{{#Wiki_filter:William R. Gideon
{{#Wiki_filter:(~ DUKE ENERGYe October 3, 2017 Serial: BSEP 17-0078 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001  
(~ DUKE                                                                                   Vice President Brunswick Nuclear Plant ENERGYe                                                                             P.O. Box 10429 Southport, NC 28461 0: 910.457.3698 October 3, 2017                                                                   10 CFR 50.90 Serial: BSEP 17-0078 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001


==Subject:==
==Subject:==
Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Request for License Amendment - DC Sources - Operating Surveillance Requirement (SR) 3.8.4.5 Ladies and Gentlemen:
Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 William R. Gideon Vice President Brunswick Nuclear Plant P.O. Box 10429 Southport, NC 28461 0: 910.457.3698 10 CFR 50.90 Request for License Amendment - DC Sources - Operating Surveillance Requirement (SR) 3.8.4.5 Ladies and Gentlemen:
Pursuant to the provisions of the Code of Federal Regulations (CFR), Title 10, Part 50.90, Duke Energy Progress, LLC (Duke Energy), hereby requests a revision to the Technical Specifications (TS) for the Brunswick Steam Electric Plant (BSEP), Unit Nos. 1 and 2.
Pursuant to the provisions of the Code of Federal Regulations (CFR), Title 10, Part 50.90, Duke Energy Progress, LLC (Duke Energy), hereby requests a revision to the Technical Specifications (TS) for the Brunswick Steam Electric Plant (BSEP), Unit Nos. 1 and 2.
The proposed amendment would revise Surveillance Requirement (SR) 3.8.4.5 contained in TS 3.8.4, "DC Sources - Operating." Specifically, the TS change proposes to amend the required supplied amperage of the battery chargers contained within SR 3.8.4.5.
The proposed amendment would revise Surveillance Requirement (SR) 3.8.4.5 contained in TS 3.8.4, "DC Sources - Operating." Specifically, the TS change proposes to amend the required supplied amperage of the battery chargers contained within SR 3.8.4.5. provides an evaluation of the proposed TS changes. Enclosures 2 and 3 provide the existing TS pages marked-up to show the proposed changes for Unit 1 and 2, respectively.
Enclosure 1 provides an evaluation of the proposed TS changes. Enclosures 2 and 3 provide the existing TS pages marked-up to show the proposed changes for Unit 1 and 2, respectively.
Enclosures 4 and 5 provide revised (i.e., typed) TS pages for Unit 1 and 2, respectively.
Enclosures 4 and 5 provide revised (i.e., typed) TS pages for Unit 1 and 2, respectively.
Enclosures 6 and 7 provide relevant sections of BSEP Calculations, BNP-E-6.079, Revision 6, "125 V DC Battery Charger Sizing Calculation," and BNP-E-6.120, Revision 10, "DC System Battery Load Study," respectively, related to the topic of this license amendment request.
Enclosures 6 and 7 provide relevant sections of BSEP Calculations, BNP-E-6.079, Revision 6, "125 V DC Battery Charger Sizing Calculation," and BNP-E-6.120, Revision 10, "DC System Battery Load Study," respectively, related to the topic of this license amendment request.
Line 31: Line 29:
In accordance with 10 CFR 50.91 (b)(1 ), Duke Energy is providing the State of North Carolina with a copy of the proposed license amendment.
In accordance with 10 CFR 50.91 (b)(1 ), Duke Energy is providing the State of North Carolina with a copy of the proposed license amendment.
This document contains no regulatory commitments.
This document contains no regulatory commitments.
Please refer any questions regarding this submittal to Mr. Lee Grzeck, Manager - Regulatory Affairs, at (910) 457-2487.
Please refer any questions regarding this submittal to Mr. Lee Grzeck, Manager - Regulatory Affairs, at (910) 457-2487.  


U.S. Nuclear Regulatory Commission Page 2 of 3 I certify under penalty of perjury that the foregoing is true and correct. Executed on October 3, 2017.
U.S. Nuclear Regulatory Commission Page 2 of 3 I certify under penalty of perjury that the foregoing is true and correct. Executed on October 3, 2017.
Sincerely, wd)
Sincerely, wd)
William R. Gideon WRG/mkb
William R. Gideon WRG/mkb  


==Enclosures:==
==Enclosures:==
Line 44: Line 42:
: 5. Proposed Unit 2 BSEP TS (Retyped Pages)
: 5. Proposed Unit 2 BSEP TS (Retyped Pages)
: 6. BSEP Calculation BNP-E-6.079, Revision 6, "125 V DC Battery Charger Sizing Calculation" (relevant sections)
: 6. BSEP Calculation BNP-E-6.079, Revision 6, "125 V DC Battery Charger Sizing Calculation" (relevant sections)
: 7. BSEP Calculation BNP-E-6.120, Revision 10, "DC System Battery Load Study" (relevant sections)
: 7. BSEP Calculation BNP-E-6.120, Revision 10, "DC System Battery Load Study" (relevant sections)  


U.S. Nuclear Regulatory Commission Page 3 of 3 cc (with enclosures):
U.S. Nuclear Regulatory Commission Page 3 of 3 cc (with enclosures):
U.S. Nuclear Regulatory Commission, Region II ATIN: Ms. Catherine Haney, Regional Administrator 245 Peachtree Center Ave, NE, Suite 1200 Atlanta, GA 30303-1257 U.S. Nuclear Regulatory Commission ATIN: Mr. Andrew Hon (Mail Stop OWFN 8G9A)       (Electronic Copy Only) 11555 Rockville Pike Rockville, MD 20852-2738 Andrew.Hon@nrg.gov U.S. Nuclear Regulatory Commission ATIN: Mr. Gale Smith, NRG Senior Resident Inspector 8470 River Road Southport, NC 28461-8869 Mr. W. Lee Cox, Ill, Chief (Electronic Copy Only)
U.S. Nuclear Regulatory Commission, Region II ATIN: Ms. Catherine Haney, Regional Administrator 245 Peachtree Center Ave, NE, Suite 1200 Atlanta, GA 30303-1257 U.S. Nuclear Regulatory Commission A TIN: Mr. Andrew Hon (Mail Stop OWFN 8G9A)
Radiation Protection Section NC Department of Health and Human Services 1645 Mail Service Center Raleigh, NC 27699-1645 lee.cox@dhhs.nc.gov Chair - North Carolina Utilities Commission (Electronic Copy Only) 4325 Mail Service Center Raleigh, NC 27699-4300 swatson@ncuc.net
(Electronic Copy Only) 11555 Rockville Pike Rockville, MD 20852-2738 Andrew.Hon@nrg.gov U.S. Nuclear Regulatory Commission ATIN: Mr. Gale Smith, NRG Senior Resident Inspector 8470 River Road Southport, NC 28461-8869 Mr. W. Lee Cox, Ill, Chief (Electronic Copy Only)
Radiation Protection Section NC Department of Health and Human Services 1645 Mail Service Center Raleigh, NC 27699-1645 lee.cox@dhhs.nc.gov Chair - North Carolina Utilities Commission (Electronic Copy Only) 4325 Mail Service Center Raleigh, NC 27699-4300 swatson@ncuc.net  


BSEP 17-0078 Enclosure 1 Page 1 of 5 Evaluation of the Proposed Change
Evaluation of the Proposed Change BSEP 17-0078 Page 1 of 5  


==Subject:==
==Subject:==
Request for License Amendment - DC Sources - Surveillance Requirement (SR) 3.8.4.5
Request for License Amendment - DC Sources - Surveillance Requirement (SR) 3.8.4.5
: 1.       Summary Description Duke Energy Progress, LLC (Duke Energy), is requesting Nuclear Regulatory Commission (NRC) approval of the proposed revision to the Technical Specifications (TSs) for the Brunswick Steam Electric Plant (BSEP), Unit Nos. 1 and 2. The proposed amendment would revise Surveillance Requirement (SR) 3.8.4.5 contained in TS 3.8.4, "DC Sources - Operating."
: 1.
Summary Description Duke Energy Progress, LLC (Duke Energy), is requesting Nuclear Regulatory Commission (NRC) approval of the proposed revision to the Technical Specifications (TSs) for the Brunswick Steam Electric Plant (BSEP), Unit Nos. 1 and 2. The proposed amendment would revise Surveillance Requirement (SR) 3.8.4.5 contained in TS 3.8.4, "DC Sources - Operating."
Specifically, the TS change proposes to amend the required supplied amperage of the battery chargers contained within SR 3.8.4.5.
Specifically, the TS change proposes to amend the required supplied amperage of the battery chargers contained within SR 3.8.4.5.
: 2.       Detailed Description 2.1. Proposed Change The proposed change revises the required supplied amperage of the battery chargers contained within SR 3.8.4.5. Specifically, the proposed change would revise the required battery charge supplied amperage from greater than 250 amps to greater than 300 amps. The other requirements (i.e., voltage and time) of the battery chargers contained in SR 3.8.4.5 are unaffected.
: 2.
2.2. Background Currently, TS SR 3.8.4.5 requires, "Verify each required battery charger supplies ~ 250 amps at~ 135 volts for~ 4 hours." The safety-related battery chargers in-service at BSEP were purchased with a 300 amp continuous rating and a 375 amp current limit rating.
Detailed Description 2.1.
Proposed Change The proposed change revises the required supplied amperage of the battery chargers contained within SR 3.8.4.5. Specifically, the proposed change would revise the required battery charge supplied amperage from greater than 250 amps to greater than 300 amps. The other requirements (i.e., voltage and time) of the battery chargers contained in SR 3.8.4.5 are unaffected.
2.2.  
 
===Background===
Currently, TS SR 3.8.4.5 requires, "Verify each required battery charger supplies ~ 250 amps at~ 135 volts for~ 4 hours." The safety-related battery chargers in-service at BSEP were purchased with a 300 amp continuous rating and a 375 amp current limit rating.
Historically, BSEP's battery charger calculation, "125 V DC Battery Charger Sizing Calculation" (i.e., BNP-E-6.079), provided, in part, as Enclosure 6, credits the 300 amp battery charger capability based on the charger's continuous current rating. However, BSEP did not actually require the battery chargers to supply greater than 250 amps until after the 2013 NRC Component Design Basis Inspection (CDBI). During the 2013 NRC CDBI, it was discovered that the DC System Battery Load Study (i.e., BNP-E-6.120), provided, in part, as Enclosure 7, credited transfer of specific non-safety loads (i.e., uninterruptible power supply (UPS) and lighting, and communications inverters) from the batteries to the alternating current (AC) source once AC bus power was restored. Due to the specific loads being non-safety related, their transfer cannot be credited.
Historically, BSEP's battery charger calculation, "125 V DC Battery Charger Sizing Calculation" (i.e., BNP-E-6.079), provided, in part, as Enclosure 6, credits the 300 amp battery charger capability based on the charger's continuous current rating. However, BSEP did not actually require the battery chargers to supply greater than 250 amps until after the 2013 NRC Component Design Basis Inspection (CDBI). During the 2013 NRC CDBI, it was discovered that the DC System Battery Load Study (i.e., BNP-E-6.120), provided, in part, as Enclosure 7, credited transfer of specific non-safety loads (i.e., uninterruptible power supply (UPS) and lighting, and communications inverters) from the batteries to the alternating current (AC) source once AC bus power was restored. Due to the specific loads being non-safety related, their transfer cannot be credited.
BN P-E-6.120 now relies on at least 300 amps to be supplied from the battery chargers. As such, SR 3.8.4.5 is being revised to reflect actual plant calculations.
BN P-E-6.120 now relies on at least 300 amps to be supplied from the battery chargers. As such, SR 3.8.4.5 is being revised to reflect actual plant calculations.
: 3.     Technical Evaluation The electrical power system at BSEP comprises various AC and direct current (DC) systems.
: 3.
The 125/250 volt DC power supply system consists of batteries and battery chargers, associated buses, electrical circuitry, switches, indicators, and alarm devices required for operation and surveillance of the system.
Technical Evaluation The electrical power system at BSEP comprises various AC and direct current (DC) systems.
The 125/250 volt DC power supply system consists of batteries and battery chargers, associated buses, electrical circuitry, switches, indicators, and alarm devices required for operation and surveillance of the system.  


BSEP 17-0078 Enclosure 1 Page 2 of 5 3.1 . 125/250 VDC Power System Description The purpose of the 125/250 VDC Power System is to ensure sufficient power will be available to supply safety-related equipment required for the safe shutdown of the facility and the mitigation and control of accident conditions within the facility. Each unit contains two separate and redundant divisions for all equipment and wiring associated with Engineering Safety Features (ESF) and their supporting systems. The 125/250 VDC system provides reliable motive and control power to the ESF loads such that no single credible event can disable the containment isolation function or prevent the standby cooling systems from performing their intended functions.
3.1.
125/250 VDC Power System Description BSEP 17-0078 Page 2 of 5 The purpose of the 125/250 VDC Power System is to ensure sufficient power will be available to supply safety-related equipment required for the safe shutdown of the facility and the mitigation and control of accident conditions within the facility. Each unit contains two separate and redundant divisions for all equipment and wiring associated with Engineering Safety Features (ESF) and their supporting systems. The 125/250 VDC system provides reliable motive and control power to the ESF loads such that no single credible event can disable the containment isolation function or prevent the standby cooling systems from performing their intended functions.
Each unit contains a 125/250 VDC Power System which consists of two separate divisions. Each division contains two 125 VDC batteries wired in a series/parallel arrangement to its distribution panel to allow for 125 VDC or 250 VDC loading. Each battery contains its own independent charger. The major loads supplied by this system are 250 voe valve operators and pumps, and 125 voe control/logic systems, plant annunciation, and emergency lighting. Each of the 125 VDC battery chargers is provided with AC power via their respective division Emergency Bus.
Each unit contains a 125/250 VDC Power System which consists of two separate divisions. Each division contains two 125 VDC batteries wired in a series/parallel arrangement to its distribution panel to allow for 125 VDC or 250 VDC loading. Each battery contains its own independent charger. The major loads supplied by this system are 250 voe valve operators and pumps, and 125 voe control/logic systems, plant annunciation, and emergency lighting. Each of the 125 VDC battery chargers is provided with AC power via their respective division Emergency Bus.
3.2. Revise the Required Supplied Amperage of SR 3.8.4.5 Prior to 2013, the battery load study calculation was based on a battery duty cycle of one minute for a Loss of Offsite Power (LOOP)/Loss of Coolant Accident (LOCA) event. At the end of the one minute LOOP/LOCA duty cycle, the chargers are credited for supplying the DC system with sufficient margin available for battery recharge based on certain loads being transferred automatically back to their respective AC buses.
3.2.
Revise the Required Supplied Amperage of SR 3.8.4.5 Prior to 2013, the battery load study calculation was based on a battery duty cycle of one minute for a Loss of Offsite Power (LOOP)/Loss of Coolant Accident (LOCA) event. At the end of the one minute LOOP/LOCA duty cycle, the chargers are credited for supplying the DC system with sufficient margin available for battery recharge based on certain loads being transferred automatically back to their respective AC buses.
It was discovered during the 2013 NRG CDBI inspection (i.e., Inspection Report 50-325/2013-007 and 50-324/2013-007, dated December 6, 2013, ML13340A629) that certain non-safety loads, specifically the UPS lighting and communications inverters, were being credited in plant calculations as automatically transferring back to the AC buses. Because the specific loads are non-safety, their automatic transfer cannot be credited. If the UPS units and communications inverters fail to transfer to the AC supply, they will continue to be powered from the DC supply after the chargers are restored.
It was discovered during the 2013 NRG CDBI inspection (i.e., Inspection Report 50-325/2013-007 and 50-324/2013-007, dated December 6, 2013, ML13340A629) that certain non-safety loads, specifically the UPS lighting and communications inverters, were being credited in plant calculations as automatically transferring back to the AC buses. Because the specific loads are non-safety, their automatic transfer cannot be credited. If the UPS units and communications inverters fail to transfer to the AC supply, they will continue to be powered from the DC supply after the chargers are restored.
Under these conditions, the system load will exceed the charger capability, resulting in a continual discharge of the batteries. Recent analysis of the DC system loading with the UPS load remaining on the batteries without transferring to the AC source showed that voltage remained acceptable (i.e., greater than 107 V) for at least four hours. The revised calculation verified the analyzed duty cycle for the worst case loading remains bounded by the Maintenance Surveillance Test (MST) procedure test criteria, in regards to the batteries. The battery charger test criteria contained in the MST will be updated in accordance with the site's normal procedure update process based on the updated design bases. MST test history has shown the chargers each supply a minimum of 340 amps of the total DC load. The MST test data provides validation that this is well within the capability of each charger. Based on the above, the failure of the non-safety loads to transfer to the AC source when it becomes available would not affect the battery's ability to supply the required voltage to safety-related loads.
Under these conditions, the system load will exceed the charger capability, resulting in a continual discharge of the batteries. Recent analysis of the DC system loading with the UPS load remaining on the batteries without transferring to the AC source showed that voltage remained acceptable (i.e., greater than 107 V) for at least four hours. The revised calculation verified the analyzed duty cycle for the worst case loading remains bounded by the Maintenance Surveillance Test (MST) procedure test criteria, in regards to the batteries. The battery charger test criteria contained in the MST will be updated in accordance with the site's normal procedure update process based on the updated design bases. MST test history has shown the chargers each supply a minimum of 340 amps of the total DC load. The MST test data provides validation that this is well within the capability of each charger. Based on the above, the failure of the non-safety loads to transfer to the AC source when it becomes available would not affect the battery's ability to supply the required voltage to safety-related loads.
The BSEP Updated Final Safety Analysis Report (UFSAR), Section 8.3.2.1.2, discusses that the battery charges have been sized appropriately, taking into account worst case
The BSEP Updated Final Safety Analysis Report (UFSAR), Section 8.3.2.1.2, discusses that the battery charges have been sized appropriately, taking into account worst case  


