PNP 2014-004, Summary of January 2, 2014 Teleconference with Nuclear Regulatory Staff on - Request for Additional Information - Reactor Vessel Internals - ME9569 Response Schedule

From kanterella
(Redirected from ML14007A151)
Jump to navigation Jump to search

Summary of January 2, 2014 Teleconference with Nuclear Regulatory Staff on - Request for Additional Information - Reactor Vessel Internals - ME9569 Response Schedule
ML14007A151
Person / Time
Site: Palisades Entergy icon.png
Issue date: 01/07/2014
From: Gustafson O
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PNP 2014-004, TAC ME9569
Download: ML14007A151 (2)


Text

Entergy Nuclear Operations, Inc.

Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, Ml 49043-9530 Tel 269 764 2000 Otto W Gustafson Regulatory Assurance Manager PNP 201 4-004 January07, 2014 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Summary of January 2, 2014 Teleconference with Nuclear Regulatory Staff on Palisades Request for Additional Information Reactor Vessel Internals ME9569 Response Schedule Palisades Nuclear Plant Docket 50-255 License No. DPR-20

References:

1. Entergy Nuclear Operations, Inc. letter to NRC, Revised Program Plan for Aging Management of Reactor Vessel Internals, September 13, 2012 (ADAMS Accession Number ML12257A352)
2. NRC e-mail, Palisades Request for Additional Information ME9569

- Revised Program Plan for Aging Management of Reactor Vessel Internals, March 4, 2013 (ADAMS Accession Number ML13063A318)

3. Entergy Nuclear Operations, Inc. letter to NRC, Response to Request for Additional Information Revised Program Plan for Aging Management of Reactor Vessel Internals, April 4, 2013 (ADAMS Accession Number ML13094A414)
4. NRC e-mail, Palisades Request for Additional Information Reactor Vessel Internals ME9569 Email Resend, December 12, 2013 (ADAMS Accession N umber ML13346A644)

Dear Sir or Madam:

Entergy Nuclear Operations, Inc. (ENO) submitted Reference I to the Nuclear Regulatory Commission (NRC) which provided the revised program plan for aging management of reactor vessel internals. ENO received a request for additional information (RAI) from the NRC in Reference 2. ENO provided a response to the RAI in Reference 3. ENO received a second RAI from the NRC in Reference 4. ENO and the NRC held a conference call, on January 2, 2014, to discuss the RAI, during which END requested an extension to the response schedule from within 30 days of receipt of Reference 4 to within 120 days of receipt of Reference 4. The extension is necessary to

PNP 201 4-004 Page 2 of 2 allow ENO time to retrieve supporting design data needed to provide a response that is consistent with industry guidance. The teleconference concluded with the NRC staff participants determining ENOs extension request was acceptable.

Therefore this letter confirms that ENOs response to the second RAI is extended to within 120 days from receipt of Reference 4.

This letter contains no new or revised commitments.

Sincerely,

p. p.

for Otto W. Gustafson owg/jpm cc: Administrator, Region Ill, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC