{{#Wiki_filter:Progress Energy                                                                10 1 CFR   26.7 1(d)
{{#Wiki_filter:10 CFR 26.7 1(d)
F2.1d PO Box 1551 411 Fayetteville Street Mall Raleigh NC 27602 Serial: PE&RAS-08-003 February 27, 2008 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555-0001 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 DOCKET NOS. 50-325 AND 50-324 / LICENSE NOS. DPR-71 AND DPR-62 CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT DOCKET NO. 50-302 / LICENSE NO. DPR-72 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-400 / LICENSE NO. NPF-63 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261 / LICENSE NO. DPR-23 SEMIANNUAL 10 CFR 26 FITNESS FOR DUTY PROGRAM DATA Ladies and Gentlemen:
Progress Energy 1 F2.1d PO Box 1551 411 Fayetteville Street Mall Raleigh NC 27602 Serial: PE&RAS-08-003 February 27, 2008 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555-0001 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 DOCKET NOS. 50-325 AND 50-324 / LICENSE NOS. DPR-71 AND DPR-62 CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT DOCKET NO. 50-302 / LICENSE NO. DPR-72 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-400 / LICENSE NO. NPF-63 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261 / LICENSE NO. DPR-23 SEMIANNUAL 10 CFR 26 FITNESS FOR DUTY PROGRAM DATA Ladies and Gentlemen:
Pursuant to 10 CFR 26.71 (d), enclosed is the semiannual Fitness For Duty (FFD) Program performance data for the above listed plants belonging to Carolina Power & Light Company, now doing business as Progress Energy Carolinas, Inc. (PEC), and Florida Power Corporation, now doing business as Progress Energy Florida, Inc. (PEF).
Pursuant to 10 CFR 26.71 (d), enclosed is the semiannual Fitness For Duty (FFD) Program performance data for the above listed plants belonging to Carolina Power & Light Company, now doing business as Progress Energy Carolinas, Inc. (PEC), and Florida Power Corporation, now doing business as Progress Energy Florida, Inc. (PEF).
The enclosed report provides FFD Program performance data for personnel subject to the requirements of 10 CFR 26, for the period July 1, 2007 through December 31, 2007.
The enclosed report provides FFD Program performance data for personnel subject to the requirements of 10 CFR 26, for the period July 1, 2007 through December 31, 2007.
Line 23: Line 23:
Please contact me at (919) 546-6901 if you need additional information concerning this report.
Please contact me at (919) 546-6901 if you need additional information concerning this report.
Sincere
Sincere
                                                      ) J. *aul Fulford (Iylanager - Performance s-Evaluation & Regulatory Affairs DBM Enclosure c:       V. M. McCree, Regional Administrator - Region II USNRC Resident Inspector - BSEP, Unit Nos. 1 and 2 USNRC Resident Inspector - CR3 USNRC Resident Inspector - SHNPP, Unit No. 1 USNRC Resident Inspector - HBRSEP, Unit No. 2 S. N. Bailey, NRR Project Manager - BSEP, Unit Nos. 1 and 2; CR3 M. G. Vaaler, NRR Project Manager - SHNPP, Unit No. 1; HBRSEP, Unit No. 2 E. S. Finley, Jr. - North Carolina Utilities Commission R. Vance -. North Carolina Utilities Commission S. Watson- North Carolina Utilities Commission02(
) J. *aul Fulford (Iylanager - Performance s-Evaluation & Regulatory Affairs DBM Enclosure c:
V. M. McCree, Regional Administrator - Region II USNRC Resident Inspector - BSEP, Unit Nos. 1 and 2 USNRC Resident Inspector - CR3 USNRC Resident Inspector - SHNPP, Unit No. 1 USNRC Resident Inspector - HBRSEP, Unit No. 2 S. N. Bailey, NRR Project Manager - BSEP, Unit Nos. 1 and 2; CR3 M. G. Vaaler, NRR Project Manager - SHNPP, Unit No. 1; HBRSEP, Unit No. 2 E. S. Finley, Jr. - North Carolina Utilities Commission R. Vance -. North Carolina Utilities Commission S. Watson-North Carolina Utilities Commission02(
B. 0. Hall - North Carolina Department of Environmental and Natural Resources
B. 0. Hall - North Carolina Department of Environmental and Natural Resources


