{{#Wiki_filter:Mike Blevins                         Luminant Power Executive Vice President             P 0 Box 1002
{{#Wiki_filter:Mike Blevins Executive Vice President
                                                                & Chief Nuclear Officer             6322 North FM 56 Mike.Blevins @Luminant.com           Glen Rose, TX 76043 Luminant                                                                                             T 254 897 5209 C 817 559 9085 F 254 897 6652 CP-200801644                                                                               Ref. # 10CFR50.55a(3)(i)
& Chief Nuclear Officer Mike.Blevins @ Luminant.com Luminant Power P 0 Box 1002 6322 North FM 56 Glen Rose, TX 76043 Luminant T 254 897 5209 C 817 559 9085 F 254 897 6652 CP-200801644 Log # TXX-08143 Ref. # 10CFR50.55a(3)(i)
Log # TXX-08143 December 9, 2008 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
December 9, 2008 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555


==SUBJECT:==
==SUBJECT:==
Line 27: Line 27:


==REFERENCES:==
==REFERENCES:==
: 1.       Letter logged TXX-08113 dated September 24, 2008 from Mike Blevins to the NRC, Relief Request No. P -2 for the Unit 1 and Unit 2 Inservice Testing Plan for Pumps and Valves, Second Interval.
: 1.
: 2. Letter dated September 27, 2006 from David Terao of the NRC to Mike Blevins, Relief Request for 10-Year Pump and Valve Inservice Testing Program.
Letter logged TXX-08113 dated September 24, 2008 from Mike Blevins to the NRC, Relief Request No. P -2 for the Unit 1 and Unit 2 Inservice Testing Plan for Pumps and Valves, Second Interval.
: 3. Letter dated November 10, 2008 from Balwant Singal of the NRC to Mike Blevins, Request for Additional Information Regarding Relief Request No. P-2 Associated with Inservice testing Plan for Pumps and Valves.
: 2.
Letter dated September 27, 2006 from David Terao of the NRC to Mike Blevins, Relief Request for 10-Year Pump and Valve Inservice Testing Program.
: 3.
Letter dated November 10, 2008 from Balwant Singal of the NRC to Mike Blevins, Request for Additional Information Regarding Relief Request No. P-2 Associated with Inservice testing Plan for Pumps and Valves.


==Dear Sir or Madam:==
==Dear Sir or Madam:==
Luminant Generation Company LLC (Luminant Power) requested relief from ASME OM Code 1998 Edition, through 2000 Addenda, for the testing of the Safeguards Building Sump Pumps (SBSPs) at Comanche Peak Nuclear Power Plant (CPNPP) via Reference 1 pursuant to 10 CFR 50.55a(3)(i).
Luminant Generation Company LLC (Luminant Power) requested relief from ASME OM Code 1998 Edition, through 2000 Addenda, for the testing of the Safeguards Building Sump Pumps (SBSPs) at Comanche Peak Nuclear Power Plant (CPNPP) via Reference 1 pursuant to 10 CFR 50.55a(3)(i).
Reference 2 granted relief on an interim period of up to two refueling cycles but not to exceed 4 years.
Reference 2 granted relief on an interim period of up to two refueling cycles but not to exceed 4 years.
This interim relief will end in September 2009.
This interim relief will end in September 2009.
Luminant Power has provided the information requested per Reference 3 in the Attachment to this letter.
Luminant Power has provided the information requested per Reference 3 in the Attachment to this letter.
A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway - Comanche Peak . Diablo Canyon
A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway - Comanche Peak. Diablo Canyon
* Palo Verde
* Palo Verde
* San Onofre
* San Onofre
* South Texas Project   Wolf Creek Aco7 AJ24
* South Texas Project Wolf Creek Aco7 AJ24


U. S. Nuclear Regulatory Commission TXX-08143 Page 2 of 2 December 9, 2008 This communication contains no new commitment regarding Comanche Peak Units 1 and 2.
U. S. Nuclear Regulatory Commission TXX-08143 Page 2 of 2 December 9, 2008 This communication contains no new commitment regarding Comanche Peak Units 1 and 2.
Should you have any questions, please contact Mr. Jack Hicks at (254) 897-6725.
Should you have any questions, please contact Mr. Jack Hicks at (254) 897-6725.
Sincerely, Luminant Generation Company LLC Mike Blevins By:             *.*
Sincerely, Luminant Generation Company LLC Mike Blevins By:
AFred W. Madden Director, Oversight & Regulatory Affairs Attachment       Response to Request for Additional Information Enclosure         OPT-518A/B, "Safeguards Building Sump Pumps and Check Valve Test" c-         E. E. Collins, Region IV B. K. Singal, NRR Resident Inspectors, Comanche Peak Brian Welch, ANII, Comanche Peak A. Jones, TDLR y
AFred W. Madden Director, Oversight & Regulatory Affairs Attachment Response to Request for Additional Information Enclosure OPT-518A/B, "Safeguards Building Sump Pumps and Check Valve Test" c -
E. E. Collins, Region IV B. K. Singal, NRR Resident Inspectors, Comanche Peak Brian Welch, ANII, Comanche Peak A. Jones, TDLR y


Attachment to TXX-08143 Page 1 of 2 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION FOR RELIEF REQUEST NO. P-2 FOR THE UNIT 1 AND UNIT 2 INSERVICE TESTING PLAN FOR PUMPS AND VALVES (ASME OM CODE 1998 EDITION, THROUGH 2000 ADDENDA; SECOND INTERVAL START DATE: AUGUST 3,2004)
Attachment to TXX-08143 Page 1 of 2 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION FOR RELIEF REQUEST NO. P-2 FOR THE UNIT 1 AND UNIT 2 INSERVICE TESTING PLAN FOR PUMPS AND VALVES (ASME OM CODE 1998 EDITION, THROUGH 2000 ADDENDA; SECOND INTERVAL START DATE: AUGUST 3,2004)
Line 51: Line 54:
NRC QUESTION The RR states a test can be performed that demonstrates the SBSP can meet its intended safety functions. Please provide a copy of the test procedure that will be used, including acceptance criteria to be utilized, to determine acceptable pump performance.
NRC QUESTION The RR states a test can be performed that demonstrates the SBSP can meet its intended safety functions. Please provide a copy of the test procedure that will be used, including acceptance criteria to be utilized, to determine acceptable pump performance.
LUMINANT POWER RESPONSE Procedures OPT-518A/B, "Safeguards Building Sump Pumps and Check Valve Test" are enclosed. Acceptance criteria are included in the procedures.
LUMINANT POWER RESPONSE Procedures OPT-518A/B, "Safeguards Building Sump Pumps and Check Valve Test" are enclosed. Acceptance criteria are included in the procedures.
: 2.       NRC QUESTION The RR states the SBSP test will require pumping the same quantity of fluid along a repeatable system path, while measuring flow and vibration. Please describe how the flow rate is measured or determined. Also, discuss any system parameters associated with the flow path that will affect the results of the test and how those parameters will be controlled such that repeatability is achieved.
: 2.
NRC QUESTION The RR states the SBSP test will require pumping the same quantity of fluid along a repeatable system path, while measuring flow and vibration. Please describe how the flow rate is measured or determined. Also, discuss any system parameters associated with the flow path that will affect the results of the test and how those parameters will be controlled such that repeatability is achieved.
LUMINANT POWER RESPONSE The flow rate is measured using an ultrasonic portable flow measurement instrument.
LUMINANT POWER RESPONSE The flow rate is measured using an ultrasonic portable flow measurement instrument.
This instrument straps on the outside of the SBSP discharge pipe. System configuration is established in OPT-518A/B assuring that a repeatable system flow path will be utilized each time.
This instrument straps on the outside of the SBSP discharge pipe. System configuration is established in OPT-518A/B assuring that a repeatable system flow path will be utilized each time.
The factors that could potentially affect the repeatability of the test are:
The factors that could potentially affect the repeatability of the test are:
: a. any changes in system resistance, and
: a.
: b. degradation in the in-line check valve.
any changes in system resistance, and
: b.
degradation in the in-line check valve.
These factors are addressed as discussed below:
These factors are addressed as discussed below:
: a. The system resistance changes can be due to different valve line-ups, throttling of flow, or additional flow sources. This is being addressed by ensuring that the valve line-ups are verified and other sump pumps are
: a.
                        .turned off during the performance of the test using procedure OPT-518A/B "Safeguards Building Sump Pumps and Check Valve Test."
The system resistance changes can be due to different valve line-ups, throttling of flow, or additional flow sources. This is being addressed by ensuring that the valve line-ups are verified and other sump pumps are
.turned off during the performance of the test using procedure OPT-518A/B "Safeguards Building Sump Pumps and Check Valve Test."


Attachment to TXX-08143 Page 2 of 2 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION FOR RELIEF REQUEST NO. P-2 FOR THE UNIT 1 AND UNIT 2 INSERVICE TESTING PLAN FOR PUMPS AND VALVES (ASME OM CODE 1998 EDITION, THROUGH 2000 ADDENDA; SECOND INTERVAL START DATE: AUGUST 3,2004)
Attachment to TXX-08143 Page 2 of 2 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION FOR RELIEF REQUEST NO. P-2 FOR THE UNIT 1 AND UNIT 2 INSERVICE TESTING PLAN FOR PUMPS AND VALVES (ASME OM CODE 1998 EDITION, THROUGH 2000 ADDENDA; SECOND INTERVAL START DATE: AUGUST 3,2004)
(TAC NOS. MD9722 AND MD9723)
(TAC NOS. MD9722 AND MD9723)
: b. Degradation in the pump discharge check valve could result in a change in flowrate and affect the repeatability of the test. However, this specific test and flow path are also used to perform open and closed tests of the pump discharge check valves. Therefore, failure to meet the flow requirement or trends of degradation in flow will result in evaluating or repairing the pumps and discharge check valves.
: b.
: 3.       NRC QUESTION The RR states the required SBSP head to pump to the Waste Holdup Tank is greater than the required head to discharge to the Floor Drain Tank, which is the normal lineup. Please discuss the safety-related lineup of the sump pumps and how the discharge head required during testing and normal operation differs from the discharge head required during emergency conditions.
Degradation in the pump discharge check valve could result in a change in flowrate and affect the repeatability of the test. However, this specific test and flow path are also used to perform open and closed tests of the pump discharge check valves. Therefore, failure to meet the flow requirement or trends of degradation in flow will result in evaluating or repairing the pumps and discharge check valves.
: 3.
NRC QUESTION The RR states the required SBSP head to pump to the Waste Holdup Tank is greater than the required head to discharge to the Floor Drain Tank, which is the normal lineup. Please discuss the safety-related lineup of the sump pumps and how the discharge head required during testing and normal operation differs from the discharge head required during emergency conditions.
LUMINANT POWER RESPONSE The design flow for the SBSPs is 50 gpm at no specific head requirement. The' SBSPs are designed with a capacity of 50 gpm due to a flange or mechanical seal passive failure to the ECCS pumps. The SBSPs are designed to deliver to both the waste holdup tank and the floor drain tank. The normal lineup is also the same as the emergency line-up which is discharging to the floor drain tank. However, it is permissible to be aligned to the waste holdup tank during normal operations and realignment is not required during an accident. The path to the waste holdup tank (which is our proposed test path) has a greater system resistance due to the piping configuration. Therefore, testing to the waste holdup tank is a more stringent test to verify the design flowrate of 50 gpm.
LUMINANT POWER RESPONSE The design flow for the SBSPs is 50 gpm at no specific head requirement. The' SBSPs are designed with a capacity of 50 gpm due to a flange or mechanical seal passive failure to the ECCS pumps. The SBSPs are designed to deliver to both the waste holdup tank and the floor drain tank. The normal lineup is also the same as the emergency line-up which is discharging to the floor drain tank. However, it is permissible to be aligned to the waste holdup tank during normal operations and realignment is not required during an accident. The path to the waste holdup tank (which is our proposed test path) has a greater system resistance due to the piping configuration. Therefore, testing to the waste holdup tank is a more stringent test to verify the design flowrate of 50 gpm.


Line 70: Line 79:


COMANCHE PEAK NUCLEAR POWER PLANT UNIT 1 OPERATIONS TESTING MANUAL ELECTRONIC CONTROLLED COPY CHANGES ARE NOT INDICATED LATEST CHANGE NOTICE EFFECTIVE DATE Verify current status in the Document Control Database prior to use.
COMANCHE PEAK NUCLEAR POWER PLANT UNIT 1 OPERATIONS TESTING MANUAL ELECTRONIC CONTROLLED COPY CHANGES ARE NOT INDICATED LATEST CHANGE NOTICE EFFECTIVE DATE Verify current status in the Document Control Database prior to use.
INITIAL & DATE QUALITY RELATED SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE TEST PROCEDURE NO. OPT-518A REVISION NO. 10 EFFECTIVE DATE:         12/02/08   1200 SURVEILLANCE TEST PREPARED BY (Print):         J.D. Stone                                                   Ext: 0564 TECHNICAL REVIEW BY (Print): Tom Nash                                                     Ext: 5513 APPROVED BY: D.W. McGaugqhey for Dave Goodwin                                   Date: 11/19/08 DIRECTOR, OPERATIONS
INITIAL & DATE QUALITY RELATED SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE TEST PROCEDURE NO. OPT-518A REVISION NO. 10 EFFECTIVE DATE:
12/02/08 1200 SURVEILLANCE TEST PREPARED BY (Print):
J.D. Stone TECHNICAL REVIEW BY (Print): Tom Nash Ext: 0564 Ext: 5513 APPROVED BY: D.W. McGaugqhey for Dave Goodwin DIRECTOR, OPERATIONS Date:
11/19/08


CPNPP                                                         PROCEDURE NO.
CPNPP PROCEDURE NO.
OPERATIONS TESTING MANUAL                                     UNIT 1           OPT-518A SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE TEST                                     REVISION NO. 10       PAGE 2 OF 9 1.0   PURPOSE This procedure satisfies ASME testing of Safeguards Building Sump Pumps and valves for requirements of Technical Specification 5.5.8, in part.
OPERATIONS TESTING MANUAL UNIT 1 OPT-518A SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE TEST REVISION NO. 10 PAGE 2 OF 9 1.0 PURPOSE This procedure satisfies ASME testing of Safeguards Building Sump Pumps and valves for requirements of Technical Specification 5.5.8, in part.
Section 8.11: CP1-WPAPSS-01               CP1-WPAPSS-02 1VD-0003                   1VD-0004
Section 8.11:
    -Section 8.2:   CP1-WPAPSS-03               CP1-WPAPSS-04 1VD-0011                   1VD-0012 2.0   ACCEPTANCE AND REVIEW CRITERIA 2.1     Acceptance Criteria 2.1.1 The acceptance criteria are listed on data sheets.
CP1-WPAPSS-01 CP1-WPAPSS-02 1VD-0003 1VD-0004
      .2.2     Review Criteria None 3.0   DEFINITIONS/ACRONYMS None
-Section 8.2:
CP1-WPAPSS-03 CP1-WPAPSS-04 1VD-0011 1VD-0012 2.0 ACCEPTANCE AND REVIEW CRITERIA 2.1 Acceptance Criteria 2.1.1 The acceptance criteria are listed on data sheets.
.2.2 Review Criteria None 3.0 DEFINITIONS/ACRONYMS None


==4.0   REFERENCES==
==4.0 REFERENCES==
4.1 Performance 4.1.1 Technical Specification 5.5.8, "Inservice Testing Program" 4.1.2 RWS-108, "Vents and Drain System" 4.1.3 TSP-507, "Vibration Data Collection" 4.2 Development 4.2.1 FSAR 9.3.3, "Equipment and Floor Drain System" 4.2.2 DBD-ME-236, "Vents and Drains System" 4.2.3 M1-0236, "Flow Diagram - Vents and Drains System Safeguards and Auxiliary Building" 4.2.4 M1-0236-B,."Flow Diagram - Vents and Drains System Safeguards and Auxiliary Building"


4.1    Performance 4.1.1  Technical Specification 5.5.8, "Inservice Testing Program" 4.1.2  RWS-108, "Vents and Drain System" 4.1.3  TSP-507, "Vibration Data Collection" 4.2    Development 4.2.1  FSAR 9.3.3, "Equipment and Floor Drain System" 4.2.2  DBD-ME-236, "Vents and Drains System" 4.2.3  M1-0236, "Flow Diagram - Vents and Drains System Safeguards and Auxiliary Building" 4.2.4  M1-0236-B, ."Flow Diagram - Vents and Drains System Safeguards and Auxiliary Building"
CPNPP PROCEDURE NO.
 
OPERATIONS TESTING MANUAL UNIT 1 OPT-518A SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE TEST REVISION NO. 10 PAGE 3 OF 9 5.0 PRECAUTIONS. LIMITATIONS AND NOTES 5.1 Precautions 5.1.1 Do NOT allow floor drains to overflow during performance of this test.
CPNPP                                                                 PROCEDURE NO.
5.1.2 The sump is a potentially contaminated area.
OPERATIONS TESTING MANUAL                                       UNIT 1                   OPT-518A SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE TEST                                     REVISION NO. 10             PAGE 3 OF 9 5.0 PRECAUTIONS. LIMITATIONS AND NOTES 5.1   Precautions 5.1.1   Do NOT allow floor drains to overflow during performance of this test.
5.2 Limitations None 5.3 Notes 5.3.1 This procedure can be used to satisfy Post Work Testing requirements as long as applicable Precautions, Limitations and Prerequisites are satisfied. IF any section is NOT performed in its entirety, THEN fill in the appropriate spaces on the data sheet and N/A all spaces NOT performed.
5.1.2   The sump is a potentially contaminated area.
5.3.2 Approximately 30 feet of hose will be required for this test (sump fill options are available).
5.2   Limitations None 5.3   Notes 5.3.1   This procedure can be used to satisfy Post Work Testing requirements as long as applicable Precautions, Limitations and Prerequisites are satisfied. IF any section is NOT performed in its entirety, THEN fill in the appropriate spaces on the data sheet and N/A all spaces NOT performed.
5.3.3 Filling the sumps can cause water to backup and possibly overflow from floor drains. The sump Hi-Hi level alarm should be approached carefully to avoid overfilling the sumps.
5.3.2   Approximately 30 feet of hose will be required for this test (sump fill options are available).
5.3.3   Filling the sumps can cause water to backup and possibly overflow from floor drains. The sump Hi-Hi level alarm should be approached carefully to avoid overfilling the sumps.
Previous test performance observations have indicated that the Hi-Hi level alarm actuates at approximately one (1") inch below the grating in the floor drains.
Previous test performance observations have indicated that the Hi-Hi level alarm actuates at approximately one (1") inch below the grating in the floor drains.
5.3.4   On September 27, 2006, the NRC granted interim relief for testing the Safeguard Building Sump Pumps. The interim relief is granted for up to two cycles on each Unit and no more than four years. The purpose of this relief is for CPSES to determine a final solution to this problem. Refer to EVAL-2006-002428-01
5.3.4 On September 27, 2006, the NRC granted interim relief for testing the Safeguard Building Sump Pumps. The interim relief is granted for up to two cycles on each Unit and no more than four years. The purpose of this relief is for CPSES to determine a final solution to this problem. Refer to EVAL-2006-002428-01


CPNPP                                                               PROCEDURE NO.
CPNPP PROCEDURE NO.
OPERATIONS TESTING MANUAL                                       UNIT 1                 OPT-518A SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE TEST                                     REVISION NO. 10             PAGE 4 OF 9 6.0 PREREQUISITES El 6.1   This procedure can be performed on Unit 1 in any MODE.
OPERATIONS TESTING MANUAL UNIT 1 OPT-518A SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE TEST REVISION NO. 10 PAGE 4 OF 9 6.0 PREREQUISITES El 6.1 This procedure can be performed on Unit 1 in any MODE.
LI 6.2   Notify Maintenance to install a portable flowmeter on at least a 5 foot run of pipe near 1VD-0900.
LI 6.2 Notify Maintenance to install a portable flowmeter on at least a 5 foot run of pipe near 1VD-0900.
(located 790' elev., Rm X-179). IF a Panametrics Flow instrument is used, THEN inform Maintenance that previous test performance has indicated that using the "STATISTICS" mode provides a more rapid collection of data.
(located 790' elev., Rm X-179). IF a Panametrics Flow instrument is used, THEN inform Maintenance that previous test performance has indicated that using the "STATISTICS" mode provides a more rapid collection of data.
Line No.:           3-VD-1-007-152R-3 OD:                 3.5 inches Wall Thick:         0.216 inches El 6.3   Two operators are available (one stationed at pump, one stationed upstairs to manipulate breakers).
Line No.:
El 6.4   No operations are in progress that will drain large amounts of water to the Safeguards Building Floor Drain Sumps.
3-VD-1-007-152R-3 OD:
El 6.5   Ensure safeguards sumps are NOT isolated to the rad waste systems.
3.5 inches Wall Thick:
El 6.6   Notify vibration monitoring personnel to be available for vibration monitoring during pump run.
0.216 inches El 6.3 Two operators are available (one stationed at pump, one stationed upstairs to manipulate breakers).
7.0 TEST EQUIPMENT LI 7.1   Portable flow meter with a minimum of +/-2% (or better) of indicated reading accuracy.
El 6.4 No operations are in progress that will drain large amounts of water to the Safeguards Building Floor Drain Sumps.
El 7.2   30' ft. of hose (sump fill options are available).
El 6.5 Ensure safeguards sumps are NOT isolated to the rad waste systems.
LI 7     Vibrometer and transducer meeting the range/accuracy requirements of TSP-507.
El 6.6 Notify vibration monitoring personnel to be available for vibration monitoring during pump run.
7.0 TEST EQUIPMENT LI 7.1 Portable flow meter with a minimum of +/-2% (or better) of indicated reading accuracy.
El 7.2 30' ft. of hose (sump fill options are available).
LI 7
Vibrometer and transducer meeting the range/accuracy requirements of TSP-507.


