PNP 2014-081, Response to Fourth Request for Additional Information - Reactor Vessel Internals (ME9569): Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:* En
{{#Wiki_filter:Entergy Nuclear Operations, Inc.
~ Entergy    tergy Entergy Entergy Nuclear Palisades 27780 Nuclear Operations, Palisades Nuclear 27780 Blue Blue Star Operations, Inc Nuclear Plant Plant Star Memorial Covert, MI 49043-9530 ecv;t Inc.*
Palisades Nuclear Plant 27780 Blue Star Memorial Highway Entergy ecv;t 4:o3953o Jeffery A. Hardy Regulatory Assurance Manager PNP 201 4-081 August 14, 2014 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Memorial Highway 4:o3953o Tel 269 764 2000 Highway Jeffery Jeffery A. Hardy Hardy Regulatory Assurance Regulatory   Assurance Manager Manager PNP 2014-081 PNP   201 4-081 14, 2014 August 14,2014 U. S. Nuclear Regulatory Commission ATTN: Document AnN:    Document Control Desk Washington, DC 20555-0001


==SUBJECT:==
==SUBJECT:==
Response to Fourth Request for Additional Information - Reactor Vessel Internals (ME9569)
Response to Fourth Request for Additional Information Reactor Vessel Internals (ME9569)
Palisades Nuclear Plant Docket 50-255 License No. DPR-20
Palisades Nuclear Plant Docket 50-255 License No. DPR-20


==REFERENCES:==
==REFERENCES:==
: 1. Entergy Nuclear Operations, Inc. letter to NRC, PNP 2012-009, "Revised          Revised Program Plan for Aging Management of Reactor Vessel Internals,"      Internals, September 13, 2012 (ADAMS Accession Number ML                ML12257A352) 12257A352)
1.
: 2. NRC e-mail, Palisades "Palisades - Request for Additional Information - ME9569-ME9569     -
Entergy Nuclear Operations, Inc. letter to NRC, PNP 2012-009, Revised Program Plan for Aging Management of Reactor Vessel Internals, September 13, 2012 (ADAMS Accession Number ML12257A352) 2.
Revised Program Plan for Aging Management of Reactor Vessel Internals, March 04,2013 Internals,"        04, 2013 (ADAMS Accession Number ML              ML13063A318) 13063A318)
NRC e-mail, Palisades Request for Additional Information ME9569 Revised Program Plan for Aging Management of Reactor Vessel Internals, March 04, 2013 (ADAMS Accession Number ML13063A318) 3.
: 3. Entergy Nuclear Operations, Inc. letter to NRC, PNP 2013-022,
Entergy Nuclear Operations, Inc. letter to NRC, PNP 2013-022, Response to Request for Additional Information Revised Program Plan for Aging Management of Reactor Vessel Internals, April 04, 2013 (ADAMS Accession Number ML13094A414) 4.
NRC e-mail, Palisades Request for Additional Information Reactor Vessel Internals
- ME9569 Email Resend, December 12, 2013 (ADAMS Accession Number ML13346A644) 5.
Entergy Nuclear Operations, Inc. letter to NRC, Summary of January 2, 2014 Teleconference with Nuclear Regulatory Staff on Palisades Req uest for Additional Information Reactor Vessel Internals ME9569 Response Schedule, January 07, 2014 (ADAMS Accession Number ML14007A151) 6.
Entergy Nuclear Operations, Inc. letter to NRC, PNP 2014-001, Response to Second Request for Additional Information
- Reactor Vessel Internals ME9569, April 03, 2014 (ADAMS Accession Number ML14097A376) 7.
NRC e-mail, Request for Additional Information
- Palisades Aging Management Program for Reactor Vessel Internals
- ME9569, June 09, 2014 (ADAMS Accession Number ML14160B264)
~Entergy Entergy Nuclear Operations, Inc
* Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043-9530 Tel 269 764 2000 Jeffery A. Hardy Regulatory Assurance Manager PNP 2014-081 August 14,2014 U. S. Nuclear Regulatory Commission AnN: Document Control Desk Washington, DC 20555-0001
 
==SUBJECT:==
Response to Fourth Request for Additional Information - Reactor Vessel Internals (ME9569)
Palisades Nuclear Plant Docket 50-255 License No. DPR-20