Line 33: Line 34:
==SUMMARY==
==SUMMARY==
DATA AND ANALYSIS
DATA AND ANALYSIS
[Carolina Power &Light Company [Florida Power Corporationi Description                             (Progress Energy Carolinas, Inc.) (Progress Energy Florida, Inc.)J Data Analysis         Brunswick       Harris     Robinson7[             Crystal River Number of Random             29371638 Tests Conducted29371638
[Carolina Power &Light Company [Florida Power Corporationi Description (Progress Energy Carolinas, Inc.)
* Average Population           19             17         7315
(Progress Energy Florida, Inc.)J Data Analysis Brunswick Harris Robinson7[
                      .~Eligible   for Testing SRandom Testing Rate             23%         33%         23%                     25%
Crystal River Number of Random 29371638 Tests Conducted29371638
Number of Random8331 D                                                                     83931 P, E                     Tests Conducted
* Average Population 19 17 7315
: r. Average Population31525 0         .        Eligible for Testing   _______________                        ___________
.~Eligible for Testing SRandom Testing Rate 23%
7ý
33%
:3                     Random Testing Rate                     27%                                   25%
23%
* rj~           Number of Random                         18                                       2
25%
:3               Tests Conducted z Average Population 0           .        Eligible for Testing31806 SH                 Random Testing Rate                       56%                                   50%
Number of Random8331 D
  *Data   for corporate and other support staff are included with site data, as appropriate.
83931 P, E Tests Conducted
: r. Average Population31525 0
Eligible for Testing 7ý
:3 Random Testing Rate 27%
25%
* rj~
Number of Random 18 2
:3 Tests Conducted z Average Population 0
Eligible for Testing31806 SH Random Testing Rate 56%
50%
*Data for corporate and other support staff are included with site data, as appropriate.
Analysis of the data indicates no program weakness requiring management action.
Analysis of the data indicates no program weakness requiring management action.


Line 49: Line 60:
EVENTS REPORTED BY TELEPHONE UNDER 10 CFR 26.73 During this reporting period, no licensed operator or supervisor tested positive, and no significant FFD event report was made.
EVENTS REPORTED BY TELEPHONE UNDER 10 CFR 26.73 During this reporting period, no licensed operator or supervisor tested positive, and no significant FFD event report was made.


United States Nuclear Regulatory Commission Enclosure to Serial: PE&RAS-08-003 Page 3 of 10 FITNESS FOR DUTY PROGRAM PERFORMANCE DATA Personnel Subject to 10 CFR 26 Carolina Power & Light Company, now doing business as Progress Energy Carolinas, Inc., (PEC)                                 December 31, 2007 Company                                       6 Months Ending Brunswick Steam Electric Plant Location Cindy Cunningham                                                         919-546-5360 Contact Name                               Phone (include area code)
United States Nuclear Regulatory Commission Enclosure to Serial: PE&RAS-08-003 Page 3 of 10 FITNESS FOR DUTY PROGRAM PERFORMANCE DATA Personnel Subject to 10 CFR 26 Carolina Power & Light Company, now doing business as Progress Energy Carolinas, Inc., (PEC)
Cutoffs: Screen/Confirmation (ng/ml)             D Appendix A to 10 CFR 26 Marijuana         50/15   Amphetamines             1000/500                       /
December 31, 2007 Company 6 Months Ending Brunswick Steam Electric Plant Location Cindy Cunningham 919-546-5360 Contact Name Phone (include area code)
Cocaine         300/150   Phencyclidine             25/25                         /
Cutoffs: Screen/Confirmation (ng/ml)
Opiates         300/300   Alcohol (% BAC)           0.04%                         /
D Appendix A to 10 CFR 26 Marijuana 50/15 Amphetamines 1000/500  
Long-Term                 Short-Term Testing Results         Licensee Employees       Contractor Personnel   Contractor Personnel Average Number with               852                       N/A                         443 Unescorted Access CATEGORIES             # Tested       # Positive # Tested   # Positive   # Tested         # Positive Pre-Access                 30               0       N/A         N/A         204                 2 For Cause:
/
Post accident             2               0       N/A         N/A           1                 0 Observed behavior         0               0       N/A         N/A           3                 0 Random                     187             0       N/A         N/A         109                 0, Follow-Up                   4               0       N/A         N/A           0                 0 Other                       0               0       N/A         N/A           0                   0 Refusal to Participate     0               0       N/A         N/A           0                   0 Total                     223             0       N/A         N/A         317                 2
Cocaine 300/150 Phencyclidine 25/25  
/
Opiates 300/300 Alcohol (% BAC) 0.04%  
/
Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with 852 N/A 443 Unescorted Access CATEGORIES  
# Tested  
# Positive  
# Tested  
# Positive  
# Tested  
# Positive Pre-Access 30 0
N/A N/A 204 2
For Cause:
Post accident 2
0 N/A N/A 1
0 Observed behavior 0
0 N/A N/A 3
0 Random 187 0
N/A N/A 109 0,
Follow-Up 4
0 N/A N/A 0
0 Other 0
0 N/A N/A 0
0 Refusal to Participate 0
0 N/A N/A 0
0 Total 223 0
N/A N/A 317 2