CPNPP                                                               PROCEDURE NO.
CPNPP PROCEDURE NO.
OPERATIONS TESTING MANUAL                                     UNIT 1                   OPT-518A SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE TEST                                     REVISION NO. 10             PAGE 5 OF 9 8.0 INSTRUCTIONS 8.1   Safeauards Buildina Sumo Pumo 1-01/1-02 and Check Valve Test NOTE:       Record all data on OPT-518A-1.
OPERATIONS TESTING MANUAL UNIT 1 OPT-518A SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE TEST REVISION NO. 10 PAGE 5 OF 9 8.0 INSTRUCTIONS 8.1 Safeauards Buildina Sumo Pumo 1-01/1-02 and Check Valve Test NOTE:
CAUTION:   Do NOT allow sumps to overflow during the performance of this test. Restoration for a sum pump down may require sump pumps to be energized. If this condition occurs prior to test completion the test should be restarted at the last data step ensuring correct lineup per the 17       ~Shift Manager.
Record all data on OPT-518A-1.
8.1.1   Open the breaker for the pumps:
CAUTION:
LI
Do NOT allow sumps to overflow during the performance of this test. Restoration for a sum pump down may require sump pumps to be energized. If this condition occurs prior to test completion the test should be restarted at the last data step ensuring correct lineup per the 17  
* 1EB2-1/9H/BKR, SAFEGUARD BUILDING SUMP 1-01 PUMP 1-02 MOTOR BREAKER LI
~Shift Manager.
* 1EB1-1/8C/BKR, SAFEGUARD BUILDING SUMP 1-02 PUMP 1-03 MOTOR BREAKER LI
8.1.1 Open the breaker for the pumps:
* 1EBI-1/8H/BKR, SAFEGUARD BUILDING SUMP 1-02 PUMP 1-04 MOTOR BREAKER LI
LI 1EB2-1/9H/BKR, SAFEGUARD BUILDING SUMP 1-01 PUMP 1-02 MOTOR BREAKER LI 1EB1-1/8C/BKR, SAFEGUARD BUILDING SUMP 1-02 PUMP 1-03 MOTOR BREAKER LI 1EBI-1/8H/BKR, SAFEGUARD BUILDING SUMP 1-02 PUMP 1-04 MOTOR BREAKER LI XB2-2/4J/BKR, AUXILIARY BUILDING SUMP X-06 PUMP X-1 1 MOTOR BREAKER LI XB2-2/4M/BKR, AUXILIARY BUILDING SUMP X-06 PUMP X-12 MOTOR BREAKER LI XB1-2/2J/BKR, AUXILIARY BUILDING SUMP X-08 PUMP X-15 MOTOR BREAKER LI XB1-2/2M/BKR, AUXILIARY BUILDING SUMP X-08 PUMP X-16 MOTOR BREAKER 8.1.2 Align the Safeguards Bldg Sumps discharge to the Waste Holdup Tank by performing the following:
* XB2-2/4J/BKR, AUXILIARY BUILDING SUMP X-06 PUMP X-1 1 MOTOR BREAKER LI
LI A.
* XB2-2/4M/BKR, AUXILIARY BUILDING SUMP X-06 PUMP X-12 MOTOR BREAKER LI
Obtain Duty Radwaste Supervisor concurrence prior to alternating sump discharge.
* XB1-2/2J/BKR, AUXILIARY BUILDING SUMP X-08 PUMP X-15 MOTOR BREAKER LI
EL B.
* XB1-2/2M/BKR, AUXILIARY BUILDING SUMP X-08 PUMP X-16 MOTOR BREAKER 8.1.2   Align the Safeguards Bldg Sumps discharge to the Waste Holdup Tank by performing the following:
Open 1VD-0030, SFGD BLDG SMP 1-01/1-02 DISCH HDRTOWHTX-01 ISOLVLV, Aux Bldg 790' above 1EB4-1.
LI     A. Obtain Duty Radwaste Supervisor concurrence prior to alternating sump discharge.
LI C. Close 1VD-0027-RO, SFGD BLDG SMP 1-01/1-02 DISCH HDR TO FDT 1 ISOL VLV RMT OPER Sfgd Bldg 790' Trn B ECCS VIv Rm.
EL     B. Open 1VD-0030, SFGD BLDG SMP 1-01/1-02 DISCH HDRTOWHTX-01 ISOLVLV, Aux Bldg 790' above 1EB4-1.
LI 8.1.3 Ensure a water supply for filling Sump 1-01 is available by: using XWP-7414A, LWPS FDT 1 DRN VLV OR by connecting a hose to 1 DD-0346, Ul SFGD BLDG EL 773 DEMIN/RMUW SERV VLV 0346 (located outside RHR Pump Room 1-052) AND routing hose to Safeguards Building Floor Drain Sump 1-01 (hose should be tied down, if possible).
LI     C. Close 1VD-0027-RO, SFGD BLDG SMP 1-01/1-02 DISCH HDR TO FDT 1 ISOL VLV RMT OPER Sfgd Bldg 790' Trn B ECCS VIv Rm.
LI     8.1.3   Ensure a water supply for filling Sump 1-01 is available by: using XWP-7414A, LWPS FDT 1 DRN VLV OR by connecting a hose to 1 DD-0346, Ul SFGD BLDG EL 773 DEMIN/RMUW SERV VLV 0346 (located outside RHR Pump Room 1-052) AND routing hose to Safeguards Building Floor Drain Sump 1-01 (hose should be tied down, if possible).


CPNPP                                                               PROCEDURE NO.
CPNPP PROCEDURE NO.
OPERATIONS TESTING MANUAL                                     UNIT 1                   OPT-518A SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE TEST                                     REVISION NO. 10             PAGE 6 OF 9 NOTE:     0     The next step will establish flow from Sump 1-01 Pump 1-01. Experience indicates that it may take 10-20 seconds for the flow instrument to respond. However, the pump will only run for approximately 50 seconds until low sump level turns the pump off.
OPERATIONS TESTING MANUAL UNIT 1 OPT-518A SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE TEST REVISION NO. 10 PAGE 6 OF 9 NOTE:
0     Indicated flow on portable flow meter of _Ž50 gpm satisfies full open stroke test for check valve 1VD*0003 AND full closed stroke test for check valves 1VD-0004, 1VD-001 1 and 1VD-0012. Sump level does NOT have to be maintained during the next step.
0 The next step will establish flow from Sump 1-01 Pump 1-01. Experience indicates that it may take 10-20 seconds for the flow instrument to respond. However, the pump will only run for approximately 50 seconds until low sump level turns the pump off.
8.1.4 Ensure vibration and flow equipment has been installed and personnel are available to take readings.
0 Indicated flow on portable flow meter of _Ž50 gpm satisfies full open stroke test for check valve 1VD*0003 AND full closed stroke test for check valves 1VD-0004, 1VD-001 1 and 1VD-0012. Sump level does NOT have to be maintained during the next step.
11    8.1.5 Fill Safeguards Building Floor Drain Sump 1-01 until Sump Pump 1-01 STARTS.
11 8.1.4 Ensure vibration and flow equipment has been installed and personnel are available to take readings.
8.1.6 Record the following:
8.1.5 Fill Safeguards Building Floor Drain Sump 1-01 until Sump Pump 1-01 STARTS.
El     "    Indicated flow from the portable flow meter.
8.1.6 Record the following:
El
El El Indicated flow from the portable flow meter.
* Start MH vibration data acquisition approximately 5 to 10 seconds after the pump starts.
Start MH vibration data acquisition approximately 5 to 10 seconds after the pump starts.
El   8.1.7 Record 1VD-0003 full open stroke test results and 1VD-0004, 1VD-0011, 1VD-0012 full closed stroke test results.
El 8.1.7 Record 1VD-0003 full open stroke test results and 1VD-0004, 1VD-0011, 1VD-0012 full closed stroke test results.
8.1.8 Open 1EB2-1/9C/BKR, SAFEGUARD BUILDING SUMP 1-01 PMP 1-01 MOTOR BREAKER.
8.1.8 Open 1EB2-1/9C/BKR, SAFEGUARD BUILDING SUMP 1-01 PMP 1-01 MOTOR BREAKER.
NOTE:     0     The next step will establish flow from Sump 1-01 Pump 1-02. Experience indicates that it may take 10-20 seconds for the flow instrument to respond. However, the pump will only run for approximately 50 seconds until low sump level turns the pump off.
NOTE:
* Indicated flow on portable flow meter _Ž50 gpm satisfies full open stroke test for check valve 1VD-0004 AND full closed stroke test for check valves 1VD-0003, 1VD-001 1 and 1VD-0012. Sump level does NOT have to be maintained during the next step.
0 The next step will establish flow from Sump 1-01 Pump 1-02. Experience indicates that it may take 10-20 seconds for the flow instrument to respond. However, the pump will only run for approximately 50 seconds until low sump level turns the pump off.
LI1   8.1.9 Ensure vibration and flow equipment has been installed and personnel are available to take readings.
Indicated flow on portable flow meter _Ž50 gpm satisfies full open stroke test for check valve 1VD-0004 AND full closed stroke test for check valves 1VD-0003, 1VD-001 1 and 1VD-0012. Sump level does NOT have to be maintained during the next step.
LI1 8.1.9 Ensure vibration and flow equipment has been installed and personnel are available to take readings.
8.1.10 Close 1EB2-1/9H/BKR, SAFEGUARDS BUILDING SUMP 1-01 PUMP 1-02 MOTOR BREAKER.
8.1.10 Close 1EB2-1/9H/BKR, SAFEGUARDS BUILDING SUMP 1-01 PUMP 1-02 MOTOR BREAKER.
8.1.11 Refill Safeguards Building Floor Drain Sump 1-01 until Sump Pump 1-02 STARTS.
8.1.11 Refill Safeguards Building Floor Drain Sump 1-01 until Sump Pump 1-02 STARTS.
8.1.12 Record the following:
8.1.12 Record the following:
EL "        Indicated flow from the portable flow meter.
EL El Indicated flow from the portable flow meter.
El "        Start MH vibration data acquisition approximately 5 to 10 seconds after the pump starts.
Start MH vibration data acquisition approximately 5 to 10 seconds after the pump starts.
8.1.13 Record 1VD-0004 full open stroke test results and 1VD-0003, 1VD-0011, 1VD-0012, full closed stroke test results.
8.1.13 Record 1VD-0004 full open stroke test results and 1VD-0003, 1VD-0011, 1VD-0012, full closed stroke test results.
8.1.14 Proceed to Section 9.0, Restoration and complete the section.
8.1.14 Proceed to Section 9.0, Restoration and complete the section.


CPNPP                                                               PROCEDURE NO.,
CPNPP PROCEDURE NO.,
OPERATIONS TESTING MANUAL                                       UNIT 1                 OPT-518A SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE                                           I TEST                                       REVISION NO. 10           PAGE 7 OF 9 8.2   Safeguards Building Sump Pump 1-03/1-04 and Check Valve Test NOTE:       Record all data on OPT-518A-2.
OPERATIONS TESTING MANUAL UNIT 1 OPT-518A SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE I
CAUTION:     Do NOT allow sumps to overflow during the performance of this test. Restoration for a sump pump down may require sump pumps to be energized. If this condition occurs prior to test completion the test should be restarted at the last data step ensuring correct lineup per the 17         Shift Manager.
TEST REVISION NO. 10 PAGE 7 OF 9 8.2 Safeguards Building Sump Pump 1-03/1-04 and Check Valve Test NOTE:
8.2.1   Open the following breakers:
Record all data on OPT-518A-2.
LI       e* 1EB2-1/9C/BKR, SAFEGUARD BUILDING SUMP 1-01 PUMP 1-01 MOTOR BREAKER Ii
CAUTION:
* 1EB2-1/9H/BKR, SAFEGUARD BUILDING SUMP 1-01 PUMP 1-02 MOTOR BREAKER LI
Do NOT allow sumps to overflow during the performance of this test. Restoration for a sump pump down may require sump pumps to be energized. If this condition occurs prior to test completion the test should be restarted at the last data step ensuring correct lineup per the 17 Shift Manager.
* 1EB1-1/8H/BKR, SAFEGUARD BUILDING SUMP 1-02 PUMP 1-04 MOTOR BREAKER El
8.2.1 Open the following breakers:
* XB2-2/4J/BKR, AUXILIARY BUILDING SUMP X-06 PUMP X-1 1 MOTOR BREAKER LI       0   XB2-2/4M/BKR, AUXILIARY BUILDING SUMP X-06 PUMP X-12 MOTOR BREAKER El
LI e* 1EB2-1/9C/BKR, SAFEGUARD BUILDING SUMP 1-01 PUMP 1-01 MOTOR BREAKER Ii 1EB2-1/9H/BKR, SAFEGUARD BUILDING SUMP 1-01 PUMP 1-02 MOTOR BREAKER LI 1EB1-1/8H/BKR, SAFEGUARD BUILDING SUMP 1-02 PUMP 1-04 MOTOR BREAKER El XB2-2/4J/BKR, AUXILIARY BUILDING SUMP X-06 PUMP X-1 1 MOTOR BREAKER LI 0
* XB1-2/2J/BKR, AUXILIARY BUILDING SUMP X-08 PUMP X-15 MOTOR BREAKER El
XB2-2/4M/BKR, AUXILIARY BUILDING SUMP X-06 PUMP X-12 MOTOR BREAKER El XB1-2/2J/BKR, AUXILIARY BUILDING SUMP X-08 PUMP X-15 MOTOR BREAKER El XB1-2/2M/BKR, AUXILIARY BUILDING SUMP X-08 PUMP X-16 MOTOR BREAKER 8.2.2 Align the Safeguards Bldg Sumps discharge to the Waste Holdup Tank by performing the following:
* XB1-2/2M/BKR, AUXILIARY BUILDING SUMP X-08 PUMP X-16 MOTOR BREAKER 8.2.2   Align the Safeguards Bldg Sumps discharge to the Waste Holdup Tank by performing the following:
EL A.
EL       A. Obtain Duty Radwaste Supervisor concurrence prior to alternating sump discharge.
Obtain Duty Radwaste Supervisor concurrence prior to alternating sump discharge.
EL       B. Open 1VD-0030, SFGD BLDG SMP 1-01/1-02 DISCH HDR TO WHT X-01 ISOL VLV, Aux Bldg 790' above 1 EB4-1.
EL B.
LI   '   C. Close 1VD-0027-RO, SFGD BLDG SMP 1-01/1-02 DISCH HDR TO FDT 1 ISOL VLV RMT OPER Sfgd Bldg 790' Trn B ECCS VIv Rm.
Open 1VD-0030, SFGD BLDG SMP 1-01/1-02 DISCH HDR TO WHT X-01 ISOL VLV, Aux Bldg 790' above 1 EB4-1.
El   8.2.3   Ensure a source of fill water is available for the Sump 1-02 by either connecting a hose to 1DD-0345, U1 SFGD BLDG EL 773 DEMIN/RMUW SERV VLV 0345, AND routing the hose to Safeguards Building Floor Drain Sump 1-02 (the hose should be tied down, if possible)
LI '
C. Close 1VD-0027-RO, SFGD BLDG SMP 1-01/1-02 DISCH HDR TO FDT 1 ISOL VLV RMT OPER Sfgd Bldg 790' Trn B ECCS VIv Rm.
El 8.2.3 Ensure a source of fill water is available for the Sump 1-02 by either connecting a hose to 1DD-0345, U1 SFGD BLDG EL 773 DEMIN/RMUW SERV VLV 0345, AND routing the hose to Safeguards Building Floor Drain Sump 1-02 (the hose should be tied down, if possible)
OR using another source of water as approved by the Unit Supervisor.
OR using another source of water as approved by the Unit Supervisor.


CPNPP                                                               PROCEDURE NO.
CPNPP PROCEDURE NO.
OPERATIONS TESTING MANUAL                                     UNIT 1                   OPT-518A SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE TEST                                     REVISION NO. 10             PAGE 8 OF 9 NOTE:     0     The next step will establish flow from Sump 1-02 Pump 1-03. Experience indicates that it may take 10-20 seconds for the flow instrument to respond. However, the pump will only run for approximately 50 seconds until low sump level turns the pump off.
OPERATIONS TESTING MANUAL UNIT 1 OPT-518A SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE TEST REVISION NO. 10 PAGE 8 OF 9 NOTE:
0     Indicated flow on portable flow meter of >_50 gpm satisfies full open stroke test for check valve 1VD-001 1 AND full closed stroke test for check valves 1VD-0012, 1VD-0003 and 1VD-0004. Sump level does NOT have to be maintained during the next step.
0 The next step will establish flow from Sump 1-02 Pump 1-03. Experience indicates that it may take 10-20 seconds for the flow instrument to respond. However, the pump will only run for approximately 50 seconds until low sump level turns the pump off.
El   8.2.4 Ensure vibration and flow equipment has been installed and personnel are available to take readings.
0 Indicated flow on portable flow meter of >_50 gpm satisfies full open stroke test for check valve 1VD-001 1 AND full closed stroke test for check valves 1VD-0012, 1VD-0003 and 1VD-0004. Sump level does NOT have to be maintained during the next step.
L]   8.2.5 Fill Safeguards Building Floor Drain Sump 1-02 until Sump Pump 1-03 STARTS.
El 8.2.4 Ensure vibration and flow equipment has been installed and personnel are available to take readings.
8.2.6 Record the following:
L]
El
8.2.5 Fill Safeguards Building Floor Drain Sump 1-02 until Sump Pump 1-03 STARTS.
* Indicated flow from the portable flow meter.
8.2.6 Record the following:
El    "    Start MH vibration data acquisition approximately 5 to 10 seconds after the pump starts.
El El Indicated flow from the portable flow meter.
L[J   8.2.7 Record 1VD-001 1 full open stroke test results and 1VD-0012, 1VD-0003, 1VD-0004 full closed stroke test results.
Start MH vibration data acquisition approximately 5 to 10 seconds after the pump starts.
El   8.2.8 Open 1EBI-1/8C/BKR, SAFEGUARD BUILDING SUMP 1-02 PMP 1-03 MOTOR BREAKER.
L[J 8.2.7 Record 1VD-001 1 full open stroke test results and 1VD-0012, 1VD-0003, 1VD-0004 full closed stroke test results.
NOTE:     0     The next step will establish flow from Sump 1-02 Pump 1-04. Experience indicates that it may take 10-20 seconds for the flow instrument to respond. However, the pump will only run for approximately 50 seconds until low sump level turns the pump off.
El 8.2.8 Open 1EBI-1/8C/BKR, SAFEGUARD BUILDING SUMP 1-02 PMP 1-03 MOTOR BREAKER.
0       Indicated flow on portable flow meter of Ž50 gpm satisfies full open stroke test for check valve 1VD-0012 AND full closed stroke test for check valves 1VD-001 1, 1VD-0003 and 1VD-0004. Sump level does NOT have to be maintained during the next step.
NOTE:
EL   8.2.9 Ensure vibration and flow equipment has been installed and personnel are available to take readings.
0 The next step will establish flow from Sump 1-02 Pump 1-04. Experience indicates that it may take 10-20 seconds for the flow instrument to respond. However, the pump will only run for approximately 50 seconds until low sump level turns the pump off.
r-I   8.2.10 Close 1EBI-1/8H/BKR, SAFEGUARD BUILDING SUMP 1-02 PUMP 1-04 MOTOR BREAKER.
0 Indicated flow on portable flow meter of Ž50 gpm satisfies full open stroke test for check valve 1VD-0012 AND full closed stroke test for check valves 1VD-001 1, 1VD-0003 and 1VD-0004. Sump level does NOT have to be maintained during the next step.
LI   8.2.11 Refill Safeguards Building Floor Drain Sump 1-02 until Sump Pump 1-04 STARTS.
EL 8.2.9 Ensure vibration and flow equipment has been installed and personnel are available to take readings.
r-I 8.2.10 Close 1EBI-1/8H/BKR, SAFEGUARD BUILDING SUMP 1-02 PUMP 1-04 MOTOR BREAKER.
LI 8.2.11 Refill Safeguards Building Floor Drain Sump 1-02 until Sump Pump 1-04 STARTS.
8.2.12 Record the following:
8.2.12 Record the following:
F-1 "        Indicated flow from the portable flow meter.
F-1 El Indicated flow from the portable flow meter.
El "        Start MH vibration data acquisition approximately 5 to 10 seconds after the pump starts.
Start MH vibration data acquisition approximately 5 to 10 seconds after the pump starts.
8.2.13 Record 1VD-0012 full open stroke test results and 1VD-0011, 1VD-0003, 1VD-0004 full closed stroke test results.
8.2.13 Record 1VD-0012 full open stroke test results and 1VD-0011, 1VD-0003, 1VD-0004 full closed stroke test results.
IJ   8.2.14 Proceed to Section 9.0, Restoration and complete the section.
IJ 8.2.14 Proceed to Section 9.0, Restoration and complete the section.


CPNPP                                                           PROCEDURE NO.
CPNPP PROCEDURE NO.
OPERATIONS TESTING MANUAL                                 UNIT 1                 OPT-518A SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE TEST                                   REVISION NO. 10           PAGE 9 OF 9 9.0 RESTORATION 9.1   Align the Safeguards Bldg Sumps discharge to the Floor Drain Tank by performing the following:
OPERATIONS TESTING MANUAL UNIT 1 OPT-518A SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE TEST REVISION NO. 10 PAGE 9 OF 9 9.0 RESTORATION 9.1 Align the Safeguards Bldg Sumps discharge to the Floor Drain Tank by performing the following:
r-   A. Obtain Duty Radwaste Supervisor concurrence prior to alternating sump discharge.
r-A.
LI   B. Open 1VD-0027-RO, SFGD BLDG SMP 1-01/1-02 DISCH HDR TO FDT 1 ISOL VLV RMT OPER 0I   C. Close 1VD-0030, SFGD BLDG SMP 1-01/1-02 DISCH HDR TO WHT X-01 ISOL VLV
Obtain Duty Radwaste Supervisor concurrence prior to alternating sump discharge.
[IV] 9.2   Ensure the following breakers are ON:
LI B.
El   a   1EB2-1/9C/BKR, SAFEGUARD BUILDING SUMP 1-01 PUMP 1-01 MOTOR BREAKER EU
Open 1VD-0027-RO, SFGD BLDG SMP 1-01/1-02 DISCH HDR TO FDT 1 ISOL VLV RMT OPER 0I C. Close 1VD-0030, SFGD BLDG SMP 1-01/1-02 DISCH HDR TO WHT X-01 ISOL VLV
* 1EB2-1/9H/BKR, SAFEGUARD BUILDING SUMP 1-01 PUMP 1-02 MOTOR BREAKER EL
[IV]
* 1EB1-1/8C/BKR, SAFEGUARD BUILDING SUMP 1-02 PUMP 1-03 MOTOR BREAKER L-
9.2 Ensure the following breakers are ON:
* 1EB1-1/8H/BKR, SAFEGUARD BUILDING SUMP 1-02 PUMP 1-04 MOTOR BREAKER LI
El a
* XB2-2/4J/BKR, AUXILIARY BUILDING SUMP X-06 PUMP X-1 1 MOTOR BREAKER El e     XB2-2/4M/BKR, AUXILIARY BUILDING SUMP X-06 PUMP X-12 MOTOR BREAKER LI
1EB2-1/9C/BKR, SAFEGUARD BUILDING SUMP 1-01 PUMP 1-01 MOTOR BREAKER EU 1EB2-1/9H/BKR, SAFEGUARD BUILDING SUMP 1-01 PUMP 1-02 MOTOR BREAKER EL 1EB1-1/8C/BKR, SAFEGUARD BUILDING SUMP 1-02 PUMP 1-03 MOTOR BREAKER L-
* XB1-2/2J/BKR, AUXILIARY BUILDING SUMP X-08 PUMP X-15 MOTOR BREAKER LI .     XB1-2/2M/BKR, AUXILIARY BUILDING SUMP X-08 PUMP X-16 MOTOR BREAKER El   9.3   Ensure the valve used to fill the sump is closed AND any hose is removed.
* 1EB1-1/8H/BKR, SAFEGUARD BUILDING SUMP 1-02 PUMP 1-04 MOTOR BREAKER LI XB2-2/4J/BKR, AUXILIARY BUILDING SUMP X-06 PUMP X-1 1 MOTOR BREAKER El e XB2-2/4M/BKR, AUXILIARY BUILDING SUMP X-06 PUMP X-12 MOTOR BREAKER LI XB1-2/2J/BKR, AUXILIARY BUILDING SUMP X-08 PUMP X-15 MOTOR BREAKER LI.
9.4   Ensure the following equipment has been removed:
XB1-2/2M/BKR, AUXILIARY BUILDING SUMP X-08 PUMP X-16 MOTOR BREAKER El 9.3 Ensure the valve used to fill the sump is closed AND any hose is removed.
El   0,   Remove the portable flow meter El   0 Remove vibration equipment 10.0 ATTACHMENTS/FORMS 10.1 Attachments None 10.2 Forms 10.2.1   OPT-518A-1, "SFGD BLDG SMP 01 Check Valve Test Data Sheet" 10.2.2 -OPT-518A-2, "SFGD BLDG SMP 02 Check Valve Test Data Sheet"
9.4 Ensure the following equipment has been removed:
El 0,
Remove the portable flow meter El 0 Remove vibration equipment 10.0 ATTACHMENTS/FORMS 10.1 Attachments None 10.2 Forms 10.2.1 OPT-518A-1, "SFGD BLDG SMP 01 Check Valve Test Data Sheet" 10.2.2 -OPT-518A-2, "SFGD BLDG SMP 02 Check Valve Test Data Sheet"