===Response===
==REFERENCES:==
                      "Response to Request for Additional Information - Revised Program Plan for Aging Management of Reactor Vessel Internals,"Internals, April 04, 2013 (ADAMS Accession Number ML1          3094A41 4)
: 1. Entergy Nuclear Operations, Inc. letter to NRC, PNP 2012-009, "Revised Program Plan for Aging Management of Reactor Vessel Internals,"
ML13094A414)
September 13, 2012 (ADAMS Accession Number ML12257A352)
: 4. NRC e-mail, Palisades "Palisades - Request for Additional Information Information - Reactor Vessel Internals Internals - ME9569
: 2. NRC e-mail, "Palisades - Request for Additional Information - ME9569-Revised Program Plan for Aging Management of Reactor Vessel Internals," March 04,2013 (ADAMS Accession Number ML13063A318)
                                          - ME9569 - Email Resend, Resend," December 12,        12, 2013 (ADAMS Accession Number ML13346A644)
: 3. Entergy Nuclear Operations, Inc. letter to NRC, PNP 2013-022, "Response to Request for Additional Information - Revised Program Plan for Aging Management of Reactor Vessel Internals," April 04, 2013 (ADAMS Accession Number ML13094A414)
ML13346A644)
: 4. NRC e-mail, "Palisades - Request for Additional Information - Reactor Vessel Internals - ME9569 - Email Resend," December 12, 2013 (ADAMS Accession Number ML13346A644)
: 5. Entergy Nuclear Operations, Operations, Inc.
: 5. Entergy Nuclear Operations, Inc. letter to NRC, "Summary of January 2, 2014 Teleconference with Nuclear Regulatory Staff on Palisades-Request for Additional Information - Reactor Vessel Internals - ME9569 Response Schedule," January 07, 2014 (ADAMS Accession Number ML14007A151)
Inc. letter to NRC, NRC, Summary "Summary of JanuaryJanuary 2, 2014 2014  Teleconference   with  Nuclear with Nuclear Regulatory Staff   Staff onon Palisades Palisades-   -
: 6. Entergy Nuclear Operations, Inc. letter to NRC, PNP 2014-001, "Response to Second Request for Additional Information - Reactor Vessel Internals - ME9569," April 03, 2014 (ADAMS Accession Number ML14097A376)
Req  uest for Additional Information - Reactor Vessel Internals Request                                                         Internals - ME9569 ME9569
: 7. NRC e-mail, "Request for Additional Information - Palisades - Aging Management Program for Reactor Vessel Internals - ME9569," June 09, 2014 (ADAMS Accession Number ML14160B264)


===Response===
PNP 2014-081 Page 2 of 2 8.
Response Schedule, Schedule," January January 07, 07, 2014 (ADAMS (ADAMS Accession Number      Number ML1  4007A1 51)
Entergy Nuclear Operations, Inc. letter to NRC, PNP 2014-067, Response to Third Request for Additional Information Reactor Vessel Internals (ME9569), July 01, 2014 (ADAMS Accession Number ML14183A014) 9.
ML14007A151)
NRC e-mail, Request for Additional Information: Palisades Aging Management Program for Reactor Vessel Internals (ME9569),
: 6. Entergy
August 01, 2014
: 6.          Nuclear Operations, Entergy Nuclear                 Inc. letter Operations, Inc.           to NRC, letter to NRC, PNP PNP 2014-001, 2014-001,


===Response===
==Dear Sir or Madam:==
                      "Response to to Second Second Request Request forfor Additional Additional Information          Reactor Vessel Information - Reactor
In Reference 1, Entergy Nuclear Operations, Inc. (ENO) submitted to the Nuclear Regulatory Commission (NRC) a revised program plan for aging management of reactor vessel internals.
                                                                                              -            Vessel Internals Internals - ME9569, ME9569," April    03, 2014 April 03,  2014 (ADAMS (ADAMS Accession Accession NumberNumber ML1  4097A376)
In Reference 2, the NRC issued a request for additional information (RAI). ENO responded to the RAI in Reference 3.
ML 14097  A376)
In Reference 4, the NRC issued a second RAI with a 30-day required response.
: 7. NRC
In Reference 5, ENO documented a teleconference during which the NRC accepted a request to extend the second RAI response from 30 days to 120 days. ENO responded to the second RAI in Reference 6.
: 7. NRC e-mail, e-mail, Request "Request for for Additional Additional Information Information - Palisades
In Reference 7, the NRC issued a third RAI with a 30-day required response. ENO responded to the third RAI in Reference 8.
                                                                                  -  Palisades - Aging Aging Management      Program    for Management Program for ReactorReactor Vessel Vessel Internals Internals - ME9569,
In Reference 9, the NRC issued a fourth RAI with a 30-day required response.
                                                                                      -  ME9569," JuneJune 09, 09, 2014 (ADAMS 2014  (ADAMS Accession Accession Number Number ML14160B264)
The response to the fourth RAt is provided in the attachment.
ML14160B264)
This submittal contains no proprietary information.
This submittal contains no new or revised commitments.
Sincerely, jah/jse


