Letter Sequence RAI |
|---|
|
|
MONTHYEARML1130102002011-10-24024 October 2011 LAR-11-006 - Revision to Technical Specification 3.3.5. Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation Project stage: Request DCL-11-072, Attachment 2 - Potential Transformer Characteristic Ratio and Phase Angle Curve2011-10-24024 October 2011 Attachment 2 - Potential Transformer Characteristic Ratio and Phase Angle Curve Project stage: Request ML1202406872012-01-24024 January 2012 Acceptance Review Email, License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power DG Start Instrumentation and Fsaru Project stage: Acceptance Review ML1206101612012-03-0101 March 2012 Email, Request for Additional Information, License Amendment Request 11-06, Revision to Technical Specification 3.3.5, Loss of Power Diesel Generator Start Instrumentation Project stage: RAI ML1206902582012-03-0909 March 2012 Email, Request for Additional Information, Round 2, Amendment Request, Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation, and Fsaru Project stage: RAI DCL-12-031, Response to NRC Request for Additional Information Regarding PG&E Letter DCL-11-072, License Amendment Request 11-06, Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation Dated October2012-03-30030 March 2012 Response to NRC Request for Additional Information Regarding PG&E Letter DCL-11-072, License Amendment Request 11-06, Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation Dated October 1 Project stage: Response to RAI DCL-12-038, Response to NRC Request for Additional Information Regarding PG&E Letter DCL-11-072. License Amendment Request 11-06, Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start2012-04-12012 April 2012 Response to NRC Request for Additional Information Regarding PG&E Letter DCL-11-072. License Amendment Request 11-06, Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Project stage: Response to RAI DCL-12-047, Proposed Implementation Schedule for License Amendment Request 11-06, Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation2012-04-30030 April 2012 Proposed Implementation Schedule for License Amendment Request 11-06, Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation Project stage: Request ML1213205642012-05-11011 May 2012 Email, Request for Additional Information, Round 3, Amendment Request, Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation, and Final Safety Analysis Report Update Project stage: RAI DCL-12-062, Response to NRC Request for Additional Information Regarding PG&E Letter DCL-11-0722012-06-18018 June 2012 Response to NRC Request for Additional Information Regarding PG&E Letter DCL-11-072 Project stage: Response to RAI ML1217903462012-06-27027 June 2012 Email, Request for Additional Information, Round 4, Amendment Request, Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation, and Final Safety Analysis Report Update Project stage: RAI ML12275A1452012-10-0303 October 2012 FRN, Withdrawal of License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation, and Final Safety Analysis Report Update Project stage: Withdrawal ML12275A1442012-10-0303 October 2012 Withdrawal of License Amendment Request Project stage: Withdrawal 2012-03-09
[Table View] |
Text
From:
Sebrosky, Joseph Sent:
Friday, March 09, 2012 11:00 AM To:
Soenen, Philippe R Cc:
Lent, Susan; Burkhardt, Janet; 'Baldwin, Thomas (DCPP)'; Mazumdar, Subinoy; Stattel, Richard; Rahn, David
Subject:
RE: Request for Additional information for DCPP regarding TS 3.3.5 (ME7520 and ME 7521)
- Philippe, By letter dated October 24, 2011, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML113010196), Pacific Gas and Electric Company (PG&E) submitted PG&E Letter DCL-11-072, License Amendment Request 11-06 Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation.
PG&E submitted a request for revision to Facility Operating License Nos. DPR-80 and DPR-82, revising Technical Specification (TS) 3.3.5 and final safety analysis report update (FSARU)
Appendix 6.2D and Sections 6.3, 15.3, and 15.4, revise the loss-of-coolant accident (LOCA) control room operator and offsite dose analysis of record described in the FSARU, and provide a new process for revising input values to this analysis.
The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the information provided in your application and determined that the following additional information is required in order to complete its review. This request for additional information (RAI) was discussed with you on March 8, 2012. It was agreed that a response to this RAI would be provided by April 9, 2012.
Should the NRC determine that this RAI is no longer necessary prior to this date, the request will be withdrawn. If circumstances result in the need to revise the requested response date, please contact me at (301) 415-1132 or via e-mail at joseph.sebrosky@nrc.gov. The NRC staff has determined that no security-related or proprietary information is contained herein.
Request for Additional Information
- 4. It is stated in clause 5.2 of Calculation No. 9000041128, Since the two sided T1A uncertainty is calculated at 95% Cl (CUDO = 1.96 X ), the one sided actuation point 95% probability will equal to (1.645 X ) or in other words: (1.645 / 1.96)
Provide a technical justification as to why a one-sided probability distribution of channel uncertainty is used in calculating compliance to the NRC staffs position requiring a 95/95 tolerance limit for this application.
- 5. Clause 4, Inputs, lists reference accuracy for the devices used for 4.16 kV Bus Under-Voltage Relay & Timer setpoint calculations. Provide documentation to demonstrate that the reference accuracies used for all these devices are valid for a minimum of 95/95 confidence level as stated in RG 1.105., i.e. - 2 to 2.
- 6. Please provide diagrams indicating how the different devices described above are connected including the connection of the potential transformers and the relays, to enable the staff to understand the justifications requested above. Indicate what combination of relays are required to ensure that the required protective action is successfully achieved.