{{#Wiki_filter:S. ..-
{{#Wiki_filter:S...-
rv
rv
                                                                                                                  -1 iAMRO MM2S 100 0   00 200 100 100,.
-1 iAMRO MM2S 100 0 00 200 100 100,.
k~owTIRS LIP Ratios and Estimates for Durations Less Than 1-Hour Duration                         5 Minutes                 15 Minutes                         30 Minutes Ratio to 1 Hour LIP                       0.32                       0.50                                 0.73 LIP                 19.4 in. x 0.32 = 6.21 in. 19.4 in. x 0.50 = 9.70 in.     19.4 in. x 0.73 = 14.16 in.
k~owTIRS LIP Ratios and Estimates for Durations Less Than 1-Hour Duration 5 Minutes 15 Minutes 30 Minutes Ratio to 1 Hour LIP 0.32 0.50 0.73 LIP 19.4 in. x 0.32 = 6.21 in.
19.4 in. x 0.50 = 9.70 in.
19.4 in. x 0.73 = 14.16 in.


==Reference:==
==Reference:==
NOAA, 1982.
NOAA, 1982.
Legend:
Legend:
Figure 4-1
Figure 4-1 Turkey Point Nuclear Generating Station Units 3&4 (PTN)
* Turkey Point Nuclear Generating Station Units 3&4 (PTN)                                       HMR52 hour 1-Square Mile PMP Document Name: FPL062-GIS-A015                                             Flooding Hazard Reevaluation By: MLS Date: 2/8/2013                                     Turkey Point Nuclear Generating Station Units 3&4 (PTN)
HMR52 hour 1-Square Mile PMP Document Name: FPL062-GIS-A015 Flooding Hazard Reevaluation By: MLS Date: 2/8/2013 Turkey Point Nuclear Generating Station Units 3&4 (PTN)


20.0                                                                     19.4 inches 1-hour 18.0 16.0 14.0 0    12.0 4.0                                         I 10.0 Cumulative 0.
0 4.0 0.
8.0                                                                          Precipitation F   KI~~¶3(
E 20.0 18.0 16.0 14.0 12.0 10.0 8.0 6.0 4.0 19.4 inches 1-hour Cumulative Precipitation I
6.0 E
F KI~~¶3(
4.0 2.0 0.0      "
2.0 0.0 0
0        10 20         30       40        50                60 Time (minutes)
10 20 30 Time (minutes) 40 50 60 Figure 4-2 60 Minute Local Intense Precipitation (LIP) Curve Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)
Figure 4-2 60 Minute Local Intense Precipitation (LIP) Curve Document Name: FPLO62-GIS-AO14 Flooding Hazard Reevaluation By: MLS Date: 2/8/2013                                   Turkey Point Nuclear Generating Station Units 3&4 (PTN)
Document Name: FPLO62-GIS-AO14 By: MLS Date: 2/8/2013


1.4 I I   I I I   I  I  F I      I                                                                            I I      I  I I        I I        I-I 1.2                                                                    I                ll   lll                                           I   I       II j +/- 1III        I I I I II I I I II I II I I   I       I I       I I~ I II lI     I I       I I I   I I I   I I I41 1       I     I 1.0
WJ U
                                                    -I--+
0 4J C.
i i- i i ! i i   i i i ! !        ! i   F -+                   I       I     I     II         I I I       II   I WJ 44444H   . . . . . . . .        - - -  -  -
CI 1.4 1.2 1.0 0.8 0.6 0.4 0.2 0.0 j +/- 1III I I I I I
0.8 U
ll lll I
MLTii iiiL VViiWVVi                                   V iii         ViVV V 0
I II I I I I I I I I I I I I I I I I I~ I II lI I I I I I I I I I I I4 1 1 I I
* Incremental 4J        0.6    i  i i ! i i i i       i i i         ! !i       ! i i i Ii i I i i     1 11 Precipitation at One Minute C.                                                                                                                                                                        Intervals CI 0.4        ! ii                  I                                                i i i !   i i i ! i     i i i i ! i           !    !
-I--+ -
LL 0.2 II Il-I'll-I 0.0    in                   Muwi                                   m 1 3       5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51 53 55 57 59 Time (minutes)
i i
Figure 4-3 Local Intense Precipitation (LIP) Distribution Document Name: FPL062-GIS-A014                                                                                                                     Flooding Hazard Reevaluation By: MLS Date: 2/8/2013                                                                                                             Turkey Point Nuclear Generating Station Units 3&4 (PTN)
i i  
! i i i i i  
! i F -+
I I
I II I I I II I
I I I I I I
I F I I
I I I I I I I I-I 44444H MLT ii ii L i
VViiWVVi V
iii Vi VV V i
i i ! i i i i i i i  
! ! i  
! i i i i i i i I
I 1 11 LL Incremental Precipitation at One Minute Intervals
! i i i i !
I i i i ! i i i i i ! i i
Il-I'll-I II in Muwi m
1 3 5
7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51 53 55 57 59 Time (minutes)
Figure 4-3 Local Intense Precipitation (LIP) Distribution Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)
Document Name: FPL062-GIS-A014 By: MLS Date: 2/8/2013


Figure 4-4 Elevations Rendered on the Study Area Grid Document Name: FPL062-GIS-A015             Flooding Hazard Reevaluation By: MLS Date: 2/8/2013 Turkey Point Nuclear Generating Station Units 3&4 (PTN)
Figure 4-4 Elevations Rendered on the Study Area Grid Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)
Document Name: FPL062-GIS-A015 By: MLS Date: 2/8/2013


Legend
Legend Points of Interest Manning's n
* Points of Interest           Manning's n   0.02 0.025        0.08        0.10 o            0.12
[*
[*       Structures Feet 0         150       300       450 I     __ 1             I       I Figure 4-5 0       40       80       120     160 Meters                                                       Manning's n Value Document Name: FPLTP077-GIS-A021 Projection: State Plane Florida East, NAD 83 (US Feet)                   Flooding Hazard Reevaluation By: MLS Date: 01/06/2013                                   Turkey Point Nuclear Generating Station Units 3&4 (PTN)
Structures Feet 0
150 300 450 I
__ 1 I
I 0
40 80 120 160 Meters Document Name: FPLTP077-GIS-A021 Projection: State Plane Florida East, NAD 83 (US Feet)
By: MLS Date: 01/06/2013 0.02 0.025 0.08 0.10 o
0.12 Figure 4-5 Manning's n Value Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)


00 Li 1:1 Refrences: 1. SFWMD, 2007a Feet Legend                                                                                             0    250          500    750
00 Li 1:1 Refrences: 1. SFWMD, 2007a Legend
  =I Structures             Flow Depth (ft)     -   1.1-1.2  S1.9 - 2.0 I      3.6 - 4.0 I      I            I      I II4.1 - 5.0 0.6              1.3- 1.4 S2.1 - 2.5                      0  50    100    150  200  250 0.7-0 .8         1.5- 1.6 S2.6 - 3.0       S5.1 - 6.0                 Meters 0.9-1*0          1.7- 1.8  3.1 - 3.5    1   61 -70 Figure 4-6 Maximum Flow Depth (ft)
=I Structures Flow Depth (ft) -
Document Name: FPLTP077-GIS-AO12 Projection: State Plane Florida East, NAD 83 (US Feet)                               Flooding Hazard Reevaluation By: MLS Date: 01/06/2013                                               Turkey Point Nuclear Generating Station Units 3&4 (PTN)
0.6 0.7-0.8 0.9-1*0 1.1-1.2 1.3-1.4 1.5-1.6 1.7-1.8 S1.9 - 2.0 S2.1 - 2.5 S2.6 - 3.0 3.1 - 3.5 I
3.6 - 4.0 II4.1 - 5.0 S5.1 - 6.0 1
61 -70 Feet 0
250 500 750 I
I I
I 0
50 100 150 200 250 Meters Figure 4-6 Document Name: FPLTP077-GIS-AO12 Projection: State Plane Florida East, NAD 83 (US Feet)
By: MLS Date: 01/06/2013 Maximum Flow Depth (ft)
Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)


==References:==
==References:==
: 1. SFWMD, 2007a.
: 1. SFWMD, 2007a.
Legend
Legend Points of Interest Structures Flow Depth (ft) 1.1 - 1.2 1.9 - 2.0 3.6 - 4.0 06 13-14 21-25 4.41-50 0.7- 0.8 1.5-1.6 2.6-3.0 5.1-6.0 0.9-1.0  
* Points of                 Flow Depth (ft)       1.1 - 1.2 1.9 - 2.0       3.6 - 4.0 Interest 06           13- 14   21- 25         4.41- 50 Structures 0.7- 0.8     1.5- 1.6 2.6- 3.0       5.1- 6.0 0.9- 1.0   = 1.7- 1.8 3.1- 3.5       6.1- 7.0 Feet 0           100           200           300 Figure 4-7 I
=
* I       I         I         I Points of Interest Overlaid with 0       20         40     60       80 the Maximum Flow Depth (ft)
1.7-1.8 3.1-3.5 6.1-7.0 300 Feet 0
Meters Document Name: FPLTPO77-GIS-AO1 3                                                 Flooding Hazard Reevaluation Projection: Station Plane Florida East, NAD 82 (US Feet)
100 200 I
By: MLS Date: 01/06/2013                                             Turkey Point Nuclear Generating Station Units 3&4 (PTN)
* I I
 
I I
Figure 4-8
0 20 40 60 80 Meters Document Name: FPLTPO77-GIS-AO1 3 Projection: Station Plane Florida East, NAD 82 (US Feet)
By: MLS Date: 01/06/2013 Figure 4-7 Points of Interest Overlaid with the Maximum Flow Depth (ft)
Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)


==Reference:==
==Reference:==
FPL. 2010.         Points of Interest Overlaid with Main Plant Site Drawing Document Name: FPL062-GIS-A015               Flooding Hazard Reevaluation By: MLS Date: 2/8/2013 Turkey Point Nuclear Generating Station Units 3&4 (PTN)
FPL. 2010.
Document Name: FPL062-GIS-A015 By: MLS Date: 2/8/2013 Figure 4-8 Points of Interest Overlaid with Main Plant Site Drawing Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)


==References:==
==References:==
: 1. SFWMD, 2007a Legend Points of                 Velocity (ft/s)       0,601 - 0.800       1.501 - 1.750       3.001 - 3.500 Interest 0.000 - 0.200 0.801 - 1.000       1.751 - 2.000       3.501 - 4.500 I--]Structures 0.201 - 0.400 1.001 - 1.250       2.001 - 2.500       4.501 - 6.000 0.401 - 0.600 1.251 - 1.500       2.501 - 3.000       6.001 - 7.460 Feet 0           100         200         300 Figure 4-9 I*     I         I         I 0       24       48         72       96 Points of Interest Overlaid with Meters the Peak Flow Velocity (ft/s)
: 1. SFWMD, 2007a Legend Points of Interest I--]Structures Velocity (ft/s) 0,601 - 0.800 1.501 - 1.750 3.001 - 3.500 0.000 - 0.200 0.801 - 1.000 1.751 - 2.000 3.501 - 4.500 0.201 - 0.400 1.001 - 1.250 2.001 - 2.500 4.501 - 6.000 0.401 - 0.600 1.251 - 1.500 2.501 - 3.000 6.001 - 7.460 Feet 0
Document Name: FPLTP077-GIS-A027                                                     Flooding Hazard Reevaluation Projection: Station Plane Florida East, NAD 82 (US Feet)
100 200 300 I*
By: MLS Date: 01/06/2013                                               Turkey Point Nuclear Generating Station Units 3&4 (PTN)
I I
 