PNP 2014-081 PNP  2014-081 Page 22 of Page    of 22 Entergy Nuclear
==Attachment:==
: 8. Entergy     Nuclear Operations, Operations, Inc.
Response to Fourth Request for Additional Information for Reactor Vessel Internals (ME9569) cc:
Inc. letter letter to NRC, PNP to NRC,   PNP 2014-067, 2014-067, Response    to Third Request                  Information - Reactor "Response to Third Request for Additional Information         Reactor Vessel Vessel Internals (ME9569),"
Administrator, Region III, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USN RC PNP 2014-081 Page 2 of 2
Internals    (ME9569), July 01, 2014 2014 (ADAMS Accession Number Number 41 83A01 4)
: 8. Entergy Nuclear Operations, Inc. letter to NRC, PNP 2014-067, "Response to Third Request for Additional Information - Reactor Vessel Internals (ME9569)," July 01, 2014 (ADAMS Accession Number ML14183A014)
ML114183A014)
: 9. NRC e-mail, "Request for Additional Information: Palisades Aging Management Program for Reactor Vessel Internals (ME9569),"
ML
August 01, 2014  
: 9. NRC
: 9. NRC e-mail, "Request Request for Additional Information:
Information: Palisades Palisades Aging Management Program Management        Program for Reactor Reactor Vessel Internals (ME9569),"
(ME9569),
August 01, 2014 Madam:


==Dear Sir or Madam:==
==Dear Sir or Madam:==
In Reference 1, Entergy Nuclear Operations, Inc. (ENO) submitted to the Nuclear Regulatory Commission (NRC) a revised program plan for aging management of reactor vessel internals.
In Reference 1, Entergy Nuclear Operations, Inc. (ENO) submitted to the Nuclear Regulatory Commission (NRC) a revised program plan for aging management of reactor vessel internals.
In Reference 2, the NRC issued a request for additional information (RAI). ENO responded to the RAI in Reference 3.
In Reference 2, the NRC issued a request for additional information (RAI). ENO responded to the RAI in Reference 3.
Line 77: Line 85:
In Reference 7, the NRC issued a third RAI with a 30-day required response. ENO responded to the third RAI in Reference 8.
In Reference 7, the NRC issued a third RAI with a 30-day required response. ENO responded to the third RAI in Reference 8.
In Reference 9, the NRC issued a fourth RAI with a 30-day required response.
In Reference 9, the NRC issued a fourth RAI with a 30-day required response.
The response to the fourth RAI RAt is provided in the attachment.
The response to the fourth RAI is provided in the attachment.
This submittal submittal contains no proprietary information.
This submittal contains no proprietary information.
This submittal contains no  no new or revised commitments.
This submittal contains no new or revised commitments.
Sincerely, jah/jse jah/jse
Sincerely, jah/jse  
 
==Attachment:==


==Attachment:==
==Attachment:==
 
Response to Fourth Request for Additional Information for Reactor Vessel Internals (ME9569) cc:
===Response===
Administrator, Region III, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC  
Response to to Fourth Fourth Request Request for for Additional Additional Information Information for for Reactor Reactor Vessel Vessel Internals Internals (ME9569) cc:
cc:      Administrator, Administrator, Region Region III, III, USNRC USNRC Project Project Manager, Manager, Palisades, Palisades, USNRC USNRC Resident  Inspector,  Palisades, Resident Inspector, Palisades, USN      RC USNRC


