10 CFR 26.7 1(d)

Progress Energy 1 F2.1d PO Box 1551 411 Fayetteville Street Mall Raleigh NC 27602 Serial: PE&RAS-08-003 February 27, 2008 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555-0001 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 DOCKET NOS. 50-325 AND 50-324 / LICENSE NOS. DPR-71 AND DPR-62 CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT DOCKET NO. 50-302 / LICENSE NO. DPR-72 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-400 / LICENSE NO. NPF-63 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261 / LICENSE NO. DPR-23 SEMIANNUAL 10 CFR 26 FITNESS FOR DUTY PROGRAM DATA Ladies and Gentlemen:

Pursuant to 10 CFR 26.71 (d), enclosed is the semiannual Fitness For Duty (FFD) Program performance data for the above listed plants belonging to Carolina Power & Light Company, now doing business as Progress Energy Carolinas, Inc. (PEC), and Florida Power Corporation, now doing business as Progress Energy Florida, Inc. (PEF).

The enclosed report provides FFD Program performance data for personnel subject to the requirements of 10 CFR 26, for the period July 1, 2007 through December 31, 2007.

This document contains no new regulatory commitment.

Please contact me at (919) 546-6901 if you need additional information concerning this report.

Sincere

) J. *aul Fulford (Iylanager - Performance s-Evaluation & Regulatory Affairs DBM Enclosure c:

V. M. McCree, Regional Administrator - Region II USNRC Resident Inspector - BSEP, Unit Nos. 1 and 2 USNRC Resident Inspector - CR3 USNRC Resident Inspector - SHNPP, Unit No. 1 USNRC Resident Inspector - HBRSEP, Unit No. 2 S. N. Bailey, NRR Project Manager - BSEP, Unit Nos. 1 and 2; CR3 M. G. Vaaler, NRR Project Manager - SHNPP, Unit No. 1; HBRSEP, Unit No. 2 E. S. Finley, Jr. - North Carolina Utilities Commission R. Vance -. North Carolina Utilities Commission S. Watson-North Carolina Utilities Commission02(

B. 0. Hall - North Carolina Department of Environmental and Natural Resources

United States Nuclear Regulatory Commission Enclosure to Serial: PE&RAS-08-003 Page 1 of 10 Fitness For Duty Program (July 1, 2007 - December 31, 2007)

PERFORMANCE DATA

United States Nuclear Regulatory Commission Enclosure to Serial: PE&RAS-08-.003 Page 2 of 10

SUMMARY

DATA AND ANALYSIS

[Carolina Power &Light Company [Florida Power Corporationi Description (Progress Energy Carolinas, Inc.)

(Progress Energy Florida, Inc.)J Data Analysis Brunswick Harris Robinson7[

Crystal River Number of Random 29371638 Tests Conducted29371638

  • Average Population 19 17 7315

.~Eligible for Testing SRandom Testing Rate 23%

33%

23%

25%

Number of Random8331 D

83931 P, E Tests Conducted

r. Average Population31525 0

Eligible for Testing 7ý

3 Random Testing Rate 27%

25%

  • rj~

Number of Random 18 2

3 Tests Conducted z Average Population 0

Eligible for Testing31806 SH Random Testing Rate 56%

50%

  • Data for corporate and other support staff are included with site data, as appropriate.

Analysis of the data indicates no program weakness requiring management action.

SUMMARY

OF MANAGEMENT ACTIONS Unescorted access for the individuals with confirmed positive tests was denied or revoked as applicable.

EVENTS REPORTED BY TELEPHONE UNDER 10 CFR 26.73 During this reporting period, no licensed operator or supervisor tested positive, and no significant FFD event report was made.