I 0
I-
24 48 72 96 Meters Document Name: FPLTP077-GIS-A027 Projection: Station Plane Florida East, NAD 82 (US Feet)
                                                    -      I                  - -  --  -                                  I -~       I~
By: MLS Date: 01/06/2013 Figure 4-9 Points of Interest Overlaid with the Peak Flow Velocity (ft/s)
i1 I
Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)
I§kfl
* 1~
                              *1~                                                                                                                                  4-----
/
                                                                                          -      =  I:.....
10331'
                                                                                                        ~         t r--TT   .....
'I, 7
II-K
~
I -~
I ~
OONDEI$ ER PIT i1 I I§kfl
=
I: ~
t
~i~I r--TT  
.1
]OO -E &2 4-----
71
71
                                                /
//
10331' K          OONDEI$ ER PIT
/
                                                                            ~i~I                                                    ]OO -E&2
1 NDI-ŽýP 1 I1 h
                                                  ~
~ L~!~'" -~
                                      'I,
'4-I FT4."-
                                                                                                                          .1
____~~~  
                                                                                                                                                                                    //
-1 50oecFý l'~~mn4--
7                                                                                      h 1                 ~
Co FLOR LW E
NDI-ŽýP L~!~'"
1 I1
                                                                                                                                                          -~                     /
                                          '4-Co E
I         FT4."-
____~~~                         -1     50oecFý l'~~mn4--                                                               FLOR     LW woo;
                                                                                                                                    '~A~A                      __


==Reference:==
==Reference:==
FPL, 1999.
FPL, 1999.
Figure 4-10 Approximate Flood Protected Areas Document Name: FPL062-GIS-A014 Flooding Hazard Reevaluation By: MLS Date: 2/8/2013                                                                                                             Turkey Point Nuclear Generating Station Units 3&4 (PTN)
woo;
'~A~A Figure 4-10 Approximate Flood Protected Areas Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)
Document Name: FPL062-GIS-A014 By: MLS Date: 2/8/2013


0.5
0.5 0 i-i-FT1  
                  -  1-i-i-       FT1                                 -~   -
-~
i2~K~L-i-L~iJ I-~ --
i2~K~L-i-L~iJ I ifi 4- {
I               H         if   II      1211't ifi                          4- {                L13 I
I H
                                                    -t   I             -
if I
1211'
_ I -~ --
t I
I
{ F--
- -t I  
~
I 00 00
-0.5 Z
4-M
-1.5 o
7111Z7 IV'L 1 L
I
I
                                                                            -  ~      -
{I  F--
0 00 00                                7111Z7 IV'L                                1          L  '                        I Z
        -0.5
                                    -V
_7 janu~ar 20331~
_7 janu~ar 20331~
W       r         ~         H               . Tidal Data (Virginia Key, FL)
W r  
I Linear Trend (Sea aru  I      !~
~
ff      I              Ti                                                      Level Rise) 4-M s-i L &I I
H
        -1.5 I i o                          200           400           600       800             1000   1200         1400         1600 Months (0 = Jan 1994)
-V aru I
ff !~
I Ti I
L13 Tidal Data (Virginia Key, FL)
Linear Trend (Sea Level Rise)
L &I I
- s-i -
I i 200 400 600 800 1000 1200 1400 1600 Months (0 = Jan 1994)


==References:==
==References:==
NOAA, 2012e.
NOAA, 2012e.
Figure 4-12 Sea Level Rise - Linear Trend Document Name: FPL062-GIS-A014                                                                           Flooding Hazard Reevaluation By: MLS Date: 2/8/2013                                                                       Turkey Point Nuclear Generating Station Units 3&4 (PTN)
Figure 4-12 Sea Level Rise - Linear Trend Document Name: FPL062-GIS-A014 By: MLS Date: 2/8/2013 Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)


3.5 3                                                                                               I -%
3.5 3
i      I 2.5 2
2.5 2
01.5 Tidal Data (Virginia Key, FL) 2nd Order Trend
01.5 0
* 0                                                                                                    ___(Sea     Level Rise) alJ
" -0.5 alJ
  " -0.5
-1.5 S-2 cu05 I -%
                                                                                            =
i I
                                                                                    -I
Tidal Data (Virginia Key, FL) 2nd Order Trend
      -1.5 cu05 S-2
___(Sea Level Rise) 1600
                  )            200         400 600       800       1000 1200           1400          1600 Months (0 = Jan 1994)
-I
=
)
200 400 600 800 1000 1200 Months (0 = Jan 1994) 1400


==References:==
==References:==
NOAA, 2012e.
NOAA, 2012e.
Figure 4-13 Sea Level Rise - 2nd Order Trend Document Name: FPL062-GIS-A014 Flooding Hazard Reevaluation By: MLS Date: 2/8/2013                                                   Turkey Point Nuclear Generating Station Units 3&4 (PTN)
Figure 4-13 Sea Level Rise - 2nd Order Trend Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)
Document Name: FPL062-GIS-A014 By: MLS Date: 2/8/2013


Strom Tracks for CalibrationNalidation Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)
Strom Tracks for CalibrationNalidation Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)


Miami Harbor Entrance IHO                     DELFT3D Computed Tide 1                                                  Resynthesized Tide 0-5 Ci)
Miami Harbor Entrance IHO 1
DELFT3D Computed Tide Resynthesized Tide 0-5 Ci)
E a)
E a)
                                      -0.51         III'                   ~IIIIII!.I I
-0.51 III'
                                    -1 W
~IIIIII!.I I
                                  -1.5 1 Sep   15 Sep         29 Sep   13 Oct                   27 Oct Time Figure 4-15 Tidal Station Calibration Results at IHO Station Miami Harbor Entrance, Florida Document Name: FPLO62-GIS-AO14 Flooding Hazard Reevaluation By: MLS Date: 2/8/2013                                                   Turkey Point Nuclear Generating Station Units 3&4 (PTN)
-1 W
-1.5 1 Sep 15 Sep 29 Sep Time 13 Oct 27 Oct Figure 4-15 Tidal Station Calibration Results at IHO Station Miami Harbor Entrance, Florida Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)
Document Name: FPLO62-GIS-AO14 By: MLS Date: 2/8/2013


,=ll Legend Turkey Point Nuclear
,=ll Legend Turkey Point Nuclear Generating Station Units 3 & 4 (PTN)
* Generating Station Units 3 & 4 (PTN)
Hurricane Position (6 hr Time Step)
Hurricane Position (6 hr Time Step)
Hurricane Andrew (Calibration)
Hurricane Andrew (Calibration)
Hurricane Donna (Validation)
Hurricane Donna (Validation)
DELFT3D Grid Model L ____ Do m a in
DELFT3D Grid Model L _ _ _ _ D o m a in


==References:==
==References:==
: 1. ESRI, 2013a, 2. NOAA, 2012.a Miles 0         350       700     1,050 I           I           I         I I     I       I       I     I 0     400     800     1,200 1,600 Kilometers Document Name: FPLTP077-GIS-AO07 Projection: Geographic Coordinate System, WGS 84 By: MLS Date: 01/06/2013 Figure 4-16 Strom Tracks for CalibrationNalidation Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)
: 1. ESRI, 2013a, 2. NOAA, 2012.a Miles 0
350 700 1,050 I
I I
I I
I I
I I
0 400 800 1,200 1,600 Kilometers Document Name: FPLTP077-GIS-AO07 Projection: Geographic Coordinate System, WGS 84 By: MLS Date: 01/06/2013 Figure 4-16 Strom Tracks for CalibrationNalidation Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)


==Reference:==
==Reference:==
NOAA, 2012n.
NOAA, 2012n.
Note: Reported values are in meters NGVD 29 datum.
Note: Reported values are in meters NGVD 29 datum.
Figure 4-17 Legend:
Legend:
Observed Storm Surge Water Levels
Turkey Point Nuclear Generating Station Units 3&4 (PTN)
* Turkey Point Nuclear Generating Station Units 3&4 (PTN)             for Hurricane Andrew Document Name: FPL062-GIS-AO15                                         Flooding Hazard Reevaluation By: MLS Date: 2/8/2013 Turkey Point Nuclear Generating Station Units 3&4 (PTN)
Figure 4-17 Observed Storm Surge Water Levels for Hurricane Andrew Document Name: FPL062-GIS-AO15 By: MLS Date: 2/8/2013 Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)


Water Level (meters in Mean Sea Level)
Water Level (meters in Mean Sea Level)
                                                                                                              -ý3 25.65 -                                                                     Wind Vector 2.5 25.6 -                                                                   PTN 2
-ý3 25.65 -
25.55 I 1.5 I         I M 25.5 F 0
25.6 -
0 25.45 -
25.55 I M
0 0
25.5 F Wind Vector PTN
-80.
-0r1Ck
-8.
-80.2
-80.15
-80.1 1.5 I
I 2
2.5 25.45 -
25.4 -
25.4 -
                                                                                            -80.
25.35 F 25.3 -
0r1Ck 25.35 F 25.3 -
-80.5  
                              -80.5 -80.45 -80.4   -80.35   -80.3   -80.25 -80.2 -80.15    -80.1 x coordinate --
-80.45  
-80.4  
-80.35  
-80.3  
-80.25 x coordinate --
Time Step 1 (Output Time Step 368 [August 24, 1992 @ 09:30:00])
Time Step 1 (Output Time Step 368 [August 24, 1992 @ 09:30:00])
Figure 4-18 DELFT3D Computed Hurricane Andrew Storm Surge at Time Step 1 in the Fine Grid 2 Model Domain Document Name: FPL062-GIS-AO14                                                                           Flooding Hazard Reevaluation By: MLS Date: 2/8/2013                                                                     Turkey Point Nuclear Generating Station Units 3&4 (PTN)
Figure 4-18 DELFT3D Computed Hurricane Andrew Storm Surge at Time Step 1 in the Fine Grid 2 Model Domain Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)
Document Name: FPL062-GIS-AO14 By: MLS Date: 2/8/2013


Water Level (meters- in Me;             ed) 4 25.65 -                                                                         Wind Vector 25.6 F                                                                         PTN                  3 25.55 F F 12 25.5         - -
Water Level (meters-in Me; ed) 4 25.65 -
                                          =  =
Wind Vector PTN 25.6 F 3
1
25.55 F F 1 2
                    .' 25.45 Hurricane
25.5
                                                                                              ýt°*rr.ý T-rac 25.4 F                                                                                               0 25.35 k
.' 25.45
                                                                                                                              -1 25.3   F
=
                                -80.5   -80.45 -80.4   -80.35   -80.3   -80.25 -80.2 -80.15       -80.1 x coordinate --,
=
1 Hurricane
ýt°*rr.ý T-rac 25.4 F 0
25.35 k
-1 25.3 F
-80.5  
-80.45  
-80.4  
-80.35  
-80.3  
-80.25  
-80.2  
-80.15  
-80.1 x coordinate --,
Time Step 2 (Output Time Step 369 [August 24, 1992 @ 10:00:00])
Time Step 2 (Output Time Step 369 [August 24, 1992 @ 10:00:00])
Figure 4-19 DELFT3D Computed Hurricane Andrew Storm Surge at Time Step 2 in the Fine Grid 2 Model Domain Document Name: FPLO62-GIS-AO14                                                                               Flooding Hazard Reevaluation By: MLS Date: 2/8/2013                                                                           Turkey Point Nuclear Generating Station Units 3&4 (PTN)
Figure 4-19 DELFT3D Computed Hurricane Andrew Storm Surge at Time Step 2 in the Fine Grid 2 Model Domain Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)
Document Name: FPLO62-GIS-AO14 By: MLS Date: 2/8/2013