ATTACHMENT Response to Fourth Request for Additional Information for Reactor Vessel Internals (ME9569)
ATTACHMENT Response to Fourth Request for Additional Information for Reactor Vessel Internals (ME9569)
By letter dated September 13, 2012, Entergy Nuclear Operations, Inc. (ENO) submitted to the Nuclear Regulatory Commission (NRC) a revised program plan for aging management of reactor vessel internals at Palisades Nuclear Plant (PNP). By electronic mail, dated August 01, 2014, the NRC issued a fourth request for additional information (RAI) concerning the program plan. The requested information is provided below.
By {{letter dated|date=September 13, 2012|text=letter dated September 13, 2012}}, Entergy Nuclear Operations, Inc. (ENO) submitted to the Nuclear Regulatory Commission (NRC) a revised program plan for aging management of reactor vessel internals at Palisades Nuclear Plant (PNP). By electronic mail, dated August 01, 2014, the NRC issued a fourth request for additional information (RAI) concerning the program plan. The requested information is provided below.
: 1. NRC Information Request - RAI-4.1 Please confirm that the weld joining the very bottom of the core support barrel to the plate that forms the bottom of the lower core support structure (Figure B), is considered a "Core Core Weld, at PNP and is subject to EVT-1 visual examination as a Support Barrel Lower Girth Weld,"
1.
Primary inspection category component.
NRC Information Request RAI-4.1 Please confirm that the weld joining the very bottom of the core support barrel to the plate that forms the bottom of the lower core support structure (Figure B), is considered a Core Support Barrel Lower Girth Weld, at PNP and is subject to EVT-1 visual examination as a Primary inspection category component.
    "Primary" ENO Response The weld joining the bottom of the core support barrel to the plate that forms the bottom of Core Support Barrel Lower Girth Weld" the lower core support structure is considered a "Core                                   Weld at Primary inspection category PNP, and is subject to EVT-1 visual examination as a "Primary" component.
ENO Response The weld joining the bottom of the core support barrel to the plate that forms the bottom of the lower core support structure is considered a Core Support Barrel Lower Girth Weld at PNP, and is subject to EVT-1 visual examination as a Primary inspection category component.
As discussed in the RAI, Figure 14, "Palisades Palisades Reactor Vessel Internals Inspection Plan,"
As discussed in the RAI, Figure 14, Palisades Reactor Vessel Internals Inspection Plan, of Reference 1 shows an elevation cross section of the PNP core support barrel and has four circled areas corresponding to portions to be inspected. The figure caption states the following:
Plan, of Reference 11 shows an elevation cross section of the PNP core support barrel and has four circled areas corresponding to portions to be inspected. The figure caption states the following:
Primary: EVT-1 examination of core of upper flange weld and lower cylinder girth welds no later than 2 RFOs [refueling outages] from the beginning of the LR [license renewal]
EVT-1 Primary: EVT -1 examination of core of upper flange weld and lower cylinder girth welds no later than 2 RFOs [refueling outages] from the beginning of the LR [license renewal]
period (ten year intervals)
Coverage: 100% of accessible surfaces of upper flange weld and lower cylinder girth welds The lower-most weld circled in the figure is the weld that joins the bottom of the core support barrel to the plate that forms the bottom of the lower core support structure. This weld is considered to be a Core Support Barrel Lower Girth Weld and is subject to EVT-1 visual examination as a Primary inspection category component.
2.
NRC Information Request RAI-4.2 Please confirm that Entergy Nuclear Operations, Inc. understands there to be an error in MRP-227-A, Tables 4-2 and 4-5 in that both the Core Support Barrel Lower Flange Weld, and Core Support Barrel Lower Core Barrel Flange, should have been identified as not applicable to PNP.
Page 1 of 2 ATTACHMENT Response to Fourth Request for Additional Information for Reactor Vessel Internals (ME9569)
By {{letter dated|date=September 13, 2012|text=letter dated September 13, 2012}}, Entergy Nuclear Operations, Inc. (ENO) submitted to the Nuclear Regulatory Commission (NRC) a revised program plan for aging management of reactor vessel internals at Palisades Nuclear Plant (PNP). By electronic mail, dated August 01, 2014, the NRC issued a fourth request for additional information (RAI) concerning the program plan. The requested information is provided below.
: 1.
NRC Information Request - RAI-4.1 Please confirm that the weld joining the very bottom of the core support barrel to the plate that forms the bottom of the lower core support structure (Figure B), is considered a "Core Support Barrel Lower Girth Weld," at PNP and is subject to EVT-1 visual examination as a "Primary" inspection category component.
ENO Response The weld joining the bottom of the core support barrel to the plate that forms the bottom of the lower core support structure is considered a "Core Support Barrel Lower Girth Weld" at PNP, and is subject to EVT-1 visual examination as a "Primary" inspection category component.
As discussed in the RAI, Figure 14, "Palisades Reactor Vessel Internals Inspection Plan,"
of Reference 1 shows an elevation cross section of the PNP core support barrel and has four circled areas corresponding to portions to be inspected. The figure caption states the following:
Primary: EVT -1 examination of core of upper flange weld and lower cylinder girth welds no later than 2 RFOs [refueling outages] from the beginning of the LR [license renewal]
period (ten year intervals)
period (ten year intervals)
Coverage: 100%)
Coverage: 100%) of accessible surfaces of upper flange weld and lower cylinder girth welds The lower-most weld circled in the figure is the weld that joins the bottom of the core support barrel to the plate that forms the bottom of the lower core support structure. This weld is considered to be a "Core Support Barrel Lower Girth Weld" and is subject to EVT-1 visual examination as a "Primary" inspection category component.
100% of accessible surfaces of upper flange weld and lower cylinder girth welds The lower-most weld circled in the figure is the weld that joins the bottom of the core support barrel to the plate that forms the bottom of the lower core support structure. This weld is considered to be a Core "Core Support Barrel Lower Girth Weld Weld" and is subject to EVT-1 visual examination as a Primary "Primary" inspection category component.
: 2.
: 2. NRC NRC Information Information Request - RAI-4.2 Please confirm that Entergy Nuclear Operations, Inc. understands there to be an error in MRP-227-A, Tables 4-2 and 4-5 in    in that both both the Core "Core Support Support Barrel Lower Flange Weld, Weld,"
NRC Information Request - RAI-4.2 Please confirm that Entergy Nuclear Operations, Inc. understands there to be an error in MRP-227-A, Tables 4-2 and 4-5 in that both the "Core Support Barrel Lower Flange Weld,"
and   "Core Support and Core    Support Barrel Lower Core Barrel Flange,    should have Flange," should       been identified have been             as not identified as not applicable applicable to PNP.
and "Core Support Barrel Lower Core Barrel Flange," should have been identified as not applicable to PNP.
Page Page 11 of 22
Page 1 of 2