United States Nuclear Regulatory Commission Enclosure to Serial: PE&RAS-08-003 Page 3 of 10 FITNESS FOR DUTY PROGRAM PERFORMANCE DATA Personnel Subject to 10 CFR 26 Carolina Power & Light Company, now doing business as Progress Energy Carolinas, Inc., (PEC)

December 31, 2007 Company 6 Months Ending Brunswick Steam Electric Plant Location Cindy Cunningham 919-546-5360 Contact Name Phone (include area code)

Cutoffs: Screen/Confirmation (ng/ml)

D Appendix A to 10 CFR 26 Marijuana 50/15 Amphetamines 1000/500

/

Cocaine 300/150 Phencyclidine 25/25

/

Opiates 300/300 Alcohol (% BAC) 0.04%

/

Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with 852 N/A 443 Unescorted Access CATEGORIES

  1. Tested
  1. Positive
  1. Tested
  1. Positive
  1. Tested
  1. Positive Pre-Access 30 0

N/A N/A 204 2

For Cause:

Post accident 2

0 N/A N/A 1

0 Observed behavior 0

0 N/A N/A 3

0 Random 187 0

N/A N/A 109 0,

Follow-Up 4

0 N/A N/A 0

0 Other 0

0 N/A N/A 0

0 Refusal to Participate 0

0 N/A N/A 0

0 Total 223 0

N/A N/A 317 2

United States Nuclear Regulatory Commission Enclosure to Serial: PE&RAS-08-003 Page 4 of 10 Breakdown of Confirmed Positive Tests for Specific Substances BRUNSWICK Marijuana (NRCIPEC Amphet-Phency-Refusal CUTOFF)

Cocaine Opiates amines clidine Alcohol to Test Adulteration 2 3 4

5 Licensee Employees 0

0 0

0 0

0 0

0 Long-Term Contracts 0

0 0

0 0

0 0

0 Short-Term Contracts 0/1 1

0 0

0 0

0 0

A Total 10/1 1

0

[,

0 0

0 0

1ITI[III1/ZI]

United States Nuclear Regulatory Commission Enclosure to Serial: PE&RAS-08-003 Page 5 of 10 FITNESS FOR DUTY PROGRAM PERFORMANCE DATA Personnel Subject to 10 CFR 26 Carolina Power & Light Company, now doing business as Progress Energy Carolinas, Inc., (PEC)

December 31, 2007 Company 6 Months Ending Shearon Harris Nuclear Power Plant Location Cindy Cunningham 919-546-5360 Contact Name Phone (include area code)

Cutoffs: Screen/Confirmation (ng/ml)

-- Appendix A to 10 CFR 26 Marijuana 50/15 Amphetamines 1000/500

/

Cocaine 300/150 Phencyclidine 25/25

/

Opiates 300/300 Alcohol (% BAC) 0.04%

/

Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with 663 N/A 484 Unescorted Access CATEGORIES

  1. Tested
  1. Positive
  1. Tested
  1. Positive
  1. Tested
  1. Positive Pre-Access 39 0

N/A N/A 805 7

For Cause:

Post accident 1

0 N/A N/A 2

0 Observed behavior 0

0 N/A N/A 3

0 Random 246 0

N/A N/A 132 1

Follow-Up 0

0 N/A N/A 7

0 Other 0

0 N/A N/A 2

0 Refusal to Participate 0

0 N/A N/A 0

0 Total 286 0

N/A N/A 951 8

United States Nuclear Regulatory Commission Enclosure to Serial: PE&RAS-08-003 Page 6 of 10 Breakdown of Confirmed Positive Tests for Specific Substances HARRIS Marijuana (NRC/PEC Amphet-Phency-Refusal CUTOFF)

Cocaine Opiates amines clidine Alcohol to Test Adulteration 2 3 4

5 Licensee Employees 0

0 0

0 0

0 0

0 Long-Term Contracts 0

0 0

0 0

0 0

0 Short-Term Contracts 1/5 2

0 0

0 0

0 0

A Total 1

1/5]