BSEP 17-0078 Enclosure 1 Page 3 of 5 loading, to take the batteries from a minimum state (i.e., 105 V) to 95% of full charge in eight hours after an event. Further analysis of the worst case battery 1B-2, demonstrated that sufficient charger capacity margin is available, if the UPS units are manually transferred to their AC source within the four hour time frame, for the battery to be recharged in eight hours as discussed in the BSEP UFSAR. Specifically, the analysis showed that with the chargers restored at one minute after the LOOP/LOCA event and with the UPS units remaining on the battery for a period of time not exceeding four hours, the battery chargers have adequate capacity to recharge the batteries within eight hours.
BSEP 17-0078 Page 3 of 5 loading, to take the batteries from a minimum state (i.e., 105 V) to 95% of full charge in eight hours after an event. Further analysis of the worst case battery 1 B-2, demonstrated that sufficient charger capacity margin is available, if the UPS units are manually transferred to their AC source within the four hour time frame, for the battery to be recharged in eight hours as discussed in the BSEP UFSAR. Specifically, the analysis showed that with the chargers restored at one minute after the LOOP/LOCA event and with the UPS units remaining on the battery for a period of time not exceeding four hours, the battery chargers have adequate capacity to recharge the batteries within eight hours.
An Engineering Change (EC) has updated the battery load study calculation with a new post-LOOP/LOCA battery duty cycle based on the non-safety loads being transferred to their respective AC source, automatically or via manual operator action, within four hours instead of one minute based on increased loads remaining on battery power.
An Engineering Change (EC) has updated the battery load study calculation with a new post-LOOP/LOCA battery duty cycle based on the non-safety loads being transferred to their respective AC source, automatically or via manual operator action, within four hours instead of one minute based on increased loads remaining on battery power.
Administrative controls have been established to verify non-safety loads are transferred to AC sources within the four hour duty cycle. The Operations Standing Instruction (i.e., administrative controls) will be replaced by procedural requirements as part of an Abnormal Operating Procedure (AOP).
Administrative controls have been established to verify non-safety loads are transferred to AC sources within the four hour duty cycle. The Operations Standing Instruction (i.e., administrative controls) will be replaced by procedural requirements as part of an Abnormal Operating Procedure (AOP).
The difference between the increased duty load, in combination with the credited 300 amp chargers, and TS surveillance requirement of greater than or equal to 250 amps was not recognized until 2017. Based on this discovery, the electrical calculations were reviewed and it was determined that the testing requirements contained in TS SR 3.8.4.5 were not aligned with the design criteria contained in the electrical calculations. The 250 amp requirement contained in TS SR 3.8.4.5 is below the battery charger design continuous rating of 300 amps. The proposed TS change will bring the TS SR 3.8.4.5 criteria into alignment with the credited supplied amperage rating of the station battery chargers.
The difference between the increased duty load, in combination with the credited 300 amp chargers, and TS surveillance requirement of greater than or equal to 250 amps was not recognized until 2017. Based on this discovery, the electrical calculations were reviewed and it was determined that the testing requirements contained in TS SR 3.8.4.5 were not aligned with the design criteria contained in the electrical calculations. The 250 amp requirement contained in TS SR 3.8.4.5 is below the battery charger design continuous rating of 300 amps. The proposed TS change will bring the TS SR 3.8.4.5 criteria into alignment with the credited supplied amperage rating of the station battery chargers.
: 4. Regulatory Evaluation 4.1 . Applicable Regulatory Requirements/Criteria 10 CFR 50.90 provides direction to licensees seeking to revise their license to file an application for amendment with the NRG. The Technical Specifications constitutes Appendix A to the Operating License for each facility. This would require a license amendment to revise any portion of the Technical Specifications, such as requested here.
: 4.
10 CFR 50.36(c)(3) states that a facility's technical specification will include surveillance requirements, defined as "requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met." The TS Bases qualify TS SR 3.8.4.5 requirements as derived from the design capacity of the chargers so that required battery charger supply can restore the batteries from a minimum charge state to fully charged under any load condition.
Regulatory Evaluation 4.1.
As stated in the NRC's "Safety Evaluation of the Brunswick Steam Electric Station Units 1 and 2," dated November 1973, BSEP meets the intent of the General Design Criterion (GDC), published in the Federal Register on May 21, 1971, as Appendix A to
Applicable Regulatory Requirements/Criteria 1 O CFR 50.90 provides direction to licensees seeking to revise their license to file an application for amendment with the NRG. The Technical Specifications constitutes Appendix A to the Operating License for each facility. This would require a license amendment to revise any portion of the Technical Specifications, such as requested here.
1 O CFR 50.36(c)(3) states that a facility's technical specification will include surveillance requirements, defined as "requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met." The TS Bases qualify TS SR 3.8.4.5 requirements as derived from the design capacity of the chargers so that required battery charger supply can restore the batteries from a minimum charge state to fully charged under any load condition.
As stated in the NRC's "Safety Evaluation of the Brunswick Steam Electric Station Units 1 and 2," dated November 1973, BSEP meets the intent of the General Design Criterion (GDC), published in the Federal Register on May 21, 1971, as Appendix A to  


BSEP 17-0078 Enclosure 1 Page 4 of 5 10 CFR Part 50. The proposed change does not affect compliance with the intent of the GDCs. In particular, the intent of GDC 17, "Electric power systems," and GDC 18, "Inspection and testing of electrical power systems," will continue to be met.
BSEP 17-0078 Page 4 of 5 1 O CFR Part 50. The proposed change does not affect compliance with the intent of the GDCs. In particular, the intent of GDC 17, "Electric power systems," and GDC 18, "Inspection and testing of electrical power systems," will continue to be met.
Duke Energy has determined that the proposed change does not require an exemption or relief from regulatory requirements and does not affect conformance with any GDC as described in the BSEP UFSAR.
Duke Energy has determined that the proposed change does not require an exemption or relief from regulatory requirements and does not affect conformance with any GDC as described in the BSEP UFSAR.
4.2. No Significant Hazards Consideration Determination In accordance with 10 CFR 50.90, "Application for amendment of license, construction permit, or early site permit," Duke Energy Progress, LLC (Duke Energy), requests an amendment to the Facility Operating License for Brunswick Steam Electric Plant (BSEP) to revise Surveillance Requirement (SR) 3.8.4.5 contained in Technical Specification (TS} 3.8.4, "DC Sources - Operating." Specifically, the TS change proposes to amend the required supplied amperage of the battery chargers contained within SR 3.8.4.5.
4.2.
The proposed change has been reviewed considering applicable requirements of 10 CFR 50.36, 10 CFR 50, Appendix A, and other applicable NRC documents. Duke Energy has evaluated the proposed change to the battery charger amperage requirements of SRs 3.8.4.5 and determined that the change does not involve a Significant Hazards Consideration. In support of this determination, an evaluation of each of the three standards, set forth in 10 CFR 50.92, is provided below.
No Significant Hazards Consideration Determination In accordance with 1 O CFR 50.90, "Application for amendment of license, construction permit, or early site permit," Duke Energy Progress, LLC (Duke Energy), requests an amendment to the Facility Operating License for Brunswick Steam Electric Plant (BSEP) to revise Surveillance Requirement (SR) 3.8.4.5 contained in Technical Specification (TS} 3.8.4, "DC Sources - Operating." Specifically, the TS change proposes to amend the required supplied amperage of the battery chargers contained within SR 3.8.4.5.
The proposed change has been reviewed considering applicable requirements of 1 O CFR 50.36, 1 O CFR 50, Appendix A, and other applicable NRC documents. Duke Energy has evaluated the proposed change to the battery charger amperage requirements of SRs 3.8.4.5 and determined that the change does not involve a Significant Hazards Consideration. In support of this determination, an evaluation of each of the three standards, set forth in 1 O CFR 50.92, is provided below.
: 1) Does the proposed amendment involve a significant increase in the probability or consequences of an accident previously evaluated?
: 1) Does the proposed amendment involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No The proposed change to the battery charger amperage requirements of SR 3.8.4.5 contained in TS 3.8.4 does not impact the physical function of plant structures, systems, or components (SSC) or the manner in which SCCs perform their design function. The proposed change does not authorize the addition of any new plant equipment or systems, nor does it alter the assumptions of any accident analyses.
Response: No The proposed change to the battery charger amperage requirements of SR 3.8.4.5 contained in TS 3.8.4 does not impact the physical function of plant structures, systems, or components (SSC) or the manner in which SCCs perform their design function. The proposed change does not authorize the addition of any new plant equipment or systems, nor does it alter the assumptions of any accident analyses.
Line 88: Line 99:
Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
: 2) Does the proposed amendment create the possibility of a new or different kind of accident from any accident previously evaluated?
: 2) Does the proposed amendment create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No
Response: No  


BSEP 17-0078 Enclosure 1 Page 5 of 5 The proposed change to the battery charger amperage requirements of SR 3.8.4.5 contained in TS 3.8.4 does not require any modification to the plant or change equipment operation. The proposed change will not introduce failure modes that could result in a new accident, and the change does not alter assumptions made in the safety analysis. Performance of battery testing is not a precursor to any accident previously evaluated. The proposed change will not alter the design configuration, or method of operation of plant equipment beyond its normal functional capabilities. The proposed change does not create any new credible failure mechanisms, malfunctions, or accident initiators.
BSEP 17-0078 Page 5 of 5 The proposed change to the battery charger amperage requirements of SR 3.8.4.5 contained in TS 3.8.4 does not require any modification to the plant or change equipment operation. The proposed change will not introduce failure modes that could result in a new accident, and the change does not alter assumptions made in the safety analysis. Performance of battery testing is not a precursor to any accident previously evaluated. The proposed change will not alter the design configuration, or method of operation of plant equipment beyond its normal functional capabilities. The proposed change does not create any new credible failure mechanisms, malfunctions, or accident initiators.
Therefore, the proposed change does not create the possibility of a new or different kind of accident from those that have been previously evaluated.
Therefore, the proposed change does not create the possibility of a new or different kind of accident from those that have been previously evaluated.
: 3) Does the proposed amendment involve a significant reduction in a margin of safety?
: 3) Does the proposed amendment involve a significant reduction in a margin of safety?
Response: No The proposed change to the battery charger amperage requirements of SR 3.8.4.5 contained in TS 3.8.4 does not alter or exceed a design basis or safety limit. There is no change being made to safety analysis assumptions or the safety limits that would adversely affect plant safety as a result of the proposed change. Margins of safety are unaffected by the proposed change and the applicable requirements of 10 CFR 50.36(c)(2)(ii) and 10 CFR 50, Appendix A will continue to be met.
Response: No The proposed change to the battery charger amperage requirements of SR 3.8.4.5 contained in TS 3.8.4 does not alter or exceed a design basis or safety limit. There is no change being made to safety analysis assumptions or the safety limits that would adversely affect plant safety as a result of the proposed change. Margins of safety are unaffected by the proposed change and the applicable requirements of 1 O CFR 50.36(c)(2)(ii) and 1 O CFR 50, Appendix A will continue to be met.
Therefore, the proposed change does not involve any reduction in a margin of safety.
Therefore, the proposed change does not involve any reduction in a margin of safety.
4.3.     Conclusions In conclusion, and based on the considerations discussed above, the proposed change does not involve a significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and, accordingly, a finding of "no significant hazards consideration" is justified. Also, there is a reasonable assurance that the health and safety of the public will not be impacted by the proposed change to revise the battery charger amperage requirements of SR 3.8.4.5 contained within TS 3.8.4. The change will be in compliance with the NRC regulations, and the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
4.3.
: 5.       Environmental Consideration The proposed amendment would change a requirement with respect to installed facility components located within the restricted area of the plant as defined in 10 CFR Part 20.
Conclusions In conclusion, and based on the considerations discussed above, the proposed change does not involve a significant hazards consideration under the standards set forth in 1 O CFR 50.92(c), and, accordingly, a finding of "no significant hazards consideration" is justified. Also, there is a reasonable assurance that the health and safety of the public will not be impacted by the proposed change to revise the battery charger amperage requirements of SR 3.8.4.5 contained within TS 3.8.4. The change will be in compliance with the NRC regulations, and the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
However, the proposed amendment does not involve: (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9). Therefore, pursuant to 10 CFR 51.22(b),
: 5.
no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendment.
Environmental Consideration The proposed amendment would change a requirement with respect to installed facility components located within the restricted area of the plant as defined in 1 O CFR Part 20.
However, the proposed amendment does not involve: (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion set forth in 1 O CFR 51.22(c)(9). Therefore, pursuant to 1 O CFR 51.22(b),
no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendment.  


BSEP 17-0078 Enclosure 2 Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Request for License Amendment - DC Sources - Operating Surveillance Requirements (SRs) 3.8.4.5 Proposed Unit 1 BSEP TS (Markups)
Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Request for License Amendment - DC Sources - Operating Surveillance Requirements (SRs) 3.8.4.5 Proposed Unit 1 BSEP TS (Markups)
BSEP 17-0078


DC Sources-Operating 3.8.4 SURVEILLANCE REQUIREMENTS (continued)
DC Sources-Operating 3.8.4 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                                      FREQUENCY SR 3.8.4.4     Remove visible corrosion and verify battery cell to cell In accordance with and terminal connections are coated with                 the Surveillance anti-corrosion material.                                 Frequency Control Program SR 3.8.4.5      Verify each required battery charger supplies           In accordance with
SR 3.8.4.4 SR 3.8.4.5 SR 3.8.4.6 Brunswick Unit 1 SURVEILLANCE Remove visible corrosion and verify battery cell to cell and terminal connections are coated with anti-corrosion material.
                ~ 2-aQ amps at ~ 135 V for ~ 4 hours.                   the Surveillance Frequency Control Program SR 3.8.4.6      -------------------NOTES--------------------
Verify each required battery charger supplies  
: 1. The modified performance discharge test in SR 3.8.4.7 may be performed in lieu of the service test in SR 3.8.4.6 once per 60 months.
~ 2-aQ amps at ~ 135 V for ~ 4 hours.  
: 2. This Surveillance shall not be performed in MODE 1 or 2 for the Unit 1 DC electrical power subsystems . However, credit may be taken for unplanned events that satisfy this SR.
-------------------NOTES--------------------
: 3. A single test at the specified Frequency will satisfy this Surveillance for both units.
: 1.
Verify battery capacity is adequate to supply, and       In accordance with maintain in OPERABLE status, the required               the Surveillance emergency loads for the design duty cycle when           Frequency Control subjected to a battery service test.                     Program (continued)
The modified performance discharge test in SR 3.8.4.7 may be performed in lieu of the service test in SR 3.8.4.6 once per 60 months.
Brunswick Unit 1                              3.8-25                     Amendment No.     m I
: 2.
This Surveillance shall not be performed in MODE 1 or 2 for the Unit 1 DC electrical power subsystems. However, credit may be taken for unplanned events that satisfy this SR.
: 3.
A single test at the specified Frequency will satisfy this Surveillance for both units.
Verify battery capacity is adequate to supply, and maintain in OPERABLE status, the required emergency loads for the design duty cycle when subjected to a battery service test.
3.8-25 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program (continued)
Amendment No. m I  


BSEP 17-0078 Enclosure 3 Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Request for License Amendment - DC Sources - Operating Surveillance Requirements (SRs) 3.8.4.5 Proposed Unit 2 BSEP TS (Markups)
Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Request for License Amendment - DC Sources - Operating Surveillance Requirements (SRs) 3.8.4.5 Proposed Unit 2 BSEP TS (Markups)
BSEP 17-0078


DC Sources-Operating 3.8.4 SURVEILLANCE REQUIREMENTS (continued)
300 DC Sources-Operating 3.8.4 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                                    FREQUENCY SR 3.8.4.4     Remove visible corrosion and verify battery cell to cell In accordance with and terminal connections are coated with                 the Surveillance anti-corrosion material.                                 Frequency Control Program SR 3.8.4.5      Verify each required battery charger supplies           In accordance with
SR 3.8.4.4 SR 3.8.4.5 SR 3.8.4.6 Brunswick Unit 2 SURVEILLANCE Remove visible corrosion and verify battery cell to cell and terminal connections are coated with anti-corrosion material.
                    ;::: 2W amps at ~ 135 V for ~ 4 hours.                   the Surveillance Frequency Control 300                                                                          Program SR 3.8.4.6      ---------------------NOTES-----------------------
Verify each required battery charger supplies  
: 1.     The modified performance discharge test in SR 3.8.4.7 may be performed in lieu of the service test in SR 3.8.4.6 once per 60 months.
;::: 2W amps at ~ 135 V for ~ 4 hours.  
: 2.     This Surveillance shall not be performed in MODE 1 or 2 for the Unit 2 DC electrical power subsystems. However, credit may be taken for unplanned events that satisfy this SR.
---------------------NOTES-----------------------
: 3.     A single test at the specified Frequency will satisfy this Surveillance for both units.
: 1.
Verify battery capacity is adequate to supply, and       In accordance with maintain in OPERABLE status, the required               the Surveillance emergency loads for the design duty cycle when           Frequency Control subjected to a battery service test.                     Program (continued)
The modified performance discharge test in SR 3.8.4.7 may be performed in lieu of the service test in SR 3.8.4.6 once per 60 months.
Brunswick Unit 2                              3.8-25                     Amendment No. aG4     I
: 2.
This Surveillance shall not be performed in MODE 1 or 2 for the Unit 2 DC electrical power subsystems. However, credit may be taken for unplanned events that satisfy this SR.
: 3.
A single test at the specified Frequency will satisfy this Surveillance for both units.
Verify battery capacity is adequate to supply, and maintain in OPERABLE status, the required emergency loads for the design duty cycle when subjected to a battery service test.
3.8-25 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program (continued)
Amendment No. aG4 I  


BSEP 17-0078 Enclosure 4 Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Request for License Amendment - DC Sources - Operating Surveillance Requirements (SRs) 3.8.4.5 Proposed Unit 1 BSEP TS (Retyped Pages)
Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Request for License Amendment - DC Sources - Operating Surveillance Requirements (SRs) 3.8.4.5 Proposed Unit 1 BSEP TS (Retyped Pages)
BSEP 17-0078


DC Sources-Operating 3.8.4 SURVEILLANCE REQUIREMENTS (continued)
DC Sources-Operating 3.8.4 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                                                FREQUENCY SR 3.8.4.4     Remove visible corrosion and verify battery cell to cell             In accordance with and terminal connections are coated with                             the Surveillance anti-corrosion material.                                             Frequency Control Program SR 3.8.4.5      Verify each required battery charger supplies                       In accordance with
SR 3.8.4.4 SR 3.8.4.5 SR 3.8.4.6 Brunswick Unit 1 SURVEILLANCE Remove visible corrosion and verify battery cell to cell and terminal connections are coated with anti-corrosion material.
                ~ 300 amps at ~ 135 V for ~ 4 hours.                                 the Surveillance Frequency Control Program SR 3.8.4.6      -------------------------------NO TES-------------------------------
Verify each required battery charger supplies  
: 1.     The modified performance discharge test in SR 3.8.4.7 may be performed in lieu of the service test in SR 3.8.4.6 once per 60 months.
~ 300 amps at ~ 135 V for ~ 4 hours.  
: 2.     This Surveillance shall not be performed in MODE 1 or 2 for the Unit 1 DC electrical power subsystems. However, credit may be taken for unplanned events that satisfy this SR.
-------------------------------NO TES-------------------------------
: 3.     A single test at the specified Frequency will satisfy this Surveillance for both units.
: 1.
Verify battery capacity is adequate to supply, and                   In accordance with maintain in OPERABLE status, the required                           the Surveillance emergency loads for the design duty cycle when                       Frequency Control subjected to a battery service test.                                 Program (continued)
The modified performance discharge test in SR 3.8.4.7 may be performed in lieu of the service test in SR 3.8.4.6 once per 60 months.
Brunswick Unit 1                                3.8-25                               Amendment No.
: 2.
This Surveillance shall not be performed in MODE 1 or 2 for the Unit 1 DC electrical power subsystems. However, credit may be taken for unplanned events that satisfy this SR.
: 3.
A single test at the specified Frequency will satisfy this Surveillance for both units.
Verify battery capacity is adequate to supply, and maintain in OPERABLE status, the required emergency loads for the design duty cycle when subjected to a battery service test.
3.8-25 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program (continued)
Amendment No.  