(For Information Only)                         Record of Changes                                                   Page 1 Rev/PCN       Affected Pages                                       Description of Change 5/1               4       Add instruction to hang test gauge at centerline of pipe (SMF-2003-003683).
(For Information Only)
6/0             ALL       Deleted requirement to place a clearance for pump coupling guard removal (the guards are bolted outside the pump and not near the rotating equipment), added note 5:3.3 that expands on the caution information when approaching the HI-HI Level alarm during sump fill, resequenced steps for initial setup for test since clearance is not required, added step to ensure 1VD-0900 is closed prior to initial pump start and opened after pump start, deleted measurement of hl since the gauge is now hung at the centerline of the pipe and the value is a fixed amount at 15.167 feet, added notification to the Control Room prior to start of sump fill, added operational experience to indicate that flow value on the portable flow instrument takes a little time to stabilize but pump will only run for approximately 50 seconds after start, restoration resequenced since no clearance removal is required, added final position check and IV of for all valves and breakers to the forms.
Record of Changes Page 1 Rev/PCN Affected Pages Description of Change 5/1 4
6/1               2       Changed ASME Section XI to ASME Testing as Section XI. no longer pertains to valves.
Add instruction to hang test gauge at centerline of pipe (SMF-2003-003683).
6/2             2, 4       Minor reword for LCOAR statement. Increase pressure gauge accuracy to comply with changes to the IST plan.
6/0 ALL Deleted requirement to place a clearance for pump coupling guard removal (the guards are bolted outside the pump and not near the rotating equipment), added note 5:3.3 that expands on the caution information when approaching the HI-HI Level alarm during sump fill, resequenced steps for initial setup for test since clearance is not required, added step to ensure 1VD-0900 is closed prior to initial pump start and opened after pump start, deleted measurement of hl since the gauge is now hung at the centerline of the pipe and the value is a fixed amount at 15.167 feet, added notification to the Control Room prior to start of sump fill, added operational experience to indicate that flow value on the portable flow instrument takes a little time to stabilize but pump will only run for approximately 50 seconds after start, restoration resequenced since no clearance removal is required, added final position check and IV of for all valves and breakers to the forms.
7/0               all       This revision changes the procedure purpose. The sump pumps are no longer required to be tested as part of the IST Plan. This procedure only verifies stroke of the check valves. As a result of this change the title of the procedure has also changed.
6/1 2
8/0               all       This revision adds steps to take vibration readings on the Safeguard Building Sump Pumps as part of the interim relief as granted by the NRC per EVAL-2006-002428-01.
Changed ASME Section XI to ASME Testing as Section XI. no longer pertains to valves.
9/0               all       This revision'adds steps to sections 8.1 and 8.2 to align the Safeguard Building Sumps to the Waste Holdup Tank during flow testing. Step added to section 9.0, Restoration to restore the Safeguard Building Sumps to the Floor Drain Tank.
6/2 2, 4 Minor reword for LCOAR statement. Increase pressure gauge accuracy to comply with changes to the IST plan.
9/1       3, 4, 5, 6, 7, 8 Remove reference to a pressure gauge in the Prerequisite section. The pressure gauge is longer required for this test procedure. Only two operators are required for this test since maintenance will read the portable flowmeter. Change step 5.1.1 to not allow floor drains to overflow instead of the sump. Change step 8.1.4, 8.1. 9, 8.2.4 and 8.2.9 to ensure the flow equipment has also been installed.
7/0 all This revision changes the procedure purpose. The sump pumps are no longer required to be tested as part of the IST Plan. This procedure only verifies stroke of the check valves. As a result of this change the title of the procedure has also changed.
9/2             6, 8       This PCN changes the label for all Safeguards Building Sump Pumps vibration points from MOH to MH. This change is a result of EVAL-2006-003019-01. These are small motors with only one location for MH, MV and MA, therefore, MIH and MOH are the same point (MH).
8/0 all This revision adds steps to take vibration readings on the Safeguard Building Sump Pumps as part of the interim relief as granted by the NRC per EVAL-2006-002428-01.
10/0                         Added Auxiliary Building Sump X-06 and X-08 pumps to breaker list per Engineering request. Updated site name.
9/0 all This revision'adds steps to sections 8.1 and 8.2 to align the Safeguard Building Sumps to the Waste Holdup Tank during flow testing. Step added to section 9.0, Restoration to restore the Safeguard Building Sumps to the Floor Drain Tank.
9/1 3, 4, 5, 6, 7, 8 Remove reference to a pressure gauge in the Prerequisite section. The pressure gauge is longer required for this test procedure. Only two operators are required for this test since maintenance will read the portable flowmeter. Change step 5.1.1 to not allow floor drains to overflow instead of the sump. Change step 8.1.4, 8.1. 9, 8.2.4 and 8.2.9 to ensure the flow equipment has also been installed.
9/2 6, 8 This PCN changes the label for all Safeguards Building Sump Pumps vibration points from MOH to MH. This change is a result of EVAL-2006-003019-01. These are small motors with only one location for MH, MV and MA, therefore, MIH and MOH are the same point (MH).
10/0 Added Auxiliary Building Sump X-06 and X-08 pumps to breaker list per Engineering request. Updated site name.


SFGD BLDG SMP 01 CHECK VALVE TEST DATA SHEET STEP                                                OBSERVED   ACCEPTANCE CRITERIA           INITIALS 6.0     PREREQUISITES MET                               N/A                N/A 8.1.6
SFGD BLDG SMP 01 CHECK VALVE TEST DATA SHEET OBSERVED ACCEPTANCE CRITERIA STEP INITIALS 6.0 PREREQUISITES MET 8.1.6 INDICATED FLOW VIBRATION AMPLITUDE TEST REFER MEASURED PARAMETER VALUE VALUE MH 0.105 8.1.7 IVD-0003 FULL OPEN STROKE AND 1VD-0004, 1VD-0011, 1VD-0012 FULL CLOSED STROKE TEST RESULTS 8.1.12 0
* INDICATED FLOW                             GPM          >50 GPM
INDICATED FLOW 0
* VIBRATION AMPLITUDE TEST         REFER       MEASURED           ALERT          ACTION PARAMETER         VALUE         VALUE         LIMIT HIGH    LIMIT HIGH        UNITS MH           0.105                         >0.263        >0.630        IN/SEC PK 8.1.7   IVD-0003 FULL OPEN STROKE AND 1VD-0004, 1VD-0011, 1VD-0012 FULL CLOSED STROKE                           _>50 GPM TEST RESULTS                               SAT/UNSAT        (Step 8.1.6) 8.1.12 0     INDICATED FLOW                             GPM          _>50 GPM 0     VIBRATION AMPLITUDE TEST         REFER       MEASURED           ALERT        ACTION PARAMETER         VALUE         VALUE         LIMIT HIGH    LIMIT HIGH        UNITS MH           0.113                         >0.283        >0.678      IN/SEC PK 8.1.13 1VD-0004 FULL OPEN STROKE AND 1VD-0003, 1VD-0011, 1VD-0012 FULL CLOSED STROKE                         2!50 GPM TEST RESULTS                              SAT/UNSAT         (Step 8.1.12) 9.0     RESTORATION                                             OBSERVED        INITIALS    VERIFIED 9.1     SAFEGUARDS BUILDING SUMPS ALIGNED TO FLOOR DRAIN TANK                                                 N/A                          N/A 9.2     0     1EB2-1/9C/BKR       ON                             ON/OFF
VIBRATION AMPLITUDE TEST REFER MEASURED PARAMETER VALUE VALUE L
* 1EB2-1/9H/BKR       ON                            ON/OFF
MH 0.113 8.1.13 1VD-0004 FULL OPEN STROKE AND 1VD-0003, 1VD-0011, 1VD-0012 FULL CLOSED STROKE TEST RESULTS N/A N/A GPM
* 1EBI-1/8C/BKR       ON                            ON/OFF
>50 GPM ALERT LIMIT HIGH
* 1EBl-1/8H/BKR       ON                             ON/OFF 0     XB2-2/4J/BKR       ON                            ON/OFF 0     XB2-2/4M/BKR       ON                             ON/OFF 0     XB1-2/2J/BKR       ON                            ON/OFF
>0.263 ACTION LIMIT HIGH
* XB1-2/2M/BKR       ON                             ON/OFF OPT-518A-1 Page 1 of 2 R-13
>0.630 UNITS IN/SEC PK SAT/UNSAT GPM
_>50 GPM (Step 8.1.6)
_>50 GPM ALERT IMIT HIGH
>0.283 ACTION LIMIT HIGH
>0.678 UNITS IN/SEC PK SAT/UNSAT 2!50 GPM (Step 8.1.12) 9.0 RESTORATION 9.1 SAFEGUARDS BUILDING SUMPS ALIGNED TO FLOOR DRAIN TANK 9.2 0
1EB2-1/9C/BKR ON 1EB2-1/9H/BKR ON 1EBI-1/8C/BKR ON 1EBl-1/8H/BKR ON 0
XB2-2/4J/BKR ON 0
XB2-2/4M/BKR ON 0
XB1-2/2J/BKR ON XB1-2/2M/BKR ON OBSERVED N/A ON/OFF ON/OFF ON/OFF ON/OFF ON/OFF ON/OFF ON/OFF ON/OFF INITIALS VERIFIED N/A OPT-518A-1 Page 1 of 2 R-13


SFGD BLDG SMP 01 CHECK VALVE TEST DATA SHEET 9.3 FILL VALVES CLOSED WITH ANY FILL HOSE REMOVED                         N/A 9.4
SFGD BLDG SMP 01 CHECK VALVE TEST DATA SHEET 9.3 FILL VALVES CLOSED WITH ANY FILL HOSE REMOVED 9.4 REMOVE THE PORTABLE FLOW METER REMOVE VIBRATION EQUIPMENT COMMENTS/DISCREPANCIES:
* REMOVE THE PORTABLE FLOW METER                                 N/A
N/A N/A N/A CORRECTIVE ACTIONS:
* REMOVE VIBRATION EQUIPMENT                                     N/A COMMENTS/DISCREPANCIES:
PERFORMED BY:
CORRECTIVE ACTIONS:
DATE:
PERFORMED BY:                                                   DATE:
SIGNATURE REVIEWED BY:
SIGNATURE REVIEWED BY:                                                   DATE:
OPERATIONS MANAGEMENT DATE:
OPERATIONS MANAGEMENT OPT-518A-1 Page 2 of 2 R-13
OPT-518A-1 Page 2 of 2 R-13


(For Information Only)                         Record of Changes                                                   Page 1 Rev/PCN       Affected Pages                                     Description of Change 8/0             ALL       Form revised to be consistent with OPT-518A revision. Requirement to place a clearance for pump coupling guard removal (the guards are bolted outside the pump and not near the rotating equipment) has been deleted, hl value is now a fixed value of 15.167 feet, added final position check and IV of for all valves and breakers to the
(For Information Only)
                            *forms.
Record of Changes Page 1 Rev/PCN Affected Pages Description of Change 8/0 ALL Form revised to be consistent with OPT-518A revision. Requirement to place a clearance for pump coupling guard removal (the guards are bolted outside the pump and not near the rotating equipment) has been deleted, hl value is now a fixed value of 15.167 feet, added final position check and IV of for all valves and breakers to the
9/0               all     A revision to OPT-518A changes the procedure purpose. The sump pumps are no longer required to be tested as part of the IST Plan. This procedure only verifies stroke' of the check valves. As a result of this change the title of the procedure, has also changed.
* forms.
10/0             ALL       This revision adds steps to take vibration readings on the Safeguard Building Sump Pumps as part of the interim relief as granted by the NRC per EVAL-2006-002428-01.
9/0 all A revision to OPT-518A changes the procedure purpose. The sump pumps are no longer required to be tested as part of the IST Plan. This procedure only verifies stroke' of the check valves. As a result of this change the title of the procedure, has also changed.
11/0             ALL       This revision removes the pump vibration requirements and add a requirement for MOH.
10/0 ALL This revision adds steps to take vibration readings on the Safeguard Building Sump Pumps as part of the interim relief as granted by the NRC per EVAL-2006-002428-01.
12/0             ALL       This revision provides the baseline vibration data for Safeguard Building Sump Pumps 1-01 and 1-02. Had to renumber sections 8.1 and 8.2 because steps were added to the procedure to align the Safeguard Building Sumps to the Waste Holdup Tank for flow testing. Added step 9.1 to verify that the Safeguards Building Sumps are aligned to the Floor Drain Tank.
11/0 ALL This revision removes the pump vibration requirements and add a requirement for MOH.
12/1               1       This PCN changes the label for all Safeguards Building Sump Pumps vibration points from MOH to MH. This changeis a result of EVAL-2006-003019-01. These are small motors with only one location for MH, MV and MA, therefore, MIH and MOH are the same point (MH).
12/0 ALL This revision provides the baseline vibration data for Safeguard Building Sump Pumps 1-01 and 1-02. Had to renumber sections 8.1 and 8.2 because steps were added to the procedure to align the Safeguard Building Sumps to the Waste Holdup Tank for flow testing. Added step 9.1 to verify that the Safeguards Building Sumps are aligned to the Floor Drain Tank.
13/0                       Added sump X-06 and X-08 breakers to 9.2 to reflect parent procedure changes.
12/1 1
This PCN changes the label for all Safeguards Building Sump Pumps vibration points from MOH to MH. This changeis a result of EVAL-2006-003019-01. These are small motors with only one location for MH, MV and MA, therefore, MIH and MOH are the same point (MH).
13/0 Added sump X-06 and X-08 breakers to 9.2 to reflect parent procedure changes.


SFGD BLDG SMP 02 CHECK VALVE TEST DATA SHEET STEP                                            OBSERVED   ACCEPTANCE CRITERIA         INITIALS 6.0    PREREQUISITE5S MET                           N/A               N/A 8.2.6  e      INDICAT ED FLOW                           GPM         >50 GPM
STEP 6.0 PREREQUISITE5 8.2.6 e
* VIBRATION AMPLITUDE TEST         REFER           MEASURED         ALERT      ACTION PARAMETER         VALUE           VALUE         LIMIT HIGH LIMIT HIGH        UNITS MH                                                                   IN/SEC PK 8.2.7   1VD-001 1 FULL OPEN STROKE AND 1VD-0003, 1VD-0004, 1VD-0012 FULL CLOSED STROKE                       >_50 GPM TEST RESULTS                             SAT/UNSAT          (Step 8.2.6) 8.2.12 9       INDICATED FLOW                           GPM          >_50 GPM
INDICAT SFGD BLDG SMP 02 CHECK VALVE TEST DATA SHEET OBSERVED ACCEPTANCE CRITERIA INITIALS S MET N/A N/A ED FLOW GPM  
* VIBRATION AMPLITUDE TEST         REFER           MEASURED         ALERT      ACTION PARAMETER         VALUE           VALUE         LIMIT HIGH LIMIT HIGH        UNITS MH                                                                   IN/SEC PK 8.2.13 1VD-0012 FULL OPEN STROKE AND 1VD-0003, 1VD-0011, 1VD-0004 FULL CLOSED STROKE                       Ž_50 GPM TEST RESULTS                            SAT/UNSAT        (Step 8.2.12) 9.0     RESTORATION                                           OBSERVED        INITIALS    VERIFIED 9.1     SAFEGUARDS BUILDING SUMPS ALIGNED TO FLOOR DRAIN TANK                                               N/A                        N/A 9.2     0     1EB2-1/9C/BKR       ON                         ON/OFF
>50 GPM VIBRATION AMPLITUDE TEST REFER MEASURED PARAMETER VALUE VALUE MH 8.2.7 1VD-001 1 FULL OPEN STROKE AND 1VD-0003, 1VD-0004, 1VD-0012 FULL CLOSED STROKE TEST RESULTS 8.2.12 9 INDICATED FLOW VIBRATION AMPLITUDE TEST REFER MEASURED PARAMETER VALUE VALUE MH 8.2.13 1VD-0012 FULL OPEN STROKE AND 1VD-0003, 1VD-0011, 1VD-0004 FULL CLOSED STROKE TEST RESULTS ALERT LIMIT HIGH SAT/UNSAT GPM ALERT LIMIT HIGH SAT/UNSAT ACTION LIMIT HIGH UNITS IN/SEC PK
* 1EB2-1/9H/BKR       ON                          ON/OFF
>_50 GPM (Step 8.2.6)
* 1EBI-1/8C/BKR       ON                         ON/OFF
>_50 GPM ACTION LIMIT HIGH UNITS IN/SEC PK
* 1EBI-1/8H/BKR       ON                         ON/OFF
Ž_50 GPM (Step 8.2.12) 9.0 RESTORATION 9.1 SAFEGUARDS BUILDING SUMPS ALIGNED TO FLOOR DRAIN TANK 9.2 0
* XB2-2/4J/BKR       ON                         ON/OFF
1EB2-1/9C/BKR ON 1EB2-1/9H/BKR ON 1EBI-1/8C/BKR ON 1EBI-1/8H/BKR ON XB2-2/4J/BKR ON XB2-2/4M/BKR ON XB1-2/2J/BKR ON XB1-2/2M/BKR ON OBSERVED N/A ON/OFF ON/OFF ON/OFF ON/OFF ON/OFF ON/OFF ON/OFF ON/OFF INITIALS VERIFIED N/A OPT-518A-2 Page 1 of 2 R-12
* XB2-2/4M/BKR       ON                          ON/OFF
* XB1-2/2J/BKR       ON                         ON/OFF
* XB1-2/2M/BKR       ON                           ON/OFF OPT-518A-2 Page 1 of 2 R-12


SFGD BLDG SMP 02 CHECK VALVE TEST DATA SHEET 9.3  FILL VALVES CLOSED WITH ANY FILL HOSE REMOVED                         N/A 9.4
9.3 9.4 SFGD BLDG SMP 02 CHECK VALVE TEST DATA SHEET FILL VALVES CLOSED WITH ANY FILL HOSE REMOVED REMOVE THE PORTABLE FLOW METER REMOVE VIBRATION EQUIPMENT N/A N/A N/A COMMENTS/DISCREPANCIES:
* REMOVE THE PORTABLE FLOW METER                                 N/A
* REMOVE VIBRATION EQUIPMENT                                      N/A COMMENTS/DISCREPANCIES:
CORRECTIVE ACTIONS:
CORRECTIVE ACTIONS:
PERFORMED BY:                                                   DATE:
PERFORMED BY:
SIGNATURE REVIEWED BY:                                                    DATE:
SIGNATURE DATE:
DATE:
REVIEWED BY:
OPERATIONS MANAGEMENT OPT-518A-2 Page 2 of 2 R-12
OPERATIONS MANAGEMENT OPT-518A-2 Page 2 of 2 R-12


(For Information Only)                       Record of Changes                                                 Page 1 Rev/PCN       Affected Pages                                   Description of Chanqe 7/0             ALL     Form revised to be consistent with OPT-518A revision. Requirement to place a clearance for pump coupling guard removal (the guards are bolted outside the pump and not near the rotating equipment) has been deleted, hl value is now a fixed value of 15.167 feet, added final position check and IV of for all valves and breakers to the forms.
(For Information Only)
8/0             ALL     A revision to OPT-518A changes the procedure purpose. The sump pumps are no longer required to be tested as part of the IST Plan. This procedure only verifies stroke of the check valves. As a result of this change the title of the procedure has also changed.
Record of Changes Page 1 Rev/PCN Affected Pages Description of Chanqe 7/0 ALL Form revised to be consistent with OPT-518A revision. Requirement to place a clearance for pump coupling guard removal (the guards are bolted outside the pump and not near the rotating equipment) has been deleted, hl value is now a fixed value of 15.167 feet, added final position check and IV of for all valves and breakers to the forms.
9/0             ALL     This revision adds steps to take vibration readings on the Safeguard Building Sump Pumps as part of the interim relief as granted by the NRC per EVAL-2006-002428-01.
8/0 ALL A revision to OPT-518A changes the procedure purpose. The sump pumps are no longer required to be tested as part of the IST Plan. This procedure only verifies stroke of the check valves. As a result of this change the title of the procedure has also changed.
10/0               all     This revision removes the pump vibration requirements and add a requirement for MOH.
9/0 ALL This revision adds steps to take vibration readings on the Safeguard Building Sump Pumps as part of the interim relief as granted by the NRC per EVAL-2006-002428-01.
11/0             ALL     This revision renumbers sections 8.1 and 8.2 because steps were added to the procedure to align the Safeguard Building Sumps to the Waste Holdup Tank for flow testing. Added step 9.1 to verify that the Safeguards Building Sumps are aligned to the Floor Drain Tank.
10/0 all This revision removes the pump vibration requirements and add a requirement for MOH.
11/1               1     This PCN changes the label for all Safeguards Building Sump Pumps vibration points from MOH to MH. This change is a result of EVAL-2006-003019-01. These are small motors with only one location for MH, MV and MA, therefore, MIH and MOH are the same point (MH).
11/0 ALL This revision renumbers sections 8.1 and 8.2 because steps were added to the procedure to align the Safeguard Building Sumps to the Waste Holdup Tank for flow testing. Added step 9.1 to verify that the Safeguards Building Sumps are aligned to the Floor Drain Tank.
12/0                       Added sump X-06 and X-08 breakers to 9.2 to reflect parent procedure changes.
11/1 1
This PCN changes the label for all Safeguards Building Sump Pumps vibration points from MOH to MH. This change is a result of EVAL-2006-003019-01. These are small motors with only one location for MH, MV and MA, therefore, MIH and MOH are the same point (MH).
12/0 Added sump X-06 and X-08 breakers to 9.2 to reflect parent procedure changes.


COMANCHE PEAK NUCLEAR POWER PLANT UNIT 2 OPERATIONS TESTING MANUAL ELECTRONIC CONTROLLED COPY CHANGES ARE NOT INDICATED LATEST CHANGE NOTICE EFFECTIVEDATE
COMANCHE PEAK NUCLEAR POWER PLANT UNIT 2 OPERATIONS TESTING MANUAL ELECTRONIC CONTROLLED COPY CHANGES ARE NOT INDICATED LATEST CHANGE NOTICE EFFECTIVEDATE
                    /,       Verify current status in the Document Control Database prior to use.
/,
INITIAL & DATE QUALITY RELATED SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE TEST PROCEDURE NO. OPT-518B REVISION NO. 11 EFFECTIVE DATE:       12/02/08 1200 SURVEILLANCE TEST PREPARED BY (Print):         J.D. Stone                                                   Ext: 0564 TECHNICAL REVIEW BY (Print): Tom Nash                                                     Ext: 5513 APPROVED BY: D.W. McGaughey for Dave Goodwin                                 Date: 11/19/08 DIRECTOR, OPERATIONS
Verify current status in the Document Control Database prior to use.
INITIAL & DATE QUALITY RELATED SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE TEST PROCEDURE NO. OPT-518B REVISION NO. 11 EFFECTIVE DATE: 12/02/08 1200 SURVEILLANCE TEST PREPARED BY (Print):
J.D. Stone TECHNICAL REVIEW BY (Print): Tom Nash Ext: 0564 Ext: 5513 APPROVED BY: D.W. McGaughey for Dave Goodwin DIRECTOR, OPERATIONS Date: 11/19/08


CPNPP                                                         PROCEDURE NO.
CPNPP PROCEDURE NO.
OPERATIONS TESTING MANUAL                                     UNIT 2             OPT-518B SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE TEST                                     REVISION NO. 11       PAGE 2 OF 9 1.0 PURPOSE This procedure satisfies ASME testing of Safeguards Building Sump Pumps and valves for requirements of Technical Specification 5.5.8, in part.
OPERATIONS TESTING MANUAL UNIT 2 OPT-518B SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE TEST REVISION NO. 11 PAGE 2 OF 9 1.0 PURPOSE This procedure satisfies ASME testing of Safeguards Building Sump Pumps and valves for requirements of Technical Specification 5.5.8, in part.
Section 8.1:   CP2-WPAPSS-01               CP2-WPAPSS-02 2VD-0003                   2VD-0004 Section 8.2:   CP2-WPAPSS-03               CP2-WPAPSS-04 2VD-0011                   2VD-0012 2.0 ACCEPTANCE AND REVIEW CRITERIA 2.1     Acceptance Criteria 2.1.1 The acceptance criteria are listed on data sheets.
Section 8.1:
2.2     Review Criteria None 3.0 DEFINITIONS/ACRONYMS None
CP2-WPAPSS-01 CP2-WPAPSS-02 2VD-0003 2VD-0004 Section 8.2:
CP2-WPAPSS-03 CP2-WPAPSS-04 2VD-0011 2VD-0012 2.0 ACCEPTANCE AND REVIEW CRITERIA 2.1 Acceptance Criteria 2.1.1 The acceptance criteria are listed on data sheets.
2.2 Review Criteria None 3.0 DEFINITIONS/ACRONYMS None


==4.0 REFERENCES==
==4.0 REFERENCES==
4.1 Performance 4.1.1 Technical Specification 5.5.8, "Inservice Testing Program" 4.1.2 RWS-108, "Vents and Drain System" 4.1.3 TSP-507, "Vibration Data Collection" 4.2 Development 4.2.1 FSAR 9.3.3, "Equipment and Floor Drain System" 4.2.2 DBD-ME-236, "Vents and Drains System" 4.2.3 M2-0236, "Flow Diagram - Vents and Drains System Safeguards and Auxiliary Building" 4.2.4 M2-0236-B, "Flow Diagram - Vents and Drains System Safeguards and Auxiliary Building"


4.1    Performance 4.1.1  Technical Specification 5.5.8, "Inservice Testing Program" 4.1.2  RWS-108, "Vents and Drain System" 4.1.3  TSP-507, "Vibration Data Collection" 4.2    Development 4.2.1  FSAR 9.3.3, "Equipment and Floor Drain System" 4.2.2  DBD-ME-236, "Vents and Drains System" 4.2.3  M2-0236, "Flow Diagram - Vents and Drains System Safeguards and Auxiliary Building" 4.2.4  M2-0236-B, "Flow Diagram - Vents and Drains System Safeguards and Auxiliary Building"
CPNPP PROCEDURE NO.
 
