LUG#4 I ITERMINAL PLATE ON CELL # 39 I TERM. PLT.-LUG#5 I ITO INTERTIER 4/0 CABLE LUGS TERM. PLT.-LUG#6 1 4 TI I 4OP1-TERM. PLT.

ITERMINAL PLATE TO ICELL # 40 I 4OP2-TERM. PLT.

l I I TERM. PLT.-LUG#13 I TERM. PLT.-LUG#2 I TERM. PLT.-LUG#3 1 gTERMINAL PLATE ON CELL # 40 ITO INTERTIER 4/0 CABLE LUGS I TERM. PLT.-LUG#46 I TERM. PLT.-LUG#5 I I TERM. PLT.-LUG#6 I 58N1-TERM. PLT. I TERMINAL PLATE TO CELL # 58 I 58N2-TERM. PLT. I

PROCJWORK PLAN NO. PROCEDUREIWORK PLAN TITLE: PAGE: 44 of 44 2403.001 UNIT II 2D11 PERFORMANCE TEST ELECTRICAL MAINTENANCE CHANGE: 009-01-0 DATA SHEET 2 Page 6 of 6 "AS LEFT" BATTERY BANK 2D11 IBATTERY RACK CELL TO TERMINAL IRECORD RESISTANCE IN I IPLATE AND TERMINAL PLATE TO IMICRO OHMS FOR LISTED I ICABLE CONNECTIONS ICONNECTIONS I I TERM. PLT.-LUG#1 l ITERMINAL PLATE TO I TERM. PLT.-LUG#2 l OUTGOING 250 MCM CABLE LUGS CELL # 58 l l I l TERM. PLT.-LUG#3 i COMMENTS:

Test Equip. and Cal. Due. Date: / , I

__ _ _ / , _ _ _ _/ , _ _ _ _/_ _

Performed by: ._...

Date Second Person Verifier:

Date