NUREG-0569, Forwards NUREG-0569, Evaluation of Integrity of SEP Reactor Vessels, Completing Review of SEP Topic V-6.W/o Encl: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 1: Line 1:
#REDIRECT [[NUREG-0569, Forwards NUREG-0569, Evaluation of Integrity of SEP Reactor Vessels, Completing Review of SEP Topic V-6. W/O Encl]]
{{Adams
| number = ML13322A746
| issue date = 03/05/1980
| title = Forwards NUREG-0569, Evaluation of Integrity of SEP Reactor Vessels, Completing Review of SEP Topic V-6.W/o Encl
| author name = Ziemann D
| author affiliation = NRC/NRR
| addressee name = Dietch R
| addressee affiliation = Southern California Edison Co
| docket = 05000206
| license number =
| contact person =
| document report number = NUDOCS 8004080699
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 1
}}
 
=Text=
{{#Wiki_filter:O 9DISIR-IBUTION NRC PDR Local PDR ORB #2 Reading NRR reading DEisenhut Docket No. 50-206 RVollmer OELD OI&E (3)
DLZiemann PWO'Connor Mr. R. Dietch HSmith Vice President DCrutchfield Huclear Engineering and Operations CHofmayer Southern California Edison Company JShapaker 2244 'Iz1nut Grove Avenue NSIC Post Office Box 800 TERA Rosemead, California 91770 ACRS (16)
KHoge
 
==Dear fMr. Dietch:==
RE:
COMPLETION OF SEP TOPIC V-G, REACThO VESSEL I LT"RITY SAN ONOFRE NUCLEAR GENERATING STATION, UNIT NO. 1 Enclosed herewith is a report entitled, "Evaluation of the Integrity of SEP Reactor Vessels," (NUREG-0569) for your inforimation.
This report documcnts our review of the design specifications and quality assurance pro,-rams used in reactor vessel construction. It also provides the status el surveillance programs, pressure-temperature operating limits, inservice inspection programs and other vessel related issucs. for plants in the Systematic Evaluation Program (SEP).
This evaluation completed our review of SEP Topic V-6 and will be used as input to the integrated review of San Onofre Nuclear Generating Station, Unit No. 1.
Stncerely, Dennis L. Ziemann, Chief Operating Reactors Branch #,2 Division of Operating Reactors
 
==Enclosure:==
NUREG-0569 cc w/o enclosure:
See next page a I IM 8004080 1
OFFICE DOR 2.
OR:0RB.#.2... DO.
2..
SURN MEO a
: l.
:ah....
PWO'Connor..
DL eri n............................
suR AME DATE 3
/ 80.......3/.
./.80......
. 3/180 NRC FORM 318 (976) NRCM 0240 oUnSn GOVERNMENT PRINTING OFFICE 1979-289-369}}

Latest revision as of 02:32, 11 January 2025

Forwards NUREG-0569, Evaluation of Integrity of SEP Reactor Vessels, Completing Review of SEP Topic V-6.W/o Encl
ML13322A746
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 03/05/1980
From: Ziemann D
Office of Nuclear Reactor Regulation
To: Dietch R
Southern California Edison Co
References
NUDOCS 8004080699
Download: ML13322A746 (1)


Text

O 9DISIR-IBUTION NRC PDR Local PDR ORB #2 Reading NRR reading DEisenhut Docket No. 50-206 RVollmer OELD OI&E (3)

DLZiemann PWO'Connor Mr. R. Dietch HSmith Vice President DCrutchfield Huclear Engineering and Operations CHofmayer Southern California Edison Company JShapaker 2244 'Iz1nut Grove Avenue NSIC Post Office Box 800 TERA Rosemead, California 91770 ACRS (16)

KHoge

Dear fMr. Dietch:

RE:

COMPLETION OF SEP TOPIC V-G, REACThO VESSEL I LT"RITY SAN ONOFRE NUCLEAR GENERATING STATION, UNIT NO. 1 Enclosed herewith is a report entitled, "Evaluation of the Integrity of SEP Reactor Vessels," (NUREG-0569) for your inforimation.

This report documcnts our review of the design specifications and quality assurance pro,-rams used in reactor vessel construction. It also provides the status el surveillance programs, pressure-temperature operating limits, inservice inspection programs and other vessel related issucs. for plants in the Systematic Evaluation Program (SEP).

This evaluation completed our review of SEP Topic V-6 and will be used as input to the integrated review of San Onofre Nuclear Generating Station, Unit No. 1.

Stncerely, Dennis L. Ziemann, Chief Operating Reactors Branch #,2 Division of Operating Reactors

Enclosure:

NUREG-0569 cc w/o enclosure:

See next page a I IM 8004080 1

OFFICE DOR 2.

OR:0RB.#.2... DO.

2..

SURN MEO a

l.
ah....

PWO'Connor..

DL eri n............................

suR AME DATE 3

/ 80.......3/.

./.80......

. 3/180 NRC FORM 318 (976) NRCM 0240 oUnSn GOVERNMENT PRINTING OFFICE 1979-289-369