Water Level (meters in Mean Sea Leve 1)
Water Level (meters in Mean Sea Leve 1) 25.65 I 25.6 F 25.55 F T
                                            ~Q\\\          \\'~
25.5 0
Wind 25.65 I                                                                       Vector                4 PTN 25.6 F 3
S25.45
25.55 F T
~Q\\\\\\ \\\\'~
25.5 V        12 0                                                                                                       I S25.45 25.4 -                                                                  ýrlc Afler edrW 7 raCk                    0 orn 25.35 -
t,.
t,.                                                                          -1I 25.3
Wind Vector PTN
                                                                                                                            -2
ýrlc 7
                              -80.5 -80.45   -80.4   -80.35     -80.3   -80.25 -80.2 -80.15     -80.1 x coordinate --+
Afler orn raCk edrW V 12 4
Time Step 3 (Output Time Step 370 [August 24, 1992 @ 10:30:00])
3 I
Figure 4-20 DELFT3D Computed Hurricane Andrew Storm Surge at Time Step 3 in the Fine Grid 2 Model Domain Document Name: FPL062-GIS-A014                                                                               Flooding Hazard Reevaluation By: MLS Date: 2/8/2013                                                                         Turkey Point Nuclear Generating Station Units 3&4 (PTN)
25.4 -
0
-1I 25.35 -
25.3
-80.5  
-80.45  
-80.4  
-80.35  
-80.3  
-80.25  
-80.2  
-80.15  
-80.1 x coordinate --+
-2 Time Step 3 (Output Time Step 370 [August 24, 1992 @ 10:30:00])
Figure 4-20 DELFT3D Computed Hurricane Andrew Storm Surge at Time Step 3 in the Fine Grid 2 Model Domain Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)
Document Name: FPL062-GIS-A014 By: MLS Date: 2/8/2013


Water Level (m in MSL)
Water Level (m in MSL)
Wind 25.*5 5                                                               Vector                       4 PTN                         3.5 25.65 t25.55 2.5 t' 25.45 25,5 2                                                                                                     -2
Wind 25.*5 5 Vector 4
                                              .0.
PTN 3.5 25.65 t 25.55 25.45 2.5 t' 25,5 2  
25.35 25.3 -                                                                                             0.
-2
                                -60.5 -80.45 -80.4 -80.35   -80.3       -80.25 -80.2 -80.15 -60.1 x coordinate -*
.0.
25.35 25.3 -
0.
-60.5  
-80.45  
-80.4  
-80.35  
-80.3  
-80.25  
-80.2  
-80.15  
-60.1 x coordinate -*
Time Step 1 (Output Time Step 8340 [September 10, 1960 @ 07:58:00])
Time Step 1 (Output Time Step 8340 [September 10, 1960 @ 07:58:00])
Figure 4-21 DELFT3D Computed Hurricane Donna Storm Surge at Time Step I in the Fine Grid 2 Model Domain Document Name: FPL062-GIS-A014                                                                                     Flooding Hazard Reevaluation By: MLS Date: 2/8/2013                                                                               Turkey Point Nuclear Generating Station Units 3&4 (PTN)
Figure 4-21 DELFT3D Computed Hurricane Donna Storm Surge at Time Step I in the Fine Grid 2 Model Domain Document Name: FPL062-GIS-A014 By: MLS Date: 2/8/2013 Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)


==Reference:==
==Reference:==
Harris, 1963.
Harris, 1963.
Note: Reported values are in feet NGVD 29 datum.
Note: Reported values are in feet NGVD 29 datum.
Legend                                                                                           Figure 4-22
Legend Turkey Point Nuclear Generating Station Units 3&4 (PTN)
  "*        Turkey Point Nuclear Generating Station Units 3&4 (PTN)
Figure 4-22 Observed Storm Surge Water Levels for Hurricane Donna Document Name: FPL062-GIS-A014 By: MLS Date: 2/8/2013 Flooding Hazard Reevaluation Turkey Point Nuclear. Generating Station Units 3&4 (PTN)
Observed Storm Surge Water Levels for Hurricane Donna Flooding Hazard Reevaluation Document Name: FPL062-GIS-A014 By: MLS Date: 2/8/2013 Turkey Point Nuclear. Generating Station Units 3&4 (PTN)


==Reference:==
==Reference:==
NWS, 1979.
NWS, 1979.
Legend:                                                       Figure 4-23
Legend:
'*        Turkey Point Nuclear Generating           Coastal Distance Intervals in Station Units 3&4 (PTN)                   Nautical Miles and Kilometers Document Name: FPL062-GIS-AO15                     Flooding Hazard Reevaluation By: MLS Date: 2/8/2013 Turkey Point Nuclear Generating Station Units 3&4 (PTN)
Turkey Point Nuclear Generating Station Units 3&4 (PTN)
Figure 4-23 Coastal Distance Intervals in Nautical Miles and Kilometers Document Name: FPL062-GIS-AO15 By: MLS Date: 2/8/2013 Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)


0         0           0         0     0      0          a        o    0 In       '1           03         0             0                 01 ca EASTPORT, ME S
0 0
: 0.     -  k 1
0 0
                                                                -ý   ck 1    11 1 1 I j M
0 In  
F-7.
'1 03 0
co co 1
0 0
0 BOSTON. MASS-     b NEWYORK. NY -     b CHINCOTEAGUE. VA -
a o
CAPEHATTERAS, N C -O 0HAR.ESTON, S C                                                         ig                          -4 a-2 DAYTONABEACH.FLA --
0 01 ca co co 0
MlAWEFLA    -
1 F-7.
FT MYERS. FL-A TARPONSPRINGS. FLA --
: 0.
cc                                                                    a APALACHKX1A. FLA---
k ck
PENSACOLA, FLA SLOX,   miss LAKECHARLES,   LA--)-
-ý M
GALVESTON, TEX ------a PORT ISABEL. TEX I             I 1i       I   I 1     I         f 0       I         0     .      0       )     0         )     0 0                         CN4    0   N           1     C4      0 In o                       NK      N
EASTPORT, ME BOSTON. MASS -
                                                                                    %    ,0         0       a0     .0 C4 V         4       N4     N4     N   (         (       N4       N4 (INDl     3W1SSId lSI+/-N33
b NEW YORK. NY -
b CHINCOTEAGUE.
VA -
CAPE HATTERAS, N C -O 0HAR.ESTON, S C DAYTONA BEACH. FLA --
MlAWE FLA FT MYERS. FL-A TARPON SPRINGS.
FLA --
APALACHKX1A. FLA---
PENSACOLA, FLA
: SLOX, miss LAKE CHARLES, LA--)-
GALVESTON, TEX ------a PORT ISABEL. TEX S
1 1
1 1 1 1 I j ig
-4 a-2 cc a
I I 1i I
I 1 I
f 0
I 0
0  
)
0  
)
0 0
C 4 N
0 N
1 C 4 0
o K
N N  
,0 0
a0  
.0 V
4 N4 N4 N
(
(
N4 N4 In C4 (INDl 3W1SSId lSI+/-N33


==Reference:==
==Reference:==
NWS, 1979.
NWS, 1979.
Figure 4-24 Legend:
Figure 4-24 Legend:
STurkey Point Nuclear Generating                                                       Central Pressure for the Station Units 3&4 (PTN)                                                     Probable Maximum Hurricane (PMH)
STurkey Point Nuclear Generating Station Units 3&4 (PTN)
Document Name: FPLO62-GIS-AO15                                                         Flooding Hazard Reevaluation By: MLS Date: 2/8/2013                                                 Turkey Point Nuclear Generating Station Units 3&4 (PTN)
Central Pressure for the Probable Maximum Hurricane (PMH)
Document Name: FPLO62-GIS-AO15 By: MLS Date: 2/8/2013 Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)


MD) b,     0           0       o         0       0     0
MD) b, 0
: 4. _Cv       V4           o EASTPORT, W------                           I          I        I        I        I      I BOSTON, MASS       -      !
0 o
NEW YORK. N.Y.-
0 0
* C -INCOTEAGLE, VA.     --
0
: 4.
_Cv V4 EASTPORT, W------
BOSTON, MASS NEW YORK.
N.Y.-
C -INCOTEAGLE, VA.
CAPE HATTERAS, N.C.---)
CAPE HATTERAS, N.C.---)
                                                                    -A                                                    -
CHARLESTON, S.C.--
CHARLESTON,   S.C.--
DAYTONA BEACH. FLA. -.
x DAYTONA BEACH. FLA. -.                                                                                 z X                  CC 9
MIAMI. FLA.
0 MIAMI.FLA.                 >  LU ao FT. MYERS. FLA     .--
FT. MYERS.
TARPON SPRINGS. FLA.--,
FLA TARPON SPRINGS. FLA.--,
APALACHICOLA. FLA.----.1 PENSACOLA. FLA.---                           0~
APALACHICOLA.
BILOXI. MISS.             :
FLA.----.1 PENSACOLA. FLA.---
BILOXI. MISS.
LAKE CHARLES. LA.--i--
LAKE CHARLES. LA.--i--
GALVESTON,   TEX.           3-*
GALVESTON, TEX.
PORT ISABEL,. TEX.-" I I       I                         I
3-*
                                                        *    ' '    '    '    '  L-   ' :it     . ,    . "ie   WI  C
PORT ISABEL,. TEX.-" I I
                                                                                                                        .0 0*
I I
C         l     t4 (IW NJ         scNim wflwixvw         :50 smliG
I I
I o
X 9
LU
-A CC 0~
x z
0 ao I
I I
' L-  
' :it  
. "ie  
. 0 0*
C l
t4 WI C
(IW NJ scNim wflwixvw :50 smliG


==Reference:==
==Reference:==
NWS, 1979.
NWS, 1979.
Figure 4-25 Legend:
Legend:
Adopted Upper and Lower Limits of
Turkey Point Nuclear Generating Station Units 3&4 (PTN)
",*    Turkey Point Nuclear Generating                                                 Radius of Maximum Winds for the Station Units 3&4 (PTN)                                                        Probable Maximum Hurricane (PMH)
Document Name: FPLO62-GIS-AO15 By: MLS Date: 2/8/2013 Figure 4-25 Adopted Upper and Lower Limits of Radius of Maximum Winds for the Probable Maximum Hurricane (PMH)
Document Name: FPLO62-GIS-AO15                                                               Flooding Hazard Reevaluation By: MLS Date: 2/8/2013 Turkey Point Nuclear Generating Station Units 3&4 (PTN)
Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)


()I H/W)t I o               . a       'l     *          .
() I H/W)t I o
0 "
a  
I - I -   ~-     *  -        I   -           I   -     -   -5     -
'l 0
EASTPORT. kE.-                   I 11 I1 1 11 1 11 1                                      I    5 BOSTONK MASS-NEW YORK. N.Y.-
I -
c.NcEAGU*, VA.---.-                                   l-I CAPE HATTERAS, N.O.-.
I -
CHARLESTON,     S.C.--
~ -
Ii DAYTONA BEAC*., FLA. -*                                                                                 z 2
I -
Z MIAMaFU.L                                                                                         ~~10 FT. MYERS& FLA.-
I -
* TARPON SPRINS, FLAr.-B APALACHICOLA. FLA.--N PENSACOLA. FLA.------*-
- -5 EASTPORT.
kE.-
BOSTONK MASS-NEW YORK.
N.Y.-
c.NcEAGU*, VA.---.-
CAPE HATTERAS, N.O.-.
CHARLESTON, S.C.--
DAYTONA BEAC*., FLA. -*
MIAMa FU.L FT. MYERS& FLA.-
TARPON SPRINS, FLAr.-B APALACHICOLA. FLA.--N PENSACOLA.
FLA.------*-
SLOX. MSS.---
SLOX. MSS.---
LAKE CHARLES, LA.----*
LAKE CHARLES, LA.----*
GALVESTON, TEX.--
GALVESTON, TEX.--
AORT ISASEL. TEX.--
AORT ISASEL. TEX.--
                                                                ~I~~iii~~~~~~~
I 11 I1 1 11 1 11 1 I
h~
5 l-I
1I1I  *  ..    * ..
~~10 Ii z
* I I
2 Z
il II I-  1      iý-
~I iii I
0   40       0                                      -      0 WII           Gaads QOUVM8O0i
1I1 I
il II h~ ~~ ~~~~~~~
i
ý-
I I-1 0
40 0
WII Gaads QOUVM8O0i 0