BSEP 17-0078 Enclosure 5 Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Request for License Amendment - DC Sources - Operating Surveillance Requirements (SRs) 3.8.4.5 Proposed Unit 2 BSEP TS (Retyped Pages)
Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Request for License Amendment - DC Sources - Operating Surveillance Requirements (SRs) 3.8.4.5 Proposed Unit 2 BSEP TS (Retyped Pages)
BSEP 17-0078


DC Sources-Operating 3.8.4 SURVEILLANCE REQUIREMENTS (continued)
DC Sources-Operating 3.8.4 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                                      FREQUENCY SR 3.8.4.4     Remove visible corrosion and verify battery cell to cell In accordance with and terminal connections are coated with                 the Surveillance anti-corrosion material.                                 Frequency Control Program SR 3.8.4.5      Verify each required battery charger supplies             In accordance with
SR 3.8.4.4 SR 3.8.4.5 SR 3.8.4.6 Brunswick Unit 2 SURVEILLANCE Remove visible corrosion and verify battery cell to cell and terminal connections are coated with anti-corrosion material.
                ~ 300 amps at ~ 135 V for ~ 4 hours.                     the Surveillance Frequency Control Program SR 3.8.4.6      ------------~~---~-~-~----NOl"ES-~-~-~-~-~--------------
Verify each required battery charger supplies  
: 1.     "The modified performance discharge test in SR 3.8.4.7 may be performed in lieu of the service test in SR 3.8.4.6 once per 60 months.
~ 300 amps at ~ 135 V for ~ 4 hours.  
: 2. This Surveillance shall not be performed in MODE 1 or 2 for the Unit 2 DC electrical power subsystems. However, credit may be taken for unplanned events that satisfy this SR.
------------~~---~-~-~----NOl"ES-~-~-~-~-~--------------
: 3. A single test at the specified Frequency will satisfy this Surveillance for both units.
: 1.  
Verify battery capacity is adequate to supply, and       In accordance with maintain in OPERABLE status, the required                 the Surveillance emergency loads for the design duty cycle when           Frequency Control subjected to a battery service test.                     Program (continue9)
"The modified performance discharge test in SR 3.8.4.7 may be performed in lieu of the service test in SR 3.8.4.6 once per 60 months.
Brunswick Unit 2                            3.8-25                       Amendment No.
: 2.
This Surveillance shall not be performed in MODE 1 or 2 for the Unit 2 DC electrical power subsystems. However, credit may be taken for unplanned events that satisfy this SR.
: 3.
A single test at the specified Frequency will satisfy this Surveillance for both units.
Verify battery capacity is adequate to supply, and maintain in OPERABLE status, the required emergency loads for the design duty cycle when subjected to a battery service test.
3.8-25 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program (continue9)
Amendment No.  


BSEP 17-0078 Enclosure 6 Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Request for License Amendment - DC Sources - Operating Surveillance Requirements (SRs) 3.8.4.5 BSEP Calculation BNP-E-6.079, Revision 6, "125 V DC Battery Charger Sizing Calculation" (Enclosure 6 contains six pages)
Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Request for License Amendment - DC Sources - Operating Surveillance Requirements (SRs) 3.8.4.5 BSEP 17-0078 BSEP Calculation BNP-E-6.079, Revision 6, "125 V DC Battery Charger Sizing Calculation" (Enclosure 6 contains six pages)  


(_~DUKE
(_~DUKE  
~ ENERGY.
~ ENERGY.
Facility Code :           BNP Applicable Facilities :   BNP Document Number :         BNP-E-6.079 Document Revision Number : 006 Document EC Number :
Facility Code :
Change Reason :           AR02096967 Document Title :           UNIT 1 & 2 - 125 V DC BATTERY CHARGER SIZING CALCULATION Field, Rex S.              Preparer                             6/27/2017 Kuffour, Edward 0.          Design Verifier                       6/27/2017 Anderson, Jon J.            Approver                             6/27/2017 Notes:
Applicable Facilities :
Document Number :
Document Revision Number :
Document EC Number :
Change Reason :
Document Title :
Field, Rex S.
Kuffour, Edward 0.
Anderson, Jon J.
Notes:
BNP BNP BNP-E-6.079 006 AR02096967 UNIT 1 & 2 - 125 V DC BATTERY CHARGER SIZING CALCULATION Preparer 6/27/2017 Design Verifier 6/27/2017 Approver 6/27/2017  


Unit 1 & 2 - 125 VDC Battery Charger Sizing Calculation Calculation Number:                                   BNP-E-6.079                                 Rev#     6 System :   5230, 5240, 5245                                       DSD List:   0   Yes [8J No
Unit 1 & 2 - 125 VDC Battery Charger Sizing Calculation Calculation Number:
[BNP, HNP, RNP] Sub-Type:       ELE                                 Microfiche Attachment List:   D Yes [8J No
BNP-E-6.079 Rev#
                                ~------------
6 System: 5230, 5240, 5245 DSD List: 0 Yes [8J No
Quality Level A                                                     Priority E:  [8J Yes D No
[BNP, HNP, RNP] Sub-Type: ELE Microfiche Attachment List:
                                ~------------
D Yes [8J No  
DAii       [8J BNP Unit     __ 1 & 2_ __         0 CNS Unit                     D HNP Unit 0   MNS Unit                          D ONS Unit                      D RNP Unit 0   WLS Unit                          D LNP Unit                      D HAR Unit D General Office                       D Keowee Hydro Station Originated By                   Design Verification Review By                   Approved By Signature                              Signature                             Signature E-sign                                 E-sign                                E-sign Verification Method 1 [8J 2 D 3 D Other D Printed Name                           Printed Name                          Printed Name Rex S Field                             Ed Kuffour                             Jon Anderson Date                                    Date                                   Date E-date                                 E-date                                 E-date D YES [8J NO Check Box for Multiple Originators or Design Verifiers (see next page)
~------------
Quality Level A  
~------------
DAii
[8J BNP Unit
__ 1 & 2 __ _ 0 CNS Unit D ONS Unit D LNP Unit 0 MNS Unit 0 WLS Unit D General Office D Keowee Hydro Station Originated By Design Verification Review By Signature Signature E-sign E-sign Verification Method 1 [8J 2 D 3 D Other D Printed Name Printed Name Rex S Field Ed Kuffour Date Date E-date E-date Priority E: [8J Yes D No D HNP Unit D RNP Unit D HAR Unit Approved By Signature E-sign Printed Name Jon Anderson Date E-date D YES [8J NO Check Box for Multiple Originators or Design Verifiers (see next page)
For Vendor Calculations:
For Vendor Calculations:
Vendor: N/A                                         Vendor Document#: N/A Owners Review By: N/A                                                           Date: N/A Approval By: N/A                                                         Date: N/A
Vendor: N/A Vendor Document#: N/A Owners Review By: N/A Date: N/A Approval By: N/A Date: N/A  


Calculation BNP-E-6.079 Revision 6 Page 8 3.1.2.3 LOCA/LOOP The battery load profile resulting from a coincident LOCA/LOOP DBE is defined as a four (4) hour discharge profile in the battery load study (ref.
3.1.2.3 LOCA/LOOP Calculation BNP-E-6.079 Revision 6 Page 8 The battery load profile resulting from a coincident LOCA/LOOP DBE is defined as a four (4) hour discharge profile in the battery load study (ref.
2.3). Aging and temperature derating factors will be used to determine the minimum allowable state of battery charge. This profile consists of two (2) discharge periods. The first period is one (1) minute in duration in which time zero is the initiation of a OBA LOCA/LOOP. All DC loads are fed from the batteries for the first 10 seconds (until the respective EDGs start and close the output breaker. At that point, the battery chargers are fed by the EOG and assume 300A of the DC load. Any remaining load is fed by the batteries.
2.3). Aging and temperature derating factors will be used to determine the minimum allowable state of battery charge. This profile consists of two (2) discharge periods. The first period is one (1) minute in duration in which time zero is the initiation of a OBA LOCA/LOOP. All DC loads are fed from the batteries for the first 10 seconds (until the respective EDGs start and close the output breaker. At that point, the battery chargers are fed by the EOG and assume 300A of the DC load. Any remaining load is fed by the batteries.
The maximum uncorrected discharge at the one (1) minute mark is 10.32 Ah and at the four (4) hour mark is 688.66 Ah (ref 2.3; battery 1B-2 Att D pg 121/322).
The maximum uncorrected discharge at the one (1) minute mark is 10.32 Ah and at the four (4) hour mark is 688.66 Ah (ref 2.3; battery 1 B-2 Att D pg 121/322).
The minimum voltage requirement for the first minute is 107Vdc (1.78 Vpc).
The minimum voltage requirement for the first minute is 107Vdc (1.78 Vpc).
From ref 2.3 (Att H), the one (1) minute discharge is limited to 1020 A.
From ref 2.3 (Att H), the one (1) minute discharge is limited to 1020 A.
Line 172: Line 228:
735.14 A* 1 min/ 60 min= 12.25 Ah For the initial minute, (ref 2.3; Att G, Table 1) demonstrates that the actual value of (uncorrected) ampere-hours discharged under this scenario (LOCA/LOOP) is enveloped by the above. The MST one (1) minute test value of 725A is also bounded by this maximum value of 735A.
735.14 A* 1 min/ 60 min= 12.25 Ah For the initial minute, (ref 2.3; Att G, Table 1) demonstrates that the actual value of (uncorrected) ampere-hours discharged under this scenario (LOCA/LOOP) is enveloped by the above. The MST one (1) minute test value of 725A is also bounded by this maximum value of 735A.
The basis for the allowable time to recharge the batteries is to 95% of their capacity is not specifically identified for this scenario. Therefore, it will be considered to be approximately eight (8) hours (ref UFSAR 8.3.2.1.2).
The basis for the allowable time to recharge the batteries is to 95% of their capacity is not specifically identified for this scenario. Therefore, it will be considered to be approximately eight (8) hours (ref UFSAR 8.3.2.1.2).
For a four (4) hour duration, the discharge is limited to 244 A [976 Ah] (ref 2.3 Att H pg 4). Four (4) hours is chosen because from ref 2.3 analysis, this is the maximum amount of time the DC load (specifically B division and battery 2A-1) can be continuously energized without operator action
For a four (4) hour duration, the discharge is limited to 244 A [976 Ah] (ref 2.3 Att H pg 4). Four (4) hours is chosen because from ref 2.3 analysis, this is the maximum amount of time the DC load (specifically B division and battery 2A-1) can be continuously energized without operator action  


Calculation BNP-E-6.079 Revision 6 Page 9 to decrease the load and begin recharging the batteries. The remainder of A division batteries would not require operator action to prevent the batteries from continually discharging.
Calculation BNP-E-6.079 Revision 6 Page 9 to decrease the load and begin recharging the batteries. The remainder of A division batteries would not require operator action to prevent the batteries from continually discharging.
The allowable discharge is:
The allowable discharge is:
Eqn (6)       244 A I (1.11 )(1.25) =175.86 A This is enveloped by the MST test value of 200A from 30 minutes to four (4) hours.
Eqn (6) 244 A I (1.11 )(1.25) = 175.86 A This is enveloped by the MST test value of 200A from 30 minutes to four (4) hours.
From on the worst case battery 1B-2 as noted in BNP-E-6.120 R10 Attachment D, depleted amp-hour totals and battery amps (negative values indicating recharging) were taken at the four (4) hour time mark to determine the amount of time to recharge. The values are corrected for a battery charger voltage of 135V as opposed to a battery voltage of 125 V as calculated in ref 2.3 (Attachment B1) and noted below in Table A.
From on the worst case battery 1B-2 as noted in BNP-E-6.120 R10 Attachment D, depleted amp-hour totals and battery amps (negative values indicating recharging) were taken at the four (4) hour time mark to determine the amount of time to recharge. The values are corrected for a battery charger voltage of 135V as opposed to a battery voltage of 125 V as calculated in ref 2.3 (Attachment B1) and noted below in Table A.
Battery Voltages After Restoration of the Battery Chargers IEEE 485-1983 requires that the batteries be capable of supplying load to the DC system when the DC load exceeds the output capability of the system battery chargers. EC 93932 included the effects of battery voltage due to charger output being less than the load of the DC system. EC 300753 and 407321 evaluated battery voltages and loading after the first minute in situations when the DC loading remained greater than the battery charger amperage output limit (300A).
Battery Voltages After Restoration of the Battery Chargers IEEE 485-1983 requires that the batteries be capable of supplying load to the DC system when the DC load exceeds the output capability of the system battery chargers. EC 93932 included the effects of battery voltage due to charger output being less than the load of the DC system. EC 300753 and 407321 evaluated battery voltages and loading after the first minute in situations when the DC loading remained greater than the battery charger amperage output limit (300A).
Analysis in BNP-E-6.120 R10 determined loading after the first minute is greater than 300A for the B batteries and battery 2A-1, therefore, these batteries are continually depleting after the first minute rather than recharging. For the B batteries this is due primarily to the LTG/COMM UPS units which contribute approximately 185-195A. Battery 2A-1 loading is slightly above 300A due to miscellaneous loads. A reduction in loading will permit these batteries to be recharged.
Analysis in BNP-E-6.120 R10 determined loading after the first minute is greater than 300A for the B batteries and battery 2A-1, therefore, these batteries are continually depleting after the first minute rather than recharging. For the B batteries this is due primarily to the L TG/COMM UPS units which contribute approximately 185-195A. Battery 2A-1 loading is slightly above 300A due to miscellaneous loads. A reduction in loading will permit these batteries to be recharged.
Based on UFSAR, the batteries must be able to recharge within eight (8) hours for any load condition. Based on the worst case battery 1B-2, depleted amp hour totals and battery amps (negative values indicating recharging) were taken at the four (4) hour time mark (Attachment D page 121 I 322) to determine the amount of time to recharge. This table indicates if the LTG/COMM UPS' units are transferred to their appropriate AC source within four (4) hours, the B batteries are capable of recharging within eight (8) hours.
Based on UFSAR, the batteries must be able to recharge within eight (8) hours for any load condition.
Based on the worst case battery 1 B-2, depleted amp hour totals and battery amps (negative values indicating recharging) were taken at the four (4) hour time mark (Attachment D page 121 I 322) to determine the amount of time to recharge.
This table indicates if the L TG/COMM UPS' units are transferred to their appropriate AC source within four (4) hours, the B batteries are capable of recharging within eight (8) hours.  


Calculation BNP-E-6.079 Revision 6 Page 10 TABLE A Load (r)       Load (k)        Load (i)          Load (t)
TABLE A Load (r)
Battery             Amps          Amps           Amps              Amps (A)               (8)           (C)              (D)        (E)=(B)+(C)+(D) 1B-2             101.34         23.54           73.19              198.07
Load (k)
                        =(B)*135/125   =(C)*125/135         =(D)         Adjusted Load (t) 1B-2 (adjusted)         109.45         21.80           73.19             204.43 Battery Adjusted Loading = 204.43 - 198.07 = 6.36 TABLE B Charging         Add'I Isolate UPS         18-2                     Amps after       Battery after this no.     Depleted                       UPS         Adjusted       Time to of hours           Ah rs         10%         Offline       Loading       Recharge (A)               (B)         (C)           (D)             (E)             (F)
Battery Amps Amps (A)
Ref Att D pg                 Ref Att D pg                         F 120 I 322     C=B*1.1       121 I 322       Table A     =CI (D + E) 2             350.16         385.18       -105.73         6.36           3.88 3             521 .84       574.02       -105.73         6.36           5.78 4             694.44         763.88       -105.73         6.36           7.69 If the batteries were depleted to a maximum value based on four (4) hours from ref 2.3 (Att H), the maximum amount of DC load the battery chargers could feed is:
(8)
Eqn (7)               Ac= 300- l .l x244*4AH = 165.8A 8.
(C) 1B-2 101.34 23.54  
=(B)*135/125  
=(C)*125/135 Calculation BNP-E-6.079 Revision 6 Page 10 Load (i)
Load (t)
Amps Amps (D)
(E)=(B)+(C)+(D) 73.19 198.07
=(D)
Adjusted Load (t) 1 B-2 (adjusted) 109.45 21.80 73.19 204.43 Battery Adjusted Loading = 204.43 - 198.07 = 6.36 TABLE B Charging Add'I Isolate UPS 18-2 Amps after Battery after this no.
Depleted UPS Adjusted Time to of hours Ah rs 10%
Offline Loading Recharge (A)
(B)
(C)
(D)
(E)
(F)
Ref Att D pg Ref Att D pg F
120 I 322 C=B*1.1 121 I 322 Table A  
=CI (D + E) 2 350.16 385.18  
-105.73 6.36 3.88 3
521.84 574.02  
-105.73 6.36 5.78 4
694.44 763.88  
-105.73 6.36 7.69 If the batteries were depleted to a maximum value based on four (4) hours from ref 2.3 (Att H), the maximum amount of DC load the battery chargers could feed is:
Eqn (7)
Ac= 300- l.l x244*4AH = 165.8A 8.
The minimum amount of current to recharge the batteries in approximately eight (8) hours would be:
The minimum amount of current to recharge the batteries in approximately eight (8) hours would be:
Eqn (8)                   300 A-165.8 A= 134.2 A However, as noted in Table B [from ref 2.3 analysis], at four (4) hours, the recharge rate is 106. 78 A. Therefore, the maximum battery charger rate to feed a DC load while recharging the batteries is:
Eqn (8) 300 A-165.8 A= 134.2 A However, as noted in Table B [from ref 2.3 analysis], at four (4) hours, the recharge rate is 106. 78 A. Therefore, the maximum battery charger rate to feed a DC load while recharging the batteries is:
Eqn (9)                   300 Amps - (105.73 - 6.27) A= 200.63 A
Eqn (9) 300 Amps - (105.73 - 6.27) A= 200.63 A  