United States Nuclear Regulatory Commission Enclosure to Serial: PE&RAS-08-003 Page 4 of 10 Breakdown of Confirmed Positive Tests for Specific Substances BRUNSWICK Marijuana (NRCIPEC                   Amphet- Phency-         Refusal CUTOFF) Cocaine Opiates amines   clidine Alcohol to Test Adulteration 2 3 4 5 Licensee Employees             0       0       0       0         0       0       0         0 Long-Term Contracts           0       0       0     0         0       0       0         0 0                                0        0                  A Short-Term Contracts         0/1       1               0         0       0 Total                   10/1         1         0               0       0       0 [,      0       1ITI[III1/ZI]
United States Nuclear Regulatory Commission Enclosure to Serial: PE&RAS-08-003 Page 4 of 10 Breakdown of Confirmed Positive Tests for Specific Substances BRUNSWICK Marijuana (NRCIPEC Amphet-Phency-Refusal CUTOFF)
Cocaine Opiates amines clidine Alcohol to Test Adulteration 2 3 4
5 Licensee Employees 0
0 0
0 0
0 0
0 Long-Term Contracts 0
0 0
0 0
0 0
0 Short-Term Contracts 0/1 1
0 0
0 0
0 0
A Total 10/1 1
0
[,
0 0
0 0
1ITI[III1/ZI]


United States Nuclear Regulatory Commission Enclosure to Serial: PE&RAS-08-003 Page 5 of 10 FITNESS FOR DUTY PROGRAM PERFORMANCE DATA Personnel Subject to 10 CFR 26 Carolina Power & Light Company, now doing business as Progress Energy Carolinas, Inc., (PEC)                                 December 31, 2007 Company                                       6 Months Ending Shearon Harris Nuclear Power Plant Location Cindy Cunningham                                                         919-546-5360 Contact Name                               Phone (include area code)
United States Nuclear Regulatory Commission Enclosure to Serial: PE&RAS-08-003 Page 5 of 10 FITNESS FOR DUTY PROGRAM PERFORMANCE DATA Personnel Subject to 10 CFR 26 Carolina Power & Light Company, now doing business as Progress Energy Carolinas, Inc., (PEC)
Cutoffs: Screen/Confirmation (ng/ml)             -- Appendix A to 10 CFR 26 Marijuana         50/15   Amphetamines             1000/500                       /
December 31, 2007 Company 6 Months Ending Shearon Harris Nuclear Power Plant Location Cindy Cunningham 919-546-5360 Contact Name Phone (include area code)
Cocaine         300/150   Phencyclidine             25/25                         /
Cutoffs: Screen/Confirmation (ng/ml)  
Opiates         300/300   Alcohol (% BAC)           0.04%                         /
-- Appendix A to 10 CFR 26 Marijuana 50/15 Amphetamines 1000/500  
Long-Term                 Short-Term Testing Results         Licensee Employees       Contractor Personnel   Contractor Personnel Average Number with               663                       N/A                         484 Unescorted Access CATEGORIES             # Tested       # Positive # Tested   # Positive   # Tested         # Positive Pre-Access                 39               0       N/A         N/A         805                 7 For Cause:
/
Post accident             1               0       N/A         N/A           2                 0 Observed behavior         0               0       N/A         N/A           3                   0 Random                     246             0       N/A         N/A         132                 1 Follow-Up                   0               0       N/A         N/A           7                 0 Other                       0               0       N/A         N/A           2                 0 Refusal to Participate     0               0       N/A         N/A           0                 0 Total                     286             0       N/A         N/A         951                 8
Cocaine 300/150 Phencyclidine 25/25  
/
Opiates 300/300 Alcohol (% BAC) 0.04%  
/
Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with 663 N/A 484 Unescorted Access CATEGORIES  
# Tested  
# Positive  
# Tested  
# Positive  
# Tested  
# Positive Pre-Access 39 0
N/A N/A 805 7
For Cause:
Post accident 1
0 N/A N/A 2
0 Observed behavior 0
0 N/A N/A 3
0 Random 246 0
N/A N/A 132 1
Follow-Up 0
0 N/A N/A 7
0 Other 0
0 N/A N/A 2
0 Refusal to Participate 0
0 N/A N/A 0
0 Total 286 0
N/A N/A 951 8