OPERATIONS TESTING MANUAL UNIT 2 OPT-518B SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE TEST REVISION NO. 11 PAGE 3 OF 9 5.0 PRECAUTIONS. LIMITATIONS AND NOTES 5.1 Precautions 5.1.1 Do NOT allow floor drains to overflow during performance of this test.
CPNPP                                                                 PROCEDURE NO.
5.1.2 The sump is a potentially contaminated area.
OPERATIONS TESTING MANUAL                                       UNIT 2                   OPT-518B SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE TEST                                     REVISION NO. 11             PAGE 3 OF 9 5.0 PRECAUTIONS. LIMITATIONS AND NOTES 5.1   Precautions 5.1.1   Do NOT allow floor drains to overflow during performance of this test.
5.2 Limitations None 5.3 Notes 5.3.1 This procedure can be used to satisfy Post Work Testing requirements as long as applicable Precautions, Limitations and Prerequisites are satisfied. IF any section is NOT performed in its entirety, THEN fill in the appropriate spaces on the data sheet and N/A all spaces NOT performed.
5.1.2   The sump is a potentially contaminated area.
5.3.2 Approximately 30 feet of hose will be required for this'test (sump fill options are available).
5.2   Limitations None 5.3   Notes 5.3.1   This procedure can be used to satisfy Post Work Testing requirements as long as applicable Precautions, Limitations and Prerequisites are satisfied. IF any section is NOT performed in its entirety, THEN fill in the appropriate spaces on the data sheet and N/A all spaces NOT performed.
5.3.3 Filling the sumps can cause water to backup and possibly overflow from floor drains. The sump Hi-Hi level alarm should be approached carefully to avoid overfilling the sumps.
5.3.2   Approximately 30 feet of hose will be required for this'test (sump fill options are available).
5.3.3   Filling the sumps can cause water to backup and possibly overflow from floor drains. The sump Hi-Hi level alarm should be approached carefully to avoid overfilling the sumps.
Previous test performance observations have indicated that the Hi-Hi level alarm actuates at approximately one (1") inch below the grating in the floor drains.
Previous test performance observations have indicated that the Hi-Hi level alarm actuates at approximately one (1") inch below the grating in the floor drains.
5.3.4   On September 27, 2006, the NRC granted interim relief for testing the Safeguard Building Sump Pumps. The interim relief is granted for up to two cycles on each Unit and no more than four years. The purpose of this relief is for CPSES to determine a final solution to this problem. Refer to EVAL-2006-002428-01.
5.3.4 On September 27, 2006, the NRC granted interim relief for testing the Safeguard Building Sump Pumps. The interim relief is granted for up to two cycles on each Unit and no more than four years. The purpose of this relief is for CPSES to determine a final solution to this problem. Refer to EVAL-2006-002428-01.


CPNPP                                                               PROCEDURE NO.
CPNPP PROCEDURE NO.
OPERATIONS TESTING MANUAL                                     UNIT 2                   OPT-518B SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE TEST                                     REVISION NO. 11               PAGE 4 OF 9 6.0 PREREQUISITES 6.1   This procedure can be performed on Unit 2 in any MODE.
OPERATIONS TESTING MANUAL UNIT 2 OPT-518B SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE TEST REVISION NO. 11 PAGE 4 OF 9 6.0 PREREQUISITES 6.1 This procedure can be performed on Unit 2 in any MODE.
6.2   Notify Maintenance to install a portable flowmeter on at least a 5 foot run of pipe downstream of XVD-0323. (located 790' elev., Rm X-174). IF a Panametrics Flow instrument is used, THEN inform Maintenance that previous test performance has indicated that using the "STATISTICS" mode provides a more rapid collection of data.
6.2 Notify Maintenance to install a portable flowmeter on at least a 5 foot run of pipe downstream of XVD-0323. (located 790' elev., Rm X-174). IF a Panametrics Flow instrument is used, THEN inform Maintenance that previous test performance has indicated that using the "STATISTICS" mode provides a more rapid collection of data.
Line No.:           3-VD-2-001-152R-5 OD:                 3.5 inches Wall Thick:       0.216 inches El   6.3   Two operators are available (one stationed at pump, one stationed upstairs to manipulate breakers).
Line No.:
El   6.4   No operations are in progress that will drain large amounts of water to the Safeguards Building Floor Drain Sumps.
3-VD-2-001-152R-5 OD:
El   6.5   Ensure safeguards sumps are NOT isolated to the rad waste systems.
3.5 inches Wall Thick:
El   6.6   Notify vibration monitoring personnel to be available for vibration monitoring during pump run.
0.216 inches El 6.3 Two operators are available (one stationed at pump, one stationed upstairs to manipulate breakers).
7.0 TEST EQUIPMENT El   7.1   Portable flow meter with a minimum of +/-2% (or better) of indicated reading accuracy.
El 6.4 No operations are in progress that will drain large amounts of water to the Safeguards Building Floor Drain Sumps.
El   7.2   30' ft. of hose (sump fill options are available).
El 6.5 Ensure safeguards sumps are NOT isolated to the rad waste systems.
S7.3   Vibrometer and transducer meeting the range/accuracy requirements of TSP-507.
El 6.6 Notify vibration monitoring personnel to be available for vibration monitoring during pump run.
7.0 TEST EQUIPMENT El 7.1 Portable flow meter with a minimum of +/-2% (or better) of indicated reading accuracy.
El 7.2 30' ft. of hose (sump fill options are available).
S7.3 Vibrometer and transducer meeting the range/accuracy requirements of TSP-507.


CPNPP                                                               PROCEDURE NO.
CPNPP PROCEDURE NO.
OPERATIONS TESTING MANUAL                                     UNIT 2                   OPT-518B SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE TEST                                     REVISION NO. 11             PAGE 5 OF 9 8.0 INSTRUCTIONS 8.1   Safeauards Buildina SumD Pump 2-01/2-02 and Check Valve Test NOTE:       Record all data on OPT-518B-1.
OPERATIONS TESTING MANUAL UNIT 2 OPT-518B SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE TEST REVISION NO. 11 PAGE 5 OF 9 8.0 INSTRUCTIONS 8.1 Safeauards Buildina SumD Pump 2-01/2-02 and Check Valve Test NOTE:
CAUTION:   Do NOT allow sumps to overflow during the performance of this test. Restoration for a sump pump down may require sump pumps to be energized. If this condition occurs prior to test completion the test should be restarted at the last data step ensuring correct lineup per the Shift Manager.
Record all data on OPT-518B-1.
8.1.1   Open the breaker for the pumps:
CAUTION:
LI
Do NOT allow sumps to overflow during the performance of this test. Restoration for a sump pump down may require sump pumps to be energized. If this condition occurs prior to test completion the test should be restarted at the last data step ensuring correct lineup per the Shift Manager.
* 2EB2-1/9H/BKR, SAFEGUARD BUILDING SUMP 2-01 PUMP 2-02 MOTOR BREAKER LI
8.1.1 Open the breaker for the pumps:
* 2EB1-1/8C/BKR, SAFEGUARD BUILDING SUMP 2-02 PUMP 2-03 MOTOR BREAKER LI
LI 2EB2-1/9H/BKR, SAFEGUARD BUILDING SUMP 2-01 PUMP 2-02 MOTOR BREAKER LI 2EB1-1/8C/BKR, SAFEGUARD BUILDING SUMP 2-02 PUMP 2-03 MOTOR BREAKER LI 2EBI-1/8H/BKR, SAFEGUARD BUILDING SUMP 2-02 PUMP 2-04 MOTOR BREAKER LI XB2-2/4J/BKR, AUXILIARY BUILDING SUMP X-06 PUMP X-1 1 MOTOR BREAKER EL 0
* 2EBI-1/8H/BKR, SAFEGUARD BUILDING SUMP 2-02 PUMP 2-04 MOTOR BREAKER LI
XB2-2/4M/BKR, AUXILIARY BUILDING SUMP X-06 PUMP X-12 MOTOR BREAKER LI XB1-2/2J/BKR, AUXILIARY BUILDING SUMP X-08 PUMP X-15 MOTOR BREAKER LI XB1-2/2M/BKR, AUXILIARY BUILDING SUMP X-08 PUMP X-16 MOTOR BREAKER 8.1.2 Align the Safeguards Bldg Sumps discharge to the Waste Holdup Tank by performing the following:
* XB2-2/4J/BKR, AUXILIARY BUILDING SUMP X-06 PUMP X-1 1 MOTOR BREAKER EL     0   XB2-2/4M/BKR, AUXILIARY BUILDING SUMP X-06 PUMP X-12 MOTOR BREAKER LI
LI A. Obtain Duty Radwaste Supervisor concurrence prior to alternating sump discharge.
* XB1-2/2J/BKR, AUXILIARY BUILDING SUMP X-08 PUMP X-15 MOTOR BREAKER LI
L B. Open 2VD-0030, SFGD BLDG SMP 2-01/2-02 DISCH HDR TO WHT X-01 ISOL VLV, U2 SFGD BLDG 790' TRN B ECCS VLV RM.
* XB1-2/2M/BKR, AUXILIARY BUILDING SUMP X-08 PUMP X-16 MOTOR BREAKER 8.1.2   Align the Safeguards Bldg Sumps discharge to the Waste Holdup Tank by performing the following:
EL C. Close 2VD-0027-RO, SFGD BLDG SMP 2-01/2-02 DISCH HDR TO FDT 2 ISOL VLV RMT OPER, U2 SFGD BLDG 800' TRN B ECCS VLV OPERATING ROOM.
LI     A. Obtain Duty Radwaste Supervisor concurrence prior to alternating sump discharge.
EL D. Verify Open XVD-0323, U2 SFGD BLDG FLR DRN HDR TO WHT X-01 ISOL VLV, AB 790' Boron Recycle Panel Area.
L       B. Open 2VD-0030, SFGD BLDG SMP 2-01/2-02 DISCH HDR TO WHT X-01 ISOL VLV, U2 SFGD BLDG 790' TRN B ECCS VLV RM.
rI 8.1.3 Ensure a water supply for filling Sump 2-01 is available by: using XWP-7414B, LWPS FDT 2 DRN VLV OR by connecting a hose to 2DD-0346, U2 SFGD BLDG EL 773 DEMIN/RMUW SERV VLV 0346 (located outside RHR Pump Room 2-052) AND routing hose to Safeguards Building Floor Drain Sump 2-01 (hose should be tied down, if possible).
EL     C. Close 2VD-0027-RO, SFGD BLDG SMP 2-01/2-02 DISCH HDR TO FDT 2 ISOL VLV RMT OPER, U2 SFGD BLDG 800' TRN B ECCS VLV OPERATING ROOM.
EL     D. Verify Open XVD-0323, U2 SFGD BLDG FLR DRN HDR TO WHT X-01 ISOL VLV, AB 790' Boron Recycle Panel Area.
rI     8.1.3   Ensure a water supply for filling Sump 2-01 is available by: using XWP-7414B, LWPS FDT 2 DRN VLV OR by connecting a hose to 2DD-0346, U2 SFGD BLDG EL 773 DEMIN/RMUW SERV VLV 0346 (located outside RHR Pump Room 2-052) AND routing hose to Safeguards Building Floor Drain Sump 2-01 (hose should be tied down, if possible).


CPNPP                                                               PROCEDURE NO.
CPNPP PROCEDURE NO.
OPERATIONS TESTING MANUAL                                     UNIT 2                   OPT-518B SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE TEST                                     REVISION NO. 11             PAGE 6 OF 9 NOTE:     0     The next step will establish flow from Sump 2-01 Pump 2-01. Experience indicates that it may take 10-20 seconds for the flow instrument to respond. However, the pump will only run for approximately 50 seconds until low sump level turns the pump off.
OPERATIONS TESTING MANUAL UNIT 2 OPT-518B SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE TEST REVISION NO. 11 PAGE 6 OF 9 NOTE:
0     Indicated flow on portable flow meter of 2!50 gpm satisfies full open stroke test for check valve 2VD-0003 AND full closed stroke test for check valves 2VD-0004, 2VD-001 1 and 2VD-0012. Sump level does NOT have to be maintained during the next step.
0 The next step will establish flow from Sump 2-01 Pump 2-01. Experience indicates that it may take 10-20 seconds for the flow instrument to respond. However, the pump will only run for approximately 50 seconds until low sump level turns the pump off.
E     8.1.4 Ensure vibration and flow equipment has been installed and personnel are available to take readings.
0 Indicated flow on portable flow meter of 2!50 gpm satisfies full open stroke test for check valve 2VD-0003 AND full closed stroke test for check valves 2VD-0004, 2VD-001 1 and 2VD-0012. Sump level does NOT have to be maintained during the next step.
El    8.1.5 Fill Safeguards Building Floor Drain Sump 2-01 until Sump Pump 2-01 STARTS.
E El 8.1.4 Ensure vibration and flow equipment has been installed and personnel are available to take readings.
8.1.6 Record the following:
8.1.5 Fill Safeguards Building Floor Drain Sump 2-01 until Sump Pump 2-01 STARTS.
LI     "    Indicated flow from the portable flow meter.
8.1.6 Record the following:
LI
LI LI Indicated flow from the portable flow meter.
* Start MH vibration data acquisition approximately 5 to 10 seconds after the pump starts.
Start MH vibration data acquisition approximately 5 to 10 seconds after the pump starts.
0I   8.1.7 Record 2VD-0003 full open stroke test results and 2VD-0004, 2VD-0011, 2VD-0012 full closed stroke test results.
0I 0I 8.1.7 Record 2VD-0003 full open stroke test results and 2VD-0004, 2VD-0011, 2VD-0012 full closed stroke test results.
0I    8.1.8 Open 2EB2-1/9C/BKR, SAFEGUARD BUILDING SUMP 2-01 PMP 2-01 MOTOR BREAKER.
8.1.8 Open 2EB2-1/9C/BKR, SAFEGUARD BUILDING SUMP 2-01 PMP 2-01 MOTOR BREAKER.
NOTE:     0     The next step will establish flow from Sump 2-01 Pump 2-02. Experience indicates that it may take 10-20 seconds for the flow instrument to respond. However, the pump will only run for approximately 50 seconds until low sump level turns the pump off.
NOTE:
0     Indicated flow on portable flow meter Ž>50 gpm satisfies full open stroke, test for check valve 2VD-0004 AND full closed stroke test for check valves 2VD-0003, 2VD-001 1 and 2VD-0012. Sump level does NOT have to be maintained during the next step.
0 The next step will establish flow from Sump 2-01 Pump 2-02. Experience indicates that it may take 10-20 seconds for the flow instrument to respond. However, the pump will only run for approximately 50 seconds until low sump level turns the pump off.
8.1.9 Ensure vibration and flow equipment has been installed and personnel are available to take readings.
0 Indicated flow on portable flow meter Ž> 50 gpm satisfies full open stroke, test for check valve 2VD-0004 AND full closed stroke test for check valves 2VD-0003, 2VD-001 1 and 2VD-0012. Sump level does NOT have to be maintained during the next step.
El 8.1.10 Close 2EB2-1/9H/BKR, SAFEGUARDS BUILDING SUMP 2-01 PUMP 2-02 MOTOR LI          BREAKER.
El LI 8.1.9 Ensure vibration and flow equipment has been installed and personnel are available to take readings.
8.1.10 Close 2EB2-1/9H/BKR, SAFEGUARDS BUILDING SUMP 2-01 PUMP 2-02 MOTOR BREAKER.
8.1.11 Refill Safeguards Building Floor Drain Sump 2-01 until Sump Pump 2-02 STARTS.
8.1.11 Refill Safeguards Building Floor Drain Sump 2-01 until Sump Pump 2-02 STARTS.
8.1.12 Record the following:
8.1.12 Record the following:
El
El El Indicated flow from the portable flow meter.
* Indicated flow from the portable flow meter.
Start MH vibration data acquisition approximately 5 to 10 seconds after the pump starts.
El
0L 8.1.13 Record 2VD-0004 full open stroke test results and 2VD-0003, 2VD-001 1, 2VD-0012, full closed stroke test results.
* Start MH vibration data acquisition approximately 5 to 10 seconds after the pump starts.
LI 8.1.14 Proceed to Section 9.0), Restoration and complete the section.
0L   8.1.13 Record 2VD-0004 full open stroke test results and 2VD-0003, 2VD-001 1, 2VD-0012, full closed stroke test results.
LI   8.1.14 Proceed to Section 9.0), Restoration and complete the section.


CPNPP                                                               PROCEDURE NO.
CPNPP PROCEDURE NO.
OPERATIONS TESTING MANUAL                                       UNIT 2                 OPT-518B SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE TEST                                       REVISION NO. 11           PAGE 7 OF 9 8.2   Safeguards Building Sump Pump 2-03/2-04 and Check Valve Test NOTE:       Record all data on OPT-518B-2.
OPERATIONS TESTING MANUAL UNIT 2 OPT-518B SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE TEST REVISION NO. 11 PAGE 7 OF 9 8.2 Safeguards Building Sump Pump 2-03/2-04 and Check Valve Test NOTE:
CAUTION:   Do NOT allow sumps to overflow during the performance of this test. Restoration for a sump completion the test should be restarted at the last data step ensuring correct lineup per the hift Manager.
Record all data on OPT-518B-2.
8.2.1   Open the following breakers:
CAUTION:
LI
Do NOT allow sumps to overflow during the performance of this test. Restoration for a sump completion the test should be restarted at the last data step ensuring correct lineup per the hift Manager.
* 2EB2-1/9C/BKR, SAFEGUARD BUILDING SUMP 2-01 PUMP 2-01 MOTOR BREAKER El       0   2EB2-1/9H/BKR, SAFEGUARD BUILDING SUMP 2-01 PUMP 2-02 MOTOR BREAKER L       *0 2EBI-1/8H/BKR, SAFEGUARD BUILDING SUMP 2-02 PUMP 2-04 MOTOR BREAKER Li
8.2.1 Open the following breakers:
* XB2-2/4J/BKR, AUXILIARY BUILDING SUMP X-06 PUMP X-1 1 MOTOR BREAKER EL       0   XB2-2/4M/BKR, AUXILIARY BUILDING SUMP X-06 PUMP X-12 MOTOR BREAKER LI
LI 2EB2-1/9C/BKR, SAFEGUARD BUILDING SUMP 2-01 PUMP 2-01 MOTOR BREAKER El 0 2EB2-1/9H/BKR, SAFEGUARD BUILDING SUMP 2-01 PUMP 2-02 MOTOR BREAKER L  
* XB1-2/2J/BKR, AUXILIARY BUILDING SUMP X-08 PUMP X-15 MOTOR BREAKER LI
*0 2EBI-1/8H/BKR, SAFEGUARD BUILDING SUMP 2-02 PUMP 2-04 MOTOR BREAKER Li XB2-2/4J/BKR, AUXILIARY BUILDING SUMP X-06 PUMP X-1 1 MOTOR BREAKER EL 0
* XB1-2/2M/BKR, AUXILIARY BUILDING SUMP X-08 PUMP X-16 MOTOR BREAKER 8.2.2 Align the Safeguards Bldg Sumps discharge to the Waste Holdup Tank by performing the following:
XB2-2/4M/BKR, AUXILIARY BUILDING SUMP X-06 PUMP X-12 MOTOR BREAKER LI XB1-2/2J/BKR, AUXILIARY BUILDING SUMP X-08 PUMP X-15 MOTOR BREAKER LI XB1-2/2M/BKR, AUXILIARY BUILDING SUMP X-08 PUMP X-16 MOTOR BREAKER 8.2.2 Align the Safeguards Bldg Sumps discharge to the Waste Holdup Tank by performing the following:
Li       A. Obtain Duty Radwaste Supervisor concurrence prior to alternating sump discharge.
Li A. Obtain Duty Radwaste Supervisor concurrence prior to alternating sump discharge.
EL       B. Open 2VD-0030, SFGD BLDG SMP 2-01/2-02 DISCH HDR TO WHT X-01 ISOL VLV, U2 SFGD BLDG 790' TRN B ECCS VLV RM.
EL B. Open 2VD-0030, SFGD BLDG SMP 2-01/2-02 DISCH HDR TO WHT X-01 ISOL VLV, U2 SFGD BLDG 790' TRN B ECCS VLV RM.
EL       C. Close 2VD-0027-RO, SFGD BLDG SMP 2-01/2-02 DISCH HDR TO FDT 2 ISOL VLV RMT OPER, U2 SFGD BLDG 800' TRN B ECCS VLV OPERATING ROOM.
EL C. Close 2VD-0027-RO, SFGD BLDG SMP 2-01/2-02 DISCH HDR TO FDT 2 ISOL VLV RMT OPER, U2 SFGD BLDG 800' TRN B ECCS VLV OPERATING ROOM.
EL       D. Verify Open XVD-0323, U2 SFGD BLDG FLR DRN HDR TO WHT X-01 ISOL VLV, AB 790' Boron Recycle Panel Area.
EL D. Verify Open XVD-0323, U2 SFGD BLDG FLR DRN HDR TO WHT X-01 ISOL VLV, AB 790' Boron Recycle Panel Area.
Li     8.2.3   Ensure a source of fill water is available for the Sump 2-02 by either connecting a hose to 2DD-0345, U2 SFGD BLDG EL 773 DEMIN/RMUW SERV VLV 0345, AND routing the hose to Safeguards Building Floor Drain Sump 2-02 (the hose should be tied down, if possible)
Li 8.2.3 Ensure a source of fill water is available for the Sump 2-02 by either connecting a hose to 2DD-0345, U2 SFGD BLDG EL 773 DEMIN/RMUW SERV VLV 0345, AND routing the hose to Safeguards Building Floor Drain Sump 2-02 (the hose should be tied down, if possible)
OR using another source of water as approved by the Unit Supervisor.
OR using another source of water as approved by the Unit Supervisor.