Calculation BNP-E-6.079 Revision 6 Page 11 This is greater than the value in Eqn (7 (200.63 >165.8 A) because the batteries have not been depleted to their maximum value within four (4) hours. Also, the battery recharge rate is less than the maximum allowed (106. 78 < 134.2 A) 3.1.2.4 Reg. Guide 1.155 Station Black Out (SBO)
Calculation BNP-E-6.079 Revision 6 Page 11 This is greater than the value in Eqn (7 (200.63 >165.8 A) because the batteries have not been depleted to their maximum value within four (4) hours. Also, the battery recharge rate is less than the maximum allowed (106. 78 < 134.2 A) 3.1.2.4 Reg. Guide 1.155 Station Black Out (SBO)
The Station Blackout Coping Report (Ref. 2.30) establishes that the BSEP plant is required to maintain a four (4) hour coping duration during a Station Black Out event. However, "AOP-36.2 defines a means to cross tie AC power from the non-blacked out Unit to the blacked out Unit battery chargers within one (1) hour rather than providing a list of DC loads to be stripped". Based on a one (1) hour cross-tie capability, the aging and temperature derated, one (1) hour discharge state of the battery is used.
The Station Blackout Coping Report (Ref. 2.30) establishes that the BSEP plant is required to maintain a four (4) hour coping duration during a Station Black Out event. However, "AOP-36.2 defines a means to cross tie AC power from the non-blacked out Unit to the blacked out Unit battery chargers within one (1) hour rather than providing a list of DC loads to be stripped". Based on a one (1) hour cross-tie capability, the aging and temperature derated, one (1) hour discharge state of the battery is used.
The one (1) hour rating for the battery to accomplish the 1. 783 V/cell requirement established in Ref. 2.29 is 553 A. This is based off of a linear interpolation between the 1.78 V/Cell and 1.81 V/Cell one (1) hour ratings (Ref. 2.15).
The one ( 1) hour rating for the battery to accomplish the 1. 783 V /cell requirement established in Ref. 2.29 is 553 A. This is based off of a linear interpolation between the 1.78 V/Cell and 1.81 V/Cell one (1) hour ratings (Ref. 2.15).
1.78-1.81=1.78-1.783 => X = 553 A 558-510       558-X Therefore, the allowable discharge capacity is:
1.78-1.81=1.78-1.783 => X = 553A 558-510 558-X Therefore, the allowable discharge capacity is:
1 Hour x 553 A I (1.11 )(1.25) = 398.56 Ah Table 1 of Attachment G to ref 2.3 demonstrates that the actual value of (uncorrected) ampere-hours discharged under this scenario (SBO) is enveloped by the above.
1 Hour x 553 A I (1.11 )(1.25) = 398.56 Ah Table 1 of Attachment G to ref 2.3 demonstrates that the actual value of (uncorrected) ampere-hours discharged under this scenario (SBO) is enveloped by the above.
The basis for the allowable time to recharge .the batteries to 95% of their capacity is not specifically identified for this scenario. Therefore, it will be considered to be eight (8) hours, per bases 3.2.1.g.
The basis for the allowable time to recharge.the batteries to 95% of their capacity is not specifically identified for this scenario. Therefore, it will be considered to be eight (8) hours, per bases 3.2.1.g.
Therefore, the allowable continuous ampere load on the DC distribution system while .recharging is:
Therefore, the allowable continuous ampere load on the DC distribution system while.recharging is:
Ac= 300- I.Ix 398.56 AH = 245.2 A 8
Ac= 300- I.Ix 398.56 AH = 245.2 A 8  


BSEP 17-0078 Enclosure 7 Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Request for License Amendment - DC Sources - Operating Surveillance Requirements (SRs) 3.8.4.5 BSEP Calculation BNP-E-6.120, Revision 10, "DC System Battery Load Study" (Enclosure 7 contains seventeen pages)
Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Request for License Amendment - DC Sources - Operating Surveillance Requirements (SRs) 3.8.4.5 BSEP 17-0078 BSEP Calculation BNP-E-6.120, Revision 10, "DC System Battery Load Study" (Enclosure 7 contains seventeen pages)  


J_~DUKE
J_~DUKE  
~     ENERGY.
~ ENERGY.
Facility Code :           BNP Applicable Facilities :   BNP Document Number :         BNP-E-6.120 Document Revision Number : 010 Document EC Number :
Facility Code :
Change Reason :           EC000029647...EC0000297Zll.ECOOOC129956l.EC00002995M.ECOOOOJCIOll7l.EC0000407321 :EC0000299514.EC0000299437.fCOOl>040IM9".EC00004CW218.EC00004013'0 Document Title :            125/250 voe SYSTEM BATTERY LOAD STUDY Field, Rex                  Preparer                                                                                                                 6/27/2017 Kuffour, Edward 0.          Design Verifier                                                                                                         6/27/2017 Anderson, Jon J.            Approver                                                                                                                 6/27/2017 Notes:
Applicable Facilities :
Document Number :
Document Revision Number :
Document EC Number :
Change Reason :
Document Title :
Field, Rex Kuffour, Edward 0.
Anderson, Jon J.
Notes:
BNP BNP BNP-E-6.120 010 EC000029647... EC0000297Zll.ECOOOC129956l.EC00002995M.ECOOOOJCIOll7l.EC0000407321:EC0000299514.EC0000299437.fCOOl>040IM9".EC00004CW218.EC00004013'0 125/250 voe SYSTEM BATTERY LOAD STUDY Preparer 6/27/2017 Design Verifier 6/27/2017 Approver 6/27/2017  


125/250 voe SYSTEM BATTERY LOAD STUDY Calculation Number:                                 BNP-E-6.120                                 Rev#   10 System:   5230, 5245                                           DSD List:   D Yes ~No
125/250 voe SYSTEM BATTERY LOAD STUDY Calculation Number:
[BNP, HNP, RNP] Sub-Type:     ELE                                 Microfiche Attachment List:   D Yes ~No
BNP-E-6.120 Rev#
                                ~----------~
10 System:
Quality Level A                                                     Priority E: ~Yes D No
5230, 5245 DSD List:
                                -----------~
D Yes ~No
DAii       ~   BNP Unit     __ 1 & 2._ __      0 CNS Unit                     D HNP Unit D   MNS Unit                         D ONS Unit                    D RNP Unit D WLS Unit                          D LNP Unit                      D HAR Unit D General Office                     D Keowee Hydro Station Originated By                 Design Verification Review By                   Approved By Signature                            Signature                             Signature E-sign                               E-sign                                E-sign Verification Method 1 ~ 2 D 3 D Other D Printed Name                         Printed Name                          Printed Name Rex S Field                           Ed Kuffour                             Jon Anderson Date                                 Date                                  Date E-date                               E-date                             . E-date D YES ~ NO Check Box for Multiple Originators or Design Verifiers (see next page)
[BNP, HNP, RNP] Sub-Type:
ELE Microfiche Attachment List:
D Yes ~No  
~----------~
Quality Level A  
-----------~
DAii  
~ BNP Unit __ 1 & 2. __ _ 0 CNS Unit D ONS Unit D LNP Unit D MNS Unit D WLS Unit D General Office D Keowee Hydro Station Originated By Design Verification Review By Signature Signature E-sign E-sign Verification Method 1 ~ 2 D 3 D Other D Printed Name Printed Name Rex S Field Ed Kuffour Date Date E-date E-date Priority E:
~Yes D No D HNP Unit D RNP Unit D HAR Unit Approved By Signature E-sign Printed Name Jon Anderson Date E-date D YES ~ NO Check Box for Multiple Originators or Design Verifiers (see next page)
For Vendor Calculations:
For Vendor Calculations:
Vendor: N/A                                         Vendor Document#: NIA Owners Review By: N/A                                                         Date: N/A Approval By: N/A                                                       Date: N/A
Vendor: N/A Vendor Document#: NIA Owners Review By: N/A Date: N/A Approval By: N/A Date: N/A  


Calculation BNP-E-6.120 Revision 7 Page5 3.0   BODY OF CALCULATION 3.1   Discussion/Calculation 3.1.1 125/250 VDC Distribution System Description Each division of the Class 1E 125/250V DC system is powered by two (2) 125V DC batteries, in series, and their respective battery chargers, as depicted in Figures 1 & 2.
3.0 BODY OF CALCULATION 3.1 Discussion/Calculation 3.1.1 125/250 VDC Distribution System Description Calculation BNP-E-6.120 Revision 7 Page5 Each division of the Class 1 E 125/250V DC system is powered by two (2) 125V DC batteries, in series, and their respective battery chargers, as depicted in Figures 1 & 2.
The battery chargers are fed from the Class 1E onsite AC distribution system and normally supply power to all DC loads while maintaining the batteries in a fully charged state. Charger output is interrupted upon a loss of offsite power (LOOP) and is restored when the Emergency Diesel Generators re-energize the Emergency AC buses. During this period the batteries must be able to supply their load without charger support.
The battery chargers are fed from the Class 1 E onsite AC distribution system and normally supply power to all DC loads while maintaining the batteries in a fully charged state. Charger output is interrupted upon a loss of offsite power (LOOP) and is restored when the Emergency Diesel Generators re-energize the Emergency AC buses. During this period the batteries must be able to supply their load without charger support.
The 125/250V DC battery cells are GNB type NCN-17. Their discharge characteristics are included in Attachment H. Each 125V battery consists of 60 cells connected in series.
The 125/250V DC battery cells are GNB type NCN-17. Their discharge characteristics are included in Attachment H. Each 125V battery consists of 60 cells connected in series.
There are two 125V DC batteries in each division of each unit. The two batteries in each division are connected in series with their connection point (labeled NP), forming the common leg of the 125/250V DC system. Buses connected between the common leg and the remaining leg of either battery, i.e., P-NP or NP-N, receive 125V nominal. Buses connected between the outer legs of the two batteries (i.e., P-N) receive 250V nominal.
There are two 125V DC batteries in each division of each unit. The two batteries in each division are connected in series with their connection point (labeled NP), forming the common leg of the 125/250V DC system. Buses connected between the common leg and the remaining leg of either battery, i.e., P-NP or NP-N, receive 125V nominal. Buses connected between the outer legs of the two batteries (i.e., P-N) receive 250V nominal.
As shown in Figures 1 & 2, many panels in the DC distribution system are capable of being supplied from two power sources, the normal source and the alternate source.
As shown in Figures 1 & 2, many panels in the DC distribution system are capable of being supplied from two power sources, the normal source and the alternate source.
These alternate feeds will be taken into consideration in this study. Voltage calculations are performed in accordance with the recommendations of Reference 2.3.
These alternate feeds will be taken into consideration in this study. Voltage calculations are performed in accordance with the recommendations of Reference 2.3.
3.1.2 Battery Loading Scenarios Battery capacity must be evaluated for the following operating/loading scenarios:
3.1.2 Battery Loading Scenarios Battery capacity must be evaluated for the following operating/loading scenarios:
: 1. Design Basis Event (DBE) - LOCA with LOOP
: 1.
* Large Break LOCA with LOOP
Design Basis Event (DBE) - LOCA with LOOP Large Break LOCA with LOOP Small Break LOCA with LOOP
* Small Break LOCA with LOOP
: 2.
: 2.
* Station Blackout (SBO)
* Station Blackout (SBO)
: 3. Appendix R Fire Safety Analysis Safe Shutdown
: 3.
Appendix R Fire Safety Analysis Safe Shutdown  


Calculation BNP-E-6.120 Revision 5 Page6 FIGURE 1 UNIT 1125/250VDC DISTRIBUTION SYSTEM MCC1CA
p NP N
                                                                                                                                                ~
BATI                                                                            CHARGER                            CHARGER 1A-2                                                                              1A-1                                1A-2
(-)
(-)
SWITCHBOARD 1A p   GK1 NP I  f N
GK1 Gl6 GIB (CB).
Gl6      GIB          GJ& I I     GJ0 1           G.J.4   Gl71                   Gl9         GJ3             GJ2                 GJO'                   GJS I
DP3A DP18 BATI 1A-2 I f GJ& I I GJ01 (OGBI DP1A DPSA DP9A (SWVD)
(SWYD)
DP38 (CB) p GLBj I GKB:
I GK& I I
GLDI I
GMO NP N
GM21 I GM3 Ml
~
BATI BATI 1B-1 1 I 1B-2 FIGURE 1 UNIT 1125/250VDC DISTRIBUTION SYSTEM G.J.4 Gl71 (CB)
DP11A DP 118 GK7 SWITCHBOARD 1A Gl9 GJ3 (SWYDI GJ2 (RB)
CHARGER 1A-1 (TB)
MCC1CA
~
GJO' I I
I I
I I I
I I
I I
I I
I I
I f:
DP7A:
1XDA 1TDA 11DP17 DP3A8 (CB)
I I
I I
I I
I DP78 I (SWVOI RBEMRG LIGHTING Gl.71 I Gt(g SWITCHBOARD 1 B 1XD8 1TD8 (RB)
Gl.3 (TB)
Gl2 MCC1CB MCC 1XB
'---v--'
SWBO 28(+)
SWBD 2A(+)
~
I I (R'MJ)
I I I I I
I I I I I I
I I I I I I
I TBEMRG LIGHTING I
I I
I GL1 1 I GLB GM11 I
GM4 13711 CHARGER 18-2 1 L-MCC1CB l..--- MCC 1XB CHARGER 1A-2 GJS Gl5 Gl.9 Calculation BNP-E-6.120 Revision 5 Page6 SWBD2B
~
I I
I I
I I
I I I I I I I I I I I f:
I I
I I (RB)              (TB)
I I
(CB).                (OGBI                          (CB)                      (SWYDI DP3A                  DP1A                        DP11A                    DP7A:
I I
1XDA          1TDA                  11DP17 I
I GJB I NORMAL FEED ALTERNATE FEED  
DPSA                      DP9A                DP3A8                I I                                              '---v--'                                SWBD2B I                            SWBO 28(+)      SWBD 2A(+)
I                                                                                       ~
                                                                                                                              ~
(SWVD)                    (SWYD)                (CB)
I I      1XD8        1TD8 DP18                  DP38                      DP 118                    DP78    I
    "'""'                            (CB)                                          (SWVOI              (RB)        (TB)    I   I (R'MJ)
I   I                                                    I I  I                                                    I I  I                                                    I I  I                                                    I I  I                                                    I RBEMRG                                              I  I    TBEMRG                                        I LIGHTING                                            I  I      LIGHTING                                      I I  I                                                    I I  I                                                    I I  I                                                    I I  I                                                    I GL1 1 I p  GLBj  I GKB:  I      GK&  I I    GLDI    I  GMO          GK7        Gl.71 I    Gt(g  Gl.3          Gl2                        GLB          13711  Gl5      Gl.9        GJB I NP N
GM21 I                GM3                                                                                          GM11    I    GM4 SWITCHBOARD 1B Ml    BATI 1B-1
                              ~I        1 BATI 1B-2 CHARGER 18-2 NORMAL FEED ALTERNATE FEED MCC1CB                          1 L - MCC1CB MCC 1XB                        l..--- MCC 1XB


Calculation BNP-E-6.120 Revision 5 Page?
p NP N
FIGURE 2 UNIT 2 125/250VDC DISTRIBUTION SYSTEM BATT 2A-1      11~ -        I BATT 2A-2 CHARGER 2A-1 IL.I 1&#xa3;1
p NP N
                                                                                                                                                                            +  -            + -
FIGURE 2 Calculation BNP-E-6.120 Revision 5 Page?
CHARGER 2A-2
UNIT 2 125/250VDC DISTRIBUTION SYSTEM BATT 11~ I BATT 2A-1 2A-2  
              !:U                       (*)                                                       SWITCHBOARD 2A Gl<2                                                                                                                                GKO I I              GKJ p    ~**
!:U
NP I JI j
(*)  
        ~I                     J~
~**
I N
Gl<2
GJO:
~I I JI J~
I II          GJ* I I       Gl71 I         11      aoo I I       Ml I I              G.121 I I                  GJ1 1 I                          11 &deg;"
j I GJO: I I I GJ* I I Gl71 I I I (CO)
I  I IRlll                (TO)
(0081 (CB)
(CO)                  (0081                             (CB)                                                                                                               l'MiSEI
DP4A DP2A I
                                                                                                    ~
DP12A I
DP4A                     DP2A               I           DP12A                             DPBA'                                                                        I   DP 17 tr-I                                 2TDA I                                                                  2XDA I
tr-I (TO)
1 DP10A                          DP4A8 DP6A
(SWID) 1 DP10A DP6A DP28 DP48  
                                                                                                                                                                      -r-I I'                                                                                                sweo 1e    SWB01B I                                                      I I                                                          sweo 1A<'l S~(<)
~~
(TO)
(008)
I I                                                                                                ~
(CB)
(SWID)                                                       (CB)                I I                                                                                                  I I I I    2XDB          2TDB              I I 1                                        1 DP28                     DP48                                                             DP88                                                  DP 13                                                U2LTG    U1 LTG
(CB)
                                                                ~~
I WTSYS I CONTPNL I
TG (008)                                                       (CB)
GLS Gl<ll I
                                                                        ........                  (SWID)                                                ,........)
Ol.D GMO Ol.4 C><1 I
EBOP    STD8Y p~
                                                                                                                                                                                                              &COMM UPS
                                                                                                                                                                                                                        &COMM UPS (CB)                                                                                    (Rll)            (TB)
I I
I I
I I          I                                I                                                        I                    I I
I WTSYS                      IRWBEMRG                                                                    TBEMRG                                                    I CONTPNL                      LIGHTING                                                                  LIGHTING                                                  I I
I I
I I
GM2 GM3
-0
(*)
BATT BATT Uc*>
2B-1 ITT>
2B-2
~
CHARGER IL.I 2A-1
+
1&#xa3;1 CHARGER
+
2A-2 SWITCHBOARD 2A GKO I I GKJ 11 aoo I I M l I I G.121 I I GJ1 1 I
~
IRlll (TO) l'MiSEI I DP 17 DPBA' I I
2XDA 2TDA DP4A8 I I'
-r-I I
S~(<) sweo 1A<'l (CB)
I I
I I
                                                                                                                                                                                      "'"                  au        DJI I GMO p  GLS    Gl<ll    I                   Ol.D                    Ol.4      C><1        00..7       GK9     GLJ           Gl.2                                                               Gt.*
I I
I I  I NP                    I I
I I
N    GM2                      GM3                                                                                                          GMI                 GM4
2XDB 2TDB I I DP88 1 :
                                    -0                                                          SWITCHBOARD 2B I
1 : DP 13 TG EBOP (SWID)
(*)
(Rll)
          --        BATT          --        BATT CHARGER 28-1
(TB)
                                                                                                                                                  +
........ )
                                                                                                                                                      !!JI.
IRWBEMRG I LIGHTING I
                                                                                                                                                                        +
TBEMRG I LIGHTING 00..7 GK9 GLJ Gl.2 SWITCHBOARD 2B GMI GM4 CHARGER
                                                                                                                                                                              !!JI.
+
CHARGER 28-2         - - NORMAL FEED Uc*>        2B-1        ITT>          2B-2 MCC2CB                  I                  I            MCC2CB
+
                                                                                                                                                                                                        - - -
CHARGER 28-1  
* ALTERNATE FEED
!!JI.  
                                  ~
!!JI.
MCC2XD      ----J                          ' - - - - MCC2XD
28-2 MCC2CB I
I MCC2CB MCC2XD ----J
'---- MCC2XD 11&deg;"
sweo 1e SWB01B
~,,...,._.,
I I U2LTG U1 LTG STD8Y
&COMM
&COMM p~
UPS UPS I
I I
I I
I I
I I
I I
Gt.*
au DJI I -
NORMAL FEED I
- - -
* ALTERNATE FEED