United States Nuclear Regulatory Commission Enclosure to Serial: PE&RAS-08-003 Page 6 of 10 Breakdown of Confirmed Positive Tests for Specific Substances HARRIS Marijuana (NRC/PEC                       Amphet- Phency-             Refusal CUTOFF)   Cocaine   Opiates amines clidine     Alcohol to Test   Adulteration 2 3   4 5 Licensee Employees           0         0         0       0       0           0       0           0 Long-Term Contracts           0         0         0       0       0           0       0           0 Short-Term Contracts         1/5         2         0       0       0           0       0           0                 A Total                   1   1/5]       2   [1   0       o       01   0 1           0   1     0       11   1
United States Nuclear Regulatory Commission Enclosure to Serial: PE&RAS-08-003 Page 6 of 10 Breakdown of Confirmed Positive Tests for Specific Substances HARRIS Marijuana (NRC/PEC Amphet-Phency-Refusal CUTOFF)
Cocaine Opiates amines clidine Alcohol to Test Adulteration 2 3 4
5 Licensee Employees 0
0 0
0 0
0 0
0 Long-Term Contracts 0
0 0
0 0
0 0
0 Short-Term Contracts 1/5 2
0 0
0 0
0 0
A Total 1
1/5]
2
[1 0
o 01 0 1 0
1 0
11 1


United States Nuclear Regulatory Commission
United States Nuclear Regulatory Commission
,Enclosure to Serial: PE&RAS-08-003 Page 7 of 10 FITNESS FOR DUTY PROGRAM PERFORMANCE DATA Personnel Subject to 10 CFR 26 Carolina Power & Light Company, now doing business as Progress Energy Carolinas, Inc., (PEC)                               December 31, 2007 Company                                     6 Months Ending H. B. Robinson Steam Electric Plant Location Cindy Cunningham                                                         919-546-5360 Contact Name                               Phone (include area code)
,Enclosure to Serial: PE&RAS-08-003 Page 7 of 10 FITNESS FOR DUTY PROGRAM PERFORMANCE DATA Personnel Subject to 10 CFR 26 Carolina Power & Light Company, now doing business as Progress Energy Carolinas, Inc., (PEC)
Cutoffs: Screen/Confirmation (ng/ml)               ] Appendix A to 10 CFR 26 Marijuana         50/15   Amphetamines             1000/500                       /
December 31, 2007 Company 6 Months Ending H. B. Robinson Steam Electric Plant Location Cindy Cunningham 919-546-5360 Contact Name Phone (include area code)
Cocaine         300/150   Phencyclidine             25/25                         /
Cutoffs: Screen/Confirmation (ng/ml)  
Opiates         300/300   Alcohol (% BAC)           0.04%                         /
] Appendix A to 10 CFR 26 Marijuana 50/15 Amphetamines 1000/500  
Long-Term               Short-Term Testing Results         Licensee Employees       Contractor Personnel   Contractor Personnel Average Number with               500                     N/A                         203 Unescorted Access CATEGORIES             # Tested       # Positive # Tested   -# Positive   # Tested         # Positive Pre-Access                 15             0       N/A         N/A         57                   1 For Cause:
/
Post accident             0               0       N/A         N/A           2                 0 Observed behavior         0             0       N/A         N/A           0                 0 Random                     114             0       N/A         N/A         51                 0 Follow-Up                   0             0       N/A         N/A           0                 0 Other                       0             0       N/A         N/A           0                 0 Refusal to Participate       0             0       N/A         N/A           0                   0 Total                     129             0       N/A         N/A         110                 1
Cocaine 300/150 Phencyclidine 25/25  
/
Opiates 300/300 Alcohol (% BAC) 0.04%  
/
Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with 500 N/A 203 Unescorted Access CATEGORIES  
# Tested  
# Positive  
# Tested  
-# Positive  
# Tested  
# Positive Pre-Access 15 0
N/A N/A 57 1
For Cause:
Post accident 0
0 N/A N/A 2
0 Observed behavior 0
0 N/A N/A 0
0 Random 114 0
N/A N/A 51 0
Follow-Up 0
0 N/A N/A 0
0 Other 0
0 N/A N/A 0
0 Refusal to Participate 0
0 N/A N/A 0
0 Total 129 0
N/A N/A 110 1