ENO Response Pressurized Water Reactor (PWR)
ENO Response ENO understands that there is an error in MRP-227-A, Pressurized Water Reactor (PWR)
ENO understands that there is an error in MRP-227-A, "Pressurized Internals Inspection and Evaluation Guidelines" Guidelines (Reference 2), Tables 4-2, "CE CE plants components, and 4-5, "CE Primary components,"            CE plants Expansion components."
Internals Inspection and Evaluation Guidelines (Reference 2), Tables 4-2, CE plants Primary components, and 4-5, CE plants Expansion components. In these two tables, the Core Support Barrel Assembly, Lower flange weld and the Core Support Barrel Assembly, Lower core barrel flange should have been identified as not applicable to PNP.
components. In these two tables, Core Support Barrel Assembly, Lower flange weld" the "Core                                          weld and the "Core Core Support Barrel flange should have been identified as not applicable to PNP.
This error has been documented in the PNP corrective action program.
Assembly, Lower core barrel flange" This error has been documented in the PNP corrective action program.
References Palisades Nuclear Plant, Revised Program Plan for Aging Management of Reactor Vessel Internals, dated September 13, 2012 (ADAMS Accession No. ML12257A352) 2.
Electrical Power Research Institute, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guidelines (MRP-227-A), 1022863, dated December 2011.
Page 2 of 2 ENO Response ENO understands that there is an error in MRP-227-A, "Pressurized Water Reactor (PWR)
Internals Inspection and Evaluation Guidelines" (Reference 2), Tables 4-2, "CE plants Primary components," and 4-5, "CE plants Expansion components." In these two tables, the "Core Support Barrel Assembly, Lower flange weld" and the "Core Support Barrel Assembly, Lower core barrel flange" should have been identified as not applicable to PNP.
This error has been documented in the PNP corrective action program.
References
References
: 1.                           Revised Program Plan for Aging Management of Reactor Vessel Palisades Nuclear Plant, "Revised Internals, dated September 13, 2012 (ADAMS Accession No. ML Internals,"                                                      ML12257A352) 12257A352)
: 1.
: 2. Electrical Power Research Institute, "Materials Materials Reliability Program: Pressurized Water (MRP-227-A), 1022863, dated Reactor Internals Inspection and Evaluation Guidelines (MRP-227-A),"
Palisades Nuclear Plant, "Revised Program Plan for Aging Management of Reactor Vessel Internals," dated September 13, 2012 (ADAMS Accession No. ML12257A352)
December 2011.
: 2.
Page 22 of 22}}
Electrical Power Research Institute, "Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guidelines (MRP-227-A)," 1022863, dated December 2011.
Page 2 of 2}}

Latest revision as of 17:22, 10 January 2025

Response to Fourth Request for Additional Information - Reactor Vessel Internals (ME9569)
ML14226A807
Person / Time
Site: Palisades Entergy icon.png
Issue date: 08/14/2014
From: Hardy J
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PNP 2014-081
Download: ML14226A807 (4)


Text

Entergy Nuclear Operations, Inc.