==Reference:==
==Reference:==
NWS, 1979.
NWS, 1979.
Legend:                                                                                                 Figure 4-26
Legend:
'*"    Turkey Point Nuclear Generating                           Adopted Probable Maximum Hurricane (PMH)
Turkey Point Nuclear Generating Station Units 3&4 (PTN)
Station Units 3&4 (PTN)                                     Upper and Lower Limits of Forward Speed Document Name: FPL062-GIS-AO15                                                     Flooding Hazard Reevaluation By: MLS Date: 2/8/2013 Turkey Point Nuclear Generating Station Units 3&4 (PTN)
Document Name: FPL062-GIS-AO15 By: MLS Date: 2/8/2013 Figure 4-26 Adopted Probable Maximum Hurricane (PMH)
Upper and Lower Limits of Forward Speed Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)


(156P) N01l133NlU )DYV~i
(156P) N01l133NlU  
)DYV~i


==Reference:==
==Reference:==
NWS, 1979.
NWS, 1979.
Legend:                                                             Figure 4-27
Legend:
*"        Turkey Point Nuclear Generating               Maximum Allowable Range of the Station Units 3&4 (PTN)                 Probable Maximum Hurricane Track Direction Document Name: FPLO62-GIS-A015                           Flooding Hazard Reevaluation By: MLS Date: 2/8/2013                       Turkey Point Nuclear Generating Station Units 3&4 (PTN)
Turkey Point Nuclear Generating Station Units 3&4 (PTN)
Figure 4-27 Maximum Allowable Range of the Probable Maximum Hurricane Track Direction Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)
Document Name: FPLO62-GIS-A015 By: MLS Date: 2/8/2013


Miles Legend                                               0      40          80        120 Turkey Point           Hurricane Storm     I*    I      I I --
Legend Turkey Point Nuclear Generating Station Units 3&4 (PTN)
I
Hurricane Storm Classification (Saffir-Simpson Hurricane Scale) 0- Category 4 Miles 0
                                                                                - - -4I I
40 80 120 I -- -
Nuclear                Classification 0    50        100      150    200 Generating              (Saffir-Simpson Kilometers Station Units          Hurricane Scale) 3&4 (PTN)                  0- Category 4 ------                                          Figure 4-28
- -4I I
: w. Categroy 5 Tracks of Historical Hurricanes (Intensities of Category 4 & 5) in the Region of PTN Document Name: FPLTP077-GIS-A016                                                           Flooding Hazard Reevaluation Projection: Geographic Coordinate System, WGS 84 By: MLS Date: 01(0612013                                                   Turkey Point Nuclear Generating Station Units 3&4 (PTN)
* I I
I I
0 50 100 150 200 Kilometers Figure 4-28 Tracks of Historical Hurricanes (Intensities of Category 4 & 5) in the Region of PTN Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)
: w. Categroy 5 Document Name: FPLTP077-GIS-A016 Projection: Geographic Coordinate System, WGS 84 By: MLS Date: 01(0612013


Legend Turkey Point                       Synthetic Storm Nuclear Generating                 Tracks for Probable Station Units 3&4                 Maximum Storm (PTN)                             Surge Analyses Miles 0           20         40       60 I_     I_      I       I       I Figure 4-29 0     20     40     60   80   100 Kilometers                                                         Synthetic Storm Tracks Document Name: FPLTP077-GIS-A017 Projection: Geographic Coordinate System, WGS 84 Flooding Hazard Reevaluation By: MLS Date: 01/06/2013                                         Turkey Point Nuclear Generating Station Units 3&4 (PTN)
Legend Turkey Point Nuclear Generating Station Units 3&4 (PTN)
Miles 0
20 40 60 I _
I_
I I
I 0
20 40 60 80 100 Kilometers Synthetic Storm Tracks for Probable Maximum Storm Surge Analyses Figure 4-29 Document Name: FPLTP077-GIS-A017 Projection: Geographic Coordinate System, WGS 84 By: MLS Date: 01/06/2013 Synthetic Storm Tracks Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)


CO Go CLi
CO Go CLi
        -4 4-0 RADIUS OF MAXIMUM WINDS         (nmi)
-4 4-0 RADIUS OF MAXIMUM WINDS (nmi)


==Reference:==
==Reference:==
NWS, 1987.
NWS, 1987.
Figure 4-30 Plot Central Pressure (P0) Versus Radius of Maximum Winds (R) for Extreme Hurricanes Document Name: FPL062-GIS-A015                         Flooding Hazard Reevaluation By: MLS Date: 2/8/2013 Turkey Point Nuclear Generating Station Units 3&4 (PTN)
Figure 4-30 Plot Central Pressure (P0) Versus Radius of Maximum Winds (R) for Extreme Hurricanes Document Name: FPL062-GIS-A015 By: MLS Date: 2/8/2013 Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)


935 930 925 920 915 910 Ln u.j
935 930 925 920 915 910 Ln u.j
        -905 900 895 890 885 880 0           5     10     15       20       25       30         35      40        45 RADIUS OF MAXIMUM WINDS (NAUTICAL MILES)
-905 900 895 890 885 880 0
Figure 4-31 Plot Central Pressure (P0) Versus
5 10 15 20 25 30 RADIUS OF MAXIMUM WINDS (NAUTICAL MILES) 35 40 45 Figure 4-31


==Reference:==
==Reference:==
Radius of Maximum Winds (R)
For storms through 1985 see NWS, 1979; For storms since 1985 see Table 4-15.
For storms through 1985 see NWS, 1979;                         for Extreme Hurricanes, Revised 2013 For storms since 1985 see Table 4-15.
Document Name: FPL062-GIS-AO15 By: MLS Date: 3/8/2013 Plot Central Pressure (P0) Versus Radius of Maximum Winds (R) for Extreme Hurricanes, Revised 2013 Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)
Document Name: FPL062-GIS-AO15                                       Flooding Hazard Reevaluation By: MLS Date: 3/8/2013 Turkey Point Nuclear Generating Station Units 3&4 (PTN)


N S
N S
IA'A A         1040             L                           Iii         -4                         I'A 1020                             7TLI                                   i9 9600 98   0                             1                         O                           -  - - - - -
IA'A A
860                 -1421-~ti                                                     ~
1040 L
Iii  
-4 I'A 1020 7TLI i9 9600 98 0
1 O
860  
-1 42 1-~ti  
~
Radial Distance from Storm Center (nautical miles)
Radial Distance from Storm Center (nautical miles)
Figure 4-32 Document Name: FPLTPO77-GIS-A026                                                     Hurricane Pressure Field Projection: State Plane Florida East, NAD 83 (US Feet)                                                                     Flooding Hazard Reevaluation By: MLS Date: 01/6/2013                                               Turkey Point Nuclear Generating Station Units 3&4 (PTN)
Figure 4-32 Document Name: FPLTPO77-GIS-A026 Hurricane Pressure Field Projection: State Plane Florida East, NAD 83 (US Feet)
Flooding Hazard Reevaluation By: MLS Date: 01/6/2013 Turkey Point Nuclear Generating Station Units 3&4 (PTN)


N
A 3/4 3/4 I,
                                                        'Ii,'            I'  ~V ~
4 d
1/  'I   /  ~1 //
444
                                            'I      // /      //
'S 4
i d
S J 4 S 4 I 4~
1,      '/            7                                                                                            S I,
44 3/4, 3/4, i
                                            //       17                                                      -        .~  '~t        '-S 4  d i
d i
'I 1,
//
d/
d/
444          /                                                                             ~         '
/
                              'S     4
1/
                                                                                                                              '-5-'.
//
S J 4 S 4 I  4~                                                                                                                    SS 44 3/4, 3/4, 3/4 3/4 A
'/
17
'Ii,'
'I
/
~1 //
/ //
7
.~  
'~t
'-S
~ '
'-5-'.
I'
~V ~
N S
S S 3/4 a
' t t Nautical Miles 0
50 100 I
7 I
A
A
                      'S 'S 'S                                                                                                                   3/4        a I
_£I__
                                  \
r l A' A
I                                                                                                                       't  t N"
I I
'S
'S
'S I
I N"
\\
1.
1.
                                                ">-I                                                       II;,
">-I II;,
* Nautical Miles 0          50 I            I7        A100 A     140
A 140 120 100 80 0
_£I__          r l A' 120 100 80 0
C4
  *0 C4 0.
*0 0.
S40 20 0
S40 20 0
            -300         -250         -200       -150         -100         -50     0         50         100     150         200           250         300 Radius from Storm Center (nautical miles)
-300  
Figure 4-33 Wind Field and Wind Speed Plots Document Name: FPLTPO77-GIS-A028 Projection: State Plane Florida East, NAD 63 (US Feet)
-250  
Flooding Hazard Reevaluation By: MLS Date: 01/6/2013                                                                     Turkey Point Nuclear Generating Station Units 3&4 (PTN)
-200  
-150  
-100  
-50 0
50 100 150 200 250 300 Radius from Storm Center (nautical miles)
Figure 4-33 Document Name: FPLTPO77-GIS-A028 Projection: State Plane Florida East, NAD 63 (US Feet)
By: MLS Date: 01/6/2013 Wind Field and Wind Speed Plots Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)


9000 92000 W+     EI 1'S 6.28 ft NAVDB8 7.93 ft MLW 7.51  1ft NAVD88 5.86 Ift MLW 7.68 ft NAVD88 9.33 ft! MLW              I Miles Legend                                                                                       0        1          2      3I t_  _ I          I Turkey Point                   Miami-Dade Co.         Florida Keys DEM I- - I    I      I    I Nuclear Generating              DEM (ft NAVD88)        (ft NAVD88)
9000 92000 W+
High : 168.113       High: 93.9108        0    1    2      3    4      5 Station Units 3&4                                                                            Kilometers (PTN)
EI 1'S 6.28 ft NAVDB8 7.93 ft MLW 1ft NAVD88 Ift MLW NAVD88 MLW I
Low: -18.186          Low: -18.186
5.86 7.51 7.68 ft 9.33 ft!
* Spot Elevation Figure 4-34 Document Name: FPLTP077-GIS-A024                                                             Barrier Island Breakwater Projection: State Plane Florida East, NAD 83 (US Feet)
Legend Turkey Point Nuclear Generating Station Units 3&4 (PTN)
Vertical Datum: NAVD88                                                                     Flooding Hazard Reevaluation By: MLS Date: 01/06/2013                                                       Turkey Point Nuclear Generating Station Units 3&4 (PTN)
Spot Elevation Miami-Dade Co.
DEM (ft NAVD88)
High : 168.113 Low: -18.186 Florida Keys DEM (ft NAVD88)
High: 93.9108 Low: -18.186 Miles 0
1 2
3 t _
_ I I
I I- - I I
I I
0 1
2 3
4 5
Kilometers Figure 4-34 Document Name: FPLTP077-GIS-A024 Projection: State Plane Florida East, NAD 83 (US Feet)
Vertical Datum: NAVD88 By: MLS Date: 01/06/2013 Barrier Island Breakwater Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)