United States Nuclear Regulatory Commission Enclosure to Serial: PE&RAS-08-003 Page 8 of 10 Breakdown of Confirmed Positive Tests for Specific Substances ROBINSON Marijuana (NRC/PEC                   Amphet- Phency-           Refusal CUTOFF) Cocaine   Opiates amines clidine   Alcohol to Test Adulteration 2 3 4 5 Licensee Employees           0       0         0     0       0         0       0         0 Long-Term Contracts           0       0         0     0       0         0       0         0 Short-Term Contracts         0       1         0     0       0         0       0         0               A Total                         0       1         0     0       0   [   O       0         0
United States Nuclear Regulatory Commission Enclosure to Serial: PE&RAS-08-003 Page 8 of 10 Breakdown of Confirmed Positive Tests for Specific Substances ROBINSON Marijuana (NRC/PEC Amphet-Phency-Refusal CUTOFF)
Cocaine Opiates amines clidine Alcohol to Test Adulteration 2
3 4
5 Licensee Employees 0
0 0
0 0
0 0
0 Long-Term Contracts 0
0 0
0 0
0 0
0 Short-Term Contracts 0
1 0
0 0
0 0
0 A
Total 0
1 0
0 0
[
O 0
0


United States Nuclear Regulatory Commission Enclosure to Serial: PE&RAS-08-003 Page 9 of 10 FITNESS FOR DUTY PROGRAM PERFORMANCE DATA Personnel Subject to 10 CFR 26 Florida Power Corporation, now doing business as Progress Energy Florida, Inc., (PEF)                                               December 31, 2007 Company                                         6 Months Ending Crystal River Nuclear Plant Location Cindy Cunningham                                                             919-546-5360 Contact Name                                 Phone (include area code)
United States Nuclear Regulatory Commission Enclosure to Serial: PE&RAS-08-003 Page 9 of 10 FITNESS FOR DUTY PROGRAM PERFORMANCE DATA Personnel Subject to 10 CFR 26 Florida Power Corporation, now doing business as Progress Energy Florida, Inc., (PEF)
Cutoffs: Screen/Confirmation (ng/ml)               E   Appendix A to 10 CFR 26 Marijuana         50/15     Amphetamines             1000/500                       /
December 31, 2007 Company 6 Months Ending Crystal River Nuclear Plant Location Cindy Cunningham 919-546-5360 Contact Name Phone (include area code)
Cocaine         300/150     Phencyclidine             25/25                         /
Cutoffs: Screen/Confirmation (ng/ml)
Opiates         300/300     Alcohol (% BAC)           0.04%                         /
E Appendix A to 10 CFR 26 Marijuana 50/15 Amphetamines 1000/500  
Long-Term                 Short-Term Testing Results           Licensee Employees         Contractor Personnel   Contractor Personnel Average Number with                 706                       N/A                         549 Unescorted Access CATEGORIES                 # Tested     # Positive   # Tested   # Positive   # Tested         # Positive Pre-Access                   328             1         N/A         N/A         765                 4 For Cause:
/
Post accident               1             0         N/A         N/A           3                 0 Observed behavior           0               0         N/A         N/A           6                 1 Random                       190             0         N/A         N/A         128                 0 Follow-Up                     5               0         N/A         N/A           14               .0 Other                         0               0         N/A         N/A           0                 0 Refusal to Participate         0             0         N/A         N/A           0                 0 Total                       524             1         N/A         N/A         916                 5
Cocaine 300/150 Phencyclidine 25/25  
/
Opiates 300/300 Alcohol (% BAC) 0.04%  
/
Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with 706 N/A 549 Unescorted Access CATEGORIES  
# Tested  
# Positive  
# Tested  
# Positive  
# Tested  
# Positive Pre-Access 328 1
N/A N/A 765 4
For Cause:
Post accident 1
0 N/A N/A 3
0 Observed behavior 0
0 N/A N/A 6
1 Random 190 0
N/A N/A 128 0
Follow-Up 5
0 N/A N/A 14  
.0 Other 0
0 N/A N/A 0
0 Refusal to Participate 0
0 N/A N/A 0
0 Total 524 1
N/A N/A 916 5