Calculation BNP-E-6.120 Revision 10 Page8 3.2     Bases and Assumptions 3.2.1   Battery Loading for a Design Basis Event (DBE) 3.2.1.1 The DBE for which the batteries are evaluated is assumed to be a simultaneous loss of coolant accident (LOCA), coincident with a loss of offsite power (LOOP) and a single equipment failure (Reference 2.18, Section 2.1.1.1 ). For a design basis event, the enveloping single failure is assumed to be the complete loss of one (1) DC division. The remaining DC division must be capable of supplying power to the ESF loads required for accident mitigation, as well as to BOP loads that are connected to the 125/250 VDC system. For the available DC division, AC power to the battery chargers will be restored by the diesel generator in approximately 10 sec from LOOP initiation. However, because the first minute peak loading could exceed the maximum output of the battery charger, this analysis is based on the batteries not having charger support for the entire first minute (Reference 2.18, Section 4.2.3.11 ). In addition, DC loading after the first minute (the "B" batteries) exceeds the battery charger rating of 300A. Load greater than 300A is carried by the respective battery; however, the loading will continue to deplete. EC 407321 determined this loading condition could last approximately four (4) hours before operation action would require reducing the DC load sufficiently (transfer to an ac source or secure LTG/COMM UPS Units) to permit the battery chargers to recharge their respective battery. Therefore, the battery duty cycle for the DBE event is considered four (4) hours.
3.2 Bases and Assumptions 3.2.1 Battery Loading for a Design Basis Event (DBE)
Calculation BNP-E-6.120 Revision 10 Page8 3.2.1.1 The DBE for which the batteries are evaluated is assumed to be a simultaneous loss of coolant accident (LOCA), coincident with a loss of offsite power (LOOP) and a single equipment failure (Reference 2.18, Section 2.1.1.1 ).
For a design basis event, the enveloping single failure is assumed to be the complete loss of one (1) DC division. The remaining DC division must be capable of supplying power to the ESF loads required for accident mitigation, as well as to BOP loads that are connected to the 125/250 VDC system. For the available DC division, AC power to the battery chargers will be restored by the diesel generator in approximately 10 sec from LOOP initiation. However, because the first minute peak loading could exceed the maximum output of the battery charger, this analysis is based on the batteries not having charger support for the entire first minute (Reference 2.18, Section 4.2.3.11 ). In addition, DC loading after the first minute (the "B" batteries) exceeds the battery charger rating of 300A. Load greater than 300A is carried by the respective battery; however, the loading will continue to deplete.
EC 407321 determined this loading condition could last approximately four (4) hours before operation action would require reducing the DC load sufficiently (transfer to an ac source or secure L TG/COMM UPS Units) to permit the battery chargers to recharge their respective battery. Therefore, the battery duty cycle for the DBE event is considered four (4) hours.
During a LOCA event, the High Pressure Coolant Injection (HPCI) and Reactor Core Isolation Cooling (RCIC) systems, supported by Division I and Division II batteries, respectively, will start as a result of high drywell pressure and/or reactor pressure vessel Low Level 2 (LL2) signal. Their operation is dependent on the type of LOCA event. This study examines two types of LOCA events for battery loading:
During a LOCA event, the High Pressure Coolant Injection (HPCI) and Reactor Core Isolation Cooling (RCIC) systems, supported by Division I and Division II batteries, respectively, will start as a result of high drywell pressure and/or reactor pressure vessel Low Level 2 (LL2) signal. Their operation is dependent on the type of LOCA event. This study examines two types of LOCA events for battery loading:
a) Large Break LOCA - pipe break which results in a loss of reactor coolant inventory that is more than the make-up capability of the HPCI system. In this case, the HPCI system starts first as a result of a high drywell pressure signal, followed by the subsequent start of the RCIC system, when the reactor vessel water level 2 (LL2) is reached.
a) Large Break LOCA - pipe break which results in a loss of reactor coolant inventory that is more than the make-up capability of the HPCI system. In this case, the HPCI system starts first as a result of a high drywell pressure signal, followed by the subsequent start of the RCIC system, when the reactor vessel water level 2 (LL2) is reached.
b) Small Break LOCA - pipe br~ak which results in a loss of reactor coolant inventory that is less than the make-up capability of HPCI. In this case, it is assumed that HPCI will start on high drywell pressure signal and will maintain the reactor vessel water level above LL2. Therefore, the RCIC system will not be called upon to start. In the case of a loss of the Division I batteries which feeds the HPCI system, the HPCI System flow will maintain the reactor vessel water level between LL2 and "High Level" (Reference 2.55).
b) Small Break LOCA - pipe br~ak which results in a loss of reactor coolant inventory that is less than the make-up capability of HPCI. In this case, it is assumed that HPCI will start on high drywell pressure signal and will maintain the reactor vessel water level above LL2. Therefore, the RCIC system will not be called upon to start. In the case of a loss of the Division I batteries which feeds the HPCI system, the HPCI System flow will maintain the reactor vessel water level between LL2 and "High Level" (Reference 2.55).
* HPCI and RCIC pumps are assumed to start and secure once during the first minute and then run continuously which is a more conservative loading than system cycling.
HPCI and RCIC pumps are assumed to start and secure once during the first minute and then run continuously which is a more conservative loading than system cycling.
Therefore, no system cycling is considered. For a conservative analysis (i.e., maximum number of DC MOV motor starts), both systems' MOVs are assumed to start and shutdown due to low steam pressure during the first minute.
Therefore, no system cycling is considered. For a conservative analysis (i.e., maximum number of DC MOV motor starts), both systems' MOVs are assumed to start and shutdown due to low steam pressure during the first minute.  


Calculation BNP-E-6.120 Revision 10 Page9 For additional conservatism, and to minimize the need for separate databases, only one LOCA/LOOP analysis will be performed which envelopes both the small break LOCA and the large break LOCA scenarios.
Calculation BNP-E-6.120 Revision 10 Page9 For additional conservatism, and to minimize the need for separate databases, only one LOCA/LOOP analysis will be performed which envelopes both the small break LOCA and the large break LOCA scenarios.
3.2.1.2 This calculation is based on the analyzed DBE occurring on one (1) Unit only, with the concurrent, orderly shutdown of the other unit. Only the loads associated with these events, or those that could be transferred from the opposite unit (loads which have an alternate power source from the other unit), are applied to the batteries of the DBE unit.
3.2.1.2 This calculation is based on the analyzed DBE occurring on one (1) Unit only, with the concurrent, orderly shutdown of the other unit.
Only the loads associated with these events, or those that could be transferred from the opposite unit (loads which have an alternate power source from the other unit), are applied to the batteries of the DBE unit.
3.2.1.3 For conservatism, all loads on the non-DBE unit which have alternate power supplies from the DBE unit batteries are assumed to be powered by the DBE unit batteries (Reference subsection 3.2.1.4 for the application of this assumption to the plant Uninterruptible Power Supplies and Lighting and Communication Inverters).
3.2.1.3 For conservatism, all loads on the non-DBE unit which have alternate power supplies from the DBE unit batteries are assumed to be powered by the DBE unit batteries (Reference subsection 3.2.1.4 for the application of this assumption to the plant Uninterruptible Power Supplies and Lighting and Communication Inverters).
3.2.1.4 The plant vital power Uninterruptible Power Supply (UPS) distribution panels are normally aligned to the Primary Power Conversion Unit 1(2)A, which is fed from the Division I Emergency AC power supply, and backed-up by Division I batteries 1(2)A-1 and 1(2)A-2.
3.2.1.4 The plant vital power Uninterruptible Power Supply (UPS) distribution panels are normally aligned to the Primary Power Conversion Unit 1 (2)A, which is fed from the Division I Emergency AC power supply, and backed-up by Division I batteries 1(2)A-1 and 1(2)A-2.
If the primary unit fails, the standby unit can be manually placed in service (Reference 2.14 and 2.21 ). The Standby Power Conversion Unit 1(2)B is aligned to the Division II batteries 1(2)B-1and1(2)B-2 (Reference 2.14 and 2.21).
If the primary unit fails, the standby unit can be manually placed in service (Reference 2.14 and 2.21 ). The Standby Power Conversion Unit 1 (2)B is aligned to the Division II batteries 1(2)B-1and1(2)B-2 (Reference 2.14 and 2.21).
When determining the first minute LOCA/LOOP loading for the Division I and II batteries, the Primary Power Conversion Unit 1A is assumed to be fed from the Division I batteries; however, Tech Spec 3.8.7.2 requires verification that no combination of more than two (2) power conversion modules (consisting of either two (2) lighting inverters or one (1) lighting inverter and one (1) plant UPS unit) are aligned to Division II bus B. Based on this criteria, the two (2) Lighting and Communications Inverters represent the greatest load of any two (2) inverters and are lined up to the Division II bus B batteries. In accordance with Reference 2.2, Section 3.8.7.2, Division II shall be determined to be operable at least once per seven (7) days.
When determining the first minute LOCA/LOOP loading for the Division I and II batteries, the Primary Power Conversion Unit 1A is assumed to be fed from the Division I batteries; however, Tech Spec 3.8.7.2 requires verification that no combination of more than two (2) power conversion modules (consisting of either two (2) lighting inverters or one (1) lighting inverter and one (1) plant UPS unit) are aligned to Division II bus B.
Based on this criteria, the two (2) Lighting and Communications Inverters represent the greatest load of any two (2) inverters and are lined up to the Division II bus B batteries. In accordance with Reference 2.2, Section 3.8.7.2, Division II shall be determined to be operable at least once per seven (7) days.
3.2.1.5 This analysis is based on a complete failure or unavailability of one (1) DC Division. All loads that could be transferred from the failed division to the division under review are assumed to be transferred.
3.2.1.5 This analysis is based on a complete failure or unavailability of one (1) DC Division. All loads that could be transferred from the failed division to the division under review are assumed to be transferred.
3.2.1 .6 In accordance with Reference 2.3, "if a discrete sequence of momentary loads occurring within the same one (1) minute period can be established, the load for the one (1) minute period shall be assumed to be the maximum current at any instant". This analysis credits the discrete operation of momentary loads within the first minute LOCA/LOOP profile.
3.2.1.6 In accordance with Reference 2.3, "if a discrete sequence of momentary loads occurring within the same one (1) minute period can be established, the load for the one (1) minute period shall be assumed to be the maximum current at any instant". This analysis credits the discrete operation of momentary loads within the first minute LOCA/LOOP profile.
3.2.1. 7 No manual power circuit breaker or motor-operated disconnect switch operations are assumed to occur in the switchyard due to the LOOP or within the first sixty (60) seconds of the DBE. There are no undervoltage relaying schemes which would cause multiple power circuit breakers to trip due to loss of voltage in the switchyard. Tripping of multiple power circuit breakers could occur either by over-current conditions or if one of the Unit breakers feeding the main transformers has a failure to trip. However, this will not affect the battery load profile since the battery chargers would still have ac power until the last of the power circuit breakers has tripped . Additionally, if the power circuit breakers were to
3.2.1. 7 No manual power circuit breaker or motor-operated disconnect switch operations are assumed to occur in the switchyard due to the LOOP or within the first sixty (60) seconds of the DBE. There are no undervoltage relaying schemes which would cause multiple power circuit breakers to trip due to loss of voltage in the switchyard. Tripping of multiple power circuit breakers could occur either by over-current conditions or if one of the Unit breakers feeding the main transformers has a failure to trip. However, this will not affect the battery load profile since the battery chargers would still have ac power until the last of the power circuit breakers has tripped. Additionally, if the power circuit breakers were to  


Calculation BNP-E-6.120 Revision 10 Page 10 trip, there would not be any additional load drawn from the batteries in the form of spring charging motors. Therefore, only the normal, continuous loading associated with this equipment is considered in the load profile.
Calculation BNP-E-6.120 Revision 10 Page 10 trip, there would not be any additional load drawn from the batteries in the form of spring charging motors.
Therefore, only the normal, continuous loading associated with this equipment is considered in the load profile.
3.2.1.8 The circuit breakers for motor loads powered from 4 kV Buses C and D trip on undervoltage detection via the actuation of relay 27/59S (and 27X, 27Y) at 5-6 sec following a LOOP. The same breakers are also equipped with LOCA load shed (LLS) and unit trip load shed (UTLS) circuitry that, when enabled, will trip selected 4 kV motor loads upon receipt of a LOCA signal or a unit trip signal. Keyed selector switches are installed on the affected breaker cubicle doors to enable or disable the LLS and/or UTLS feature for each specific load, based on the Eastern Transmission Area grid loading and voltage conditions. Breakers whose UTLS feature is enabled will trip at t=O (i.e., prior to the 5-6 sec undervoltage detection). Breakers whose LLS feature is enabled will trip when the LOCA signal is generated (LL3). For maximum coincident battery loading, 4kV bus C and D load shedding is assumed to occur at t=5 sec (see Table 3-12).
3.2.1.8 The circuit breakers for motor loads powered from 4 kV Buses C and D trip on undervoltage detection via the actuation of relay 27/59S (and 27X, 27Y) at 5-6 sec following a LOOP. The same breakers are also equipped with LOCA load shed (LLS) and unit trip load shed (UTLS) circuitry that, when enabled, will trip selected 4 kV motor loads upon receipt of a LOCA signal or a unit trip signal. Keyed selector switches are installed on the affected breaker cubicle doors to enable or disable the LLS and/or UTLS feature for each specific load, based on the Eastern Transmission Area grid loading and voltage conditions. Breakers whose UTLS feature is enabled will trip at t=O (i.e., prior to the 5-6 sec undervoltage detection). Breakers whose LLS feature is enabled will trip when the LOCA signal is generated (LL3). For maximum coincident battery loading, 4kV bus C and D load shedding is assumed to occur at t=5 sec (see Table 3-12).
3.2.1.9 Per Attachment 2 of Reference 2.34, during a design basis LOCA event, reactor vessel Low Level 2 (LL2) and Low Level 3 (LL3) can be reached as early as 1.8 sec and 4.5 sec respectively.
3.2.1.9 Per Attachment 2 of Reference 2.34, during a design basis LOCA event, reactor vessel Low Level 2 (LL2) and Low Level 3 (LL3) can be reached as early as 1.8 sec and 4.5 sec respectively.
3.2.1.10 Per Reference 2.33, during a design basis LOCA event, drywell pressure rises to the "high" setpoint level almost instantaneously (<< 1 sec).
3.2.1.10 Per Reference 2.33, during a design basis LOCA event, drywell pressure rises to the "high" setpoint level almost instantaneously (<< 1 sec).
3.2.1.11 4160V breakers typically trip within three (3) - five (5) cycles. (Ref 2.49). Six (6) cycles is assumed for conservatism. Since dcPRO 3.0 analyzes in one (1) second intervals, the energy dissipated by a trip coil is assumed to be 10% (6 cycles I 60 cycles) of rated amperage over a one (1) second interval. The breakers are not assumed to trip simultaneously but dispersed (normal distribution) within a one (1) second interval.
3.2.1.11 4160V breakers typically trip within three (3) - five (5) cycles. (Ref 2.49). Six (6) cycles is assumed for conservatism. Since dcPRO 3.0 analyzes in one (1) second intervals, the energy dissipated by a trip coil is assumed to be 10% (6 cycles I 60 cycles) of rated amperage over a one (1) second interval.
The breakers are not assumed to trip simultaneously but dispersed (normal distribution) within a one (1) second interval.
Therefore, the cumulative effect is 10% of each individual contributing item.
Therefore, the cumulative effect is 10% of each individual contributing item.
3.2.1.12 4160V breaker spring charging motors have an inrush of 6 to 8 times normal operating current (1 OA) (Ref. 2.50). This inrush has been measured from testing to be 60A for 0.050 seconds in duration (peak at 0.025 second) (Attachment R). The current lowers to 20A, rises to 25A within 0.50 seconds and lowers to 1OA for the remainder of the operation. The entire cycle is 1.6 seconds. The published value from ITE for the Type HK medium voltage circuit breakers is two (2) seconds for spring charging time. The energy dissipated over the first second as noted in Attachment R is 12.9 A-s. The energy dissipated over the remaining 0.6 seconds is 6 A-s. Breakers are not assumed to close and recharge sim.ultaneously but dispersed within a one (1) second interyal. A total of two (2) seconds per closing operation is used based on vendor information and testing noted in Attachment R. An additional 20% is added to the energy dissipated for conservatism.
3.2.1.12 4160V breaker spring charging motors have an inrush of 6 to 8 times normal operating current (1 OA) (Ref. 2.50). This inrush has been measured from testing to be 60A for 0.050 seconds in duration (peak at 0.025 second) (Attachment R). The current lowers to 20A, rises to 25A within 0.50 seconds and lowers to 1 OA for the remainder of the operation. The entire cycle is 1.6 seconds. The published value from ITE for the Type HK medium voltage circuit breakers is two (2) seconds for spring charging time. The energy dissipated over the first second as noted in Attachment R is 12.9 A-s.
The energy dissipated over the remaining 0.6 seconds is 6 A-s. Breakers are not assumed to close and recharge sim.ultaneously but dispersed within a one (1) second interyal. A total of two (2) seconds per closing operation is used based on vendor information and testing noted in Attachment R. An additional 20% is added to the energy dissipated for conservatism.
The first second of operation to the batteries is calculated at 15.4 A-s and the remainder of operation (over the 2"d second) is 7.2 A-s. Spring charging motor required voltage range is 95-125 Vdc (ref 2.74). This is below the battery Vmin of 107 Vdc.
The first second of operation to the batteries is calculated at 15.4 A-s and the remainder of operation (over the 2"d second) is 7.2 A-s. Spring charging motor required voltage range is 95-125 Vdc (ref 2.74). This is below the battery Vmin of 107 Vdc.
3.2.1.13 The DG field flash is modeled based on testing that was performed 07 /22/03 and evaluation conducted 10/24/13. The data and evaluation are in Attachment M. Testing
3.2.1.13 The DG field flash is modeled based on testing that was performed 07 /22/03 and evaluation conducted 10/24/13. The data and evaluation are in Attachment M. Testing  