1U
1U
                                                                                                                .21 V-mI-11[                                                                                                     ZI II 876B00 Reterences: 1.
.21 V-mI-ZI 11[
Feet Legend                                                                 0    100        200    300 Turkey Point Nuclear                                               -    I          -  I l Station (feet)
II 876B00 Reterences: 1.
Generating Station Units                                      0 24         48     72   96
Legend Turkey Point Nuclear Generating Station Units 3 & 4 (PTN) l Station (feet)
                                                        -- Cross Section            Meters 3 & 4 (PTN)
Cross Section Feet 0
Figure 4-35 Relationship of Breakwater to Power Block Document Name: FPLTP077-GIS-A025                                                                                   Flooding Hazard Reevaluation Projection: State Plant Florida East, NAD 83 ( US feet)
100 200 300 I
By: MLS Date: 01/06/2013                                                                               Turkey Point Nuclear Generating Station Units 3&4 (PTN)
I 0
24 48 72 96 Meters Figure 4-35 Relationship of Breakwater to Power Block Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)
Document Name: FPLTP077-GIS-A025 Projection: State Plant Florida East, NAD 83 ( US feet)
By: MLS Date: 01/06/2013


Direction of Wave Propagation M
Direction of Wave Propagation M
Maximum Sustainable Wave Height or Breaking Wave Heigh t (Hb)                         Significant Wave Height (H.)
Maximum Sustainable Wave Height or Breaking Wave Heigh t (Hb)
Large Waves Break at the Breakwater Breakwater Note: Not to Scale Figure 4-36 Maximum Wave Height Over the Breakwater Structure Document Name: FPLO62-GIS-AD14
Significant Wave Height (H.)
                                                                                                      . Flooding Hazard Reevaluation By: MLS Date: 2/8/2013                                                                     Turkey Point Nuclear Generating Station Units 3&4 (PTN)
Large Waves Break at the Breakwater Breakwater Note: Not to Scale Figure 4-36 Maximum Wave Height Over the Breakwater Structure Document Name: FPLO62-GIS-AD14 By: MLS Date: 2/8/2013
. Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)


Cross Section 1 33 28 PTN FLOOR ELEVATION 23
Cross Section 1 33 28 23 O18 4L
_Area                  Assumed Flat O18 4L
*~13
                                        -!    *"*"*                                Water              f*
  *~13                                                 ~Surface                                                                          -Ground Surface
.2~
.2~
(feet-
8 3
                                                    -__._ _Elevation                       of                                                   NAVD88)
PTN FLOOR ELEVATION
I __,                                      the Cooling 8                                                                              Water Canal 3
_Area Assumed Flat Water f*
    -2 0             100         200     300         400         500       600       700     800         900       1000       1100 Distance along the Cross Section (feet)
~Surface
Figure 4-37 Representative Cross Section for Wave Analysis
-__._ _Elevation of I
the Cooling Water Canal
-Ground Surface (feet-NAVD88)
-2 0
100 200 300 400 500 600 700 800 900 1000 1100 Distance along the Cross Section (feet)
Figure 4-37


==Reference:==
==Reference:==
Ford, 2012a.
Ford, 2012a.
Document Name: FPL062-GIS-A014 Flooding Hazard Reevaluation By: MLS Date: 2/8/2013                                                                         Turkey Point Nuclear Generating Station Units 3&4 (PTN)
Document Name: FPL062-GIS-A014 By: MLS Date: 2/8/2013 Representative Cross Section for Wave Analysis Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)


75"1                       W70W                   851N 4"t 351ý 30*N
75"1 W70W 851N 4"t 351ý 30*N WN1 Quatemary rivers Thick Quatemnay shelf-edge deposits Study area Turkey point Nuclear Generating Station Units 3&4 0 100200 300 400 500 70"W es'*
                                                                  .... Quatemary rivers Thick Quatemnay shelf-edge deposits WN1 Study area
* Turkey point Nuclear Generating Station Units 3&4 0 100200 300 400 500 70"W                     es'*


==References:==
==References:==
Atlantic and Gulf of Mexico Tsunami Hazard Assessment Group, 2008 Figure 4-38 Location Map Showing the Extent of the AGMTHAG Study Area and Geologic Features That May Influence Landslide Distribution along the U.S. Atlantic Margin Document Name: FPL062-GIS-A020                                                             Flooding Hazard Reevaluation By: MLS Date: 2/8/2013                                               Turkey Point Nuclear Generating Station Units 3&4 (PTN)
Atlantic and Gulf of Mexico Tsunami Hazard Assessment Group, 2008 Figure 4-38 Location Map Showing the Extent of the AGMTHAG Study Area and Geologic Features That May Influence Landslide Distribution along the U.S. Atlantic Margin Document Name: FPL062-GIS-A020 Flooding Hazard Reevaluation By: MLS Date: 2/8/2013 Turkey Point Nuclear Generating Station Units 3&4 (PTN)


                                                                                                                          ,40"N Sediment age from cores Pleistocene 2 Pliocene A Miocene cuffiluck
35°N-
* Eocene 35°N-                                                                                                                  3$14 Landslide types Debris flow Rotational slide C LoTranslational slide l     Composite landslide 0     100   200     300     400     500 KFometers 75W                                       70w                                       awSW Note: HC = Hudson Canyon; LC = Lindenkohl Canyon; WC = Wilmington Canyon; NC = Norfolk Canyon.
,40"N Sediment age from cores Pleistocene 2
Pliocene A
Miocene cuffiluck Eocene 3$14 Landslide types Debris flow Rotational slide C LoTranslational slide l
Composite landslide 0
100 200 300 400 500 KFometers 75W 70w awSW Note: HC = Hudson Canyon; LC = Lindenkohl Canyon; WC = Wilmington Canyon; NC = Norfolk Canyon.


==References:==
==References:==
Atlantic and Gulf of Mexico Tsunami Hazard Assessment Group, 2008 Figure 4-39 Distribution of Different Landslide Types Along the U.S. Atlantic Margin Document Name: FPL062-GIS-A020 Flooding Hazard Reevaluation By: MLS Date: 2/8/2013                                               Turkey Point Nuclear Generating Station Units 3&4 (PTN)
Atlantic and Gulf of Mexico Tsunami Hazard Assessment Group, 2008 Figure 4-39 Distribution of Different Landslide Types Along the U.S. Atlantic Margin Document Name: FPL062-GIS-A020 By: MLS Date: 2/8/2013 Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)


95*W                           Bo6 Bs901        asw 30"-                                                                                                   -30"N 25N.                                                                                                     -14" Provinces salt ZiCarrofa 20                                                         Landslides                                   20N Carbonate debris flow deposi"ts
95*W Bs901 Bo6 asw 30"-  
                                                                                  -    Carborateo ta.* depos*s Temrgenous mass-wastin deposits 00"W                           90W         85"W Figure 4-40 Location Map Showing the Size, Distribution, and Composition of Landslides in the Gulf of Mexico
-30"N 25N.  
-14" Provinces salt ZiCarrofa 20 Landslides 20N Carbonate debris flow deposi"ts Carborateo ta.* depos*s Temrgenous mass-wastin deposits 00"W 90W 85"W Figure 4-40 Location Map Showing the Size, Distribution, and Composition of Landslides in the Gulf of Mexico


==References:==
==References:==
Atlantic and Gulf of Mexico Tsunami Hazard Assessment Group, 2008 Document Name: FPL062-GIS-A019                                                                             Flooding Hazard Reevaluation By: MLSDate: 2/8/2013                                                                     Turkey Point Nuclear Generating Station Units 3&4 (PTN)
Atlantic and Gulf of Mexico Tsunami Hazard Assessment Group, 2008 Document Name: FPL062-GIS-A019 Flooding Hazard Reevaluation By: MLS Date: 2/8/2013 Turkey Point Nuclear Generating Station Units 3&4 (PTN)


35N Note: Barbed lines - proposed faults by previous studies: GBF - Gorringe Bank Fault; MPF - Marquds de Pombal Fault; SVF- St. Vincente Fault; HSF - Horseshoe Fault; GCF - Gulf of Cddiz Fault. PIAB refers to the Paleo Iberia- Africa Plate Boundary.
35N Note: Barbed lines - proposed faults by previous studies: GBF - Gorringe Bank Fault; MPF - Marquds de Pombal Fault; SVF-St. Vincente Fault; HSF - Horseshoe Fault; GCF - Gulf of Cddiz Fault. PIAB refers to the Paleo Iberia-Africa Plate Boundary.
Depth contours are in meters (only contours from -250 to -2000 meters are shown.
Depth contours are in meters (only contours from -250 to -2000 meters are shown.
Inset Plates: NAM - North American Plate; EUR - Eurasia Plate; AFR - African Plate.
Inset Plates: NAM - North American Plate; EUR - Eurasia Plate; AFR - African Plate.


==References:==
==References:==
Atlantic and Gulf of Mexico Tsunami Hazard Assessment Group, 2008 Figure 4-41 Plate Tectonic Setting and Bathymetry of the Eastern Azores-Gibraltar Region Document Name: FPL062-GIS-A020 Flooding Hazard Reevaluation By: MLS Date: 2/8/2013                                             Turkey Point Nuclear Generating Station Units 3&4 (PTN)
Atlantic and Gulf of Mexico Tsunami Hazard Assessment Group, 2008 Figure 4-41 Plate Tectonic Setting and Bathymetry of the Eastern Azores-Gibraltar Region Document Name: FPL062-GIS-A020 By: MLS Date: 2/8/2013 Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)


in~
in~
1OVI 0000   M70 0000 4000 4000 -W00 -M00 -I=0 Depth (meters)
1 OVI 0000 M70 0000 4000 4000 -W00 -M00 -I=0 Depth (meters)
Note: Red lines are plate boundaries and red arrows indicate plate movement.
Note: Red lines are plate boundaries and red arrows indicate plate movement.
Figure 4-42 The Caribbean Plate Boundary and its Tectonic Elements
Figure 4-42 The Caribbean Plate Boundary and its Tectonic Elements Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)


==References:==
==References:==
Atlantic and Gulf of Mexico Tsunami Hazard Assessment Group, 2008 Document Name: FPL062-GIS-AO19                                                                                       Flooding Hazard Reevaluation By: MLS Date: 2/8/2013                                                                                 Turkey Point Nuclear Generating Station Units 3&4 (PTN)
Atlantic and Gulf of Mexico Tsunami Hazard Assessment Group, 2008 Document Name: FPL062-GIS-AO19 By: MLS Date: 2/8/2013


4.0
-j CA E
                    -j          3.0-CA          1.5 -                                 ___                  _    -
4-,
2.5 E
.4-4.,
2.0 1.5   --                                                            5 4-,
4.0 1.5 3.0-2.5 2.0 1.5 5
1.0   -                                            ____0
1.0
                    .4-
____0
                              -0.--
-0.--
4.,
-2.0
                              -1.5
-1.5 0:00 0
                              -2.0    -            __  __                          __-
2 3
23:1 0:00       0       2   3     4     5       6     7       8   9   .09::30:00 16-05-2 010.       1 My 17                                                     17-05-2010 Hours into Model Simulation Figure 4-43 Simulated Tsunami Marigram Near PTN (with Manning's n of 0.02 and non-reflective boundaries)
4 5
6 7
8 9  
.09:
010.
1 My 17 17 Hours into Model Simulation 23:1 16-05-2
:30:00 2010 Figure 4-43 Simulated Tsunami Marigram Near PTN (with Manning's n of 0.02 and non-reflective boundaries)
Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)


==References:==
==References:==
NEE, 2012.
NEE, 2012.
Document Name: FPL062-GIS-A020 Flooding Hazard Reevaluation By: MLS Date: 2/8/2013                                     Turkey Point Nuclear Generating Station Units 3&4 (PTN)
Document Name: FPL062-GIS-A020 By: MLS Date: 2/8/2013