United States Nuclear Regulatory Commission Enclosure to Serial: PE&RAS-08-003 Page 10 of 10 Breakdown of Confirmed Positive Tests for Specific Substances CRYSTAL RIVER Marijuana (NRC/PEF                     Amphet- Phency-         Refusal CUTOFF)   Cocaine   Opiates amines clidine Alcohol to Test Adulteration 2 3 4 5 Licensee Employees           0/1       0       0       0       0       0       0         0 Long-Term Contracts           0         0       0       0       0       0       0         0 Short-Term Contracts         0/3       0       0       0       0       2       0         0               A Total                         0/4       0       0       0       0       2       0         0               2/4}}
United States Nuclear Regulatory Commission Enclosure to Serial: PE&RAS-08-003 Page 10 of 10 Breakdown of Confirmed Positive Tests for Specific Substances CRYSTAL RIVER Marijuana (NRC/PEF Amphet-Phency-Refusal CUTOFF)
Cocaine Opiates amines clidine Alcohol to Test Adulteration 2
3 4
5 Licensee Employees 0/1 0
0 0
0 0
0 0
Long-Term Contracts 0
0 0
0 0
0 0
0 Short-Term Contracts 0/3 0
0 0
0 2
0 0
A Total 0/4 0
0 0
0 2
0 0
2/4}}

Latest revision as of 17:51, 14 January 2025

Progress Energy Semiannual 10 CFR 26 Fitness for Duty Program Performance Data for Period July 1, 2007 Through December 31, 2007
ML080640824
Person / Time
Site: Harris, Brunswick, Crystal River, Robinson  
Issue date: 02/27/2008
From: Fulford J
Progress Energy Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PE&RAS-08-003
Download: ML080640824 (11)


Text

10 CFR 26.7 1(d)

Progress Energy 1 F2.1d PO Box 1551 411 Fayetteville Street Mall Raleigh NC 27602 Serial: PE&RAS-08-003 February 27, 2008 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555-0001 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 DOCKET NOS. 50-325 AND 50-324 / LICENSE NOS. DPR-71 AND DPR-62 CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT DOCKET NO. 50-302 / LICENSE NO. DPR-72 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-400 / LICENSE NO. NPF-63 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261 / LICENSE NO. DPR-23 SEMIANNUAL 10 CFR 26 FITNESS FOR DUTY PROGRAM DATA Ladies and Gentlemen:

Pursuant to 10 CFR 26.71 (d), enclosed is the semiannual Fitness For Duty (FFD) Program performance data for the above listed plants belonging to Carolina Power & Light Company, now doing business as Progress Energy Carolinas, Inc. (PEC), and Florida Power Corporation, now doing business as Progress Energy Florida, Inc. (PEF).

The enclosed report provides FFD Program performance data for personnel subject to the requirements of 10 CFR 26, for the period July 1, 2007 through December 31, 2007.

This document contains no new regulatory commitment.

Please contact me at (919) 546-6901 if you need additional information concerning this report.

Sincere

) J. *aul Fulford (Iylanager - Performance s-Evaluation & Regulatory Affairs DBM Enclosure c:

V. M. McCree, Regional Administrator - Region II USNRC Resident Inspector - BSEP, Unit Nos. 1 and 2 USNRC Resident Inspector - CR3 USNRC Resident Inspector - SHNPP, Unit No. 1 USNRC Resident Inspector - HBRSEP, Unit No. 2 S. N. Bailey, NRR Project Manager - BSEP, Unit Nos. 1 and 2; CR3 M. G. Vaaler, NRR Project Manager - SHNPP, Unit No. 1; HBRSEP, Unit No. 2 E. S. Finley, Jr. - North Carolina Utilities Commission R. Vance -. North Carolina Utilities Commission S. Watson-North Carolina Utilities Commission02(

B. 0. Hall - North Carolina Department of Environmental and Natural Resources

United States Nuclear Regulatory Commission Enclosure to Serial: PE&RAS-08-003 Page 1 of 10 Fitness For Duty Program (July 1, 2007 - December 31, 2007)

PERFORMANCE DATA

United States Nuclear Regulatory Commission Enclosure to Serial: PE&RAS-08-.003 Page 2 of 10

SUMMARY

DATA AND ANALYSIS

[Carolina Power &Light Company [Florida Power Corporationi Description (Progress Energy Carolinas, Inc.)