Calculation BNP-E-6.120 Revision 10 Page 11 indicated the DG field flash can take up to five (5) seconds (modeled 5 to 10 seconds);
Calculation BNP-E-6.120 Revision 10 Page 11 indicated the DG field flash can take up to five (5) seconds (modeled 5 to 10 seconds);
Line 329: Line 497:
3.2.1.15 The RFPT EOP inrush time is assumed no greater than two (2) second. From Ref 2.67, the motor is rated at 7.5Hp, 230V, 85% efficiency with a bHp of 6.5Hp (normal operating current of 24.8A). The inrush is estimated at 2.67
3.2.1.15 The RFPT EOP inrush time is assumed no greater than two (2) second. From Ref 2.67, the motor is rated at 7.5Hp, 230V, 85% efficiency with a bHp of 6.5Hp (normal operating current of 24.8A). The inrush is estimated at 2.67
* FLA which is based on data from Ref 2.28.
* FLA which is based on data from Ref 2.28.
3.2.1.16 NCR 630621 identified that BNP was crediting voltages in excess of what was verified during battery capacity performance testing. EC 94834 and EC 95835 determined that based on the maximum instantaneous demand of approximately 700 A minimum a voltage of 107Vdc could occur at minimum battery temperatures and at the end of battery life. Therefore, the battery voltages for the LOCA/LOOP analyses were set at 107Vdc for both Unit 1 and 2. This has been corrected and IEEE 485 methodology is used for analysis. Battery voltages are no longer set at 107Vde*
3.2.1.16 NCR 630621 identified that BNP was crediting voltages in excess of what was verified during battery capacity performance testing. EC 94834 and EC 95835 determined that based on the maximum instantaneous demand of approximately 700 A minimum a voltage of 107Vdc could occur at minimum battery temperatures and at the end of battery life. Therefore, the battery voltages for the LOCA/LOOP analyses were set at 107Vdc for both Unit 1 and 2.
This has been corrected and IEEE 485 methodology is used for analysis. Battery voltages are no longer set at 107V de*
For the purposes of the LOCNLOOP evaluation, the GNB type batteries are noted as"CON 17", in 'Nhich the output of the battery is fixed at 1.783 Vpc (107Vdc). CON 17 is a dummy battery cell used with the dcPRO software to simulate the results of the battery discharge test. It is composed of 17 plates (same number of plates as the actual NCN 17cell) *.*1hose characteristics have been set to yield a constant output voltage of 1.783V(107V) battery terminal 1Joltage) irrespecti1Je of the battery load during the one minute LOCNLOOP duty cycle. This v1as done to match the minimum battery voltage recorded during the first minute of the battery capacity discharge test.
For the purposes of the LOCNLOOP evaluation, the GNB type batteries are noted as"CON 17", in 'Nhich the output of the battery is fixed at 1.783 Vpc (107Vdc). CON 17 is a dummy battery cell used with the dcPRO software to simulate the results of the battery discharge test. It is composed of 17 plates (same number of plates as the actual NCN 17cell) *.*1hose characteristics have been set to yield a constant output voltage of 1.783V(107V) battery terminal 1Joltage) irrespecti1Je of the battery load during the one minute LOCNLOOP duty cycle. This v1as done to match the minimum battery voltage recorded during the first minute of the battery capacity discharge test.
3.2.2   Battery Loading for Station Blackout 3.2.2.1 In ac~ordance with Reference 2.23, the BNP SBO coping dwation is 4 hours. However, in order to service the loads required for coping, for this period of time, the station batteries will require charger support. To accomplish this, the normally open crosstie from the non-blacked out unit will be closed within one (1) hour following the inception of the event, restoring the blacked out unit's battery chargers, thereby extending the capacity of the batteries. Consequently, this analysis established a one (1) hour SBO load profile for each of the 125/250V batteries.
3.2.2 Battery Loading for Station Blackout 3.2.2.1 In ac~ordance with Reference 2.23, the BNP SBO coping dwation is 4 hours. However, in order to service the loads required for coping, for this period of time, the station batteries will require charger support. To accomplish this, the normally open crosstie from the non-blacked out unit will be closed within one (1) hour following the inception of the event, restoring the blacked out unit's battery chargers, thereby extending the capacity of the batteries. Consequently, this analysis established a one (1) hour SBO load profile for each of the 125/250V batteries.
3.2.2.2 With the exception of HPCl/RCIC isolation valve closures that occur due to insufficient steam supply pressure, all SBO unit specific LOCA loads considered to be energized in the LOCA/LOOP scenario are also considered to be energized for the SBO event.
3.2.2.2 With the exception of HPCl/RCIC isolation valve closures that occur due to insufficient steam supply pressure, all SBO unit specific LOCA loads considered to be energized in the LOCA/LOOP scenario are also considered to be energized for the SBO event.
Additionally, loads in the LOCA/LOOP scenario that transferred to the AC source at 10 sec upon the successful starting of the Emergency Diesel Generators, including the UPS
Additionally, loads in the LOCA/LOOP scenario that transferred to the AC source at 10 sec upon the successful starting of the Emergency Diesel Generators, including the UPS  


Calculation BNP-E-6.120 DUKB SNERGY Revision 10 BRUNSNICK MJCL1!llR PLANT UNITS l & 2                                                                                                                                             Attachment D 125/250 VDC DISTRIBUTION SYSTEM STUDY                                                                                                                                           Page 121 of 322 SOFTtiARB USED: dcPRO 3. 0 BY CTA VOLTAGE/ LOAD FLOW CALCULATION REPORT CONDITION l: LOCA WI771 LOOP (CONTINUEDJ
DUKB SNERGY BRUNSNICK MJCL1!llR PLANT UNITS l  
& 2 125/250 VDC DISTRIBUTION SYSTEM STUDY SOFTtiARB USED: dcPRO 3. 0 BY CTA VOLTAGE/ LOAD FLOW CALCULATION REPORT CONDITION l: LOCA WI771 LOOP (CONTINUEDJ Calculation BNP-E-6.120 Revision 10 Attachment D Page 121 of 322
*******a**********D*********=***=********************=***==***=**=***=*************=****=*=***=*******=*=*=============*====~=*=a*sa~a=:uaa=====***=3*=*=**=
*******a**********D*********=***=********************=***==***=**=***=*************=****=*=***=*******=*=*=============*====~=*=a*sa~a=:uaa=====***=3*=*=**=
BUS:   (#41 BA'.ITBRY JB-2       (CONTINUlWJ                                     INITIAL BATTERY STATE: FULLY CHARGHD                                                     DUTY CYCLE TIHE:     5:00:00 BATTERY MANUFACTURER: GNB                                   CBLL TYPE: NCN-11                               POSTl'IVE PLATES:      8                    NUMBER OF CBLLS:        60 MINIMUM ELECTROLYTE TEMPERATURE:           60. 0&deg;F         TEMP CORRECTION FACTOR: l.llO                   AGE CORRECTION FACTOR: l.250
BUS: (#41 BA'.ITBRY JB-2 (CONTINUlWJ INITIAL BATTERY STATE: FULLY CHARGHD DUTY CYCLE TIHE:
*a* SBGHBNT ****                                 SBt:HJINr S2'ART *******************              ********=*=**************          SEGHEN'l' END **************************            Ct!Nl1LATI'Vli BATTERY      TEMP/AGE      AMPS      AMP-HRS    CELL      BATTBRY        BATTERY    TEMP/ AGE      AHPS    NIP*HRS    CVHULATIVE    CELL      BA2TERY    AHP*ROURS FR<>>I       TO           AMPS      CORR AMPS    PER PP    PER PP      VOLTS      VOLTS            AMPS      CORR AMPS    PER PP    PER PP    AHP*HRS/PP      VOLT.S      VOLTS      DISCHAllGEJ
5:00:00 BATTERY MANUFACTURER: GNB CBLL TYPE: NCN-11 MINIMUM ELECTROLYTE TEMPERATURE:
: 60. 0&deg;F TEMP CORRECTION FACTOR: l.llO  
*a* SBGHBNT ****
FR<>>I TO  
***=a**
***=a**
2150:00 2:55100 m:sm:m**=
2150:00 2:55:00 3:00:00 3:05:00 3:10:00 3:15:00 3:20:00 3:25100 3:30:00 3:35:00 3:40:00 3t45:00 3150:00 3:55:00 4:00:00 4:05:00 4il0:00 4:15:00 4:20:00 4:25:00 4:30:00 4:35:00 4:40:00 4:45:00 4:50100 4:55:00 2:55100 3:00:00 3:05:00 3:10:00 3:15:00 3:20:00 3:25:00 3130:00 3:35100 3:40:00 3:45:00 3t50100 3:55:00 4:00:00 4:05:00 4:10:00 4:15:00 4:20:00 4:25:00 4:30:00 4:35:00 4140:00 4:45:00 4:50:00 4155:00 5:00:00 BATTERY AMPS m:sm:m**=
123.88 a****=*=*
123.88 123. 93 123.97 124.03 124.08 124.l.J 124.20 124.21 124.35 124.43 124.53 124. 63 124. 75 124.81
171.88      21.48 aacaamm 6l,65
-105. 75
                                                                          **===*
*105. 13
l.936
-105. 71
                                                                                    *sr*****
-105.69
ll6.l
-105. 67
                                                                                                    ***1111*11 123.93
-105.65
                                                                                                                ========= ==***= *==*=*=
*105.63
l7l.95      21.49        l. 79
-105.62
                                                                                                                                                    ======a=i:n:
-105.60
63.44
-105.58
                                                                                                                                                                    =*=*1:1*
-105.57
l.934
*105.55 TEMP/AGE CORR AMPS a****=*=*
                                                                                                                                                                              -.aa**a*
171.88 171.95 172.02 172. 09 172.16 172.24 172.JJ 112.42 172.53 172. 65 172. 78 l72.9J 113.09 173.26
116.l 0*11*a****n 507.51 2:55:00   3:00:00         123. 93      171.95      21.49      63.44      l.934    116.l            l2J.97      172. 02      21.50        l.79        65.23      .l.933    116.0          521. 84 3:00:00   3:05:00         123.97        172.02      21.50      65.23      l.933    ll6.0            124.03      172 . 09    21.51        l.79        61.02      l.932      llS.9          536.11 3:05:00   3:10:00         124.03        172. 09    2l.5l      61.02      l.932    115.9            124.08      172.16      21.52        l. 79      68.Bl      l . .930  llS.8          550.52 3:10:00   3:15:00         124.08        172.16      21.52      68.Bl      l.930    115,8            124.lJ      172.24      2l.5J        1.79        70.61      1.929      115.'          564.87 3:15:00   3:20:00         124.l.J      172.24      21.53      70.61    l.929    115. 7          .124.20     l72.JJ      21.54        1.79        12.40      l.927      115.6          579.22 3:20:00    3:25:00        124.20        172.JJ      21.54      12.40      l.927    llS.6            124 . 27    172.42      21.55        1.80        14.20      l.925      ll5.5          593.59 3:25100    3130:00        124.21        112.42      21,5s      14.20      l.925    ll5.5            124,JS      172.SJ      21.57        1.80        16.00      l,923      ll5.4          607.96 3:30:00    3:35100        124.35        172.53      21.57      16.00      l.923    llS.4            l24.43      172.65      21,5B        1.80        '17. 19    l.92l      115.3          622.34 3:35:00    3:40:00        124.43        172. 65    2l.58      77.79      l.921    115.3            124.53       172. 78      2.l.60       1.80        19.59      1.919      ll5.l          636. 14 3:40:00    3:45:00        124.53        172. 78    21.60      19.59      l.919    115.l            124. 63      172.93      21.62        l.80        BJ.39      l.91'1    ll5.0          65l.l4 3t45:00   3t50100        124 . 63      l72.9J      2l.62      81.39     l.917    115.0            124. 75      113.09      21.64       l.80        BJ.Jg      l.914      114.9          665.56 3150:00    3:55:00        124. 75      113.09      21.64      83.19      l. 914    114 . 9          l24.87      .113.26      21 . 66      l.80        85.00      1.912      114.7          619.99 3:55:00    4:00:00        124.81        173.26      21.66      85.00      l.912    ll4.'            125.00      113.44      21.68        1.81        86.80      1.909      ll4.6          694.44 4:00:00    4:05:00      -105. 75      *146. 73  -18.34      86.80      l.987    119.2          *105. 73    -146. 70    *18. 34      -l.53        86.08      J.981      ll9.2           688.66 4:05:00    4:10:00      *105. 13      -146. 70  *18.34      86.08      l.1187    119.2          *105. 71    - 146.67    *18.JJ      *l.SJ        85.36      1.988      ll9.3          682.89 4il0:00    4:15:00      - 105. 71      -146.61    *l8.JJ      85.36      l.988    119.J
*146. 73
* 105.69    - 146.64    *lB.33      -1.SJ        84.64      l.989      119.J          677.12 4:15:00    4:20:00      -105.69        *146.64    -18.JJ      84.64      l.989    119.3          *105.67      -146. 62    - 18,JJ
-146. 70
* l.SJ        83.92      l.989      ll9.J          671.JS 4:20:00    4:25:00      -105. 67      *146.62    -18 . JJ    83.92      l.989    119.J          *.105.65    -146.59      *l8.J2      *l.SJ        83.20      1.990      119.4          665.58 4:25:00    4:30:00      -105.65       -146.59    -l8.J2      83.20      l.990    119.4          *105.63     *146.57      *l8.J2
-146.61
* l.53        82.48      1.990      ll9.4          659.82 4:30:00    4:35:00      *105.63        -146.51    -18.32      82.48      l.990    ll9.4          *105.62      *146.54      *18.32      -1.SJ         81. 76      1.991      ll9.4          654.05 4:35:00    4140:00      -105.62        -146.54    -18.32      Bl. 76    l.991    ll9.4          *105.60      -146.52     -18.Jl
*146.64
* l.53        Bl.04      1,991      ll9.5          648.28 4:40:00    4:45:00      -105.60        -146.52   -18.Jl      81.04      1.991    119.5          -105.58      -146.49      -18.Jl      -1,53        80.Jl      1.992      119.5          642.52 4:45:00    4:50:00      -105.58        -146.49    -18.Jl      80.Jl      1.992    119.5          *105.57      *146.41      *18.Jl      *l.SJ        19.59      1.992      ll9.5          636. 15 4:50100    4155:00      -105.57        -146.41    -18.Jl       19.59      1.992    ll9.5          *105.55      *146 * .f5  -18. Jl     *l. SJ        18.87      1.992      119.5          630.99 4:55:00    5:00:00      *105.55        *146.45    *l8.Jl      79.87      l.992    119.5          *105.54      *146.43      *IS.JO      *l.53         78.15      l.993      119.6          625.23 Daaa**a*Ga:m:z:i:aasaa*m*2==**Daa**==**=*n:aaaaaa*************c****m**a***=*=aa~~ ** m=aa:maa*:aaaacaco=**aaaaaaaaaeca:a:aaaaaaaaaamaa*a*********~a2*2:*:~*=~***
*146.62
BUS:  {#121 BA7TlfRY lB-2*                                                        PONER SOURCE: BATTERY lB*2
-146.59
*** SEGMENT *=**      SBGHENT START        SEGHEN:r END              **=  SEGMENT  ====    Sf.'GHEBT START      SSXlHENJ' END              c c2 SBGHSJlr  an*
-146.51
* SEGMENT START      SSGHENr END FRCW        TO        AMPS      VOLTS    AMPS    VOLTS              FROM        TO        AMPS      VOLTS    AMPS    VOLTS              FROM        TO        AMPS      VOLTS  AMPS      VOLTS
-146.54
                                                                    ==*1;-m::ra 0:00:00    0:00:01    487.6    109.l     487.6  109.l             0:00:01      0:00:02    487.l      109.l    487.l    109.l            0:00:02    0:00:03      491.5    109.0    491.5    109.0 0:00:03    0:00:04    491.3    109.l     491.3  109 . l           0:00:04      0:00:05    484.6      109.2    484.6   109.2            0:00:05    0:00:06      661.l    105.9    667.l   105.9 0:00:06    0:00:07    517.4    108.6     517.4  108.6            0:00:07      Ot00t08    474. 8    109.3    414.8    109.3            0:00:08    0:00:09      477. 7  109.J    477. 7  109.3 0:00:09    0:00:10    453.0     109.7    453.0  109. 7            0:00:10      O:OO:ll    443.2      109.9    443.2    109.9            O:OO:ll    0:00:12      431.0    llO,O  431.0    llO,O 0:00:12    0:00:.13    436.6    llO. 0    436.6  llO.O            0:00:13      0:00:14    436.2      llO.O    436.2    110.0            0:00:14    0:00:15      436.2    110.0    436.2    l.IO. 0 0:00:15    0:00:16    436.?    110. 0    436.1  110.0            0:00:16      O:OO:l 1    437.l    110.0    437.l    110.0            0: 00:11  0:00:18      436.7    llO.O    436,1    llO.O
-146.52
                                                                                              - 120 -
-146.49
-146.41
*146.45 SBt:HJINr S2'ART *******************
AMPS AMP-HRS CELL PER PP PER PP VOLTS 21.48 21.49 21.50 2l.5l 21.52 21.53 21.54 21,5s 21.57 2l.58 21.60 2l.62 21.64 21.66
-18.34
*18.34
*l8.JJ
-18.JJ
-18. JJ
-l8.J2
-18.32
-18.32
-18.Jl
-18.Jl
-18.Jl
*l8.Jl aacaamm 6l,65 63.44 65.23 61.02 68.Bl 70.61 12.40 14.20 16.00 77.79 19.59 81.39 83.19 85.00 86.80 86.08 85.36 84.64 83.92 83.20 82.48 Bl. 76 81.04 80.Jl 19.59 79.87
**===*
l.936 l.934 l.933 l.932 l.930 l.929 l.927 l.925 l.923 l.921 l.919 l.917
: l. 914 l.912 l.987 l.1187 l.988 l.989 l.989 l.990 l.990 l.991 1.991 1.992 1.992 l.992 BATTBRY VOLTS
*sr*****
ll6.l 116.l ll6.0 115.9 115,8 115. 7 llS.6 ll5.5 llS.4 115.3 115.l 115.0 114. 9 ll4.'
119.2 119.2 119.J 119.3 119.J 119.4 ll9.4 ll9.4 119.5 119.5 ll9.5 119.5 POSTl'IVE PLATES:
8 NUMBER OF CBLLS:
60 AGE CORRECTION FACTOR: l.250
********=*=************** SEGHEN'l' END **************************
BATTERY TEMP/ AGE AMPS CORR AMPS
***1111*11 123.93 l2J.97 124.03 124.08 124.lJ
.124.20 124. 27 124,JS l24.43 124.53 124. 63 124. 75 l24.87 125.00
*105. 73
*105. 71
* 105.69
*105.67
*.105.65  
*105.63  
*105.62
*105.60
-105.58
*105.57
*105.55
*105.54
 
=========
l7l.95 172. 02 172. 09 172.16 172.24 l72.JJ 172.42 172.SJ 172.65 172. 78 172.93 113.09
.113.26 113.44
-146. 70
-146.67
-146.64
-146. 62
-146.59
*146.57
*146.54
-146.52  
-146.49
*146.41
*146 *.f5
*146.43 AHPS NIP*HRS CVHULATIVE PER PP PER PP AHP*HRS/PP
 
==***=
21.49 21.50 21.51 21.52 2l.5J 21.54 21.55 21.57 21,5B 2.l.60 21.62 21.64 21. 66 21.68
*18. 34
*18.JJ
*lB.33
- 18,JJ
*l8.J2
*l8.J2
*18.32
-18.Jl
-18.Jl  
*18.Jl
-18. Jl  
*IS.JO
*==*=*=
: l. 79 l.79 l.79
: l. 79 1.79 1.79 1.80 1.80 1.80 1.80 l.80 l.80 l.80 1.81
-l.53  
*l.SJ
-1.SJ
* l.SJ
*l.SJ
*l.53
-1.SJ
* l.53
-1,53
*l.SJ
*l. SJ
*l.53
 
======a=i:n:
63.44 65.23 61.02 68.Bl 70.61 12.40 14.20 16.00
'17. 19 19.59 BJ.39 BJ.Jg 85.00 86.80 86.08 85.36 84.64 83.92 83.20 82.48
: 81. 76 Bl.04 80.Jl 19.59 18.87 78.15 CELL VOLT.S
=*=*1:1*
l.934
.l.933 l.932 l..930 1.929 l.927 l.925 l,923 l.92l 1.919 l.91'1 l.914 1.912 1.909 J.981 1.988 l.989 l.989 1.990 1.990 1.991 1,991 1.992 1.992 1.992 l.993 BA2TERY VOLTS
-.aa**a*
116.l 116.0 llS.9 llS.8 115.'
115.6 ll5.5 ll5.4 115.3 ll5.l ll5.0 114.9 114.7 ll4.6 ll9.2 ll9.3 119.J ll9.J 119.4 ll9.4 ll9.4 ll9.5 119.5 ll9.5 119.5 119.6 Ct!Nl1LATI'Vli AHP*ROURS DISCHAllGEJ 0*11*a****n 507.51 521. 84 536.11 550.52 564.87 579.22 593.59 607.96 622.34 636. 14 65l.l4 665.56 619.99 694.44 688.66 682.89 677.12 671.JS 665.58 659.82 654.05 648.28 642.52 636. 15 630.99 625.23 Daaa**a*Ga:m:z:i:aasaa*m*2==**Daa**==**=*n:aaaaaa*************c****m**a***=*=aa~~ ** m=aa:maa*:aaaacaco=**aaaaaaaaaeca:a:aaaaaaaaaamaa*a*********~a2*2:*:~*=~***
BUS: {#121 BA7TlfRY lB-2*
*** SEGMENT *=**
FRCW TO 0:00:00 0:00:03 0:00:06 0:00:09 0:00:12 0:00:15 0:00:01 0:00:04 0:00:07 0:00:10 0:00:.13 0:00:16 SBGHENT START AMPS VOLTS 487.6 491.3 517.4 453.0 436.6 436.?
109.l 109.l 108.6 109.7 llO. 0 110. 0 SEGHEN:r END AMPS 487.6 491.3 517.4 453.0 436.6 436.1 VOLTS 109.l 109. l 108.6 109. 7 llO.O 110.0 PONER SOURCE: BATTERY lB*2
**= SEGMENT====
FROM TO
 