                  -20                 0                                 40               60                 80 m
-20 0
I           lhr-. 20id/05/i 7 04130,00 AI" 4                                                                                       f              40 o30k-                                                                                                 30 20i1-                                                                                                   20 10                                                                                                     10 0                                                                                                     0
40 60 80 m
            -10o--                                                                                                   -10
I lhr-. 20id/05/i 7 04130,00 f
            -20                                                                                                       -20
AI" 40 4
            -30[-                                                                                                     -30
o30k-20i1-30 20 10 10 0
            -A                                                                                                       -40
0
                  -20                 0               20               *U                                  OU
-10o--
-20
-10
-20
-30
-40
-30[-
-A
-20 0
20


==References:==
==References:==
NEE, 2012.                     km 0<-3.0       0<D.5         M<2.5       I<4.5
NEE, 2012.
* Turkey Point Nuclear Generating M <-2.0       0<1.0         *<3.0       *'<.0 0<-1.0         l<1.5         4i1.5     N-.5           Station Units 3&4 0 <0.0       EI <2.0       * <4.0       *)>5.5 Note: Water levels are in meters relative to 1.36 m MSL; some (dry) land elevations are shown as flood water levels according to designation in Delft3D-FLOW Manning's n of 0.02 and non-reflective boundaries Figure 4-44 Tsunami Water Level Contours near PTN 4.5 Hours in the Model Simulation Corresponding to the Time Close to the Maximum Water Level at Site Document Name: FPL062-GIS-A020                                                       Flooding Hazard Reevaluation By: MLS Date: 2/8/2013                                                 Turkey Point Nuclear Generating Station Units 3&4 (PTN)
*U OU km 0<-3.0 0<D.5 M<2.5 I<4.5 M <-2.0 0<1.0  
*<3.0  
*'<.0 0<-1.0 l<1.5 4i1.5 N-.5 0 <0.0 EI <2.0  
* <4.0  
*)>5.5 Turkey Point Nuclear Generating Station Units 3&4 Note: Water levels are in meters relative to 1.36 m MSL; some (dry) land elevations are shown as flood water levels according to designation in Delft3D-FLOW Manning's n of 0.02 and non-reflective boundaries Figure 4-44 Tsunami Water Level Contours near PTN 4.5 Hours in the Model Simulation Corresponding to the Time Close to the Maximum Water Level at Site Document Name: FPL062-GIS-A020 Flooding Hazard Reevaluation By: MLS Date: 2/8/2013 Turkey Point Nuclear Generating Station Units 3&4 (PTN)


Figure 4-45
Figure 4-45


==Reference:==
==Reference:==
NEE, 2012             Meteorological and USGS Stations Near PTN Document Name: FPL062-GIS-A015             Flooding Hazard Reevaluation By: MLS Date: 2/8/2013 Turkey Point Nuclear Generating Station Units 3&4 (PTN)
NEE, 2012 Document Name: FPL062-GIS-A015 By: MLS Date: 2/8/2013 Meteorological and USGS Stations Near PTN Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)


(U C-65 E
( U C-65 E
I-'-60 0
I-'-60 0
Date Figure 4-46 Water Temperatures at the
Date Figure 4-46 Water Temperatures at the USGS Stations Near PTN


==Reference:==
==Reference:==
NEE, 2012.                               USGS Stations Near PTN Document Name: FPLO62-GIS-A014                     Flooding Hazard Reevaluation By: MLS Date: 2/8/2013               Turkey Point Nuclear Generating Station Units 3&4 (PTN) 1*
NEE, 2012.
Document Name: FPLO62-GIS-A014 By: MLS Date: 2/8/2013 Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN) 1*


mmsr.~S romi.
mmsr.~S 3I.
3I. maw. 4. orvvmu. moua. g. Nat,~   /v iz. 41. INut"~.2UI Feet I
romi. maw. 4. or vvmu. moua. g. Nat,~  
Legend                               Historic Shoreline           0       600     1,200         1,800 I_       I           I             I Turkey Point                  -    1928                  I     l       I           I           I Nuclear Generating            -    1946                  0     150     300         450         600 Station Units 3&4                                                      Meters (PTN)                        -    197111972 Figure 4-47 Historic Shoreline Changes at PTN Docuiment Name: FPLTP077-GIS-A023 Projection: State Plane Florida East, NAD 83 (US Feet)                                       Flooding Hazard Reevaluation By: MLS Date: 01/6/2013               Turkey Point Nuclear Generating Station Units 3&4 (PTN)
/v iz.
: 41. INut"~. 2UI I
Legend Historic Shoreline Turkey Point 1928 Nuclear Generating 1946 Station Units 3&4 (PTN) 197111972 Feet 0
600 1,200 1,800 I_
I I
I I
l I
I I
0 150 300 450 600 Meters Figure 4-47 Docuiment Name: FPLTP077-GIS-A023 Projection: State Plane Florida East, NAD 83 (US Feet)
By: MLS Date: 01/6/2013 Historic Shoreline Changes at PTN Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)


20.0-
20.0-19.0-
                                            / --    TOTAL PRESSURE 19.0-
*'18.0~
        *'18.0~
z W 17.0 w
z W 17.0 4              -~
U-LL Z0z_
w U-LL                               HYDRODYNAMIC Z
/ --
0z_
TOTAL PRESSURE 4
UJ w..                     HYDROSTATIC I       I   I       I     I     I     I       I     I       I     I 25       50   75     100   125   150   175     200   225   250     275     300 PRESSURE (Ib/ft2)
-~
HYDRODYNAMIC UJw..
HYDROSTATIC I
I I
I I
I I
I I
I I
25 50 75 100 125 150 175 200 225 250 275 300 PRESSURE (Ib/ft2)
Figure 4-48 Hydrostatic and Hydrodynamic Pressure Document Name: FPL062-GIS-AO15 By: MLS Date: 3/8/2013 Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)}}
Figure 4-48 Hydrostatic and Hydrodynamic Pressure Document Name: FPL062-GIS-AO15 By: MLS Date: 3/8/2013 Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)}}

Latest revision as of 09:36, 11 January 2025

Flood Hazard Reevaluation Report in Response to 50.54(f) Information Request Regarding Near-Term Task Force Recommendation 2.1. Part 2 of 2
ML13095A197
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/11/2013
From: Martinchich P
Enercon Services
To:
Office of Nuclear Reactor Regulation, Florida Power & Light Co
References
L-2013-087 FPL062-PR-001, Rev 0
Download: ML13095A197 (48)


Text

S...-

rv

-1 iAMRO MM2S 100 0 00 200 100 100,.

k~owTIRS LIP Ratios and Estimates for Durations Less Than 1-Hour Duration 5 Minutes 15 Minutes 30 Minutes Ratio to 1 Hour LIP 0.32 0.50 0.73 LIP 19.4 in. x 0.32 = 6.21 in.

19.4 in. x 0.50 = 9.70 in.

19.4 in. x 0.73 = 14.16 in.

Reference:

NOAA, 1982.

Legend:

Figure 4-1 Turkey Point Nuclear Generating Station Units 3&4 (PTN)

HMR52 hour 1-Square Mile PMP Document Name: FPL062-GIS-A015 Flooding Hazard Reevaluation By: MLS Date: 2/8/2013 Turkey Point Nuclear Generating Station Units 3&4 (PTN)

0 4.0 0.

E 20.0 18.0 16.0 14.0 12.0 10.0 8.0 6.0 4.0 19.4 inches 1-hour Cumulative Precipitation I

F KI~~¶3(

2.0 0.0 0

10 20 30 Time (minutes) 40 50 60 Figure 4-2 60 Minute Local Intense Precipitation (LIP) Curve Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)

Document Name: FPLO62-GIS-AO14 By: MLS Date: 2/8/2013

WJ U

0 4J C.

CI 1.4 1.2 1.0 0.8 0.6 0.4 0.2 0.0 j +/- 1III I I I I I

ll lll I

I II I I I I I I I I I I I I I I I I I~ I II lI I I I I I I I I I I I4 1 1 I I

-I--+ -

i i

i i

! i i i i i

! i F -+

I I

I II I I I II I

I I I I I I

I F I I

I I I I I I I I-I 44444H MLT ii ii L i

VViiWVVi V

iii Vi VV V i

i i ! i i i i i i i

! ! i

! i i i i i i i I

I 1 11 LL Incremental Precipitation at One Minute Intervals

! i i i i !

I i i i ! i i i i i ! i i

Il-I'll-I II in Muwi m

1 3 5

7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51 53 55 57 59 Time (minutes)

Figure 4-3 Local Intense Precipitation (LIP) Distribution Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)

Document Name: FPL062-GIS-A014 By: MLS Date: 2/8/2013

Figure 4-4 Elevations Rendered on the Study Area Grid Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)

Document Name: FPL062-GIS-A015 By: MLS Date: 2/8/2013

Legend Points of Interest Manning's n

[*

Structures Feet 0

150 300 450 I

__ 1 I

I 0

40 80 120 160 Meters Document Name: FPLTP077-GIS-A021 Projection: State Plane Florida East, NAD 83 (US Feet)

By: MLS Date: 01/06/2013 0.02 0.025 0.08 0.10 o

0.12 Figure 4-5 Manning's n Value Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)

00 Li 1:1 Refrences: 1. SFWMD, 2007a Legend

=I Structures Flow Depth (ft) -

0.6 0.7-0.8 0.9-1*0 1.1-1.2 1.3-1.4 1.5-1.6 1.7-1.8 S1.9 - 2.0 S2.1 - 2.5 S2.6 - 3.0 3.1 - 3.5 I

3.6 - 4.0 II4.1 - 5.0 S5.1 - 6.0 1

61 -70 Feet 0

250 500 750 I

I I

I 0

50 100 150 200 250 Meters Figure 4-6 Document Name: FPLTP077-GIS-AO12 Projection: State Plane Florida East, NAD 83 (US Feet)

By: MLS Date: 01/06/2013 Maximum Flow Depth (ft)

Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)

References:

1. SFWMD, 2007a.

Legend Points of Interest Structures Flow Depth (ft) 1.1 - 1.2 1.9 - 2.0 3.6 - 4.0 06 13-14 21-25 4.41-50 0.7- 0.8 1.5-1.6 2.6-3.0 5.1-6.0 0.9-1.0

=

1.7-1.8 3.1-3.5 6.1-7.0 300 Feet 0

100 200 I

  • I I

I I

0 20 40 60 80 Meters Document Name: FPLTPO77-GIS-AO1 3 Projection: Station Plane Florida East, NAD 82 (US Feet)

By: MLS Date: 01/06/2013 Figure 4-7 Points of Interest Overlaid with the Maximum Flow Depth (ft)

Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)

Reference:

FPL. 2010.