Palisades Nuclear Plant 27780 Blue Star Memorial Highway Entergy ecv;t 4:o3953o Jeffery A. Hardy Regulatory Assurance Manager PNP 201 4-081 August 14, 2014 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Response to Fourth Request for Additional Information Reactor Vessel Internals (ME9569)

Palisades Nuclear Plant Docket 50-255 License No. DPR-20

REFERENCES:

1.

Entergy Nuclear Operations, Inc. letter to NRC, PNP 2012-009, Revised Program Plan for Aging Management of Reactor Vessel Internals, September 13, 2012 (ADAMS Accession Number ML12257A352) 2.

NRC e-mail, Palisades Request for Additional Information ME9569 Revised Program Plan for Aging Management of Reactor Vessel Internals, March 04, 2013 (ADAMS Accession Number ML13063A318) 3.

Entergy Nuclear Operations, Inc. letter to NRC, PNP 2013-022, Response to Request for Additional Information Revised Program Plan for Aging Management of Reactor Vessel Internals, April 04, 2013 (ADAMS Accession Number ML13094A414) 4.

NRC e-mail, Palisades Request for Additional Information Reactor Vessel Internals

- ME9569 Email Resend, December 12, 2013 (ADAMS Accession Number ML13346A644) 5.

Entergy Nuclear Operations, Inc. letter to NRC, Summary of January 2, 2014 Teleconference with Nuclear Regulatory Staff on Palisades Req uest for Additional Information Reactor Vessel Internals ME9569 Response Schedule, January 07, 2014 (ADAMS Accession Number ML14007A151) 6.

Entergy Nuclear Operations, Inc. letter to NRC, PNP 2014-001, Response to Second Request for Additional Information

- Reactor Vessel Internals ME9569, April 03, 2014 (ADAMS Accession Number ML14097A376) 7.

NRC e-mail, Request for Additional Information

- Palisades Aging Management Program for Reactor Vessel Internals

- ME9569, June 09, 2014 (ADAMS Accession Number ML14160B264)

~Entergy Entergy Nuclear Operations, Inc

  • Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043-9530 Tel 269 764 2000 Jeffery A. Hardy Regulatory Assurance Manager PNP 2014-081 August 14,2014 U. S. Nuclear Regulatory Commission AnN: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Response to Fourth Request for Additional Information - Reactor Vessel Internals (ME9569)

Palisades Nuclear Plant Docket 50-255 License No. DPR-20

REFERENCES:

1. Entergy Nuclear Operations, Inc. letter to NRC, PNP 2012-009, "Revised Program Plan for Aging Management of Reactor Vessel Internals,"

September 13, 2012 (ADAMS Accession Number ML12257A352)

2. NRC e-mail, "Palisades - Request for Additional Information - ME9569-Revised Program Plan for Aging Management of Reactor Vessel Internals," March 04,2013 (ADAMS Accession Number ML13063A318)
3. Entergy Nuclear Operations, Inc. letter to NRC, PNP 2013-022, "Response to Request for Additional Information - Revised Program Plan for Aging Management of Reactor Vessel Internals," April 04, 2013 (ADAMS Accession Number ML13094A414)
4. NRC e-mail, "Palisades - Request for Additional Information - Reactor Vessel Internals - ME9569 - Email Resend," December 12, 2013 (ADAMS Accession Number ML13346A644)
5. Entergy Nuclear Operations, Inc. letter to NRC, "Summary of January 2, 2014 Teleconference with Nuclear Regulatory Staff on Palisades-Request for Additional Information - Reactor Vessel Internals - ME9569 Response Schedule," January 07, 2014 (ADAMS Accession Number ML14007A151)
6. Entergy Nuclear Operations, Inc. letter to NRC, PNP 2014-001, "Response to Second Request for Additional Information - Reactor Vessel Internals - ME9569," April 03, 2014 (ADAMS Accession Number ML14097A376)
7. NRC e-mail, "Request for Additional Information - Palisades - Aging Management Program for Reactor Vessel Internals - ME9569," June 09, 2014 (ADAMS Accession Number ML14160B264)

PNP 2014-081 Page 2 of 2 8.