==*1;-m::ra 0:00:01 0:00:04 0:00:07 0:00:10 0:00:13 0:00:16 0:00:02 0:00:05 Ot00t08 O:OO:ll 0:00:14 O:OO:l 1 Sf.'GHEBT START AMPS VOLTS 487.l 484.6 474. 8 443.2 436.2 437.l
- 120 -
109.l 109.2 109.3 109.9 llO.O 110.0 SSXlHENJ' END AMPS VOLTS 487.l 484.6 414.8 443.2 436.2 437.l 109.l 109.2 109.3 109.9 110.0 110.0 c c2 SBGHSJlr an**
FROM TO 0:00:02 0:00:05 0:00:08 O:OO:ll 0:00:14 0: 00:11 0:00:03 0:00:06 0:00:09 0:00:12 0:00:15 0:00:18 SEGMENT START AMPS VOLTS 491.5 661.l 477. 7 431.0 436.2 436.7 109.0 105.9 109.J llO,O 110.0 llO.O SSGHENr END AMPS VOLTS 491.5 667.l 477. 7 431.0 436.2 436,1 109.0 105.9 109.3 llO,O l.IO. 0 llO.O  


Calculation BNP-E-6.120 Revision 10 Attachment G Page 1 ATTACHMENT G BATTERY DISCHARGE STATE AND CHARGER LOAD FOR NORMAL, POST-LOCA/LOOP AND POST-SBO OPERATION (FOR BATTERY CHARGER SIZE VERIFICATION)
ATTACHMENT G Calculation BNP-E-6.120 Revision 10 Attachment G Page 1 BATTERY DISCHARGE STATE AND CHARGER LOAD FOR NORMAL, POST-LOCA/LOOP AND POST-SBO OPERATION (FOR BATTERY CHARGER SIZE VERIFICATION)
EVALUATION OF BATTERY VOLTAG ES AFTER RESTORATION OF BATTERY CHARGERS
EVALUATION OF BATTERY VOL TAG ES AFTER RESTORATION OF BATTERY CHARGERS  


Calculation BNP-E-6.120 Revision 10 Attachment G Page2 This attachment provides a summary of the battery discharged ampere-hours for the LOCA w/LOOP and the SBO scenarios, as well as the battery charger loading during normal operation, post LOCA/LOOP duty cycle operation and post SBO duty cycle operation. This data is used by calculation BNP-E-6.079 for sizing the battery chargers. Refer to section 3.3.2 of base calculation for additional discussion on post duty cycle operation of equipment.
Calculation BNP-E-6.120 Revision 10 Attachment G Page2 This attachment provides a summary of the battery discharged ampere-hours for the LOCA w/LOOP and the SBO scenarios, as well as the battery charger loading during normal operation, post LOCA/LOOP duty cycle operation and post SBO duty cycle operation. This data is used by calculation BNP-E-6.079 for sizing the battery chargers. Refer to section 3.3.2 of base calculation for additional discussion on post duty cycle operation of equipment.
It should be noted that calculation BNP-E-6.079 corrects the battery discharged ampere-hours for aging (factor of 1.25) and minimum electrolyte temperature (factor of 1.11 for 60&deg;F).
It should be noted that calculation BNP-E-6.079 corrects the battery discharged ampere-hours for aging (factor of 1.25) and minimum electrolyte temperature (factor of 1.11 for 60&deg;F).
Attachment D of this calculation provides the battery discharged ampere-hours for the LOCA/LOOP and the SBO events also corrected for aging and temperature. To avoid double correction of the discharged ampere-hours, Table 1 below establishes the uncorrected ampere-hours from the corrected ampere-hours found in Attachment D.
Attachment D of this calculation provides the battery discharged ampere-hours for the LOCA/LOOP and the SBO events also corrected for aging and temperature. To avoid double correction of the discharged ampere-hours, Table 1 below establishes the uncorrected ampere-hours from the corrected ampere-hours found in Attachment D.
TABLE 1 BATTERY DISCHARGED AMPERE-HOURS DISCHARGED AMPERE-HOURS                       DISCHARGED AMPERE-HOURS 125V Corrected for Aging                         Not Corrected for Aging BATTERY and Electrolyte Temperature                   and Electrolyte Temperature LOCA/LOOP         LOCA/LOOP         SBO       LOCA/LOOP       LOCA/LOOP           SBO (Att. D)         (Att. D)     (Att. D)     (Att. D)         (Att. D)         (Att. D) at 60 Sec       at 4 hours*   at 60 Min)     at60 Sec       at 4 hours       at 60 Min) 1A-1           8.05             0         335.49         5.80               0           241 .79 1A-2           7.31             0         262.61         5.27               0           189.27 1B-1           9.91           511 .22       441.10         7.14           368.45           317.91 1B-2           10.32           688.66       522.41         7.44           496.33           376.51 2A-1           8.50           31.83       360.51         6.13             22.94           259.83 2A-2           7.32             0         256.26         5.28             0.00           184.69 2B-1           9.98           524.36       466.39         7.19           377.92           336.14 2B-2           9.85           610.12       500.40         7.10           439.73           360.65 Note: Uncorrected Ampere-Hours       =Corrected Ampere-Hours + (1.25 x 1.11)
TABLE 1 BATTERY DISCHARGED AMPERE-HOURS DISCHARGED AMPERE-HOURS DISCHARGED AMPERE-HOURS 125V Corrected for Aging Not Corrected for Aging BATTERY and Electrolyte Temperature and Electrolyte Temperature LOCA/LOOP LOCA/LOOP SBO LOCA/LOOP LOCA/LOOP SBO (Att. D)
* Those batteries with zero amp-hours are effectively recharged by the battery charger during operation.
(Att. D)
(Att. D)
(Att. D)
(Att. D)
(Att. D) at 60 Sec at 4 hours*
at 60 Min) at60 Sec at 4 hours at 60 Min) 1A-1 8.05 0
335.49 5.80 0
241.79 1A-2 7.31 0
262.61 5.27 0
189.27 1B-1 9.91 511.22 441.10 7.14 368.45 317.91 1B-2 10.32 688.66 522.41 7.44 496.33 376.51 2A-1 8.50 31.83 360.51 6.13 22.94 259.83 2A-2 7.32 0
256.26 5.28 0.00 184.69 2B-1 9.98 524.36 466.39 7.19 377.92 336.14 2B-2 9.85 610.12 500.40 7.10 439.73 360.65 Note: Uncorrected Ampere-Hours = Corrected Ampere-Hours + (1.25 x 1.11)
* Those batteries with zero amp-hours are effectively recharged by the battery charger during operation.  


Calculation BNP-E-6.120 Revision 10 Attachment G Page3 TABLE 2 BATTERY CHARGER LOADING (AMPERES NORMAL POST OPERATION                                 POST SBO BATTERY                                   LOCA/LOOP (max allowable                          (from Att. B2 at CHARGER                                (from Att. B1) (> 4 voltage) (from Att.                            61 min) hrs)
TABLE 2 BATTERY CHARGER LOADING (AMPERES NORMAL POST OPERATION BATTERY (max allowable LOCA/LOOP CHARGER voltage) (from Att.
B1 DC 52) 1A-1                   96.00               287.78               158.74 1A-2                   44.70               238.36               103.91 1B-1                   77.60               163.57               124.11 1B-2                   99.50               198.06               163.13 2A-1                   95.60               304.73*             147.61 2A-2                   41 .80             235.68               89.49 2B-1                   80.60               164.16               134.40 28-2                   99.30               180.05               151 .27
(from Att. B1) (> 4 B1 DC 52) hrs) 1A-1 96.00 287.78 1A-2 44.70 238.36 1B-1 77.60 163.57 1B-2 99.50 198.06 2A-1 95.60 304.73*
2A-2 41.80 235.68 2B-1 80.60 164.16 28-2 99.30 180.05 Calculation BNP-E-6.120 Revision 10 Attachment G Page3 POST SBO (from Att. B2 at 61 min) 158.74 103.91 124.11 163.13 147.61 89.49 134.40 151.27
* Loading exceeds battery charger rating; therefore, battery charger remains fully loaded after four (4) hours and battery continues to deplete unless load is removed.
* Loading exceeds battery charger rating; therefore, battery charger remains fully loaded after four (4) hours and battery continues to deplete unless load is removed.
The battery charger loading in Table 2 for normal operation is obtained from the charger load tabulation found in Attachment 81 (pg 51). It is based on a system voltage of 140 VDC, which is the charger equalize voltage. Per the mentioned tabulation, this load is primarily from resistive type devices (as compared with constant power devices). Therefore, correction of this load to the maximum system voltage is conservative. The Post LOCA/LOOP is found in 1 and Post 880 in Attachment 82. From this information all battery charger loads are less than 300A with the exception of battery 2A-1.
The battery charger loading in Table 2 for normal operation is obtained from the charger load tabulation found in Attachment 81 (pg 51). It is based on a system voltage of 140 VDC, which is the charger equalize voltage.
Refer to BNP-E-6.079 for analysis of the battery chargers.
Per the mentioned tabulation, this load is primarily from resistive type devices (as compared with constant power devices). Therefore, correction of this load to the maximum system voltage is conservative.
The Post LOCA/LOOP is found in 1 and Post 880 in Attachment 82. From this information all battery charger loads are less than 300A with the exception of battery 2A-1.
Refer to BNP-E-6.079 for analysis of the battery chargers.  


BNP E-6.120 Revision 0 Attachment H Page 1 ATTACHMENT H GNB BATTERY DISCHARGE CHARACTERISTICS
ATTACHMENT H GNB BATTERY DISCHARGE CHARACTERISTICS BNP E-6.120 Revision 0 Attachment H Page 1  


aNP--6. 12..0 fl.i::v'1 s,"'"'
NUCLEAR CLASS 1 E BAfTERIES TYPE NANt -
ATTltl..HMeNT H
LEAD ANTIMONY TYPE NCNt -
                                                                                                                                            &#xa2; NUCLEAR CLASS 1 E BAfTERIES                                                                                          PAC,E 2                     :;,ect1on 35.40 TYPE NANt - LEAD ANTIMONY TYPE NCNt - LEAD CALCIUM CAPACITIES - 550 A.H. to 2550 A.H.
LEAD CALCIUM CAPACITIES -
@ 8 HOUR RATE TO 1.75 V.P.C. AVERAGE 20 VEAR LIFE EXPECTANCY SPECIFICATIONS
550 A.H. to 2550 A.H.
*Jar- Styrene-Acrylonitrile (SAN) Plastic
aNP--6. 12..0 fl.i::v'1 s,"'"' &#xa2; ATTltl..HMeNT H PAC,E 2
*Cover - Acrylonitrite Butadiene Styrene (ABS) Plastic Separators - Microporous Material                                                                           H Retainers - Fiberglass Mats Posts - NAN/NCN 7*17 two-1.5" (38.1 mm) square NAN/NCN 19-27 four-1.0" (25.4 mm) square NAN/NCN 29-35 four-1.5" (38.1 mm) square Post Seals - Floating "O" Ring - Seal Nut Vents - GNB "Pre-Vent" Flame Arrester Level Lines - High and Low - All Jar Faces Electrolyte~ Height above plates - 2.75" (69.9 mm)
:;,ect1on 35.40  
Electrolyte Withdrawal Tubes - 2 per cell Sediment Space - 1_06" (26.9 mm)
@ 8 HOUR RATE TO 1.75 V.P.C. AVERAGE 20 VEAR LIFE EXPECTANCY SPECIFICATIONS  
Specific Gravity - 1.215 @ 77&deg;F {25&deg;C)
*Jar-Styrene-Acrylonitrile (SAN) Plastic  
Inter-Cell Connectors - Lead Plated Copper tNAN and NCN are the nuclear variant of GNB's Plate Dimensions Height                                                                      Width        Thickness commercial NAX/NCX line.
*Cover -
15.0 in.        12.5 in.        .325 in.
Acrylonitrite Butadiene Styrene (ABS) Plastic Separators -
*Optional - Polycarbonate Jar and Cover                                                     Positive Plate
Microporous Material Retainers -
                          *UL 94-V-O                                                                                     381  .0  mm    317.5    mm      8.26    mm
Fiberglass Mats Posts -
* 28% Limiting Oxygen Index (LO.I.)                                                             15.0 in.       12.5 in.         .220 in .
NAN/NCN 7*17 two-1.5" (38.1 mm) square NAN/NCN 19-27 four-1.0" (25.4 mm) square NAN/NCN 29-35 four-1.5" (38.1 mm) square Post Seals -
Qualified according to IEEE 535                                                              Negative Plate Tested according to IEEE 450                                                                                            381 .0 mm 317.5 mm 5.59 mm NOM                                                                                                         Approximate            Eleclro*
Floating "O" Ring - Seal Nut Vents -
Amperes To 1.75 V.P.C. Average                           Overall Dimensions Cell Type             AH                                                                                                             Weight                lyte CAP 8 Hr. 5 Hr. 3 Hr. 1 Hr. 30 Min. 15Min. 1 Min. Length Width Height                                       Net       Packed       Per Cell 550       69     96     134   245       300     340     436     7.38 in   14.55 in   22.13 in     160lbs                   6.4 gal 187mm       368mm       562mm         72 k                   24.2 li1er 690       86     124     165   300       454     515     582     7.38 in   14.55 in   22.13in     1771bs                   6.0 ~al 187mm       388mm       562mm         80 k                   22.7 iter 825       103   149     200     375       561     686     727     7.38 in   14.55 in   22.13 in     1951bs                   5.6 ~al 187 mm     388mm       562mm         89 k                   21.2 i1er 950       119   171     238     450       666     814     873     7.38 in   14.55 in   22.13in     2131bs                   5.1 gal 187mm       388mm       562mm         97k                     19.3 liler 1070       134   194     277     525       768     939 1018       7.38in     14.55 in   22.13in     231 lbs                   5.0 gal 187 mm     368mm       562mm       105 k                   18.9 liter 1200       150 216       312     600       ~67     1060 1165       7.38in     14.55 in   22.13 in     2691bs                   4.9 ~al 187 mm     368mm       562mm       112 k                   18.5 i1er 1370       171   246     357     675       953 1165 1260           9.25in     14.55 in     22.5 in   2821bs                     6.3 gal 235mm       368mm     572mm         128 k                   23.8 liter 1495       187 270       390     750 1033 1263 1400                 9.25 in   14.55 in     22.5 in     301 lbs                   6.0 gal 235mm       368mm       572mm       137 k                   22.7 liter 1670 209           301     436     825     1136 1389 1540           11.38 in   14.55 in     22.5 in   3481bs                     8.0 gal 289 mm     36Bmm       572mm       158 k                   30.3 liter 1810 226           326     472     900 1232 1506 1680               11.38 in   14.55 in     22.5 in     3641bs                   7.6 gal 289mm       368mm       572mm       165 k                   28.8 liter 1945 243           351     507     975 1327 1622 1840               11.38 in   14.55 in     22.5 in   3801bs                     7.3~al 289*mm     368mm       572mm       173 k                   27.6 iler 2150 269           389     555     1050 1429 1747 1932               14.56 in   14.55 in     22.5 in     4461bs                   11.5 gal 370mm       368mm       572mm       203 k                   43.5 liter 2280 285           411     595     1125 1531 1872 2070               14.56 in   14.55 in     22.5 in     462lbs                   10.9 gal 370mm       388mm       572mm       210 k                   41.3 liter 2415       302     435     629     1200 1633 1996 2220               14.56 in   14.55 in     22.5 in     4791bs                   10.3 gal 370mm       368mm     572mm         218 k                   39.0 liter 2550 319           459     663     1275 1735 2121 2350               14.56 in   14.55 in     22.5 in     496lbs                   9.7 gal 370mm       368mm     572mm         225 kg                   36.7 liter GNB offers a comple1e ine ol battery racks in !WO-tier. llVee*liel. and ttwo-slep mnfigurallons. and can be ordered lo suit your seismic zone reQu;rcmen&s. For lnlotmalion oo ballery racks. please refl!f lo brochure soc!ion 43.20.
GNB "Pre-Vent" Flame Arrester Level Lines -
High and Low - All Jar Faces Electrolyte~ Height above plates - 2.75" (69.9 mm)
Electrolyte Withdrawal Tubes -
2 per cell Sediment Space -
1 _06" (26.9 mm)
Specific Gravity -
1.215 @ 77&deg;F {25&deg;C)
H Inter-Cell Connectors -
Lead Plated Copper tNAN and NCN are the nuclear variant of GNB's commercial NAX/NCX line.
Plate Dimensions
*Optional -
Polycarbonate Jar and Cover  
*UL 94-V-O
* 28% Limiting Oxygen Index (LO.I.)
Qualified according to IEEE 535 Tested according to IEEE 450 Positive Plate Negative Plate Height Width 15.0 in.
12.5 in.
381.0 mm 317.5 mm 15.0 in.
12.5 in.
381.0 mm 317.5 mm NOM Amperes To 1.75 V.P.C. Average Overall Dimensions Approximate Weight Cell Type AH CAP 8 Hr. 5 Hr. 3 Hr. 1 Hr. 30 Min. 15Min. 1 Min. Length Width Height Net Packed 550 69 96 134 245 300 340 436 7.38 in 14.55 in 22.13 in 160lbs 187mm 368mm 562mm 72 k 690 86 124 165 300 454 515 582 7.38 in 14.55 in 22.13in 1771bs 187mm 388mm 562mm 80 k 825 103 149 200 375 561 686 727 7.38 in 14.55 in 22.13 in 1951bs 187 mm 388mm 562mm 89 k 950 119 171 238 450 666 814 873 7.38 in 14.55 in 22.13in 2131bs 187mm 388mm 562mm 97k 1070 134 194 277 525 768 939 1018 7.38in 14.55 in 22.13in 231 lbs 187 mm 368mm 562mm 105 k 1200 150 216 312 600  
~67 1060 1165 7.38in 14.55 in 22.13 in 2691bs 187 mm 368mm 562mm 112 k 1370 171 246 357 675 953 1165 1260 9.25in 14.55 in 22.5 in 2821bs 235mm 368mm 572mm 128 k 1495 187 270 390 750 1033 1263 1400 9.25 in 14.55 in 22.5 in 301 lbs 235mm 368mm 572mm 137 k 1670 209 301 436 825 1136 1389 1540 11.38 in 14.55 in 22.5 in 3481bs 289 mm 36Bmm 572mm 158 k 1810 226 326 472 900 1232 1506 1680 11.38 in 14.55 in 22.5 in 3641bs 289mm 368mm 572mm 165 k 1945 243 351 507 975 1327 1622 1840 11.38 in 14.55 in 22.5 in 3801bs 289*mm 368mm 572mm 173 k 2150 269 389 555 1050 1429 1747 1932 14.56 in 14.55 in 22.5 in 4461bs 370mm 368mm 572mm 203 k 2280 285 411 595 1125 1531 1872 2070 14.56 in 14.55 in 22.5 in 462lbs 370mm 388mm 572mm 210 k 2415 302 435 629 1200 1633 1996 2220 14.56 in 14.55 in 22.5 in 4791bs 370mm 368mm 572mm 218 k 2550 319 459 663 1275 1735 2121 2350 14.56 in 14.55 in 22.5 in 496lbs 370mm 368mm 572mm 225 kg Thickness
.325 in.
8.26 mm
.220 in.
5.59 mm Eleclro*
lyte Per Cell 6.4 gal 24.2 li1er 6.0 ~al 22.7 iter 5.6 ~al 21.2 i1er 5.1 gal 19.3 liler 5.0 gal 18.9 liter 4.9 ~al 18.5 i1er 6.3 gal 23.8 liter 6.0 gal 22.7 liter 8.0 gal 30.3 liter 7.6 gal 28.8 liter 7.3~al 27.6 iler 11.5 gal 43.5 liter 10.9 gal 41.3 liter 10.3 gal 39.0 liter 9.7 gal 36.7 liter GNB offers a comple1e ine ol battery racks in !WO-tier. llVee*liel. and ttwo-slep mnfigurallons. and can be ordered lo suit your seismic zone reQu;rcmen&s. For lnlotmalion oo ballery racks. please refl!f lo brochure soc!ion 43.20.  