Document Name: FPL062-GIS-A015 By: MLS Date: 2/8/2013 Figure 4-8 Points of Interest Overlaid with Main Plant Site Drawing Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)

References:

1. SFWMD, 2007a Legend Points of Interest I--]Structures Velocity (ft/s) 0,601 - 0.800 1.501 - 1.750 3.001 - 3.500 0.000 - 0.200 0.801 - 1.000 1.751 - 2.000 3.501 - 4.500 0.201 - 0.400 1.001 - 1.250 2.001 - 2.500 4.501 - 6.000 0.401 - 0.600 1.251 - 1.500 2.501 - 3.000 6.001 - 7.460 Feet 0

100 200 300 I*

I I

I 0

24 48 72 96 Meters Document Name: FPLTP077-GIS-A027 Projection: Station Plane Florida East, NAD 82 (US Feet)

By: MLS Date: 01/06/2013 Figure 4-9 Points of Interest Overlaid with the Peak Flow Velocity (ft/s)

Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)

  • 1~

/

10331'

'I, 7

II-K

~

I -~

I ~

OONDEI$ ER PIT i1 I I§kfl

=

I: ~

t

~i~I r--TT

.1

]OO -E &2 4-----

71

//

/

1 NDI-ŽýP 1 I1 h

~ L~!~'" -~

'4-I FT4."-

____~~~

-1 50oecFý l'~~mn4--

Co FLOR LW E

Reference:

FPL, 1999.

woo;

'~A~A Figure 4-10 Approximate Flood Protected Areas Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)

Document Name: FPL062-GIS-A014 By: MLS Date: 2/8/2013

0.5 0 i-i-FT1

-~

i2~K~L-i-L~iJ I ifi 4- {

I H

if I

1211'

_ I -~ --

t I

I

{ F--

- -t I

~

I 00 00

-0.5 Z

4-M

-1.5 o

7111Z7 IV'L 1 L

I

_7 janu~ar 20331~

W r

~

H

-V aru I

ff !~

I Ti I

L13 Tidal Data (Virginia Key, FL)

Linear Trend (Sea Level Rise)

L &I I

- s-i -

I i 200 400 600 800 1000 1200 1400 1600 Months (0 = Jan 1994)

References:

NOAA, 2012e.

Figure 4-12 Sea Level Rise - Linear Trend Document Name: FPL062-GIS-A014 By: MLS Date: 2/8/2013 Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)

3.5 3

2.5 2

01.5 0

" -0.5 alJ

-1.5 S-2 cu05 I -%

i I

Tidal Data (Virginia Key, FL) 2nd Order Trend

___(Sea Level Rise) 1600

-I

=

)

200 400 600 800 1000 1200 Months (0 = Jan 1994) 1400

References:

NOAA, 2012e.

Figure 4-13 Sea Level Rise - 2nd Order Trend Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)

Document Name: FPL062-GIS-A014 By: MLS Date: 2/8/2013

Strom Tracks for CalibrationNalidation Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)

Miami Harbor Entrance IHO 1

DELFT3D Computed Tide Resynthesized Tide 0-5 Ci)

E a)

-0.51 III'

~IIIIII!.I I

-1 W

-1.5 1 Sep 15 Sep 29 Sep Time 13 Oct 27 Oct Figure 4-15 Tidal Station Calibration Results at IHO Station Miami Harbor Entrance, Florida Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)

Document Name: FPLO62-GIS-AO14 By: MLS Date: 2/8/2013

,=ll Legend Turkey Point Nuclear Generating Station Units 3 & 4 (PTN)

Hurricane Position (6 hr Time Step)

Hurricane Andrew (Calibration)

Hurricane Donna (Validation)

DELFT3D Grid Model L _ _ _ _ D o m a in

References:

1. ESRI, 2013a, 2. NOAA, 2012.a Miles 0

350 700 1,050 I

I I

I I

I I

I I

0 400 800 1,200 1,600 Kilometers Document Name: FPLTP077-GIS-AO07 Projection: Geographic Coordinate System, WGS 84 By: MLS Date: 01/06/2013 Figure 4-16 Strom Tracks for CalibrationNalidation Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)

Reference:

NOAA, 2012n.

Note: Reported values are in meters NGVD 29 datum.

Legend:

Turkey Point Nuclear Generating Station Units 3&4 (PTN)

Figure 4-17 Observed Storm Surge Water Levels for Hurricane Andrew Document Name: FPL062-GIS-AO15 By: MLS Date: 2/8/2013 Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)

Water Level (meters in Mean Sea Level)

-ý3 25.65 -

25.6 -

25.55 I M

0 0

25.5 F Wind Vector PTN

-80.

-0r1Ck

-8.

-80.2

-80.15

-80.1 1.5 I

I 2

2.5 25.45 -

25.4 -

25.35 F 25.3 -

-80.5

-80.45

-80.4

-80.35

-80.3

-80.25 x coordinate --

Time Step 1 (Output Time Step 368 [August 24, 1992 @ 09:30:00])

Figure 4-18 DELFT3D Computed Hurricane Andrew Storm Surge at Time Step 1 in the Fine Grid 2 Model Domain Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)

Document Name: FPL062-GIS-AO14 By: MLS Date: 2/8/2013

Water Level (meters-in Me; ed) 4 25.65 -

Wind Vector PTN 25.6 F 3

25.55 F F 1 2

25.5

.' 25.45

=

=

1 Hurricane

ýt°*rr.ý T-rac 25.4 F 0

25.35 k

-1 25.3 F

-80.5

-80.45

-80.4

-80.35

-80.3

-80.25

-80.2

-80.15

-80.1 x coordinate --,

Time Step 2 (Output Time Step 369 [August 24, 1992 @ 10:00:00])

Figure 4-19 DELFT3D Computed Hurricane Andrew Storm Surge at Time Step 2 in the Fine Grid 2 Model Domain Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)

Document Name: FPLO62-GIS-AO14 By: MLS Date: 2/8/2013

Water Level (meters in Mean Sea Leve 1) 25.65 I 25.6 F 25.55 F T

25.5 0

S25.45

~Q\\\\\\ \\\\'~

t,.

Wind Vector PTN

ýrlc 7

Afler orn raCk edrW V 12 4

3 I

25.4 -

0

-1I 25.35 -

25.3

-80.5

-80.45

-80.4

-80.35

-80.3

-80.25

-80.2

-80.15

-80.1 x coordinate --+

-2 Time Step 3 (Output Time Step 370 [August 24, 1992 @ 10:30:00])

Figure 4-20 DELFT3D Computed Hurricane Andrew Storm Surge at Time Step 3 in the Fine Grid 2 Model Domain Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)

Document Name: FPL062-GIS-A014 By: MLS Date: 2/8/2013

Water Level (m in MSL)

Wind 25.*5 5 Vector 4

PTN 3.5 25.65 t 25.55 25.45 2.5 t' 25,5 2

-2

.0.

25.35 25.3 -

0.

-60.5

-80.45

-80.4

-80.35

-80.3

-80.25

-80.2

-80.15

-60.1 x coordinate -*

Time Step 1 (Output Time Step 8340 [September 10, 1960 @ 07:58:00])

Figure 4-21 DELFT3D Computed Hurricane Donna Storm Surge at Time Step I in the Fine Grid 2 Model Domain Document Name: FPL062-GIS-A014 By: MLS Date: 2/8/2013 Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)

Reference:

Harris, 1963.

Note: Reported values are in feet NGVD 29 datum.

Legend Turkey Point Nuclear Generating Station Units 3&4 (PTN)

Figure 4-22 Observed Storm Surge Water Levels for Hurricane Donna Document Name: FPL062-GIS-A014 By: MLS Date: 2/8/2013 Flooding Hazard Reevaluation Turkey Point Nuclear. Generating Station Units 3&4 (PTN)

Reference:

NWS, 1979.

Legend:

Turkey Point Nuclear Generating Station Units 3&4 (PTN)

Figure 4-23 Coastal Distance Intervals in Nautical Miles and Kilometers Document Name: FPL062-GIS-AO15 By: MLS Date: 2/8/2013 Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)

0 0

0 0

0 In

'1 03 0

0 0

a o

0 01 ca co co 0

1 F-7.

0.

k ck

-ý M

EASTPORT, ME BOSTON. MASS -

b NEW YORK. NY -

b CHINCOTEAGUE.

VA -

CAPE HATTERAS, N C -O 0HAR.ESTON, S C DAYTONA BEACH. FLA --

MlAWE FLA FT MYERS. FL-A TARPON SPRINGS.

FLA --

APALACHKX1A. FLA---

PENSACOLA, FLA

SLOX, miss LAKE CHARLES, LA--)-

GALVESTON, TEX ------a PORT ISABEL. TEX S

1 1

1 1 1 1 I j ig

-4 a-2 cc a

I I 1i I

I 1 I

f 0

I 0

0

)

0

)

0 0

C 4 N

0 N

1 C 4 0

o K

N N

,0 0

a0

.0 V

4 N4 N4 N

(

(

N4 N4 In C4 (INDl 3W1SSId lSI+/-N33

Reference:

NWS, 1979.

Figure 4-24 Legend:

STurkey Point Nuclear Generating Station Units 3&4 (PTN)

Central Pressure for the Probable Maximum Hurricane (PMH)

Document Name: FPLO62-GIS-AO15 By: MLS Date: 2/8/2013 Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)

MD) b, 0

0 o

0 0

0

4.

_Cv V4 EASTPORT, W------

BOSTON, MASS NEW YORK.

N.Y.-

C -INCOTEAGLE, VA.

CAPE HATTERAS, N.C.---)

CHARLESTON, S.C.--

DAYTONA BEACH. FLA. -.

MIAMI. FLA.

FT. MYERS.

FLA TARPON SPRINGS. FLA.--,

APALACHICOLA.

FLA.----.1 PENSACOLA. FLA.---

BILOXI. MISS.

LAKE CHARLES. LA.--i--

GALVESTON, TEX.

3-*

PORT ISABEL,. TEX.-" I I

I I

I I

I o

X 9

LU

-A CC 0~

x z

0 ao I

I I

' L-

' :it

. "ie

. 0 0*

C l

t4 WI C

(IW NJ scNim wflwixvw :50 smliG

Reference:

NWS, 1979.

Legend:

Turkey Point Nuclear Generating Station Units 3&4 (PTN)

Document Name: FPLO62-GIS-AO15 By: MLS Date: 2/8/2013 Figure 4-25 Adopted Upper and Lower Limits of Radius of Maximum Winds for the Probable Maximum Hurricane (PMH)

Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)

() I H/W)t I o

a

'l 0

I -

I -

~ -

I -

I -

- -5 EASTPORT.

kE.-

BOSTONK MASS-NEW YORK.

N.Y.-

c.NcEAGU*, VA.---.-

CAPE HATTERAS, N.O.-.

CHARLESTON, S.C.--

DAYTONA BEAC*., FLA. -*

MIAMa FU.L FT. MYERS& FLA.-

TARPON SPRINS, FLAr.-B APALACHICOLA. FLA.--N PENSACOLA.

FLA.------*-

SLOX. MSS.---

LAKE CHARLES, LA.----*

GALVESTON, TEX.--

AORT ISASEL. TEX.--

I 11 I1 1 11 1 11 1 I

5 l-I

~~10 Ii z

2 Z

~I iii I

1I1 I

il II h~ ~~ ~~~~~~~

i

ý-

I I-1 0

40 0

WII Gaads QOUVM8O0i 0

Reference:

NWS, 1979.

Legend:

Turkey Point Nuclear Generating Station Units 3&4 (PTN)

Document Name: FPL062-GIS-AO15 By: MLS Date: 2/8/2013 Figure 4-26 Adopted Probable Maximum Hurricane (PMH)

Upper and Lower Limits of Forward Speed Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)

(156P) N01l133NlU

)DYV~i

Reference:

NWS, 1979.