(Progress Energy Florida, Inc.)J Data Analysis Brunswick Harris Robinson7[

Crystal River Number of Random 29371638 Tests Conducted29371638

  • Average Population 19 17 7315

.~Eligible for Testing SRandom Testing Rate 23%

33%

23%

25%

Number of Random8331 D

83931 P, E Tests Conducted

r. Average Population31525 0

Eligible for Testing 7ý

3 Random Testing Rate 27%

25%

  • rj~

Number of Random 18 2

3 Tests Conducted z Average Population 0

Eligible for Testing31806 SH Random Testing Rate 56%

50%

  • Data for corporate and other support staff are included with site data, as appropriate.

Analysis of the data indicates no program weakness requiring management action.

SUMMARY

OF MANAGEMENT ACTIONS Unescorted access for the individuals with confirmed positive tests was denied or revoked as applicable.

EVENTS REPORTED BY TELEPHONE UNDER 10 CFR 26.73 During this reporting period, no licensed operator or supervisor tested positive, and no significant FFD event report was made.

United States Nuclear Regulatory Commission Enclosure to Serial: PE&RAS-08-003 Page 3 of 10 FITNESS FOR DUTY PROGRAM PERFORMANCE DATA Personnel Subject to 10 CFR 26 Carolina Power & Light Company, now doing business as Progress Energy Carolinas, Inc., (PEC)

December 31, 2007 Company 6 Months Ending Brunswick Steam Electric Plant Location Cindy Cunningham 919-546-5360 Contact Name Phone (include area code)

Cutoffs: Screen/Confirmation (ng/ml)

D Appendix A to 10 CFR 26 Marijuana 50/15 Amphetamines 1000/500

/

Cocaine 300/150 Phencyclidine 25/25

/

Opiates 300/300 Alcohol (% BAC) 0.04%

/

Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with 852 N/A 443 Unescorted Access CATEGORIES

  1. Tested
  1. Positive
  1. Tested
  1. Positive
  1. Tested
  1. Positive Pre-Access 30 0

N/A N/A 204 2

For Cause:

Post accident 2

0 N/A N/A 1

0 Observed behavior 0

0 N/A N/A 3

0 Random 187 0

N/A N/A 109 0,

Follow-Up 4

0 N/A N/A 0

0 Other 0

0 N/A N/A 0

0 Refusal to Participate 0

0 N/A N/A 0

0 Total 223 0

N/A N/A 317 2

United States Nuclear Regulatory Commission Enclosure to Serial: PE&RAS-08-003 Page 4 of 10 Breakdown of Confirmed Positive Tests for Specific Substances BRUNSWICK Marijuana (NRCIPEC Amphet-Phency-Refusal CUTOFF)

Cocaine Opiates amines clidine Alcohol to Test Adulteration 2 3 4

5 Licensee Employees 0

0 0

0 0

0 0

0 Long-Term Contracts 0

0 0

0 0

0 0

0 Short-Term Contracts 0/1 1

0 0

0 0

0 0

A Total 10/1 1

0

[,

0 0

0 0

1ITI[III1/ZI]

United States Nuclear Regulatory Commission Enclosure to Serial: PE&RAS-08-003 Page 5 of 10 FITNESS FOR DUTY PROGRAM PERFORMANCE DATA Personnel Subject to 10 CFR 26 Carolina Power & Light Company, now doing business as Progress Energy Carolinas, Inc., (PEC)

December 31, 2007 Company 6 Months Ending Shearon Harris Nuclear Power Plant Location Cindy Cunningham 919-546-5360 Contact Name Phone (include area code)

Cutoffs: Screen/Confirmation (ng/ml)

-- Appendix A to 10 CFR 26 Marijuana 50/15 Amphetamines 1000/500

/

Cocaine 300/150 Phencyclidine 25/25

/

Opiates 300/300 Alcohol (% BAC) 0.04%

/

Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with 663 N/A 484 Unescorted Access CATEGORIES

  1. Tested
  1. Positive
  1. Tested
  1. Positive
  1. Tested
  1. Positive Pre-Access 39 0

N/A N/A 805 7

For Cause:

Post accident 1

0 N/A N/A 2

0 Observed behavior 0

0 N/A N/A 3

0 Random 246 0

N/A N/A 132 1

Follow-Up 0

0 N/A N/A 7

0 Other 0

0 N/A N/A 2

0 Refusal to Participate 0

0 N/A N/A 0

0 Total 286 0

N/A N/A 951 8

United States Nuclear Regulatory Commission Enclosure to Serial: PE&RAS-08-003 Page 6 of 10 Breakdown of Confirmed Positive Tests for Specific Substances HARRIS Marijuana (NRC/PEC Amphet-Phency-Refusal CUTOFF)