CPNPP                                                               PROCEDURE NO.
CPNPP PROCEDURE NO.
OPERATIONS TESTING MANUAL                                     UNIT 2                 OPT-518B SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE TEST                                     REVISION NO. 11             PAGE 8 OF 9 NOTE:
OPERATIONS TESTING MANUAL UNIT 2 OPT-518B SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE TEST REVISION NO. 11 PAGE 8 OF 9 NOTE:
* The next step will establish flow from Sump 2-02 Pump 2-03. Experience indicates that it may take 10-20 seconds for the flow instrument to respond. However, the pump will only run for approximately 50 seconds until low sump level turns the pump off.
The next step will establish flow from Sump 2-02 Pump 2-03. Experience indicates that it may take 10-20 seconds for the flow instrument to respond. However, the pump will only run for approximately 50 seconds until low sump level turns the pump off.
0     Indicated flow on portable flow meter of _>50 gpm satisfies full open stroke test for check valve 2VD-001 1 AND full closed stroke test for check valves 2VD-0012, 2VD-0003 and 2VD-0004. Sump level does NOT have to be maintained during the next step.
0 Indicated flow on portable flow meter of _>50 gpm satisfies full open stroke test for check valve 2VD-001 1 AND full closed stroke test for check valves 2VD-0012, 2VD-0003 and 2VD-0004. Sump level does NOT have to be maintained during the next step.
D     8.2.4 Ensure vibration and flow equipment has been installed and personnel are available to take readings.
D LI 8.2.4 Ensure vibration and flow equipment has been installed and personnel are available to take readings.
LI    8.2.5 Fill Safeguards Building Floor Drain Sump 2-02 until Sump Pump 2-03 STARTS.
8.2.5 Fill Safeguards Building Floor Drain Sump 2-02 until Sump Pump 2-03 STARTS.
8.2.6. Record the following:
8.2.6. Record the following:
El     0     Indicated flow from the portable flow meter.
El 0 Indicated flow from the portable flow meter.
E]
E]
* Start MH vibration data acquisition approximately 5 to 10 seconds after the pump starts.
Start MH vibration data acquisition approximately 5 to 10 seconds after the pump starts.
8.2.7 Record 2VD-0011 full open stroke test results and 2VD-0012, 2VD-0003, 2VD-0004 full closed stroke test results.
8.2.7 Record 2VD-0011 full open stroke test results and 2VD-0012, 2VD-0003, 2VD-0004 full closed stroke test results.
LI    8.2.8 Open 2EB1-1/8C/BKR, SAFEGUARD BUILDING SUMP.2-02 PMP 2-03 MOTOR BREAKER.
8.2.8 Open 2EB1-1/8C/BKR, SAFEGUARD BUILDING SUMP.2-02 PMP 2-03 MOTOR BREAKER.
NOTE:
LI NOTE:
* The next step will establish flow from Sump 2-02 Pump 2-04. Experience indicates that it may take 10-20 seconds for the flow instrument to respond. However, the pump will only run for approximately 50 seconds until low sump level turns the pump off.
The next step will establish flow from Sump 2-02 Pump 2-04. Experience indicates that it may take 10-20 seconds for the flow instrument to respond. However, the pump will only run for approximately 50 seconds until low sump level turns the pump off.
0     Indicated flow on portable flow meter of Ž>50 gpm satisfies full open stroke test for check valve 2VD-0012 AND full closed stroke test for check valves 2VD-001 1, 2VD-0003 and 2VD-0004. Sump level does NOT have to be maintained during the next step.
0 Indicated flow on portable flow meter of Ž>50 gpm satisfies full open stroke test for check valve 2VD-0012 AND full closed stroke test for check valves 2VD-001 1, 2VD-0003 and 2VD-0004. Sump level does NOT have to be maintained during the next step.
El   8.2.9 Ensure vibration and flow equipment has been installed and personnel are available to take readings.
El El 8.2.9 Ensure vibration and flow equipment has been installed and personnel are available to take readings.
8.2.10 Close 2EBI-1/8H/BKR, SAFEGUARD BUILDING SUMP 2-02 PUMP 2-04 MOTOR BREAKER.
8.2.10 Close 2EBI-1/8H/BKR, SAFEGUARD BUILDING SUMP 2-02 PUMP 2-04 MOTOR BREAKER.
El    8.2.11 Refill Safeguards Building Floor Drain Sump 2-02 until Sump Pump 2-04 STARTS.
8.2.11 Refill Safeguards Building Floor Drain Sump 2-02 until Sump Pump 2-04 STARTS.
8.2.12 Record the following:
8.2.12 Record the following:
EL     0     Indicated flow from the portable flow meter.
EL 0
EL     0   Start MH vibration data acquisition approximately 5 to 10 seconds after the pump starts.
Indicated flow from the portable flow meter.
EL 0
Start MH vibration data acquisition approximately 5 to 10 seconds after the pump starts.
8.2.13 Record 2VD-0012 full open stroke test results and 2VD-0011, 2VD-0003, 2VD-0004 full closed stroke test results..
8.2.13 Record 2VD-0012 full open stroke test results and 2VD-0011, 2VD-0003, 2VD-0004 full closed stroke test results..
El   8.2.14 Proceed to Section 9.0, Restoration and complete the section.
El 8.2.14 Proceed to Section 9.0, Restoration and complete the section.


CPNPP                                                           PROCEDURE NO.
CPNPP PROCEDURE NO.
OPERATIONS TESTING MANUAL                                   UNIT 2               OPT-518B SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE TEST                                   REVISION NO. 11         PAGE 9 OF 9 9.0 RESTORATION 9.1   Align the Safeguards Bldg Sumps discharge to the Floor Drain Tank by performing the following:
OPERATIONS TESTING MANUAL UNIT 2 OPT-518B SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE TEST REVISION NO. 11 PAGE 9 OF 9 9.0 RESTORATION 9.1 Align the Safeguards Bldg Sumps discharge to the Floor Drain Tank by performing the following:
El   A. Obtain Duty Radwaste Supervisor concurrence prior to alternating sump discharge.
El A.
EI   B. Open 2VD-0027-RO, SFGD BLDG SMP 2-01/2-02 DISCH HDR TO FDT 2 ISOL VLV RMT OPER, in the U2 SFGD BLDG 800' TRN B ECCS VLV OPERATING ROOM.
Obtain Duty Radwaste Supervisor concurrence prior to alternating sump discharge.
El   C. Close 2VD-0030, SFGD BLDG SMP 2-01/2-02 DISCH HDR TO WHT X-01 ISOL VLV, in the U2 SFGD BLDG 790' TRN B ECCS VLV RM.
EI B.
[IV] 9.2   Ensure the following breakers are ON:
Open 2VD-0027-RO, SFGD BLDG SMP 2-01/2-02 DISCH HDR TO FDT 2 ISOL VLV RMT OPER, in the U2 SFGD BLDG 800' TRN B ECCS VLV OPERATING ROOM.
LI
El C. Close 2VD-0030, SFGD BLDG SMP 2-01/2-02 DISCH HDR TO WHT X-01 ISOL VLV, in the U2 SFGD BLDG 790' TRN B ECCS VLV RM.
* 2EB2-1/9C/BKR, SAFEGUARD BUILDING SUMP 2-01 PUMP 2-01 MOTOR BREAKER LI
[IV]
* 2EB2-1/9H/BKR, SAFEGUARD BUILDING SUMP 2-01 PUMP 2-02 MOTOR BREAKER EL
9.2 Ensure the following breakers are ON:
* 2EB1-1/8C/BKR, SAFEGUARD BUILDING SUMP 2-02 PUMP 2-03 MOTOR BREAKER LI
LI 2EB2-1/9C/BKR, SAFEGUARD BUILDING SUMP 2-01 PUMP 2-01 MOTOR BREAKER LI 2EB2-1/9H/BKR, SAFEGUARD BUILDING SUMP 2-01 PUMP 2-02 MOTOR BREAKER EL 2EB1-1/8C/BKR, SAFEGUARD BUILDING SUMP 2-02 PUMP 2-03 MOTOR BREAKER LI
* 2EB1-1/8H/BKR, SAFEGUARD BUILDING SUMP 2-02 PUMP 2-04 MOTOR BREAKER LI
* 2EB1-1/8H/BKR, SAFEGUARD BUILDING SUMP 2-02 PUMP 2-04 MOTOR BREAKER LI XB2-2/4J/BKR, AUXILIARY BUILDING SUMP X-06 PUMP X-1 1 MOTOR BREAKER EL 0
* XB2-2/4J/BKR, AUXILIARY BUILDING SUMP X-06 PUMP X-1 1 MOTOR BREAKER EL   0   XB2-2/4M/BKR, AUXILIARY BUILDING SUMP X-06 PUMP X-12 MOTOR BREAKER LI
XB2-2/4M/BKR, AUXILIARY BUILDING SUMP X-06 PUMP X-12 MOTOR BREAKER LI XB1-2/2J/BKR, AUXILIARY BUILDING SUMP X-08 PUMP X-15 MOTOR BREAKER EL XB1-2/2M/BKR, AUXILIARY BUILDING SUMP X-08 PUMP X-16 MOTOR BREAKER El 9.3 Ensure the valve used to fill the sump is closed AND any hose is removed.
* XB1-2/2J/BKR, AUXILIARY BUILDING SUMP X-08 PUMP X-15 MOTOR BREAKER EL
9.4 Ensure the following equipment has been removed:
* XB1-2/2M/BKR, AUXILIARY BUILDING SUMP X-08 PUMP X-16 MOTOR BREAKER El   9.3   Ensure the valve used to fill the sump is closed AND any hose is removed.
LI S
9.4   Ensure the following equipment has been removed:
Remove the portable flow meter LI Remove vibration equipment 10.0 ATTACHMENTS/FORMS 10.1 Attachments
LI   S   Remove the portable flow meter LI
'None 10.2 Forms 10.2.1 OPT-518B-1, "SFGD BLDG SMP 01 Check Valve Test Data Sheet" 10.2.2 OPT-518B-2, "SFGD BLDG SMP 02 Check Valve Test Data Sheet"
* Remove vibration equipment 10.0 ATTACHMENTS/FORMS 10.1 Attachments
          'None 10.2 Forms 10.2.1   OPT-518B-1, "SFGD BLDG SMP 01 Check Valve Test Data Sheet" 10.2.2   OPT-518B-2, "SFGD BLDG SMP 02 Check Valve Test Data Sheet"


(For Information Only)                           Record of Changes                                                   Page 1 Rev/PCN       Affected Pages                                         Description of Change 6/1                 4         Add instruction to hang test gauge at centerline of pipe (SMF-2003-003683).
(For Information Only)
7/0               ALL         Deleted requirement to place a clearance for pump coupling guard removal (the guards are bolted outside the pump and not near the rotating equipment), added note 5.3.3 that expands on the caution information when approaching the HI-HI Level alarm during sump fill, resequenced steps for initial setup for test since clearance is not required, added step to ensure 2VD-0621 is closed prior to initial pump start and opened after pump start, deleted measurement of hl since the gauge is now hung at the centerline of the pipe and the value is a fixed. amount at 17.645 feet, added notification to the Control Room prior to start of sump fill, added operational experience to indicate that flow value on the portable flow instrument takes a little time to stabilize but pump will only run for approximately 50 seconds after start, restoration resequenced since no clearance removal is required, added final position check and IV of for all valves and breakers to the forms.
Record of Changes Page 1 Rev/PCN Affected Pages Description of Change 6/1 4
7/1             5, 9, 13     Changed "RO" to "RO" for 2VD-0027-R0, added [IV] designator to Steps 9.5, 9.6 and 9.7 to be consistent with forms.
Add instruction to hang test gauge at centerline of pipe (SMF-2003-003683).
7/2                 2       Changed ASME Section XI to ASME Testing as Section XI no longer pertains to valves.
7/0 ALL Deleted requirement to place a clearance for pump coupling guard removal (the guards are bolted outside the pump and not near the rotating equipment), added note 5.3.3 that expands on the caution information when approaching the HI-HI Level alarm during sump fill, resequenced steps for initial setup for test since clearance is not required, added step to ensure 2VD-0621 is closed prior to initial pump start and opened after pump start, deleted measurement of hl since the gauge is now hung at the centerline of the pipe and the value is a fixed. amount at 17.645 feet, added notification to the Control Room prior to start of sump fill, added operational experience to indicate that flow value on the portable flow instrument takes a little time to stabilize but pump will only run for approximately 50 seconds after start, restoration resequenced since no clearance removal is required, added final position check and IV of for all valves and breakers to the forms.
7/3               2, 4       Minor reword for LCOAR statement. Increase pressure gauge accuracy to comply with changes to the IST plan.
7/1 5, 9, 13 Changed "RO" to "RO" for 2VD-0027-R0, added [IV] designator to Steps 9.5, 9.6 and 9.7 to be consistent with forms.
8/0               ALL         This revision changes the procedure purpose. The sump pumps are no longer required to be tested as part of the IST Plan. This procedure only verifies stroke of the check valves. As a result of this change the title of the procedure has also changed.
7/2 2
9/0                 all       This revision adds steps to take vibration readings on the Safeguard Building Sump Pumps as part of the interim relief as granted by the NRC per EVAL-2006-002428-01.
Changed ASME Section XI to ASME Testing as Section XI no longer pertains to valves.
10/0               all       This revision adds steps to sections 8.1 and 8.2 to align the Safeguard Building Sumps to the Waste Holdup Tank during flow testing. Step added to section 9.0, Restoration to restore the Safeguard Building Sumps to the Floor Drain Tank.
7/3 2, 4 Minor reword for LCOAR statement. Increase pressure gauge accuracy to comply with changes to the IST plan.
10/1       3, 4, 5, 6, 7, 8 Remove reference to a pressure gauge in the Prerequisite section. The pressure gauge is longer required for this test procedure. Only two operators are required for this test since maintenance will read the portable flowmeter. Correct typo by changing Unit 1 to Unit 2. change step 5.1.1 to not allow floor drains to overflow instead of the sump.
8/0 ALL This revision changes the procedure purpose. The sump pumps are no longer required to be tested as part of the IST Plan. This procedure only verifies stroke of the check valves. As a result of this change the title of the procedure has also changed.
                                'Change step 6.2 to have the flowmeter placed downstream of valve XVD-0323. This is a low does area. Change step 8.1.4, 8.1. 9, 8.2.4 and 8.2.9 to ensure the flow equipment has also been installed.
9/0 all This revision adds steps to take vibration readings on the Safeguard Building Sump Pumps as part of the interim relief as granted by the NRC per EVAL-2006-002428-01.
10/2               6, 8       This PCN changes the label for all Safeguards Building Sump Pumps vibration points from MOH to MH. This change is a result of EVAL-2006-003019-01. These are small motors with only one location for MH, MV and MA, therefore, MIH and MOH are the same point (MH).
10/0 all This revision adds steps to sections 8.1 and 8.2 to align the Safeguard Building Sumps to the Waste Holdup Tank during flow testing. Step added to section 9.0, Restoration to restore the Safeguard Building Sumps to the Floor Drain Tank.
11/0                         Added Auxiliary Building Sump X-06 and X-08 pumps to breaker list per Engineering request. Updated site name.
10/1 3, 4, 5, 6, 7, 8 Remove reference to a pressure gauge in the Prerequisite section. The pressure gauge is longer required for this test procedure. Only two operators are required for this test since maintenance will read the portable flowmeter. Correct typo by changing Unit 1 to Unit 2. change step 5.1.1 to not allow floor drains to overflow instead of the sump.
'Change step 6.2 to have the flowmeter placed downstream of valve XVD-0323. This is a low does area. Change step 8.1.4, 8.1. 9, 8.2.4 and 8.2.9 to ensure the flow equipment has also been installed.
10/2 6, 8 This PCN changes the label for all Safeguards Building Sump Pumps vibration points from MOH to MH. This change is a result of EVAL-2006-003019-01. These are small motors with only one location for MH, MV and MA, therefore, MIH and MOH are the same point (MH).
11/0 Added Auxiliary Building Sump X-06 and X-08 pumps to breaker list per Engineering request. Updated site name.


SFGD BLDG SMP 01 CHECK VALVE TEST DATA SHEET STEP                                                OBSERVED   ACCEPTANCE CRITERIA           INITIALS 6.0      PREREQUISITES MET                              N/A                 N/A 8.1.6   0     INDICATED FLOW                             GPM            50 GPM 0     VIBRATION AMPLITUDE TEST           REFER       MEASURED         ALERT          ACTION PARAMETER           VALUE         VALUE         LIMIT HIGH      LIMIT HIGH        UNITS MH             0.053                         0.133          0.318        IN/SEC PK 8.1.7   2VD-0003 FULL OPEN AND 2VD-0004, 2VD-0011, 2VD-0012 FULL CLOSED STROKE                           >Ž50 GPM TEST RESULTS                              SAT/UNSAT          (Step 8.1.6) 8.1.12  0      INDICATED FLOW                            GPM          2!50 GPM 0      VIBRATION AMPLITUDE TEST           REFER       MEASURED         ALERT          ACTION PARAMETER           VALUE         VALUE         LIMIT HIGH      LIMIT HIGH        UNITS MH           0.100       _                  0.250          0.600        IN/SEC PK 8.1.13 2VD-0004 FULL OPEN STROKE AND 2VD-0003, 2VD-0011, 2VD-0012 FULL CLOSED STROKE                           _>50 GPM TEST RESULTS                              SAT/UNSAT          (Step 8.1.12)
SFGD BLDG SMP 01 CHECK STEP VALVE TEST DATA SHEET OBSERVED ACCEPTANCE CRITERIA INITIALS N/A N/A GPM 50 GPM 6.0 PREREQUISITES MET 8.1.6 0
      /
INDICATED FLOW 0
9.0     RESTORATION                                             OBSERVED          INITIALS    VERIFIED 9.1     SAFEGUARDS BUILDING SUMPS ALIGNED TO FLOOR                  N/A                        N/A DRAIN TANK 9.2     S     2EB2-1/9C/BKR       ON                            ON/OFF
VIBRATION AMPLITUDE TEST REFER MEASURED PARAMETER VALUE VALUE MH 0.053 8.1.7 2VD-0003 FULL OPEN AND 2VD-0004, 2VD-0011, 2VD-0012 FULL CLOSED STROKE TEST RESULTS 8.1.12 0
* 2EB2-1/9H/BKR       ON                            ON/OFF
INDICATED FLOW 0
* 2EBI-1/8C/BKR       ON                            ON/OFF
VIBRATION AMPLITUDE ALERT LIMIT HIGH 0.133 ACTION LIMIT HIGH 0.318 UNITS IN/SEC PK SAT/UNSAT GPM
* 2EB'1-1/8H/BKR     ON                            ON/OFF
>Ž50 GPM (Step 8.1.6) 2!50 GPM TEST REFER MEASURED PARAMETER VALUE VALUE L
* XB2-2/4J/BKR       ON                            ON/OFF
MH 0.100 8.1.13 2VD-0004 FULL OPEN STROKE AND 2VD-0003, 2VD-0011, 2VD-0012 FULL CLOSED STROKE TEST RESULTS ALERT IMIT HIGH 0.250 ACTION LIMIT HIGH 0.600 UNITS IN/SEC PK
* XB2-2/4M/BKR       ON                            ON/OFF
_>50 GPM (Step 8.1.12)
* XB1-2/2J/BKR       ON                            ON/OFF
SAT/UNSAT
* XB1-2/2M/BKR       ON                             ON/OFF OPT-518B-1 Page 1 of 2 R-16
/
9.0 RESTORATION 9.1 SAFEGUARDS BUILDING DRAIN TANK 9.2 S
2EB2-1/9C/BKR 2EB2-1/9H/BKR 2EBI-1/8C/BKR 2EB'1-1/8H/BKR XB2-2/4J/BKR XB2-2/4M/BKR XB1-2/2J/BKR XB1-2/2M/BKR OBSERVED N/A INITIALS VERIFIED N/A SUMPS ALIGNED TO FLOOR ON ON ON ON ON ON ON ON ON/OFF ON/OFF ON/OFF ON/OFF ON/OFF ON/OFF ON/OFF ON/OFF OPT-518B-1 Page 1 of 2 R-16


SFGD BLDG SMP 01 CHECK VALVE TEST DATA SHEET 9.3  FILL VALVES CLOSED WITH ANY FILL HOSE REMOVED                                 N/A 9.4
9.3 9.4 SFGD BLDG SMP 01 CHECK VALVE TEST DATA SHEET FILL VALVES CLOSED WITH ANY FILL HOSE REMOVED REMOVE THE PORTABLE FLOW METER REMOVE VIBRATION EQUIPMENT N/A N/A N/A COMMENTS/DISCREPANCIES:
* REMOVE THE PORTABLE FLOW METER                                         N/A
* REMOVE VIBRATION EQUIPMENT                                            N/A COMMENTS/DISCREPANCIES:
CORRECTIVE ACTIONS:
CORRECTIVE ACTIONS:
PERFORMED BY:                                                   DATE:
PERFORMED BY:
SIGNATURE REVIEWED BY:                                                   DATE:_______             __
DATE:
SIGNATURE REVIEWED BY:
DATE:_______
OPERATIONS MANAGEMENT OPT-51 8B-1 Page 2 of 2 R-16
OPERATIONS MANAGEMENT OPT-51 8B-1 Page 2 of 2 R-16


(For Information Only)                       Record of Changes                                                 Page 1 Rev/PCN       Affected Pages                                   Description of Change 10/0             ALL     Form revised to be consistent with OPT-518B revision. Requirement to place a clearance for pump coupling guard removal (the guards are bolted outside the pump and not near the rotating equipment) has been deleted, hl value is now a fixed value of 15.167 feet, added final position check and IV of for all valves and breakers to the forms.
(For Information Only)
11/0             all     A revision to OPT-518B changes the procedure purpose. The sump pumps are no longer required to be tested as part of the IST Plan. This procedure only verifies stroke of the check valves. As a result of this change the title of the procedure has also changed.
Record of Changes Page 1 Rev/PCN Affected Pages Description of Change 10/0 ALL Form revised to be consistent with OPT-518B revision. Requirement to place a clearance for pump coupling guard removal (the guards are bolted outside the pump and not near the rotating equipment) has been deleted, hl value is now a fixed value of 15.167 feet, added final position check and IV of for all valves and breakers to the forms.
12/0             all     This revision adds steps to take vibration readings on the Safeguard Building Sump Pumps as part of the interim relief as granted by the NRC per EVAL-2006-002428-01.
11/0 all A revision to OPT-518B changes the procedure purpose. The sump pumps are no longer required to be tested as part of the IST Plan. This procedure only verifies stroke of the check valves. As a result of this change the title of the procedure has also changed.
13/0             all     This revision removes the pump vibration requirements and add a requirement for MOH.
12/0 all This revision adds steps to take vibration readings on the Safeguard Building Sump Pumps as part of the interim relief as granted by the NRC per EVAL-2006-002428-01.
14/0             all     This revision renumbers sections 8.1 and 8.2 because steps were added to the procedure to align the Safeguard Building Sumpsto the Waste Holdup Tank for flow testing. Added step 9.1 to verify that the Safeguards Building Sumps are aligned to the Floor Drain Tank.
13/0 all This revision removes the pump vibration requirements and add a requirement for MOH.
14/1               1     This PCN changes the label for all Safeguards Building Sump Pumps vibration points from MOH to MH. This change is a result of EVAL-2006-003019-01. These are small motors with only one location for MH, MV and MA, therefore, MIH and MOH are the same point (MH).
14/0 all This revision renumbers sections 8.1 and 8.2 because steps were added to the procedure to align the Safeguard Building Sumpsto the Waste Holdup Tank for flow testing. Added step 9.1 to verify that the Safeguards Building Sumps are aligned to the Floor Drain Tank.
15                       Added reference, alert high, and action high values per EVAL-2008-003019.
14/1 1
16/0                     Added sump X-06 and X-08 breakers to 9.2 to reflect parent procedure changes.
This PCN changes the label for all Safeguards Building Sump Pumps vibration points from MOH to MH. This change is a result of EVAL-2006-003019-01. These are small motors with only one location for MH, MV and MA, therefore, MIH and MOH are the same point (MH).
15 Added reference, alert high, and action high values per EVAL-2008-003019.
16/0 Added sump X-06 and X-08 breakers to 9.2 to reflect parent procedure changes.