Entergy Nuclear Operations, Inc. letter to NRC, PNP 2014-067, Response to Third Request for Additional Information Reactor Vessel Internals (ME9569), July 01, 2014 (ADAMS Accession Number ML14183A014) 9.

NRC e-mail, Request for Additional Information: Palisades Aging Management Program for Reactor Vessel Internals (ME9569),

August 01, 2014

Dear Sir or Madam:

In Reference 1, Entergy Nuclear Operations, Inc. (ENO) submitted to the Nuclear Regulatory Commission (NRC) a revised program plan for aging management of reactor vessel internals.

In Reference 2, the NRC issued a request for additional information (RAI). ENO responded to the RAI in Reference 3.

In Reference 4, the NRC issued a second RAI with a 30-day required response.

In Reference 5, ENO documented a teleconference during which the NRC accepted a request to extend the second RAI response from 30 days to 120 days. ENO responded to the second RAI in Reference 6.

In Reference 7, the NRC issued a third RAI with a 30-day required response. ENO responded to the third RAI in Reference 8.

In Reference 9, the NRC issued a fourth RAI with a 30-day required response.

The response to the fourth RAt is provided in the attachment.

This submittal contains no proprietary information.

This submittal contains no new or revised commitments.

Sincerely, jah/jse

Attachment:

Response to Fourth Request for Additional Information for Reactor Vessel Internals (ME9569) cc:

Administrator, Region III, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USN RC PNP 2014-081 Page 2 of 2

8. Entergy Nuclear Operations, Inc. letter to NRC, PNP 2014-067, "Response to Third Request for Additional Information - Reactor Vessel Internals (ME9569)," July 01, 2014 (ADAMS Accession Number ML14183A014)
9. NRC e-mail, "Request for Additional Information: Palisades Aging Management Program for Reactor Vessel Internals (ME9569),"

August 01, 2014

Dear Sir or Madam:

In Reference 1, Entergy Nuclear Operations, Inc. (ENO) submitted to the Nuclear Regulatory Commission (NRC) a revised program plan for aging management of reactor vessel internals.

In Reference 2, the NRC issued a request for additional information (RAI). ENO responded to the RAI in Reference 3.

In Reference 4, the NRC issued a second RAI with a 30-day required response. In Reference 5, ENO documented a teleconference during which the NRC accepted a request to extend the second RAI response from 30 days to 120 days. ENO responded to the second RAI in Reference 6.

In Reference 7, the NRC issued a third RAI with a 30-day required response. ENO responded to the third RAI in Reference 8.

In Reference 9, the NRC issued a fourth RAI with a 30-day required response.

The response to the fourth RAI is provided in the attachment.

This submittal contains no proprietary information.

This submittal contains no new or revised commitments.

Sincerely, jah/jse

Attachment:

Response to Fourth Request for Additional Information for Reactor Vessel Internals (ME9569) cc:

Administrator, Region III, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC

ATTACHMENT Response to Fourth Request for Additional Information for Reactor Vessel Internals (ME9569)

By letter dated September 13, 2012, Entergy Nuclear Operations, Inc. (ENO) submitted to the Nuclear Regulatory Commission (NRC) a revised program plan for aging management of reactor vessel internals at Palisades Nuclear Plant (PNP). By electronic mail, dated August 01, 2014, the NRC issued a fourth request for additional information (RAI) concerning the program plan. The requested information is provided below.

1.

NRC Information Request RAI-4.1 Please confirm that the weld joining the very bottom of the core support barrel to the plate that forms the bottom of the lower core support structure (Figure B), is considered a Core Support Barrel Lower Girth Weld, at PNP and is subject to EVT-1 visual examination as a Primary inspection category component.

ENO Response The weld joining the bottom of the core support barrel to the plate that forms the bottom of the lower core support structure is considered a Core Support Barrel Lower Girth Weld at PNP, and is subject to EVT-1 visual examination as a Primary inspection category component.

As discussed in the RAI, Figure 14, Palisades Reactor Vessel Internals Inspection Plan, of Reference 1 shows an elevation cross section of the PNP core support barrel and has four circled areas corresponding to portions to be inspected. The figure caption states the following:

Primary: EVT-1 examination of core of upper flange weld and lower cylinder girth welds no later than 2 RFOs [refueling outages] from the beginning of the LR [license renewal]

period (ten year intervals)

Coverage: 100% of accessible surfaces of upper flange weld and lower cylinder girth welds The lower-most weld circled in the figure is the weld that joins the bottom of the core support barrel to the plate that forms the bottom of the lower core support structure. This weld is considered to be a Core Support Barrel Lower Girth Weld and is subject to EVT-1 visual examination as a Primary inspection category component.

