DCL-12-047, Proposed Implementation Schedule for License Amendment Request 11-06, Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Pacific Gas and Electric Company | {{#Wiki_filter:Pacific Gas and Electric Company April 30, 2012 PG&E Letter DCL-12-047 u.s. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 James R. Becker Site Vice President 10 CFR 50.90 Diablo Canyon Power Plant Mail Code 104/6 P. O. Box 56 Avila Beach, CA 93424 805.545.3462 Internal: 691.3462 Fax: 805.545.6445 Proposed Implementation Schedule for License Amendment Request 11-06, Revision to Technical Specification 3.3.5, "Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation" | ||
==Dear Commissioners and Staff:== | ==Dear Commissioners and Staff:== | ||
Pursuant to 10 CFR 50.90, Pacific Gas and Electric Company (PG&E) submitted an application for amendment to Facility Operating License Nos. DPR-80 and DPR-82 by PG&E Letter DCL-11-072, "License Amendment Request 11-06, Revision to Technical Specification 3.3.5, 'Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation,'" dated October 24,2011. PG&E Letter DCL-11-072 submitted for Nuclear Regulatory Commission (NRC) review and approval proposed to revise Technical Specification (TS) 3.3.5, "Loss of Power (LOP) Diesel Generator (DG) | Pursuant to 10 CFR 50.90, Pacific Gas and Electric Company (PG&E) submitted an application for amendment to Facility Operating License Nos. DPR-80 and DPR-82 by PG&E Letter DCL-11-072, "License Amendment Request 11-06, Revision to Technical Specification 3.3.5, 'Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation,'" dated October 24,2011. PG&E Letter DCL-11-072 submitted for Nuclear Regulatory Commission (NRC) review and approval proposed to revise Technical Specification (TS) 3.3.5, "Loss of Power (LOP) Diesel Generator (DG) | ||
Start Instrumentation," revise Final Safety Analysis Report Update (FSARU) | Start Instrumentation," revise Final Safety Analysis Report Update (FSARU) | ||
| Line 27: | Line 26: | ||
In PG&E letter DCL-11-072, PG&E requested that the license amendments be made effective upon NRC issuance, to be implemented during Unit 2 Refueling Outage 17 and Unit 1 Refueling Outage 18. To facilitate the actions required to implement the license amendments, PG&E requests that the implementation schedule be changed to "during Unit 1 Refueling Outage 18 and Unit 2 Refueling Outage 18." | In PG&E letter DCL-11-072, PG&E requested that the license amendments be made effective upon NRC issuance, to be implemented during Unit 2 Refueling Outage 17 and Unit 1 Refueling Outage 18. To facilitate the actions required to implement the license amendments, PG&E requests that the implementation schedule be changed to "during Unit 1 Refueling Outage 18 and Unit 2 Refueling Outage 18." | ||
If you have any questions or require additional information, please contact Mr. Tom Baldwin at (805) 545-4720. | If you have any questions or require additional information, please contact Mr. Tom Baldwin at (805) 545-4720. | ||
Sincerely, A member | Sincerely, A | ||
member of the STARS (Strategic Teaming and Resource Sharing) | |||
Alliance Callaway | |||
* Comanche Peak | * Comanche Peak | ||
* Diablo Canyon | * Diablo Canyon | ||
| Line 33: | Line 34: | ||
* San Onofre | * San Onofre | ||
* South Texas Project | * South Texas Project | ||
* Wolf Creek | * Wolf Creek | ||
Document Control Desk | Document Control Desk April 30, 2012 PG&E Letter DCL-12-047 Page 2 d ngd/4955/5030 1167 cc: | ||
Gary W. Butner, Branch Chief, California Department of Public Health Elmo E. Collins, NRC Region IV Michael S. Peck, NRC, Senior Resident Inspector Joseph M. Sebrosky, NRR Project Manager Diablo Distribution A | |||
member of the STARS (Strategic Teaming and Resource Sharing) | |||
Alliance Callaway | |||
* Comanche Peak | * Comanche Peak | ||
* Diablo Canyon | * Diablo Canyon | ||
Latest revision as of 03:25, 12 January 2025
| ML12122A012 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 04/30/2012 |
| From: | Becker J Pacific Gas & Electric Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| DCL-12-047 | |
| Download: ML12122A012 (2) | |
Text
Pacific Gas and Electric Company April 30, 2012 PG&E Letter DCL-12-047 u.s. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 James R. Becker Site Vice President 10 CFR 50.90 Diablo Canyon Power Plant Mail Code 104/6 P. O. Box 56 Avila Beach, CA 93424 805.545.3462 Internal: 691.3462 Fax: 805.545.6445 Proposed Implementation Schedule for License Amendment Request 11-06, Revision to Technical Specification 3.3.5, "Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation"
Dear Commissioners and Staff:
Pursuant to 10 CFR 50.90, Pacific Gas and Electric Company (PG&E) submitted an application for amendment to Facility Operating License Nos. DPR-80 and DPR-82 by PG&E Letter DCL-11-072, "License Amendment Request 11-06, Revision to Technical Specification 3.3.5, 'Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation,'" dated October 24,2011. PG&E Letter DCL-11-072 submitted for Nuclear Regulatory Commission (NRC) review and approval proposed to revise Technical Specification (TS) 3.3.5, "Loss of Power (LOP) Diesel Generator (DG)
Start Instrumentation," revise Final Safety Analysis Report Update (FSARU)
Appendix 6.20 and Sections 6.3, 15.3, and 15.4, revise the loss-of-coolant accident control room operator and offsite do~e analysis of record described in the FSARU, and provide a new process for revising input values to this analysis.
In PG&E letter DCL-11-072, PG&E requested that the license amendments be made effective upon NRC issuance, to be implemented during Unit 2 Refueling Outage 17 and Unit 1 Refueling Outage 18. To facilitate the actions required to implement the license amendments, PG&E requests that the implementation schedule be changed to "during Unit 1 Refueling Outage 18 and Unit 2 Refueling Outage 18."
If you have any questions or require additional information, please contact Mr. Tom Baldwin at (805) 545-4720.
Sincerely, A
member of the STARS (Strategic Teaming and Resource Sharing)
Alliance Callaway
- Comanche Peak
- Diablo Canyon
- Palo Verde
- San Onofre
- South Texas Project
- Wolf Creek
Document Control Desk April 30, 2012 PG&E Letter DCL-12-047 Page 2 d ngd/4955/5030 1167 cc:
Gary W. Butner, Branch Chief, California Department of Public Health Elmo E. Collins, NRC Region IV Michael S. Peck, NRC, Senior Resident Inspector Joseph M. Sebrosky, NRR Project Manager Diablo Distribution A
member of the STARS (Strategic Teaming and Resource Sharing)
Alliance Callaway
- Comanche Peak
- Diablo Canyon
- Palo Verde
- San Onofre
- South Texas Project
- Wolf Creek