SFGD BLDG SMP 02 CHECK V' ALVE TEST DATA SHEET STEP                                                OBSERVED   ACCEPTANCE CRITERIA         INITIALS 6.0    PREREQUISITES MET                                N/A                 N/A 8.2.6   0     INDICATED FLOW                               GPM          >50 GPM
SFGD BLDG SMP 02 CHECK V' STEP ALVE TEST DATA SHEET OBSERVED ACCEPTANCE CRITERIA INITIALS N/A N/A GPM
* VIBRATION AMPLITUDE TEST           REFER       MEASURED           ALERT          ACTION PARAMETER           VALUE         VALUE         I IMIT HIGH      LIMIT HIGH      UNITS MH             0.117                           0.293          0.700      IN/SEC PK 8.2.7   2VD-001 1 FULL OPEN AND 2VD-0003, 2VD-0004, 2VD-0012 FULL CLOSED STROKE                           Ž50 GPM TEST RESULTS                                 SAT/UNSAT          (Step 8.2.6) 8.2.12. 0     INDICATED FLOW                               GPM          _>50 GPM
>50 GPM 6.0 PREREQUISITES MET 8.2.6 0
* VIBRATION AMPLITUDE TEST           REFER       MEASURED           ALERT          ACTION PARAMETER           VALUE         VALUE         I IMIT HIGH      LIMIT HIGH      UNITS MH             0.054                           0.135          0.324      IN/SEC PK 8.2.13 2VD-0012 FULL OPEN STROKE AND 2VD-0003, 2VD-001 1, 2VD-0004 FULL CLOSED STROKE                     Ž>50 GPM TEST RESULTS                                SAT/UNSAT  (Step 8.2.12) 9.0     RESTORATION                                               OBSERVED        INITIALS    VERIFIED 9.1     SAFEGUARDS BUILDING SUMPS ALIGNED TO FLOOR                   N/A                        N/A DRAIN TANK 9.2     0     2EB2-1/9C/BKR       ON                              ON/OFF
INDICATED FLOW VIBRATION AMPLITUDE TEST REFER MEASURED PARAMETER VALUE VALUE I
* 2EB2-1/9H/BKR       ON                              ON/OFF
MH 0.117 8.2.7 2VD-001 1 FULL OPEN AND 2VD-0003, 2VD-0004, 2VD-0012 FULL CLOSED STROKE TEST RESULTS 8.2.12. 0 INDICATED FLOW VIBRATION AMPLITUDE TEST REFER MEASURED PARAMETER VALUE VALUE I
* 2EBI-1/8C/BKR       ON                             ON/OFF
MH 0.054 8.2.13 2VD-0012 FULL OPEN STROKE AND 2VD-0003, 2VD-001 1, 2VD-0004 FULL CLOSED STROKE TEST RESULTS ALERT IMIT HIGH 0.293 SAT/UNSAT GPM ALERT IMIT HIGH 0.135 SAT/UNSAT ACTION LIMIT HIGH 0.700 UNITS IN/SEC PK
* 2EBI-1/8H/BKR       ON                              ON/OFF
Ž50 GPM (Step 8.2.6)
* XB2-2/4J/BKR         ON                              ON/OFF
_>50 GPM ACTION LIMIT HIGH 0.324
* XB2-2/4M/BKR         ON                             ON/OFF
Ž>50 GPM (Step 8.2.12)
* XB1-2/2J/BKR         ON                              ON/OFF
UNITS IN/SEC PK 9.0 RESTORATION 9.1 SAFEGUARDS BUILDING SUMPS ALIGNED TO FLOOR DRAIN TANK 9.2 0
* XB1-2/2M/BKR         ON                             ON/OFF OPT-51i8B-2 Page 1 of 2 R-17
2EB2-1/9C/BKR ON 2EB2-1/9H/BKR ON 2EBI-1/8C/BKR ON 2EBI-1/8H/BKR ON XB2-2/4J/BKR ON XB2-2/4M/BKR ON XB1-2/2J/BKR ON XB1-2/2M/BKR ON OBSERVED N/A INITIALS VERIFIED N/A ON/OFF ON/OFF ON/OFF ON/OFF ON/OFF ON/OFF ON/OFF ON/OFF OPT-51i8B-2 Page 1 of 2 R-17


SFGD BLDG SMP 02 CHECK VALVE TEST DATA SHEET 9.3 FILL VALVES CLOSED WITH ANY FILL HOSE REMOVED                         N/A 9.4 0     REMOVE THE PORTABLE FLOW METER                                 N/A 0     REMOVE VIBRATION EQUIPMENT                                     N/A COMMENTS/DISCREPANCIES:
SFGD BLDG SMP 02 CHECK VALVE TEST DATA SHEET 9.3 FILL VALVES CLOSED WITH ANY FILL HOSE REMOVED 9.4 0
CORRECTIVE ACTIONS:
REMOVE THE PORTABLE FLOW METER 0
PERFORMED BY:                                                   DATE:
REMOVE VIBRATION EQUIPMENT COMMENTS/DISCREPANCIES:
SIGNATURE REVIEWED BY:                                                    DATE:
N/A N/A N/A CORRECTIVE ACTIONS:
PERFORMED BY:
REVIEWED BY:
DATE:
SIGNATURE DATE:
OPERATIONS MANAGEMENT OPT-51 8B-2 Page 2 of 2 R-17
OPERATIONS MANAGEMENT OPT-51 8B-2 Page 2 of 2 R-17


(For Information Only)                       Record of Changes                                                 Page 1 Rev/PCN       Affected Pages                                   Description of Change 10/0             ALL     Form revised to be consistent with OPT-518B revision. Requirement to place a clearance for pump coupling guard removal (the guards are bolted outside the pump and not near the rotating equipment) has been deleted, hl value is now a fixed value of 15.167 feet, added final position check and IV of for all valves and breakers to the forms.
(For Information Only)
11/0             ALL     New testing limits for the 2-04 pump per EVAL-2005-000556-01-00.
Record of Changes Page 1 Rev/PCN Affected Pages Description of Change 10/0 ALL Form revised to be consistent with OPT-518B revision. Requirement to place a clearance for pump coupling guard removal (the guards are bolted outside the pump and not near the rotating equipment) has been deleted, hl value is now a fixed value of 15.167 feet, added final position check and IV of for all valves and breakers to the forms.
12/0             ALL     A revision to OPT-518B changes the procedure purpose. The sump pumps are no longer required to be tested as part of the IST Plan. This procedure only verifies stroke, of the check valves. As a result of this change the title of the procedure has also changed.'
11/0 ALL New testing limits for the 2-04 pump per EVAL-2005-000556-01-00.
13/0             ALL     This revision adds steps to take vibration readings on the Safeguard Building Sump Pumps as part of the interim relief as granted by the NRC per EVAL-2006-002428-01.
12/0 ALL A revision to OPT-518B changes the procedure purpose. The sump pumps are no longer required to be tested as part of the IST Plan. This procedure only verifies stroke, of the check valves. As a result of this change the title of the procedure has also changed.'
14/0               all     This revision removes the pump vibration requirements and add a requirement for MOH.
13/0 ALL This revision adds steps to take vibration readings on the Safeguard Building Sump Pumps as part of the interim relief as granted by the NRC per EVAL-2006-002428-01.
15/0             ALL     This revision renumbers sections 8.1 and 8.2 because steps were added to the procedure to align the Safeguard Building Sumps to the Waste Holdup Tank for flow testing. Added step 9.1 to verify that the Safeguards Building Sumps are aligned to the Floor Drain Tank.
14/0 all This revision removes the pump vibration requirements and add a requirement for MOH.
16/0             ALL     This revision incorporates Safeguards Sump Pump 2-03 and 2-04 vibration data as supplied by EVAL-2007-000058-01.
15/0 ALL This revision renumbers sections 8.1 and 8.2 because steps were added to the procedure to align the Safeguard Building Sumps to the Waste Holdup Tank for flow testing. Added step 9.1 to verify that the Safeguards Building Sumps are aligned to the Floor Drain Tank.
16/1               1     This PCN changes the label for all Safeguards Building Sump Pumps vibration points from MOH to MH. This change is a result of EVAL-2006-003019-01. These are small motors with' only one location for MH, MV and MA, therefore, MIH and MOH are the same point (MH).
16/0 ALL This revision incorporates Safeguards Sump Pump 2-03 and 2-04 vibration data as supplied by EVAL-2007-000058-01.
16/2               1     Updates Safeguards Sump Pump 2-03 vibration data as supplied by EVAL-2008-002402-02.
16/1 1
17/0                     Added sump X-06 and X-08 breakers to 9.2 to reflect parent procedure changes.}}
This PCN changes the label for all Safeguards Building Sump Pumps vibration points from MOH to MH. This change is a result of EVAL-2006-003019-01. These are small motors with' only one location for MH, MV and MA, therefore, MIH and MOH are the same point (MH).
16/2 1
Updates Safeguards Sump Pump 2-03 vibration data as supplied by EVAL-2008-002402-02.
17/0 Added sump X-06 and X-08 breakers to 9.2 to reflect parent procedure changes.}}

Latest revision as of 14:54, 14 January 2025

Response to Request for Additional Information for Relief Request No. P-2, Inservice Testing Plan for Pumps and Valves (ASME OM Code 1998 Edition, Through 2000 Addenda, Second Interval Start August 3, 2004)
ML083540187
Person / Time
Site: Comanche Peak  
Issue date: 12/09/2008
From: Blevins M, Madden F
Luminant Power
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CP-200801644, TAC MD9722, TAC MD9723, TXX-08143
Download: ML083540187 (37)


Text

Mike Blevins Executive Vice President

& Chief Nuclear Officer Mike.Blevins @ Luminant.com Luminant Power P 0 Box 1002 6322 North FM 56 Glen Rose, TX 76043 Luminant T 254 897 5209 C 817 559 9085 F 254 897 6652 CP-200801644 Log # TXX-08143 Ref. # 10CFR50.55a(3)(i)

December 9, 2008 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION DOCKET NOS. 50-445 AND 50-446 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION, RELIEF REQUEST NO.

P-2 FOR THE UNIT 1 AND UNIT 2 INSERVICE TESTING PLAN FOR PUMPS AND VALVES (ASME OM CODE 1998 EDITION, THROUGH 2000 ADDENDA; SECOND INTERVAL START DATE: AUGUST 3,2004) (TAC NOS. MD9722 AND MD9723)

REFERENCES:

1.

Letter logged TXX-08113 dated September 24, 2008 from Mike Blevins to the NRC, Relief Request No. P -2 for the Unit 1 and Unit 2 Inservice Testing Plan for Pumps and Valves, Second Interval.

2.

Letter dated September 27, 2006 from David Terao of the NRC to Mike Blevins, Relief Request for 10-Year Pump and Valve Inservice Testing Program.

3.

Letter dated November 10, 2008 from Balwant Singal of the NRC to Mike Blevins, Request for Additional Information Regarding Relief Request No. P-2 Associated with Inservice testing Plan for Pumps and Valves.

Dear Sir or Madam:

Luminant Generation Company LLC (Luminant Power) requested relief from ASME OM Code 1998 Edition, through 2000 Addenda, for the testing of the Safeguards Building Sump Pumps (SBSPs) at Comanche Peak Nuclear Power Plant (CPNPP) via Reference 1 pursuant to 10 CFR 50.55a(3)(i).

Reference 2 granted relief on an interim period of up to two refueling cycles but not to exceed 4 years.

This interim relief will end in September 2009.

Luminant Power has provided the information requested per Reference 3 in the Attachment to this letter.

A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway - Comanche Peak. Diablo Canyon

  • Palo Verde
  • San Onofre
  • South Texas Project Wolf Creek Aco7 AJ24

U. S. Nuclear Regulatory Commission TXX-08143 Page 2 of 2 December 9, 2008 This communication contains no new commitment regarding Comanche Peak Units 1 and 2.

Should you have any questions, please contact Mr. Jack Hicks at (254) 897-6725.

Sincerely, Luminant Generation Company LLC Mike Blevins By:

AFred W. Madden Director, Oversight & Regulatory Affairs Attachment Response to Request for Additional Information Enclosure OPT-518A/B, "Safeguards Building Sump Pumps and Check Valve Test" c -

E. E. Collins, Region IV B. K. Singal, NRR Resident Inspectors, Comanche Peak Brian Welch, ANII, Comanche Peak A. Jones, TDLR y

Attachment to TXX-08143 Page 1 of 2 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION FOR RELIEF REQUEST NO. P-2 FOR THE UNIT 1 AND UNIT 2 INSERVICE TESTING PLAN FOR PUMPS AND VALVES (ASME OM CODE 1998 EDITION, THROUGH 2000 ADDENDA; SECOND INTERVAL START DATE: AUGUST 3,2004)

(TAC NOS. MD9722 AND MD9723)

NRC QUESTION The RR states a test can be performed that demonstrates the SBSP can meet its intended safety functions. Please provide a copy of the test procedure that will be used, including acceptance criteria to be utilized, to determine acceptable pump performance.

LUMINANT POWER RESPONSE Procedures OPT-518A/B, "Safeguards Building Sump Pumps and Check Valve Test" are enclosed. Acceptance criteria are included in the procedures.

2.

NRC QUESTION The RR states the SBSP test will require pumping the same quantity of fluid along a repeatable system path, while measuring flow and vibration. Please describe how the flow rate is measured or determined. Also, discuss any system parameters associated with the flow path that will affect the results of the test and how those parameters will be controlled such that repeatability is achieved.

LUMINANT POWER RESPONSE The flow rate is measured using an ultrasonic portable flow measurement instrument.

This instrument straps on the outside of the SBSP discharge pipe. System configuration is established in OPT-518A/B assuring that a repeatable system flow path will be utilized each time.

The factors that could potentially affect the repeatability of the test are:

a.

any changes in system resistance, and

b.

degradation in the in-line check valve.

These factors are addressed as discussed below:

a.

The system resistance changes can be due to different valve line-ups, throttling of flow, or additional flow sources. This is being addressed by ensuring that the valve line-ups are verified and other sump pumps are

.turned off during the performance of the test using procedure OPT-518A/B "Safeguards Building Sump Pumps and Check Valve Test."

Attachment to TXX-08143 Page 2 of 2 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION FOR RELIEF REQUEST NO. P-2 FOR THE UNIT 1 AND UNIT 2 INSERVICE TESTING PLAN FOR PUMPS AND VALVES (ASME OM CODE 1998 EDITION, THROUGH 2000 ADDENDA; SECOND INTERVAL START DATE: AUGUST 3,2004)

(TAC NOS. MD9722 AND MD9723)

b.

Degradation in the pump discharge check valve could result in a change in flowrate and affect the repeatability of the test. However, this specific test and flow path are also used to perform open and closed tests of the pump discharge check valves. Therefore, failure to meet the flow requirement or trends of degradation in flow will result in evaluating or repairing the pumps and discharge check valves.

3.

NRC QUESTION The RR states the required SBSP head to pump to the Waste Holdup Tank is greater than the required head to discharge to the Floor Drain Tank, which is the normal lineup. Please discuss the safety-related lineup of the sump pumps and how the discharge head required during testing and normal operation differs from the discharge head required during emergency conditions.

LUMINANT POWER RESPONSE The design flow for the SBSPs is 50 gpm at no specific head requirement. The' SBSPs are designed with a capacity of 50 gpm due to a flange or mechanical seal passive failure to the ECCS pumps. The SBSPs are designed to deliver to both the waste holdup tank and the floor drain tank. The normal lineup is also the same as the emergency line-up which is discharging to the floor drain tank. However, it is permissible to be aligned to the waste holdup tank during normal operations and realignment is not required during an accident. The path to the waste holdup tank (which is our proposed test path) has a greater system resistance due to the piping configuration. Therefore, testing to the waste holdup tank is a more stringent test to verify the design flowrate of 50 gpm.

ENCLOSURE TO TXX-08143 OPT-518A/B, "Safeguards Building Sump Pumps and Check Valve Test"

COMANCHE PEAK NUCLEAR POWER PLANT UNIT 1 OPERATIONS TESTING MANUAL ELECTRONIC CONTROLLED COPY CHANGES ARE NOT INDICATED LATEST CHANGE NOTICE EFFECTIVE DATE Verify current status in the Document Control Database prior to use.

INITIAL & DATE QUALITY RELATED SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE TEST PROCEDURE NO. OPT-518A REVISION NO. 10 EFFECTIVE DATE:

12/02/08 1200 SURVEILLANCE TEST PREPARED BY (Print):

J.D. Stone TECHNICAL REVIEW BY (Print): Tom Nash Ext: 0564 Ext: 5513 APPROVED BY: D.W. McGaugqhey for Dave Goodwin DIRECTOR, OPERATIONS Date:

11/19/08

CPNPP PROCEDURE NO.

OPERATIONS TESTING MANUAL UNIT 1 OPT-518A SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE TEST REVISION NO. 10 PAGE 2 OF 9 1.0 PURPOSE This procedure satisfies ASME testing of Safeguards Building Sump Pumps and valves for requirements of Technical Specification 5.5.8, in part.

Section 8.11:

CP1-WPAPSS-01 CP1-WPAPSS-02 1VD-0003 1VD-0004

-Section 8.2:

CP1-WPAPSS-03 CP1-WPAPSS-04 1VD-0011 1VD-0012 2.0 ACCEPTANCE AND REVIEW CRITERIA 2.1 Acceptance Criteria 2.1.1 The acceptance criteria are listed on data sheets.

.2.2 Review Criteria None 3.0 DEFINITIONS/ACRONYMS None

4.0 REFERENCES

4.1 Performance 4.1.1 Technical Specification 5.5.8, "Inservice Testing Program" 4.1.2 RWS-108, "Vents and Drain System" 4.1.3 TSP-507, "Vibration Data Collection" 4.2 Development 4.2.1 FSAR 9.3.3, "Equipment and Floor Drain System" 4.2.2 DBD-ME-236, "Vents and Drains System" 4.2.3 M1-0236, "Flow Diagram - Vents and Drains System Safeguards and Auxiliary Building" 4.2.4 M1-0236-B,."Flow Diagram - Vents and Drains System Safeguards and Auxiliary Building"

CPNPP PROCEDURE NO.

OPERATIONS TESTING MANUAL UNIT 1 OPT-518A SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE TEST REVISION NO. 10 PAGE 3 OF 9 5.0 PRECAUTIONS. LIMITATIONS AND NOTES 5.1 Precautions 5.1.1 Do NOT allow floor drains to overflow during performance of this test.

5.1.2 The sump is a potentially contaminated area.

5.2 Limitations None 5.3 Notes 5.3.1 This procedure can be used to satisfy Post Work Testing requirements as long as applicable Precautions, Limitations and Prerequisites are satisfied. IF any section is NOT performed in its entirety, THEN fill in the appropriate spaces on the data sheet and N/A all spaces NOT performed.

5.3.2 Approximately 30 feet of hose will be required for this test (sump fill options are available).

5.3.3 Filling the sumps can cause water to backup and possibly overflow from floor drains. The sump Hi-Hi level alarm should be approached carefully to avoid overfilling the sumps.

Previous test performance observations have indicated that the Hi-Hi level alarm actuates at approximately one (1") inch below the grating in the floor drains.

5.3.4 On September 27, 2006, the NRC granted interim relief for testing the Safeguard Building Sump Pumps. The interim relief is granted for up to two cycles on each Unit and no more than four years. The purpose of this relief is for CPSES to determine a final solution to this problem. Refer to EVAL-2006-002428-01

CPNPP PROCEDURE NO.

OPERATIONS TESTING MANUAL UNIT 1 OPT-518A SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE TEST REVISION NO. 10 PAGE 4 OF 9 6.0 PREREQUISITES El 6.1 This procedure can be performed on Unit 1 in any MODE.

LI 6.2 Notify Maintenance to install a portable flowmeter on at least a 5 foot run of pipe near 1VD-0900.

(located 790' elev., Rm X-179). IF a Panametrics Flow instrument is used, THEN inform Maintenance that previous test performance has indicated that using the "STATISTICS" mode provides a more rapid collection of data.

Line No.:

3-VD-1-007-152R-3 OD:

3.5 inches Wall Thick:

0.216 inches El 6.3 Two operators are available (one stationed at pump, one stationed upstairs to manipulate breakers).

El 6.4 No operations are in progress that will drain large amounts of water to the Safeguards Building Floor Drain Sumps.

El 6.5 Ensure safeguards sumps are NOT isolated to the rad waste systems.

El 6.6 Notify vibration monitoring personnel to be available for vibration monitoring during pump run.

7.0 TEST EQUIPMENT LI 7.1 Portable flow meter with a minimum of +/-2% (or better) of indicated reading accuracy.

El 7.2 30' ft. of hose (sump fill options are available).

LI 7

Vibrometer and transducer meeting the range/accuracy requirements of TSP-507.

CPNPP PROCEDURE NO.

OPERATIONS TESTING MANUAL UNIT 1 OPT-518A SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE TEST REVISION NO. 10 PAGE 5 OF 9 8.0 INSTRUCTIONS 8.1 Safeauards Buildina Sumo Pumo 1-01/1-02 and Check Valve Test NOTE:

Record all data on OPT-518A-1.

CAUTION:

Do NOT allow sumps to overflow during the performance of this test. Restoration for a sum pump down may require sump pumps to be energized. If this condition occurs prior to test completion the test should be restarted at the last data step ensuring correct lineup per the 17

~Shift Manager.

8.1.1 Open the breaker for the pumps:

LI 1EB2-1/9H/BKR, SAFEGUARD BUILDING SUMP 1-01 PUMP 1-02 MOTOR BREAKER LI 1EB1-1/8C/BKR, SAFEGUARD BUILDING SUMP 1-02 PUMP 1-03 MOTOR BREAKER LI 1EBI-1/8H/BKR, SAFEGUARD BUILDING SUMP 1-02 PUMP 1-04 MOTOR BREAKER LI XB2-2/4J/BKR, AUXILIARY BUILDING SUMP X-06 PUMP X-1 1 MOTOR BREAKER LI XB2-2/4M/BKR, AUXILIARY BUILDING SUMP X-06 PUMP X-12 MOTOR BREAKER LI XB1-2/2J/BKR, AUXILIARY BUILDING SUMP X-08 PUMP X-15 MOTOR BREAKER LI XB1-2/2M/BKR, AUXILIARY BUILDING SUMP X-08 PUMP X-16 MOTOR BREAKER 8.1.2 Align the Safeguards Bldg Sumps discharge to the Waste Holdup Tank by performing the following:

LI A.

Obtain Duty Radwaste Supervisor concurrence prior to alternating sump discharge.

EL B.

Open 1VD-0030, SFGD BLDG SMP 1-01/1-02 DISCH HDRTOWHTX-01 ISOLVLV, Aux Bldg 790' above 1EB4-1.

LI C. Close 1VD-0027-RO, SFGD BLDG SMP 1-01/1-02 DISCH HDR TO FDT 1 ISOL VLV RMT OPER Sfgd Bldg 790' Trn B ECCS VIv Rm.

LI 8.1.3 Ensure a water supply for filling Sump 1-01 is available by: using XWP-7414A, LWPS FDT 1 DRN VLV OR by connecting a hose to 1 DD-0346, Ul SFGD BLDG EL 773 DEMIN/RMUW SERV VLV 0346 (located outside RHR Pump Room 1-052) AND routing hose to Safeguards Building Floor Drain Sump 1-01 (hose should be tied down, if possible).

CPNPP PROCEDURE NO.

OPERATIONS TESTING MANUAL UNIT 1 OPT-518A SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE TEST REVISION NO. 10 PAGE 6 OF 9 NOTE:

0 The next step will establish flow from Sump 1-01 Pump 1-01. Experience indicates that it may take 10-20 seconds for the flow instrument to respond. However, the pump will only run for approximately 50 seconds until low sump level turns the pump off.

0 Indicated flow on portable flow meter of _Ž50 gpm satisfies full open stroke test for check valve 1VD*0003 AND full closed stroke test for check valves 1VD-0004, 1VD-001 1 and 1VD-0012. Sump level does NOT have to be maintained during the next step.

11 8.1.4 Ensure vibration and flow equipment has been installed and personnel are available to take readings.

8.1.5 Fill Safeguards Building Floor Drain Sump 1-01 until Sump Pump 1-01 STARTS.

8.1.6 Record the following:

El El Indicated flow from the portable flow meter.

Start MH vibration data acquisition approximately 5 to 10 seconds after the pump starts.

El 8.1.7 Record 1VD-0003 full open stroke test results and 1VD-0004, 1VD-0011, 1VD-0012 full closed stroke test results.

8.1.8 Open 1EB2-1/9C/BKR, SAFEGUARD BUILDING SUMP 1-01 PMP 1-01 MOTOR BREAKER.

NOTE:

0 The next step will establish flow from Sump 1-01 Pump 1-02. Experience indicates that it may take 10-20 seconds for the flow instrument to respond. However, the pump will only run for approximately 50 seconds until low sump level turns the pump off.