Legend:

Turkey Point Nuclear Generating Station Units 3&4 (PTN)

Figure 4-27 Maximum Allowable Range of the Probable Maximum Hurricane Track Direction Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)

Document Name: FPLO62-GIS-A015 By: MLS Date: 2/8/2013

Legend Turkey Point Nuclear Generating Station Units 3&4 (PTN)

Hurricane Storm Classification (Saffir-Simpson Hurricane Scale) 0- Category 4 Miles 0

40 80 120 I -- -

- -4I I

  • I I

I I

0 50 100 150 200 Kilometers Figure 4-28 Tracks of Historical Hurricanes (Intensities of Category 4 & 5) in the Region of PTN Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)

w. Categroy 5 Document Name: FPLTP077-GIS-A016 Projection: Geographic Coordinate System, WGS 84 By: MLS Date: 01(0612013

Legend Turkey Point Nuclear Generating Station Units 3&4 (PTN)

Miles 0

20 40 60 I _

I_

I I

I 0

20 40 60 80 100 Kilometers Synthetic Storm Tracks for Probable Maximum Storm Surge Analyses Figure 4-29 Document Name: FPLTP077-GIS-A017 Projection: Geographic Coordinate System, WGS 84 By: MLS Date: 01/06/2013 Synthetic Storm Tracks Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)

CO Go CLi

-4 4-0 RADIUS OF MAXIMUM WINDS (nmi)

Reference:

NWS, 1987.

Figure 4-30 Plot Central Pressure (P0) Versus Radius of Maximum Winds (R) for Extreme Hurricanes Document Name: FPL062-GIS-A015 By: MLS Date: 2/8/2013 Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)

935 930 925 920 915 910 Ln u.j

-905 900 895 890 885 880 0

5 10 15 20 25 30 RADIUS OF MAXIMUM WINDS (NAUTICAL MILES) 35 40 45 Figure 4-31

Reference:

For storms through 1985 see NWS, 1979; For storms since 1985 see Table 4-15.

Document Name: FPL062-GIS-AO15 By: MLS Date: 3/8/2013 Plot Central Pressure (P0) Versus Radius of Maximum Winds (R) for Extreme Hurricanes, Revised 2013 Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)

N S

IA'A A

1040 L

Iii

-4 I'A 1020 7TLI i9 9600 98 0

1 O

860

-1 42 1-~ti

~

Radial Distance from Storm Center (nautical miles)

Figure 4-32 Document Name: FPLTPO77-GIS-A026 Hurricane Pressure Field Projection: State Plane Florida East, NAD 83 (US Feet)

Flooding Hazard Reevaluation By: MLS Date: 01/6/2013 Turkey Point Nuclear Generating Station Units 3&4 (PTN)

A 3/4 3/4 I,

4 d

444

'S 4

S J 4 S 4 I 4~

44 3/4, 3/4, i

d i

'I 1,

//

d/

/

1/

//

'/

17

'Ii,'

'I

/

~1 //

/ //

7

.~

'~t

'-S

~ '

'-5-'.

I'

~V ~

N S

S S 3/4 a

' t t Nautical Miles 0

50 100 I

7 I

A

_£I__

r l A' A

I I

'S

'S

'S I

I N"

\\

1.

">-I II;,

A 140 120 100 80 0

C4

  • 0 0.

S40 20 0

-300

-250

-200

-150

-100

-50 0

50 100 150 200 250 300 Radius from Storm Center (nautical miles)

Figure 4-33 Document Name: FPLTPO77-GIS-A028 Projection: State Plane Florida East, NAD 63 (US Feet)

By: MLS Date: 01/6/2013 Wind Field and Wind Speed Plots Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)

9000 92000 W+

EI 1'S 6.28 ft NAVDB8 7.93 ft MLW 1ft NAVD88 Ift MLW NAVD88 MLW I

5.86 7.51 7.68 ft 9.33 ft!

Legend Turkey Point Nuclear Generating Station Units 3&4 (PTN)

Spot Elevation Miami-Dade Co.

DEM (ft NAVD88)

High : 168.113 Low: -18.186 Florida Keys DEM (ft NAVD88)

High: 93.9108 Low: -18.186 Miles 0

1 2

3 t _

_ I I

I I- - I I

I I

0 1

2 3

4 5

Kilometers Figure 4-34 Document Name: FPLTP077-GIS-A024 Projection: State Plane Florida East, NAD 83 (US Feet)

Vertical Datum: NAVD88 By: MLS Date: 01/06/2013 Barrier Island Breakwater Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)

1U

.21 V-mI-ZI 11[

II 876B00 Reterences: 1.

Legend Turkey Point Nuclear Generating Station Units 3 & 4 (PTN) l Station (feet)

Cross Section Feet 0

100 200 300 I

I 0

24 48 72 96 Meters Figure 4-35 Relationship of Breakwater to Power Block Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)

Document Name: FPLTP077-GIS-A025 Projection: State Plant Florida East, NAD 83 ( US feet)

By: MLS Date: 01/06/2013

Direction of Wave Propagation M

Maximum Sustainable Wave Height or Breaking Wave Heigh t (Hb)

Significant Wave Height (H.)

Large Waves Break at the Breakwater Breakwater Note: Not to Scale Figure 4-36 Maximum Wave Height Over the Breakwater Structure Document Name: FPLO62-GIS-AD14 By: MLS Date: 2/8/2013

. Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)

Cross Section 1 33 28 23 O18 4L

  • ~13

.2~

8 3

PTN FLOOR ELEVATION

_Area Assumed Flat Water f*

~Surface

-__._ _Elevation of I

the Cooling Water Canal

-Ground Surface (feet-NAVD88)

-2 0

100 200 300 400 500 600 700 800 900 1000 1100 Distance along the Cross Section (feet)

Figure 4-37

Reference:

Ford, 2012a.

Document Name: FPL062-GIS-A014 By: MLS Date: 2/8/2013 Representative Cross Section for Wave Analysis Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)

75"1 W70W 851N 4"t 351ý 30*N WN1 Quatemary rivers Thick Quatemnay shelf-edge deposits Study area Turkey point Nuclear Generating Station Units 3&4 0 100200 300 400 500 70"W es'*

References:

Atlantic and Gulf of Mexico Tsunami Hazard Assessment Group, 2008 Figure 4-38 Location Map Showing the Extent of the AGMTHAG Study Area and Geologic Features That May Influence Landslide Distribution along the U.S. Atlantic Margin Document Name: FPL062-GIS-A020 Flooding Hazard Reevaluation By: MLS Date: 2/8/2013 Turkey Point Nuclear Generating Station Units 3&4 (PTN)

35°N-

,40"N Sediment age from cores Pleistocene 2

Pliocene A

Miocene cuffiluck Eocene 3$14 Landslide types Debris flow Rotational slide C LoTranslational slide l

Composite landslide 0

100 200 300 400 500 KFometers 75W 70w awSW Note: HC = Hudson Canyon; LC = Lindenkohl Canyon; WC = Wilmington Canyon; NC = Norfolk Canyon.

References:

Atlantic and Gulf of Mexico Tsunami Hazard Assessment Group, 2008 Figure 4-39 Distribution of Different Landslide Types Along the U.S. Atlantic Margin Document Name: FPL062-GIS-A020 By: MLS Date: 2/8/2013 Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)

95*W Bs901 Bo6 asw 30"-

-30"N 25N.

-14" Provinces salt ZiCarrofa 20 Landslides 20N Carbonate debris flow deposi"ts Carborateo ta.* depos*s Temrgenous mass-wastin deposits 00"W 90W 85"W Figure 4-40 Location Map Showing the Size, Distribution, and Composition of Landslides in the Gulf of Mexico

References:

Atlantic and Gulf of Mexico Tsunami Hazard Assessment Group, 2008 Document Name: FPL062-GIS-A019 Flooding Hazard Reevaluation By: MLS Date: 2/8/2013 Turkey Point Nuclear Generating Station Units 3&4 (PTN)

35N Note: Barbed lines - proposed faults by previous studies: GBF - Gorringe Bank Fault; MPF - Marquds de Pombal Fault; SVF-St. Vincente Fault; HSF - Horseshoe Fault; GCF - Gulf of Cddiz Fault. PIAB refers to the Paleo Iberia-Africa Plate Boundary.

Depth contours are in meters (only contours from -250 to -2000 meters are shown.

Inset Plates: NAM - North American Plate; EUR - Eurasia Plate; AFR - African Plate.

References:

Atlantic and Gulf of Mexico Tsunami Hazard Assessment Group, 2008 Figure 4-41 Plate Tectonic Setting and Bathymetry of the Eastern Azores-Gibraltar Region Document Name: FPL062-GIS-A020 By: MLS Date: 2/8/2013 Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)

in~

1 OVI 0000 M70 0000 4000 4000 -W00 -M00 -I=0 Depth (meters)

Note: Red lines are plate boundaries and red arrows indicate plate movement.

Figure 4-42 The Caribbean Plate Boundary and its Tectonic Elements Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)

References:

Atlantic and Gulf of Mexico Tsunami Hazard Assessment Group, 2008 Document Name: FPL062-GIS-AO19 By: MLS Date: 2/8/2013

-j CA E

4-,

.4-4.,

4.0 1.5 3.0-2.5 2.0 1.5 5

1.0

____0

-0.--

-2.0

-1.5 0:00 0

2 3

4 5

6 7

8 9

.09:

010.

1 My 17 17 Hours into Model Simulation 23:1 16-05-2

30:00 2010 Figure 4-43 Simulated Tsunami Marigram Near PTN (with Manning's n of 0.02 and non-reflective boundaries)

Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)

References:

NEE, 2012.

Document Name: FPL062-GIS-A020 By: MLS Date: 2/8/2013

-20 0

40 60 80 m

I lhr-. 20id/05/i 7 04130,00 f

AI" 40 4

o30k-20i1-30 20 10 10 0

0

-10o--

-20

-10

-20

-30

-40

-30[-

-A

-20 0

20

References:

NEE, 2012.

  • U OU km 0<-3.0 0<D.5 M<2.5 I<4.5 M <-2.0 0<1.0
  • <3.0
  • '<.0 0<-1.0 l<1.5 4i1.5 N-.5 0 <0.0 EI <2.0
  • <4.0
  • )>5.5 Turkey Point Nuclear Generating Station Units 3&4 Note: Water levels are in meters relative to 1.36 m MSL; some (dry) land elevations are shown as flood water levels according to designation in Delft3D-FLOW Manning's n of 0.02 and non-reflective boundaries Figure 4-44 Tsunami Water Level Contours near PTN 4.5 Hours in the Model Simulation Corresponding to the Time Close to the Maximum Water Level at Site Document Name: FPL062-GIS-A020 Flooding Hazard Reevaluation By: MLS Date: 2/8/2013 Turkey Point Nuclear Generating Station Units 3&4 (PTN)

Figure 4-45

Reference:

NEE, 2012 Document Name: FPL062-GIS-A015 By: MLS Date: 2/8/2013 Meteorological and USGS Stations Near PTN Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)

( U C-65 E

I-'-60 0

Date Figure 4-46 Water Temperatures at the USGS Stations Near PTN

Reference:

NEE, 2012.

Document Name: FPLO62-GIS-A014 By: MLS Date: 2/8/2013 Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN) 1*

mmsr.~S 3I.

romi. maw. 4. or vvmu. moua. g. Nat,~

/v iz.

41. INut"~. 2UI I

Legend Historic Shoreline Turkey Point 1928 Nuclear Generating 1946 Station Units 3&4 (PTN) 197111972 Feet 0

600 1,200 1,800 I_

I I

I I

l I

I I

0 150 300 450 600 Meters Figure 4-47 Docuiment Name: FPLTP077-GIS-A023 Projection: State Plane Florida East, NAD 83 (US Feet)

By: MLS Date: 01/6/2013 Historic Shoreline Changes at PTN Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)

20.0-19.0-

  • '18.0~

z W 17.0 w

U-LL Z0z_

/ --

TOTAL PRESSURE 4

-~

HYDRODYNAMIC UJw..

HYDROSTATIC I

I I

I I

I I

I I

I I

25 50 75 100 125 150 175 200 225 250 275 300 PRESSURE (Ib/ft2)

Figure 4-48 Hydrostatic and Hydrodynamic Pressure Document Name: FPL062-GIS-AO15 By: MLS Date: 3/8/2013 Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)