Cocaine Opiates amines clidine Alcohol to Test Adulteration 2 3 4

5 Licensee Employees 0

0 0

0 0

0 0

0 Long-Term Contracts 0

0 0

0 0

0 0

0 Short-Term Contracts 1/5 2

0 0

0 0

0 0

A Total 1

1/5]

2

[1 0

o 01 0 1 0

1 0

11 1

United States Nuclear Regulatory Commission

,Enclosure to Serial: PE&RAS-08-003 Page 7 of 10 FITNESS FOR DUTY PROGRAM PERFORMANCE DATA Personnel Subject to 10 CFR 26 Carolina Power & Light Company, now doing business as Progress Energy Carolinas, Inc., (PEC)

December 31, 2007 Company 6 Months Ending H. B. Robinson Steam Electric Plant Location Cindy Cunningham 919-546-5360 Contact Name Phone (include area code)

Cutoffs: Screen/Confirmation (ng/ml)

] Appendix A to 10 CFR 26 Marijuana 50/15 Amphetamines 1000/500

/

Cocaine 300/150 Phencyclidine 25/25

/

Opiates 300/300 Alcohol (% BAC) 0.04%

/

Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with 500 N/A 203 Unescorted Access CATEGORIES

  1. Tested
  1. Positive
  1. Tested

-# Positive

  1. Tested
  1. Positive Pre-Access 15 0

N/A N/A 57 1

For Cause:

Post accident 0

0 N/A N/A 2

0 Observed behavior 0

0 N/A N/A 0

0 Random 114 0

N/A N/A 51 0

Follow-Up 0

0 N/A N/A 0

0 Other 0

0 N/A N/A 0

0 Refusal to Participate 0

0 N/A N/A 0

0 Total 129 0

N/A N/A 110 1

United States Nuclear Regulatory Commission Enclosure to Serial: PE&RAS-08-003 Page 8 of 10 Breakdown of Confirmed Positive Tests for Specific Substances ROBINSON Marijuana (NRC/PEC Amphet-Phency-Refusal CUTOFF)

Cocaine Opiates amines clidine Alcohol to Test Adulteration 2

3 4

5 Licensee Employees 0

0 0

0 0

0 0

0 Long-Term Contracts 0

0 0

0 0

0 0

0 Short-Term Contracts 0

1 0

0 0

0 0

0 A

Total 0

1 0

0 0

[

O 0

0

United States Nuclear Regulatory Commission Enclosure to Serial: PE&RAS-08-003 Page 9 of 10 FITNESS FOR DUTY PROGRAM PERFORMANCE DATA Personnel Subject to 10 CFR 26 Florida Power Corporation, now doing business as Progress Energy Florida, Inc., (PEF)

December 31, 2007 Company 6 Months Ending Crystal River Nuclear Plant Location Cindy Cunningham 919-546-5360 Contact Name Phone (include area code)

Cutoffs: Screen/Confirmation (ng/ml)

E Appendix A to 10 CFR 26 Marijuana 50/15 Amphetamines 1000/500

/

Cocaine 300/150 Phencyclidine 25/25

/

Opiates 300/300 Alcohol (% BAC) 0.04%

/

Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with 706 N/A 549 Unescorted Access CATEGORIES

  1. Tested
  1. Positive
  1. Tested
  1. Positive
  1. Tested
  1. Positive Pre-Access 328 1

N/A N/A 765 4

For Cause:

Post accident 1

0 N/A N/A 3

0 Observed behavior 0

0 N/A N/A 6

1 Random 190 0

N/A N/A 128 0

Follow-Up 5

0 N/A N/A 14

.0 Other 0

0 N/A N/A 0

0 Refusal to Participate 0

0 N/A N/A 0

0 Total 524 1

N/A N/A 916 5

United States Nuclear Regulatory Commission Enclosure to Serial: PE&RAS-08-003 Page 10 of 10 Breakdown of Confirmed Positive Tests for Specific Substances CRYSTAL RIVER Marijuana (NRC/PEF Amphet-Phency-Refusal CUTOFF)

Cocaine Opiates amines clidine Alcohol to Test Adulteration 2

3 4

5 Licensee Employees 0/1 0

0 0

0 0

0 0

Long-Term Contracts 0

0 0

0 0

0 0

0 Short-Term Contracts 0/3 0

0 0

0 2

0 0

A Total 0/4 0

0 0

0 2

0 0

2/4