Indicated flow on portable flow meter _Ž50 gpm satisfies full open stroke test for check valve 1VD-0004 AND full closed stroke test for check valves 1VD-0003, 1VD-001 1 and 1VD-0012. Sump level does NOT have to be maintained during the next step.

LI1 8.1.9 Ensure vibration and flow equipment has been installed and personnel are available to take readings.

8.1.10 Close 1EB2-1/9H/BKR, SAFEGUARDS BUILDING SUMP 1-01 PUMP 1-02 MOTOR BREAKER.

8.1.11 Refill Safeguards Building Floor Drain Sump 1-01 until Sump Pump 1-02 STARTS.

8.1.12 Record the following:

EL El Indicated flow from the portable flow meter.

Start MH vibration data acquisition approximately 5 to 10 seconds after the pump starts.

8.1.13 Record 1VD-0004 full open stroke test results and 1VD-0003, 1VD-0011, 1VD-0012, full closed stroke test results.

8.1.14 Proceed to Section 9.0, Restoration and complete the section.

CPNPP PROCEDURE NO.,

OPERATIONS TESTING MANUAL UNIT 1 OPT-518A SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE I

TEST REVISION NO. 10 PAGE 7 OF 9 8.2 Safeguards Building Sump Pump 1-03/1-04 and Check Valve Test NOTE:

Record all data on OPT-518A-2.

CAUTION:

Do NOT allow sumps to overflow during the performance of this test. Restoration for a sump pump down may require sump pumps to be energized. If this condition occurs prior to test completion the test should be restarted at the last data step ensuring correct lineup per the 17 Shift Manager.

8.2.1 Open the following breakers:

LI e* 1EB2-1/9C/BKR, SAFEGUARD BUILDING SUMP 1-01 PUMP 1-01 MOTOR BREAKER Ii 1EB2-1/9H/BKR, SAFEGUARD BUILDING SUMP 1-01 PUMP 1-02 MOTOR BREAKER LI 1EB1-1/8H/BKR, SAFEGUARD BUILDING SUMP 1-02 PUMP 1-04 MOTOR BREAKER El XB2-2/4J/BKR, AUXILIARY BUILDING SUMP X-06 PUMP X-1 1 MOTOR BREAKER LI 0

XB2-2/4M/BKR, AUXILIARY BUILDING SUMP X-06 PUMP X-12 MOTOR BREAKER El XB1-2/2J/BKR, AUXILIARY BUILDING SUMP X-08 PUMP X-15 MOTOR BREAKER El XB1-2/2M/BKR, AUXILIARY BUILDING SUMP X-08 PUMP X-16 MOTOR BREAKER 8.2.2 Align the Safeguards Bldg Sumps discharge to the Waste Holdup Tank by performing the following:

EL A.

Obtain Duty Radwaste Supervisor concurrence prior to alternating sump discharge.

EL B.

Open 1VD-0030, SFGD BLDG SMP 1-01/1-02 DISCH HDR TO WHT X-01 ISOL VLV, Aux Bldg 790' above 1 EB4-1.

LI '

C. Close 1VD-0027-RO, SFGD BLDG SMP 1-01/1-02 DISCH HDR TO FDT 1 ISOL VLV RMT OPER Sfgd Bldg 790' Trn B ECCS VIv Rm.

El 8.2.3 Ensure a source of fill water is available for the Sump 1-02 by either connecting a hose to 1DD-0345, U1 SFGD BLDG EL 773 DEMIN/RMUW SERV VLV 0345, AND routing the hose to Safeguards Building Floor Drain Sump 1-02 (the hose should be tied down, if possible)

OR using another source of water as approved by the Unit Supervisor.

CPNPP PROCEDURE NO.

OPERATIONS TESTING MANUAL UNIT 1 OPT-518A SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE TEST REVISION NO. 10 PAGE 8 OF 9 NOTE:

0 The next step will establish flow from Sump 1-02 Pump 1-03. Experience indicates that it may take 10-20 seconds for the flow instrument to respond. However, the pump will only run for approximately 50 seconds until low sump level turns the pump off.

0 Indicated flow on portable flow meter of >_50 gpm satisfies full open stroke test for check valve 1VD-001 1 AND full closed stroke test for check valves 1VD-0012, 1VD-0003 and 1VD-0004. Sump level does NOT have to be maintained during the next step.

El 8.2.4 Ensure vibration and flow equipment has been installed and personnel are available to take readings.

L]

8.2.5 Fill Safeguards Building Floor Drain Sump 1-02 until Sump Pump 1-03 STARTS.

8.2.6 Record the following:

El El Indicated flow from the portable flow meter.

Start MH vibration data acquisition approximately 5 to 10 seconds after the pump starts.

L[J 8.2.7 Record 1VD-001 1 full open stroke test results and 1VD-0012, 1VD-0003, 1VD-0004 full closed stroke test results.

El 8.2.8 Open 1EBI-1/8C/BKR, SAFEGUARD BUILDING SUMP 1-02 PMP 1-03 MOTOR BREAKER.

NOTE:

0 The next step will establish flow from Sump 1-02 Pump 1-04. Experience indicates that it may take 10-20 seconds for the flow instrument to respond. However, the pump will only run for approximately 50 seconds until low sump level turns the pump off.

0 Indicated flow on portable flow meter of Ž50 gpm satisfies full open stroke test for check valve 1VD-0012 AND full closed stroke test for check valves 1VD-001 1, 1VD-0003 and 1VD-0004. Sump level does NOT have to be maintained during the next step.

EL 8.2.9 Ensure vibration and flow equipment has been installed and personnel are available to take readings.

r-I 8.2.10 Close 1EBI-1/8H/BKR, SAFEGUARD BUILDING SUMP 1-02 PUMP 1-04 MOTOR BREAKER.

LI 8.2.11 Refill Safeguards Building Floor Drain Sump 1-02 until Sump Pump 1-04 STARTS.

8.2.12 Record the following:

F-1 El Indicated flow from the portable flow meter.

Start MH vibration data acquisition approximately 5 to 10 seconds after the pump starts.

8.2.13 Record 1VD-0012 full open stroke test results and 1VD-0011, 1VD-0003, 1VD-0004 full closed stroke test results.

IJ 8.2.14 Proceed to Section 9.0, Restoration and complete the section.

CPNPP PROCEDURE NO.

OPERATIONS TESTING MANUAL UNIT 1 OPT-518A SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE TEST REVISION NO. 10 PAGE 9 OF 9 9.0 RESTORATION 9.1 Align the Safeguards Bldg Sumps discharge to the Floor Drain Tank by performing the following:

r-A.

Obtain Duty Radwaste Supervisor concurrence prior to alternating sump discharge.

LI B.

Open 1VD-0027-RO, SFGD BLDG SMP 1-01/1-02 DISCH HDR TO FDT 1 ISOL VLV RMT OPER 0I C. Close 1VD-0030, SFGD BLDG SMP 1-01/1-02 DISCH HDR TO WHT X-01 ISOL VLV

[IV]

9.2 Ensure the following breakers are ON:

El a

1EB2-1/9C/BKR, SAFEGUARD BUILDING SUMP 1-01 PUMP 1-01 MOTOR BREAKER EU 1EB2-1/9H/BKR, SAFEGUARD BUILDING SUMP 1-01 PUMP 1-02 MOTOR BREAKER EL 1EB1-1/8C/BKR, SAFEGUARD BUILDING SUMP 1-02 PUMP 1-03 MOTOR BREAKER L-

  • 1EB1-1/8H/BKR, SAFEGUARD BUILDING SUMP 1-02 PUMP 1-04 MOTOR BREAKER LI XB2-2/4J/BKR, AUXILIARY BUILDING SUMP X-06 PUMP X-1 1 MOTOR BREAKER El e XB2-2/4M/BKR, AUXILIARY BUILDING SUMP X-06 PUMP X-12 MOTOR BREAKER LI XB1-2/2J/BKR, AUXILIARY BUILDING SUMP X-08 PUMP X-15 MOTOR BREAKER LI.

XB1-2/2M/BKR, AUXILIARY BUILDING SUMP X-08 PUMP X-16 MOTOR BREAKER El 9.3 Ensure the valve used to fill the sump is closed AND any hose is removed.

9.4 Ensure the following equipment has been removed:

El 0,

Remove the portable flow meter El 0 Remove vibration equipment 10.0 ATTACHMENTS/FORMS 10.1 Attachments None 10.2 Forms 10.2.1 OPT-518A-1, "SFGD BLDG SMP 01 Check Valve Test Data Sheet" 10.2.2 -OPT-518A-2, "SFGD BLDG SMP 02 Check Valve Test Data Sheet"

(For Information Only)

Record of Changes Page 1 Rev/PCN Affected Pages Description of Change 5/1 4

Add instruction to hang test gauge at centerline of pipe (SMF-2003-003683).

6/0 ALL Deleted requirement to place a clearance for pump coupling guard removal (the guards are bolted outside the pump and not near the rotating equipment), added note 5:3.3 that expands on the caution information when approaching the HI-HI Level alarm during sump fill, resequenced steps for initial setup for test since clearance is not required, added step to ensure 1VD-0900 is closed prior to initial pump start and opened after pump start, deleted measurement of hl since the gauge is now hung at the centerline of the pipe and the value is a fixed amount at 15.167 feet, added notification to the Control Room prior to start of sump fill, added operational experience to indicate that flow value on the portable flow instrument takes a little time to stabilize but pump will only run for approximately 50 seconds after start, restoration resequenced since no clearance removal is required, added final position check and IV of for all valves and breakers to the forms.

6/1 2

Changed ASME Section XI to ASME Testing asSection XI. no longer pertains to valves.

6/2 2, 4 Minor reword for LCOAR statement. Increase pressure gauge accuracy to comply with changes to the IST plan.

7/0 all This revision changes the procedure purpose. The sump pumps are no longer required to be tested as part of the IST Plan. This procedure only verifies stroke of the check valves. As a result of this change the title of the procedure has also changed.

8/0 all This revision adds steps to take vibration readings on the Safeguard Building Sump Pumps as part of the interim relief as granted by the NRC per EVAL-2006-002428-01.

9/0 all This revision'adds steps to sections 8.1 and 8.2 to align the Safeguard Building Sumps to the Waste Holdup Tank during flow testing. Step added to section 9.0, Restoration to restore the Safeguard Building Sumps to the Floor Drain Tank.

9/1 3, 4, 5, 6, 7, 8 Remove reference to a pressure gauge in the Prerequisite section. The pressure gauge is longer required for this test procedure. Only two operators are required for this test since maintenance will read the portable flowmeter. Change step 5.1.1 to not allow floor drains to overflow instead of the sump. Change step 8.1.4, 8.1. 9, 8.2.4 and 8.2.9 to ensure the flow equipment has also been installed.

9/2 6, 8 This PCN changes the label for all Safeguards Building Sump Pumps vibration points from MOH to MH. This change is a result of EVAL-2006-003019-01. These are small motors with only one location for MH, MV and MA, therefore, MIH and MOH are the same point (MH).

10/0 Added Auxiliary Building Sump X-06 and X-08 pumps to breaker list per Engineering request. Updated site name.

SFGD BLDG SMP 01 CHECK VALVE TEST DATA SHEET OBSERVED ACCEPTANCE CRITERIA STEP INITIALS 6.0 PREREQUISITES MET 8.1.6 INDICATED FLOW VIBRATION AMPLITUDE TEST REFER MEASURED PARAMETER VALUE VALUE MH 0.105 8.1.7 IVD-0003 FULL OPEN STROKE AND 1VD-0004, 1VD-0011, 1VD-0012 FULL CLOSED STROKE TEST RESULTS 8.1.12 0

INDICATED FLOW 0

VIBRATION AMPLITUDE TEST REFER MEASURED PARAMETER VALUE VALUE L

MH 0.113 8.1.13 1VD-0004 FULL OPEN STROKE AND 1VD-0003, 1VD-0011, 1VD-0012 FULL CLOSED STROKE TEST RESULTS N/A N/A GPM

>50 GPM ALERT LIMIT HIGH

>0.263 ACTION LIMIT HIGH

>0.630 UNITS IN/SEC PK SAT/UNSAT GPM

_>50 GPM (Step 8.1.6)

_>50 GPM ALERT IMIT HIGH

>0.283 ACTION LIMIT HIGH

>0.678 UNITS IN/SEC PK SAT/UNSAT 2!50 GPM (Step 8.1.12) 9.0 RESTORATION 9.1 SAFEGUARDS BUILDING SUMPS ALIGNED TO FLOOR DRAIN TANK 9.2 0

1EB2-1/9C/BKR ON 1EB2-1/9H/BKR ON 1EBI-1/8C/BKR ON 1EBl-1/8H/BKR ON 0

XB2-2/4J/BKR ON 0

XB2-2/4M/BKR ON 0

XB1-2/2J/BKR ON XB1-2/2M/BKR ON OBSERVED N/A ON/OFF ON/OFF ON/OFF ON/OFF ON/OFF ON/OFF ON/OFF ON/OFF INITIALS VERIFIED N/A OPT-518A-1 Page 1 of 2 R-13

SFGD BLDG SMP 01 CHECK VALVE TEST DATA SHEET 9.3 FILL VALVES CLOSED WITH ANY FILL HOSE REMOVED 9.4 REMOVE THE PORTABLE FLOW METER REMOVE VIBRATION EQUIPMENT COMMENTS/DISCREPANCIES:

N/A N/A N/A CORRECTIVE ACTIONS:

PERFORMED BY:

DATE:

SIGNATURE REVIEWED BY:

OPERATIONS MANAGEMENT DATE:

OPT-518A-1 Page 2 of 2 R-13

(For Information Only)

Record of Changes Page 1 Rev/PCN Affected Pages Description of Change 8/0 ALL Form revised to be consistent with OPT-518A revision. Requirement to place a clearance for pump coupling guard removal (the guards are bolted outside the pump and not near the rotating equipment) has been deleted, hl value is now a fixed value of 15.167 feet, added final position check and IV of for all valves and breakers to the

  • forms.

9/0 all A revision to OPT-518A changes the procedure purpose. The sump pumps are no longer required to be tested as part of the IST Plan. This procedure only verifies stroke' of the check valves. As a result of this change the title of the procedure, has also changed.

10/0 ALL This revision adds steps to take vibration readings on the Safeguard Building Sump Pumps as part of the interim relief as granted by the NRC per EVAL-2006-002428-01.

11/0 ALL This revision removes the pump vibration requirements and add a requirement for MOH.

12/0 ALL This revision provides the baseline vibration data for Safeguard Building Sump Pumps 1-01 and 1-02. Had to renumber sections 8.1 and 8.2 because steps were added to the procedure to align the Safeguard Building Sumps to the Waste Holdup Tank for flow testing. Added step 9.1 to verify that the Safeguards Building Sumps are aligned to the Floor Drain Tank.

12/1 1

This PCN changes the label for all Safeguards Building Sump Pumps vibration points from MOH to MH. This changeis a result of EVAL-2006-003019-01. These are small motors with only one location for MH, MV and MA, therefore, MIH and MOH are the same point (MH).

13/0 Added sump X-06 and X-08 breakers to 9.2 to reflect parent procedure changes.

STEP 6.0 PREREQUISITE5 8.2.6 e

INDICAT SFGD BLDG SMP 02 CHECK VALVE TEST DATA SHEET OBSERVED ACCEPTANCE CRITERIA INITIALS S MET N/A N/A ED FLOW GPM

>50 GPM VIBRATION AMPLITUDE TEST REFER MEASURED PARAMETER VALUE VALUE MH 8.2.7 1VD-001 1 FULL OPEN STROKE AND 1VD-0003, 1VD-0004, 1VD-0012 FULL CLOSED STROKE TEST RESULTS 8.2.12 9 INDICATED FLOW VIBRATION AMPLITUDE TEST REFER MEASURED PARAMETER VALUE VALUE MH 8.2.13 1VD-0012 FULL OPEN STROKE AND 1VD-0003, 1VD-0011, 1VD-0004 FULL CLOSED STROKE TEST RESULTS ALERT LIMIT HIGH SAT/UNSAT GPM ALERT LIMIT HIGH SAT/UNSAT ACTION LIMIT HIGH UNITS IN/SEC PK

>_50 GPM (Step 8.2.6)

>_50 GPM ACTION LIMIT HIGH UNITS IN/SEC PK

Ž_50 GPM (Step 8.2.12) 9.0 RESTORATION 9.1 SAFEGUARDS BUILDING SUMPS ALIGNED TO FLOOR DRAIN TANK 9.2 0

1EB2-1/9C/BKR ON 1EB2-1/9H/BKR ON 1EBI-1/8C/BKR ON 1EBI-1/8H/BKR ON XB2-2/4J/BKR ON XB2-2/4M/BKR ON XB1-2/2J/BKR ON XB1-2/2M/BKR ON OBSERVED N/A ON/OFF ON/OFF ON/OFF ON/OFF ON/OFF ON/OFF ON/OFF ON/OFF INITIALS VERIFIED N/A OPT-518A-2 Page 1 of 2 R-12

9.3 9.4 SFGD BLDG SMP 02 CHECK VALVE TEST DATA SHEET FILL VALVES CLOSED WITH ANY FILL HOSE REMOVED REMOVE THE PORTABLE FLOW METER REMOVE VIBRATION EQUIPMENT N/A N/A N/A COMMENTS/DISCREPANCIES:

CORRECTIVE ACTIONS:

PERFORMED BY:

SIGNATURE DATE:

DATE:

REVIEWED BY:

OPERATIONS MANAGEMENT OPT-518A-2 Page 2 of 2 R-12

(For Information Only)

Record of Changes Page 1 Rev/PCN Affected Pages Description of Chanqe 7/0 ALL Form revised to be consistent with OPT-518A revision. Requirement to place a clearance for pump coupling guard removal (the guards are bolted outside the pump and not near the rotating equipment) has been deleted, hl value is now a fixed value of 15.167 feet, added final position check and IV of for all valves and breakers to the forms.

8/0 ALL A revision to OPT-518A changes the procedure purpose. The sump pumps are no longer required to be tested as part of the IST Plan. This procedure only verifies stroke of the check valves. As a result of this change the title of the procedure has also changed.

9/0 ALL This revision adds steps to take vibration readings on the Safeguard Building Sump Pumps as part of the interim relief as granted by the NRC per EVAL-2006-002428-01.

10/0 all This revision removes the pump vibration requirements and add a requirement for MOH.

11/0 ALL This revision renumbers sections 8.1 and 8.2 because steps were added to the procedure to align the Safeguard Building Sumps to the Waste Holdup Tank for flow testing. Added step 9.1 to verify that the Safeguards Building Sumps are aligned to the Floor Drain Tank.

11/1 1

This PCN changes the label for all Safeguards Building Sump Pumps vibration points from MOH to MH. This change is a result of EVAL-2006-003019-01. These are small motors with only one location for MH, MV and MA, therefore, MIH and MOH are the same point (MH).

12/0 Added sump X-06 and X-08 breakers to 9.2 to reflect parent procedure changes.

COMANCHE PEAK NUCLEAR POWER PLANT UNIT 2 OPERATIONS TESTING MANUAL ELECTRONIC CONTROLLED COPY CHANGES ARE NOT INDICATED LATEST CHANGE NOTICE EFFECTIVEDATE

/,

Verify current status in the Document Control Database prior to use.

INITIAL & DATE QUALITY RELATED SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE TEST PROCEDURE NO. OPT-518B REVISION NO. 11 EFFECTIVE DATE: 12/02/08 1200 SURVEILLANCE TEST PREPARED BY (Print):

J.D. Stone TECHNICAL REVIEW BY (Print): Tom Nash Ext: 0564 Ext: 5513 APPROVED BY: D.W. McGaughey for Dave Goodwin DIRECTOR, OPERATIONS Date: 11/19/08

CPNPP PROCEDURE NO.

OPERATIONS TESTING MANUAL UNIT 2 OPT-518B SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE TEST REVISION NO. 11 PAGE 2 OF 9 1.0 PURPOSE This procedure satisfies ASME testing of Safeguards Building Sump Pumps and valves for requirements of Technical Specification 5.5.8, in part.

Section 8.1:

CP2-WPAPSS-01 CP2-WPAPSS-02 2VD-0003 2VD-0004 Section 8.2:

CP2-WPAPSS-03 CP2-WPAPSS-04 2VD-0011 2VD-0012 2.0 ACCEPTANCE AND REVIEW CRITERIA 2.1 Acceptance Criteria 2.1.1 The acceptance criteria are listed on data sheets.

2.2 Review Criteria None 3.0 DEFINITIONS/ACRONYMS None

4.0 REFERENCES

4.1 Performance 4.1.1 Technical Specification 5.5.8, "Inservice Testing Program" 4.1.2 RWS-108, "Vents and Drain System" 4.1.3 TSP-507, "Vibration Data Collection" 4.2 Development 4.2.1 FSAR 9.3.3, "Equipment and Floor Drain System" 4.2.2 DBD-ME-236, "Vents and Drains System" 4.2.3 M2-0236, "Flow Diagram - Vents and Drains System Safeguards and Auxiliary Building" 4.2.4 M2-0236-B, "Flow Diagram - Vents and Drains System Safeguards and Auxiliary Building"

CPNPP PROCEDURE NO.

OPERATIONS TESTING MANUAL UNIT 2 OPT-518B SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE TEST REVISION NO. 11 PAGE 3 OF 9 5.0 PRECAUTIONS. LIMITATIONS AND NOTES 5.1 Precautions 5.1.1 Do NOT allow floor drains to overflow during performance of this test.

5.1.2 The sump is a potentially contaminated area.

5.2 Limitations None 5.3 Notes 5.3.1 This procedure can be used to satisfy Post Work Testing requirements as long as applicable Precautions, Limitations and Prerequisites are satisfied. IF any section is NOT performed in its entirety, THEN fill in the appropriate spaces on the data sheet and N/A all spaces NOT performed.

5.3.2 Approximately 30 feet of hose will be required for this'test (sump fill options are available).

5.3.3 Filling the sumps can cause water to backup and possibly overflow from floor drains. The sump Hi-Hi level alarm should be approached carefully to avoid overfilling the sumps.

Previous test performance observations have indicated that the Hi-Hi level alarm actuates at approximately one (1") inch below the grating in the floor drains.

5.3.4 On September 27, 2006, the NRC granted interim relief for testing the Safeguard Building Sump Pumps. The interim relief is granted for up to two cycles on each Unit and no more than four years. The purpose of this relief is for CPSES to determine a final solution to this problem. Refer to EVAL-2006-002428-01.

CPNPP PROCEDURE NO.

OPERATIONS TESTING MANUAL UNIT 2 OPT-518B SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE TEST REVISION NO. 11 PAGE 4 OF 9 6.0 PREREQUISITES 6.1 This procedure can be performed on Unit 2 in any MODE.

6.2 Notify Maintenance to install a portable flowmeter on at least a 5 foot run of pipe downstream of XVD-0323. (located 790' elev., Rm X-174). IF a Panametrics Flow instrument is used, THEN inform Maintenance that previous test performance has indicated that using the "STATISTICS" mode provides a more rapid collection of data.

Line No.:

3-VD-2-001-152R-5 OD:

3.5 inches Wall Thick:

0.216 inches El 6.3 Two operators are available (one stationed at pump, one stationed upstairs to manipulate breakers).

El 6.4 No operations are in progress that will drain large amounts of water to the Safeguards Building Floor Drain Sumps.

El 6.5 Ensure safeguards sumps are NOT isolated to the rad waste systems.

El 6.6 Notify vibration monitoring personnel to be available for vibration monitoring during pump run.

7.0 TEST EQUIPMENT El 7.1 Portable flow meter with a minimum of +/-2% (or better) of indicated reading accuracy.

El 7.2 30' ft. of hose (sump fill options are available).

S7.3 Vibrometer and transducer meeting the range/accuracy requirements of TSP-507.

CPNPP PROCEDURE NO.

OPERATIONS TESTING MANUAL UNIT 2 OPT-518B SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE TEST REVISION NO. 11 PAGE 5 OF 9 8.0 INSTRUCTIONS 8.1 Safeauards Buildina SumD Pump 2-01/2-02 and Check Valve Test NOTE:

Record all data on OPT-518B-1.