2

[1 0

o 01 0 1 0

1 0

11 1

United States Nuclear Regulatory Commission

,Enclosure to Serial: PE&RAS-08-003 Page 7 of 10 FITNESS FOR DUTY PROGRAM PERFORMANCE DATA Personnel Subject to 10 CFR 26 Carolina Power & Light Company, now doing business as Progress Energy Carolinas, Inc., (PEC)

December 31, 2007 Company 6 Months Ending H. B. Robinson Steam Electric Plant Location Cindy Cunningham 919-546-5360 Contact Name Phone (include area code)

Cutoffs: Screen/Confirmation (ng/ml)

] Appendix A to 10 CFR 26 Marijuana 50/15 Amphetamines 1000/500

/

Cocaine 300/150 Phencyclidine 25/25

/

Opiates 300/300 Alcohol (% BAC) 0.04%

/

Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with 500 N/A 203 Unescorted Access CATEGORIES

  1. Tested
  1. Positive
  1. Tested

-# Positive

  1. Tested
  1. Positive Pre-Access 15 0

N/A N/A 57 1

For Cause:

Post accident 0

0 N/A N/A 2

0 Observed behavior 0

0 N/A N/A 0

0 Random 114 0

N/A N/A 51 0

Follow-Up 0

0 N/A N/A 0

0 Other 0

0 N/A N/A 0

0 Refusal to Participate 0

0 N/A N/A 0

0 Total 129 0

N/A N/A 110 1

United States Nuclear Regulatory Commission Enclosure to Serial: PE&RAS-08-003 Page 8 of 10 Breakdown of Confirmed Positive Tests for Specific Substances ROBINSON Marijuana (NRC/PEC Amphet-Phency-Refusal CUTOFF)

Cocaine Opiates amines clidine Alcohol to Test Adulteration 2

3 4

5 Licensee Employees 0

0 0

0 0

0 0

0 Long-Term Contracts 0

0 0

0 0

0 0

0 Short-Term Contracts 0

1 0

0 0

0 0

0 A

Total 0

1 0

0 0

[

O 0

0

United States Nuclear Regulatory Commission Enclosure to Serial: PE&RAS-08-003 Page 9 of 10 FITNESS FOR DUTY PROGRAM PERFORMANCE DATA Personnel Subject to 10 CFR 26 Florida Power Corporation, now doing business as Progress Energy Florida, Inc., (PEF)

December 31, 2007 Company 6 Months Ending Crystal River Nuclear Plant Location Cindy Cunningham 919-546-5360 Contact Name Phone (include area code)

Cutoffs: Screen/Confirmation (ng/ml)

E Appendix A to 10 CFR 26 Marijuana 50/15 Amphetamines 1000/500

/

Cocaine 300/150 Phencyclidine 25/25

/

Opiates 300/300 Alcohol (% BAC) 0.04%

/

Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with 706 N/A 549 Unescorted Access CATEGORIES

  1. Tested
  1. Positive
  1. Tested
  1. Positive
  1. Tested
  1. Positive Pre-Access 328 1

N/A N/A 765 4

For Cause:

Post accident 1

0 N/A N/A 3

0 Observed behavior 0

0 N/A N/A 6

1 Random 190 0

N/A N/A 128 0

Follow-Up 5

0 N/A N/A 14

.0 Other 0

0 N/A N/A 0

0 Refusal to Participate 0

0 N/A N/A 0

0 Total 524 1

N/A N/A 916 5

United States Nuclear Regulatory Commission Enclosure to Serial: PE&RAS-08-003 Page 10 of 10 Breakdown of Confirmed Positive Tests for Specific Substances CRYSTAL RIVER Marijuana (NRC/PEF Amphet-Phency-Refusal CUTOFF)

Cocaine Opiates amines clidine Alcohol to Test Adulteration 2

3 4

5 Licensee Employees 0/1 0

0 0

0 0

0 0

Long-Term Contracts 0

0 0

0 0

0 0

0 Short-Term Contracts 0/3 0

0 0

0 2

0 0

A Total 0/4 0

0 0

0 2

0 0

2/4