2.

NRC Information Request RAI-4.2 Please confirm that Entergy Nuclear Operations, Inc. understands there to be an error in MRP-227-A, Tables 4-2 and 4-5 in that both the Core Support Barrel Lower Flange Weld, and Core Support Barrel Lower Core Barrel Flange, should have been identified as not applicable to PNP.

Page 1 of 2 ATTACHMENT Response to Fourth Request for Additional Information for Reactor Vessel Internals (ME9569)

By letter dated September 13, 2012, Entergy Nuclear Operations, Inc. (ENO) submitted to the Nuclear Regulatory Commission (NRC) a revised program plan for aging management of reactor vessel internals at Palisades Nuclear Plant (PNP). By electronic mail, dated August 01, 2014, the NRC issued a fourth request for additional information (RAI) concerning the program plan. The requested information is provided below.

1.

NRC Information Request - RAI-4.1 Please confirm that the weld joining the very bottom of the core support barrel to the plate that forms the bottom of the lower core support structure (Figure B), is considered a "Core Support Barrel Lower Girth Weld," at PNP and is subject to EVT-1 visual examination as a "Primary" inspection category component.

ENO Response The weld joining the bottom of the core support barrel to the plate that forms the bottom of the lower core support structure is considered a "Core Support Barrel Lower Girth Weld" at PNP, and is subject to EVT-1 visual examination as a "Primary" inspection category component.

As discussed in the RAI, Figure 14, "Palisades Reactor Vessel Internals Inspection Plan,"

of Reference 1 shows an elevation cross section of the PNP core support barrel and has four circled areas corresponding to portions to be inspected. The figure caption states the following:

Primary: EVT -1 examination of core of upper flange weld and lower cylinder girth welds no later than 2 RFOs [refueling outages] from the beginning of the LR [license renewal]

period (ten year intervals)

Coverage: 100%) of accessible surfaces of upper flange weld and lower cylinder girth welds The lower-most weld circled in the figure is the weld that joins the bottom of the core support barrel to the plate that forms the bottom of the lower core support structure. This weld is considered to be a "Core Support Barrel Lower Girth Weld" and is subject to EVT-1 visual examination as a "Primary" inspection category component.

2.

NRC Information Request - RAI-4.2 Please confirm that Entergy Nuclear Operations, Inc. understands there to be an error in MRP-227-A, Tables 4-2 and 4-5 in that both the "Core Support Barrel Lower Flange Weld,"

and "Core Support Barrel Lower Core Barrel Flange," should have been identified as not applicable to PNP.

Page 1 of 2

ENO Response ENO understands that there is an error in MRP-227-A, Pressurized Water Reactor (PWR)

Internals Inspection and Evaluation Guidelines (Reference 2), Tables 4-2, CE plants Primary components, and 4-5, CE plants Expansion components. In these two tables, the Core Support Barrel Assembly, Lower flange weld and the Core Support Barrel Assembly, Lower core barrel flange should have been identified as not applicable to PNP.

This error has been documented in the PNP corrective action program.

References Palisades Nuclear Plant, Revised Program Plan for Aging Management of Reactor Vessel Internals, dated September 13, 2012 (ADAMS Accession No. ML12257A352) 2.

Electrical Power Research Institute, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guidelines (MRP-227-A), 1022863, dated December 2011.

Page 2 of 2 ENO Response ENO understands that there is an error in MRP-227-A, "Pressurized Water Reactor (PWR)

Internals Inspection and Evaluation Guidelines" (Reference 2), Tables 4-2, "CE plants Primary components," and 4-5, "CE plants Expansion components." In these two tables, the "Core Support Barrel Assembly, Lower flange weld" and the "Core Support Barrel Assembly, Lower core barrel flange" should have been identified as not applicable to PNP.

This error has been documented in the PNP corrective action program.

References

1.

Palisades Nuclear Plant, "Revised Program Plan for Aging Management of Reactor Vessel Internals," dated September 13, 2012 (ADAMS Accession No. ML12257A352)

2.

Electrical Power Research Institute, "Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guidelines (MRP-227-A)," 1022863, dated December 2011.

Page 2 of 2