CAUTION:

Do NOT allow sumps to overflow during the performance of this test. Restoration for a sump pump down may require sump pumps to be energized. If this condition occurs prior to test completion the test should be restarted at the last data step ensuring correct lineup per the Shift Manager.

8.1.1 Open the breaker for the pumps:

LI 2EB2-1/9H/BKR, SAFEGUARD BUILDING SUMP 2-01 PUMP 2-02 MOTOR BREAKER LI 2EB1-1/8C/BKR, SAFEGUARD BUILDING SUMP 2-02 PUMP 2-03 MOTOR BREAKER LI 2EBI-1/8H/BKR, SAFEGUARD BUILDING SUMP 2-02 PUMP 2-04 MOTOR BREAKER LI XB2-2/4J/BKR, AUXILIARY BUILDING SUMP X-06 PUMP X-1 1 MOTOR BREAKER EL 0

XB2-2/4M/BKR, AUXILIARY BUILDING SUMP X-06 PUMP X-12 MOTOR BREAKER LI XB1-2/2J/BKR, AUXILIARY BUILDING SUMP X-08 PUMP X-15 MOTOR BREAKER LI XB1-2/2M/BKR, AUXILIARY BUILDING SUMP X-08 PUMP X-16 MOTOR BREAKER 8.1.2 Align the Safeguards Bldg Sumps discharge to the Waste Holdup Tank by performing the following:

LI A. Obtain Duty Radwaste Supervisor concurrence prior to alternating sump discharge.

L B. Open 2VD-0030, SFGD BLDG SMP 2-01/2-02 DISCH HDR TO WHT X-01 ISOL VLV, U2 SFGD BLDG 790' TRN B ECCS VLV RM.

EL C. Close 2VD-0027-RO, SFGD BLDG SMP 2-01/2-02 DISCH HDR TO FDT 2 ISOL VLV RMT OPER, U2 SFGD BLDG 800' TRN B ECCS VLV OPERATING ROOM.

EL D. Verify Open XVD-0323, U2 SFGD BLDG FLR DRN HDR TO WHT X-01 ISOL VLV, AB 790' Boron Recycle Panel Area.

rI 8.1.3 Ensure a water supply for filling Sump 2-01 is available by: using XWP-7414B, LWPS FDT 2 DRN VLV OR by connecting a hose to 2DD-0346, U2 SFGD BLDG EL 773 DEMIN/RMUW SERV VLV 0346 (located outside RHR Pump Room 2-052) AND routing hose to Safeguards Building Floor Drain Sump 2-01 (hose should be tied down, if possible).

CPNPP PROCEDURE NO.

OPERATIONS TESTING MANUAL UNIT 2 OPT-518B SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE TEST REVISION NO. 11 PAGE 6 OF 9 NOTE:

0 The next step will establish flow from Sump 2-01 Pump 2-01. Experience indicates that it may take 10-20 seconds for the flow instrument to respond. However, the pump will only run for approximately 50 seconds until low sump level turns the pump off.

0 Indicated flow on portable flow meter of 2!50 gpm satisfies full open stroke test for check valve 2VD-0003 AND full closed stroke test for check valves 2VD-0004, 2VD-001 1 and 2VD-0012. Sump level does NOT have to be maintained during the next step.

E El 8.1.4 Ensure vibration and flow equipment has been installed and personnel are available to take readings.

8.1.5 Fill Safeguards Building Floor Drain Sump 2-01 until Sump Pump 2-01 STARTS.

8.1.6 Record the following:

LI LI Indicated flow from the portable flow meter.

Start MH vibration data acquisition approximately 5 to 10 seconds after the pump starts.

0I 0I 8.1.7 Record 2VD-0003 full open stroke test results and 2VD-0004, 2VD-0011, 2VD-0012 full closed stroke test results.

8.1.8 Open 2EB2-1/9C/BKR, SAFEGUARD BUILDING SUMP 2-01 PMP 2-01 MOTOR BREAKER.

NOTE:

0 The next step will establish flow from Sump 2-01 Pump 2-02. Experience indicates that it may take 10-20 seconds for the flow instrument to respond. However, the pump will only run for approximately 50 seconds until low sump level turns the pump off.

0 Indicated flow on portable flow meter Ž> 50 gpm satisfies full open stroke, test for check valve 2VD-0004 AND full closed stroke test for check valves 2VD-0003, 2VD-001 1 and 2VD-0012. Sump level does NOT have to be maintained during the next step.

El LI 8.1.9 Ensure vibration and flow equipment has been installed and personnel are available to take readings.

8.1.10 Close 2EB2-1/9H/BKR, SAFEGUARDS BUILDING SUMP 2-01 PUMP 2-02 MOTOR BREAKER.

8.1.11 Refill Safeguards Building Floor Drain Sump 2-01 until Sump Pump 2-02 STARTS.

8.1.12 Record the following:

El El Indicated flow from the portable flow meter.

Start MH vibration data acquisition approximately 5 to 10 seconds after the pump starts.

0L 8.1.13 Record 2VD-0004 full open stroke test results and 2VD-0003, 2VD-001 1, 2VD-0012, full closed stroke test results.

LI 8.1.14 Proceed to Section 9.0), Restoration and complete the section.

CPNPP PROCEDURE NO.

OPERATIONS TESTING MANUAL UNIT 2 OPT-518B SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE TEST REVISION NO. 11 PAGE 7 OF 9 8.2 Safeguards Building Sump Pump 2-03/2-04 and Check Valve Test NOTE:

Record all data on OPT-518B-2.

CAUTION:

Do NOT allow sumps to overflow during the performance of this test. Restoration for a sump completion the test should be restarted at the last data step ensuring correct lineup per the hift Manager.

8.2.1 Open the following breakers:

LI 2EB2-1/9C/BKR, SAFEGUARD BUILDING SUMP 2-01 PUMP 2-01 MOTOR BREAKER El 0 2EB2-1/9H/BKR, SAFEGUARD BUILDING SUMP 2-01 PUMP 2-02 MOTOR BREAKER L

  • 0 2EBI-1/8H/BKR, SAFEGUARD BUILDING SUMP 2-02 PUMP 2-04 MOTOR BREAKER Li XB2-2/4J/BKR, AUXILIARY BUILDING SUMP X-06 PUMP X-1 1 MOTOR BREAKER EL 0

XB2-2/4M/BKR, AUXILIARY BUILDING SUMP X-06 PUMP X-12 MOTOR BREAKER LI XB1-2/2J/BKR, AUXILIARY BUILDING SUMP X-08 PUMP X-15 MOTOR BREAKER LI XB1-2/2M/BKR, AUXILIARY BUILDING SUMP X-08 PUMP X-16 MOTOR BREAKER 8.2.2 Align the Safeguards Bldg Sumps discharge to the Waste Holdup Tank by performing the following:

Li A. Obtain Duty Radwaste Supervisor concurrence prior to alternating sump discharge.

EL B. Open 2VD-0030, SFGD BLDG SMP 2-01/2-02 DISCH HDR TO WHT X-01 ISOL VLV, U2 SFGD BLDG 790' TRN B ECCS VLV RM.

EL C. Close 2VD-0027-RO, SFGD BLDG SMP 2-01/2-02 DISCH HDR TO FDT 2 ISOL VLV RMT OPER, U2 SFGD BLDG 800' TRN B ECCS VLV OPERATING ROOM.

EL D. Verify Open XVD-0323, U2 SFGD BLDG FLR DRN HDR TO WHT X-01 ISOL VLV, AB 790' Boron Recycle Panel Area.

Li 8.2.3 Ensure a source of fill water is available for the Sump 2-02 by either connecting a hose to 2DD-0345, U2 SFGD BLDG EL 773 DEMIN/RMUW SERV VLV 0345, AND routing the hose to Safeguards Building Floor Drain Sump 2-02 (the hose should be tied down, if possible)

OR using another source of water as approved by the Unit Supervisor.

CPNPP PROCEDURE NO.

OPERATIONS TESTING MANUAL UNIT 2 OPT-518B SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE TEST REVISION NO. 11 PAGE 8 OF 9 NOTE:

The next step will establish flow from Sump 2-02 Pump 2-03. Experience indicates that it may take 10-20 seconds for the flow instrument to respond. However, the pump will only run for approximately 50 seconds until low sump level turns the pump off.

0 Indicated flow on portable flow meter of _>50 gpm satisfies full open stroke test for check valve 2VD-001 1 AND full closed stroke test for check valves 2VD-0012, 2VD-0003 and 2VD-0004. Sump level does NOT have to be maintained during the next step.

D LI 8.2.4 Ensure vibration and flow equipment has been installed and personnel are available to take readings.

8.2.5 Fill Safeguards Building Floor Drain Sump 2-02 until Sump Pump 2-03 STARTS.

8.2.6. Record the following:

El 0 Indicated flow from the portable flow meter.

E]

Start MH vibration data acquisition approximately 5 to 10 seconds after the pump starts.

8.2.7 Record 2VD-0011 full open stroke test results and 2VD-0012, 2VD-0003, 2VD-0004 full closed stroke test results.

8.2.8 Open 2EB1-1/8C/BKR, SAFEGUARD BUILDING SUMP.2-02 PMP 2-03 MOTOR BREAKER.

LI NOTE:

The next step will establish flow from Sump 2-02 Pump 2-04. Experience indicates that it may take 10-20 seconds for the flow instrument to respond. However, the pump will only run for approximately 50 seconds until low sump level turns the pump off.

0 Indicated flow on portable flow meter of Ž>50 gpm satisfies full open stroke test for check valve 2VD-0012 AND full closed stroke test for check valves 2VD-001 1, 2VD-0003 and 2VD-0004. Sump level does NOT have to be maintained during the next step.

El El 8.2.9 Ensure vibration and flow equipment has been installed and personnel are available to take readings.

8.2.10 Close 2EBI-1/8H/BKR, SAFEGUARD BUILDING SUMP 2-02 PUMP 2-04 MOTOR BREAKER.

8.2.11 Refill Safeguards Building Floor Drain Sump 2-02 until Sump Pump 2-04 STARTS.

8.2.12 Record the following:

EL 0

Indicated flow from the portable flow meter.

EL 0

Start MH vibration data acquisition approximately 5 to 10 seconds after the pump starts.

8.2.13 Record 2VD-0012 full open stroke test results and 2VD-0011, 2VD-0003, 2VD-0004 full closed stroke test results..

El 8.2.14 Proceed to Section 9.0, Restoration and complete the section.

CPNPP PROCEDURE NO.

OPERATIONS TESTING MANUAL UNIT 2 OPT-518B SAFEGUARDS BUILDING SUMP PUMPS AND CHECK VALVE TEST REVISION NO. 11 PAGE 9 OF 9 9.0 RESTORATION 9.1 Align the Safeguards Bldg Sumps discharge to the Floor Drain Tank by performing the following:

El A.

Obtain Duty Radwaste Supervisor concurrence prior to alternating sump discharge.

EI B.

Open 2VD-0027-RO, SFGD BLDG SMP 2-01/2-02 DISCH HDR TO FDT 2 ISOL VLV RMT OPER, in the U2 SFGD BLDG 800' TRN B ECCS VLV OPERATING ROOM.

El C. Close 2VD-0030, SFGD BLDG SMP 2-01/2-02 DISCH HDR TO WHT X-01 ISOL VLV, in the U2 SFGD BLDG 790' TRN B ECCS VLV RM.

[IV]

9.2 Ensure the following breakers are ON:

LI 2EB2-1/9C/BKR, SAFEGUARD BUILDING SUMP 2-01 PUMP 2-01 MOTOR BREAKER LI 2EB2-1/9H/BKR, SAFEGUARD BUILDING SUMP 2-01 PUMP 2-02 MOTOR BREAKER EL 2EB1-1/8C/BKR, SAFEGUARD BUILDING SUMP 2-02 PUMP 2-03 MOTOR BREAKER LI

  • 2EB1-1/8H/BKR, SAFEGUARD BUILDING SUMP 2-02 PUMP 2-04 MOTOR BREAKER LI XB2-2/4J/BKR, AUXILIARY BUILDING SUMP X-06 PUMP X-1 1 MOTOR BREAKER EL 0

XB2-2/4M/BKR, AUXILIARY BUILDING SUMP X-06 PUMP X-12 MOTOR BREAKER LI XB1-2/2J/BKR, AUXILIARY BUILDING SUMP X-08 PUMP X-15 MOTOR BREAKER EL XB1-2/2M/BKR, AUXILIARY BUILDING SUMP X-08 PUMP X-16 MOTOR BREAKER El 9.3 Ensure the valve used to fill the sump is closed AND any hose is removed.

9.4 Ensure the following equipment has been removed:

LI S

Remove the portable flow meter LI Remove vibration equipment 10.0 ATTACHMENTS/FORMS 10.1 Attachments

'None 10.2 Forms 10.2.1 OPT-518B-1, "SFGD BLDG SMP 01 Check Valve Test Data Sheet" 10.2.2 OPT-518B-2, "SFGD BLDG SMP 02 Check Valve Test Data Sheet"

(For Information Only)

Record of Changes Page 1 Rev/PCN Affected Pages Description of Change 6/1 4

Add instruction to hang test gauge at centerline of pipe (SMF-2003-003683).

7/0 ALL Deleted requirement to place a clearance for pump coupling guard removal (the guards are bolted outside the pump and not near the rotating equipment), added note 5.3.3 that expands on the caution information when approaching the HI-HI Level alarm during sump fill, resequenced steps for initial setup for test since clearance is not required, added step to ensure 2VD-0621 is closed prior to initial pump start and opened after pump start, deleted measurement of hl since the gauge is now hung at the centerline of the pipe and the value is a fixed. amount at 17.645 feet, added notification to the Control Room prior to start of sump fill, added operational experience to indicate that flow value on the portable flow instrument takes a little time to stabilize but pump will only run for approximately 50 seconds after start, restoration resequenced since no clearance removal is required, added final position check and IV of for all valves and breakers to the forms.

7/1 5, 9, 13 Changed "RO" to "RO" for 2VD-0027-R0, added [IV] designator to Steps 9.5, 9.6 and 9.7 to be consistent with forms.

7/2 2

Changed ASME Section XI to ASME Testing asSection XI no longer pertains to valves.

7/3 2, 4 Minor reword for LCOAR statement. Increase pressure gauge accuracy to comply with changes to the IST plan.

8/0 ALL This revision changes the procedure purpose. The sump pumps are no longer required to be tested as part of the IST Plan. This procedure only verifies stroke of the check valves. As a result of this change the title of the procedure has also changed.

9/0 all This revision adds steps to take vibration readings on the Safeguard Building Sump Pumps as part of the interim relief as granted by the NRC per EVAL-2006-002428-01.

10/0 all This revision adds steps to sections 8.1 and 8.2 to align the Safeguard Building Sumps to the Waste Holdup Tank during flow testing. Step added to section 9.0, Restoration to restore the Safeguard Building Sumps to the Floor Drain Tank.

10/1 3, 4, 5, 6, 7, 8 Remove reference to a pressure gauge in the Prerequisite section. The pressure gauge is longer required for this test procedure. Only two operators are required for this test since maintenance will read the portable flowmeter. Correct typo by changing Unit 1 to Unit 2. change step 5.1.1 to not allow floor drains to overflow instead of the sump.

'Change step 6.2 to have the flowmeter placed downstream of valve XVD-0323. This is a low does area. Change step 8.1.4, 8.1. 9, 8.2.4 and 8.2.9 to ensure the flow equipment has also been installed.

10/2 6, 8 This PCN changes the label for all Safeguards Building Sump Pumps vibration points from MOH to MH. This change is a result of EVAL-2006-003019-01. These are small motors with only one location for MH, MV and MA, therefore, MIH and MOH are the same point (MH).

11/0 Added Auxiliary Building Sump X-06 and X-08 pumps to breaker list per Engineering request. Updated site name.

SFGD BLDG SMP 01 CHECK STEP VALVE TEST DATA SHEET OBSERVED ACCEPTANCE CRITERIA INITIALS N/A N/A GPM 50 GPM 6.0 PREREQUISITES MET 8.1.6 0

INDICATED FLOW 0

VIBRATION AMPLITUDE TEST REFER MEASURED PARAMETER VALUE VALUE MH 0.053 8.1.7 2VD-0003 FULL OPEN AND 2VD-0004, 2VD-0011, 2VD-0012 FULL CLOSED STROKE TEST RESULTS 8.1.12 0

INDICATED FLOW 0

VIBRATION AMPLITUDE ALERT LIMIT HIGH 0.133 ACTION LIMIT HIGH 0.318 UNITS IN/SEC PK SAT/UNSAT GPM

>Ž50 GPM (Step 8.1.6) 2!50 GPM TEST REFER MEASURED PARAMETER VALUE VALUE L

MH 0.100 8.1.13 2VD-0004 FULL OPEN STROKE AND 2VD-0003, 2VD-0011, 2VD-0012 FULL CLOSED STROKE TEST RESULTS ALERT IMIT HIGH 0.250 ACTION LIMIT HIGH 0.600 UNITS IN/SEC PK

_>50 GPM (Step 8.1.12)

SAT/UNSAT

/

9.0 RESTORATION 9.1 SAFEGUARDS BUILDING DRAIN TANK 9.2 S

2EB2-1/9C/BKR 2EB2-1/9H/BKR 2EBI-1/8C/BKR 2EB'1-1/8H/BKR XB2-2/4J/BKR XB2-2/4M/BKR XB1-2/2J/BKR XB1-2/2M/BKR OBSERVED N/A INITIALS VERIFIED N/A SUMPS ALIGNED TO FLOOR ON ON ON ON ON ON ON ON ON/OFF ON/OFF ON/OFF ON/OFF ON/OFF ON/OFF ON/OFF ON/OFF OPT-518B-1 Page 1 of 2 R-16

9.3 9.4 SFGD BLDG SMP 01 CHECK VALVE TEST DATA SHEET FILL VALVES CLOSED WITH ANY FILL HOSE REMOVED REMOVE THE PORTABLE FLOW METER REMOVE VIBRATION EQUIPMENT N/A N/A N/A COMMENTS/DISCREPANCIES:

CORRECTIVE ACTIONS:

PERFORMED BY:

DATE:

SIGNATURE REVIEWED BY:

DATE:_______

OPERATIONS MANAGEMENT OPT-51 8B-1 Page 2 of 2 R-16

(For Information Only)

Record of Changes Page 1 Rev/PCN Affected Pages Description of Change 10/0 ALL Form revised to be consistent with OPT-518B revision. Requirement to place a clearance for pump coupling guard removal (the guards are bolted outside the pump and not near the rotating equipment) has been deleted, hl value is now a fixed value of 15.167 feet, added final position check and IV of for all valves and breakers to the forms.

11/0 all A revision to OPT-518B changes the procedure purpose. The sump pumps are no longer required to be tested as part of the IST Plan. This procedure only verifies stroke of the check valves. As a result of this change the title of the procedure has also changed.

12/0 all This revision adds steps to take vibration readings on the Safeguard Building Sump Pumps as part of the interim relief as granted by the NRC per EVAL-2006-002428-01.

13/0 all This revision removes the pump vibration requirements and add a requirement for MOH.

14/0 all This revision renumbers sections 8.1 and 8.2 because steps were added to the procedure to align the Safeguard Building Sumpsto the Waste Holdup Tank for flow testing. Added step 9.1 to verify that the Safeguards Building Sumps are aligned to the Floor Drain Tank.

14/1 1

This PCN changes the label for all Safeguards Building Sump Pumps vibration points from MOH to MH. This change is a result of EVAL-2006-003019-01. These are small motors with only one location for MH, MV and MA, therefore, MIH and MOH are the same point (MH).

15 Added reference, alert high, and action high values per EVAL-2008-003019.

16/0 Added sump X-06 and X-08 breakers to 9.2 to reflect parent procedure changes.

SFGD BLDG SMP 02 CHECK V' STEP ALVE TEST DATA SHEET OBSERVED ACCEPTANCE CRITERIA INITIALS N/A N/A GPM

>50 GPM 6.0 PREREQUISITES MET 8.2.6 0

INDICATED FLOW VIBRATION AMPLITUDE TEST REFER MEASURED PARAMETER VALUE VALUE I

MH 0.117 8.2.7 2VD-001 1 FULL OPEN AND 2VD-0003, 2VD-0004, 2VD-0012 FULL CLOSED STROKE TEST RESULTS 8.2.12. 0 INDICATED FLOW VIBRATION AMPLITUDE TEST REFER MEASURED PARAMETER VALUE VALUE I

MH 0.054 8.2.13 2VD-0012 FULL OPEN STROKE AND 2VD-0003, 2VD-001 1, 2VD-0004 FULL CLOSED STROKE TEST RESULTS ALERT IMIT HIGH 0.293 SAT/UNSAT GPM ALERT IMIT HIGH 0.135 SAT/UNSAT ACTION LIMIT HIGH 0.700 UNITS IN/SEC PK

Ž50 GPM (Step 8.2.6)

_>50 GPM ACTION LIMIT HIGH 0.324

Ž>50 GPM (Step 8.2.12)

UNITS IN/SEC PK 9.0 RESTORATION 9.1 SAFEGUARDS BUILDING SUMPS ALIGNED TO FLOOR DRAIN TANK 9.2 0

2EB2-1/9C/BKR ON 2EB2-1/9H/BKR ON 2EBI-1/8C/BKR ON 2EBI-1/8H/BKR ON XB2-2/4J/BKR ON XB2-2/4M/BKR ON XB1-2/2J/BKR ON XB1-2/2M/BKR ON OBSERVED N/A INITIALS VERIFIED N/A ON/OFF ON/OFF ON/OFF ON/OFF ON/OFF ON/OFF ON/OFF ON/OFF OPT-51i8B-2 Page 1 of 2 R-17

SFGD BLDG SMP 02 CHECK VALVE TEST DATA SHEET 9.3 FILL VALVES CLOSED WITH ANY FILL HOSE REMOVED 9.4 0

REMOVE THE PORTABLE FLOW METER 0

REMOVE VIBRATION EQUIPMENT COMMENTS/DISCREPANCIES:

N/A N/A N/A CORRECTIVE ACTIONS:

PERFORMED BY:

REVIEWED BY:

DATE:

SIGNATURE DATE:

OPERATIONS MANAGEMENT OPT-51 8B-2 Page 2 of 2 R-17

(For Information Only)

Record of Changes Page 1 Rev/PCN Affected Pages Description of Change 10/0 ALL Form revised to be consistent with OPT-518B revision. Requirement to place a clearance for pump coupling guard removal (the guards are bolted outside the pump and not near the rotating equipment) has been deleted, hl value is now a fixed value of 15.167 feet, added final position check and IV of for all valves and breakers to the forms.

11/0 ALL New testing limits for the 2-04 pump per EVAL-2005-000556-01-00.

12/0 ALL A revision to OPT-518B changes the procedure purpose. The sump pumps are no longer required to be tested as part of the IST Plan. This procedure only verifies stroke, of the check valves. As a result of this change the title of the procedure has also changed.'

13/0 ALL This revision adds steps to take vibration readings on the Safeguard Building Sump Pumps as part of the interim relief as granted by the NRC per EVAL-2006-002428-01.

14/0 all This revision removes the pump vibration requirements and add a requirement for MOH.

15/0 ALL This revision renumbers sections 8.1 and 8.2 because steps were added to the procedure to align the Safeguard Building Sumps to the Waste Holdup Tank for flow testing. Added step 9.1 to verify that the Safeguards Building Sumps are aligned to the Floor Drain Tank.

16/0 ALL This revision incorporates Safeguards Sump Pump 2-03 and 2-04 vibration data as supplied by EVAL-2007-000058-01.

16/1 1

This PCN changes the label for all Safeguards Building Sump Pumps vibration points from MOH to MH. This change is a result of EVAL-2006-003019-01. These are small motors with' only one location for MH, MV and MA, therefore, MIH and MOH are the same point (MH).

16/2 1

Updates Safeguards Sump Pump 2-03 vibration data as supplied by EVAL-2008-002402-02.

17/0 Added sump X-06 and X-08 breakers to 9.2 to reflect parent procedure changes.