N*N Nuclear Class 1 E Stationary Battery Rates 200 Ill~   111111111111111111111111ii1111111111111111111111111111111111111111                 t~i1litijl1 1 1 1 1 1 1 1 1 1 1 1 1 1 1                        III II Ill IIIIIIIIII 11  I~ !::
N*N Nuclear Class 1 E Stationary Battery Rates Ill~ 111111111111111111111111ii1111111111111111111111111111111111111111 t~i1litijl11111111111111111111111111111 I II II Ill I I I I I I I I I I I~ 11 !::
190 180 170 160 1so 140 cu 130
200 190 180 170 160 1 so 140 cu 130
:~
:~ 120 II) 0 Q. 110 cu Q. 100
II) 120 0
:J 90 0 :c Q.
...cu Q. 110 100
80 E
...:J Q.
70 60 so 40 30 Min 20 10 0
0     90
~Min 0
:c Q. 80 E
10 20 30 40 so 60 70 80 90 100  
<      70 60 so 40 30                                                                                                                                                                                           Min 20 10
, 10 120 130 140 Amp Per Positive Note: This Information represents the average performance of the line.
                                                                                                                                                                                                    ~Min 0
Qualified In accordance with IEEE Std 535*1986 Tested In accordance with IEEE Std 450-1987 Refer to the tables for actual discharge data.
0            10     20       30           40         so             60             70                 80           90         100           , 10       120                 130   140 Amp Per Positive Note: This Information represents the average performance of the line.                                                               Qualified In accordance with IEEE Std 535*1986 Refer to the tables for actual discharge data.                                                                                 Tested In accordance with IEEE Std 450-1987
(..,.,..
(
\\.
(
(  
                                                                                                                          \.
\\..  
                                                                                                                            \ ..


                                                                                "&Jp :..&#xa3;-6. izo llJWJ SI o,../ fl!
i i
ATr~cH~cwr          H i                                                                              PA4      if i;                                            AMP DATA l
I l
I NAN/NCN CELLS i
i l I
l                  CELL                              HOURS                         MINUTES TYPE            8  I  5   I 4 I 3 I     2 I 1.5 I 1      30 I 15        I 1 End Voltage -    1.75                                            .. _.
I 1
I NANINCN-7      69    96     11i   134 170 207   245  300      340      436 NANINCN-9      86    124   138   165 204 240   300    454    515      582 NANINCN-11    103    149   167   200 252 300   375  561      686      7'Zl NANINCN-13    119    171   198   238 292 345   450  666      814      873 I                NAN/NCN-15    134    194   '121   m   350 412     525  768      939    1018 1                  NANINCN-17    150    216   254   312 405 465   600  867      1060    1165
-I
-I NANINCN-19    171    246   290   357 48) 535   675  953      1165    1260 NANINCN-21    187    270   317   390 515 590   750  1033    1263    1400 NANINCN-23    209    301   354   436 560 660     825  1136    1389    1540 NANINCN-25    226    326   384   472 615 725     900  1232    1506    1680 NANINCN-27    243    351   412   507 670 785     975  1327    1622    1840
*I j
*I                  NANINCN-29    269    389   455   555 715 857   1050  1429    1747    1932 j                  NANINCN-31    285    411   483   595 710 925   1125  1531    1872    2072 l
l f
f                  NANINCN-33    302    435   512   629 820 995   1200  1633    1966    2220
:! it)*
:it)
()**,
NAN/NCN-35    319    459   539   663 868 1053   1275  1735    2121    2350
~
    . . ....
CELL TYPE 8 I End Voltage -
* End Voltage -    1.78 NA.NINCN-7      67    93   108   129 165 197     228  282      324    383 NANINCN-9      83    120   132   156 196   228   279  376    432      510
: 1. 75 NANINCN-7 69 NANINCN-9 86 NANINCN-11 103 NANINCN-13 119 NAN/NCN-15 134 NANINCN-17 150 NANINCN-19 171 NANINCN-21 187 NANINCN-23 209 NANINCN-25 226 NANINCN-27 243 NANINCN-29 269 NANINCN-31 285 NANINCN-33 302 NAN/NCN-35 319 End Voltage -
                  ' NANINCN-11    100    144   162   193 242   285   349  470      540    637 NANINCN-13    115    166   190   228 280   328   419  564      648    765 NANINCN-15      130  187   220   261 336   391   488  658      756    892 NANtt4CN-17    146    ?OQ   244   293 389   442   558  752      864    1020 NANINCN-19      165  239   279   333 442   508   628  846      972    1107 NANINCN-21      182  262   305   366 494   561   698  940    1080    1230 NANINCN-23    202    292   341   407 538   r;n 767    1034    1188    1287 NAN!flCN-25    219    316   369   440 590   689   837  1128    1296    1404 NANINCN-27    237    340     396   476 643   746   907  1222    1404    1521 NM-mCN-29      260    375     441   522 694   814   'D7  1316    1512    1624 NAN!flCN-31    275    399     465   555 747   879 1046    1410    1620    1740 NANmCN-33      292    4'12   492   586 795   945 1116    1504    1728    1850 NAN/NCN-35    310    445   518   623 842 1000
: 1. 78 NA.NINCN-7 67 NANINCN-9 83 NANINCN-11 100 NANINCN-13 115 NANINCN-15 130 NANtt4CN-17 146 NANINCN-19 165 NANINCN-21 182 NANINCN-23 202 NAN!flCN-25 219 NANINCN-27 237 NM-mCN-29 260 NAN!flCN-31 275 NANmCN-33 292 NAN/NCN-35 310 End Voltage -
* 1186  1598    1836    1970 End Voltage -    1.81 NANINCN-7      65    90     104   124 153   182   208  255      285    330
1.81 NANINCN-7 65 NANINCN-9 81 NAN/NCN-11 97 NAN/NCN-13 112 NAN/NCN-15 127 NANINCN-17 141 NAN/NCN-19 161 NAN,t.!CN-21 176 NAN/NCN-23 197 NANINCN-25 213 NANINCN-27 229 NANINCN-29 254 NANINCN-31 268 NANtt4CN-33 284 NAN.INCN-35 300 AMP DATA NAN/NCN CELLS HOURS 5 I 4 I 3 I 2 I 1.5 I 96 11i 134 170 207 124 138 165 204 240 149 167 200 252 300 171 198 238 292 345 194  
* NANINCN-9        81  117     127   152 184   211   255  340      380    440 NAN/NCN-11      97  140     156   185 227   264   319  425      475    550 NAN/NCN-13      112  162     183   218 263   304   383  510      570    660 NAN/NCN-15      127  182     211   252 315   363   446  595      665    no NANINCN-17      141  203     236   285 365   409     510  680      760    880 NAN/NCN-19      161  232     201   324 414   471   574  765      855    954 NAN,t.!CN-21    176  254     295   357 464   519         850      950    1060
'121 m
()**,
350 412 216 254 312 405 465 246 290 357
638 NAN/NCN-23      197  284     327   396 500   581   701  935    1045    1100 NANINCN-25      213  307     357   428 554   638     765 1020    1140    1200
: 48) 535 270 317 390 515 590 301 354 436 560 660 326 384 472 615 725 351 412 507 670 785 389 455 555 715 857 411 483 595 710 925 435 512 629 820 995 459 539 663 868 1053 93 108 129 165 197 120 132 156 196 228 144 162 193 242 285 166 190 228 280 328 187 220 261 336 391  
        ~ . .*'                                                              11n;              1306 NANINCN-27      229  330     383   464 603   691   829          1235 NANINCN-29      254  364     423   509 643   754     893 1190    1330    1386 NANINCN-31      268  387     465   540 693   814     956 1275    1425    1485 NANtt4CN-33    284  410     492   571 738   875   1020  1360    1520    1600 NAN.INCN-35    300  432     518   606 781   926   1084 1445     1615     1700}}
?OQ 244 293 389 442 239 279 333 442 508 262 305 366 494 561 292 341 407 538 r;n 316 369 440 590 689 340 396 476 643 746 375 441 522 694 814 399 465 555 747 879 4'12 492 586 795 945 445 518 623 842 1000*
90 104 124 153 182 117 127 152 184 211 140 156 185 227 264 162 183 218 263 304 182 211 252 315 363 203 236 285 365 409 232 201 324 414 471 254 295 357 464 519 284 327 396 500 581 307 357 428 554 638 330 383 464 603 691 364 423 509 643 754 387 465 540 693 814 410 492 571 738 875 432 518 606 781 926 1
245 300 375 450 525 600 675 750 825 900 975 1050 1125 1200 1275 228 279 349 419 488 558 628 698 767 837 907
'D7 1046 1116 1186 208 255 319 383 446 510 574 638 701 765 829 893 956 1020 1084  
"&Jp :..&#xa3;-6. izo llJWJ SI o,../ fl!
ATr~cH~cwr H PA4 if MINUTES 30 I 15 I 1 300 340 436 454 515 582 561 686 7'Zl 666 814 873 768 939 1018 867 1060 1165 953 1165 1260 1033 1263 1400 1136 1389 1540 1232 1506 1680 1327 1622 1840 1429 1747 1932 1531 1872 2072 1633 1966 2220 1735 2121 2350 282 324 383 376 432 510 470 540 637 564 648 765 658 756 892 752 864 1020 846 972 1107 940 1080 1230 1034 1188 1287 1128 1296 1404 1222 1404 1521 1316 1512 1624 1410 1620 1740 1504 1728 1850 1598 1836 1970 255 285 330*
340 380 440 425 475 550 510 570 660 595 665 no 680 760 880 765 855 954 850 950 1060 935 1045 1100 1020 1140 1200 11n; 1235 1306 1190 1330 1386 1275 1425 1485 1360 1520 1600 1445 1615 1700}}

Latest revision as of 08:29, 8 January 2025

Request for License Amendment - DC Sources - Operating Surveillance Requirement (SR) 3.8.4.5
ML17277A855
Person / Time
Site: Brunswick  
Issue date: 10/03/2017
From: William Gideon
Duke Energy Progress
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BSEP 17-0078
Download: ML17277A855 (41)


Text

(~ DUKE ENERGYe October 3, 2017 Serial: BSEP 17-0078 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 William R. Gideon Vice President Brunswick Nuclear Plant P.O. Box 10429 Southport, NC 28461 0: 910.457.3698 10 CFR 50.90 Request for License Amendment - DC Sources - Operating Surveillance Requirement (SR) 3.8.4.5 Ladies and Gentlemen:

Pursuant to the provisions of the Code of Federal Regulations (CFR), Title 10, Part 50.90, Duke Energy Progress, LLC (Duke Energy), hereby requests a revision to the Technical Specifications (TS) for the Brunswick Steam Electric Plant (BSEP), Unit Nos. 1 and 2.

The proposed amendment would revise Surveillance Requirement (SR) 3.8.4.5 contained in TS 3.8.4, "DC Sources - Operating." Specifically, the TS change proposes to amend the required supplied amperage of the battery chargers contained within SR 3.8.4.5. provides an evaluation of the proposed TS changes. Enclosures 2 and 3 provide the existing TS pages marked-up to show the proposed changes for Unit 1 and 2, respectively.

Enclosures 4 and 5 provide revised (i.e., typed) TS pages for Unit 1 and 2, respectively.

Enclosures 6 and 7 provide relevant sections of BSEP Calculations, BNP-E-6.079, Revision 6, "125 V DC Battery Charger Sizing Calculation," and BNP-E-6.120, Revision 10, "DC System Battery Load Study," respectively, related to the topic of this license amendment request.

Duke Energy requests approval for the proposed amendment by October 3, 2018, with a 120-day implementation period.

In accordance with 10 CFR 50.91 (b)(1 ), Duke Energy is providing the State of North Carolina with a copy of the proposed license amendment.

This document contains no regulatory commitments.

Please refer any questions regarding this submittal to Mr. Lee Grzeck, Manager - Regulatory Affairs, at (910) 457-2487.

U.S. Nuclear Regulatory Commission Page 2 of 3 I certify under penalty of perjury that the foregoing is true and correct. Executed on October 3, 2017.

Sincerely, wd)

William R. Gideon WRG/mkb

Enclosures:

1. Evaluation of the Proposed Change
2. Proposed Unit 1 BSEP TS (Markup)
3. Proposed Unit 2 BSEP TS (Markup)
4. Proposed Unit 1 BSEP TS (Retyped Pages)
5. Proposed Unit 2 BSEP TS (Retyped Pages)
6. BSEP Calculation BNP-E-6.079, Revision 6, "125 V DC Battery Charger Sizing Calculation" (relevant sections)
7. BSEP Calculation BNP-E-6.120, Revision 10, "DC System Battery Load Study" (relevant sections)

U.S. Nuclear Regulatory Commission Page 3 of 3 cc (with enclosures):

U.S. Nuclear Regulatory Commission, Region II ATIN: Ms. Catherine Haney, Regional Administrator 245 Peachtree Center Ave, NE, Suite 1200 Atlanta, GA 30303-1257 U.S. Nuclear Regulatory Commission A TIN: Mr. Andrew Hon (Mail Stop OWFN 8G9A)

(Electronic Copy Only) 11555 Rockville Pike Rockville, MD 20852-2738 Andrew.Hon@nrg.gov U.S. Nuclear Regulatory Commission ATIN: Mr. Gale Smith, NRG Senior Resident Inspector 8470 River Road Southport, NC 28461-8869 Mr. W. Lee Cox, Ill, Chief (Electronic Copy Only)

Radiation Protection Section NC Department of Health and Human Services 1645 Mail Service Center Raleigh, NC 27699-1645 lee.cox@dhhs.nc.gov Chair - North Carolina Utilities Commission (Electronic Copy Only) 4325 Mail Service Center Raleigh, NC 27699-4300 swatson@ncuc.net

Evaluation of the Proposed Change BSEP 17-0078 Page 1 of 5

Subject:

Request for License Amendment - DC Sources - Surveillance Requirement (SR) 3.8.4.5

1.

Summary Description Duke Energy Progress, LLC (Duke Energy), is requesting Nuclear Regulatory Commission (NRC) approval of the proposed revision to the Technical Specifications (TSs) for the Brunswick Steam Electric Plant (BSEP), Unit Nos. 1 and 2. The proposed amendment would revise Surveillance Requirement (SR) 3.8.4.5 contained in TS 3.8.4, "DC Sources - Operating."

Specifically, the TS change proposes to amend the required supplied amperage of the battery chargers contained within SR 3.8.4.5.

2.

Detailed Description 2.1.

Proposed Change The proposed change revises the required supplied amperage of the battery chargers contained within SR 3.8.4.5. Specifically, the proposed change would revise the required battery charge supplied amperage from greater than 250 amps to greater than 300 amps. The other requirements (i.e., voltage and time) of the battery chargers contained in SR 3.8.4.5 are unaffected.

2.2.

Background

Currently, TS SR 3.8.4.5 requires, "Verify each required battery charger supplies ~ 250 amps at~ 135 volts for~ 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />." The safety-related battery chargers in-service at BSEP were purchased with a 300 amp continuous rating and a 375 amp current limit rating.

Historically, BSEP's battery charger calculation, "125 V DC Battery Charger Sizing Calculation" (i.e., BNP-E-6.079), provided, in part, as Enclosure 6, credits the 300 amp battery charger capability based on the charger's continuous current rating. However, BSEP did not actually require the battery chargers to supply greater than 250 amps until after the 2013 NRC Component Design Basis Inspection (CDBI). During the 2013 NRC CDBI, it was discovered that the DC System Battery Load Study (i.e., BNP-E-6.120), provided, in part, as Enclosure 7, credited transfer of specific non-safety loads (i.e., uninterruptible power supply (UPS) and lighting, and communications inverters) from the batteries to the alternating current (AC) source once AC bus power was restored. Due to the specific loads being non-safety related, their transfer cannot be credited.

BN P-E-6.120 now relies on at least 300 amps to be supplied from the battery chargers. As such, SR 3.8.4.5 is being revised to reflect actual plant calculations.

3.

Technical Evaluation The electrical power system at BSEP comprises various AC and direct current (DC) systems.

The 125/250 volt DC power supply system consists of batteries and battery chargers, associated buses, electrical circuitry, switches, indicators, and alarm devices required for operation and surveillance of the system.

3.1.

125/250 VDC Power System Description BSEP 17-0078 Page 2 of 5 The purpose of the 125/250 VDC Power System is to ensure sufficient power will be available to supply safety-related equipment required for the safe shutdown of the facility and the mitigation and control of accident conditions within the facility. Each unit contains two separate and redundant divisions for all equipment and wiring associated with Engineering Safety Features (ESF) and their supporting systems. The 125/250 VDC system provides reliable motive and control power to the ESF loads such that no single credible event can disable the containment isolation function or prevent the standby cooling systems from performing their intended functions.

Each unit contains a 125/250 VDC Power System which consists of two separate divisions. Each division contains two 125 VDC batteries wired in a series/parallel arrangement to its distribution panel to allow for 125 VDC or 250 VDC loading. Each battery contains its own independent charger. The major loads supplied by this system are 250 voe valve operators and pumps, and 125 voe control/logic systems, plant annunciation, and emergency lighting. Each of the 125 VDC battery chargers is provided with AC power via their respective division Emergency Bus.

3.2.

Revise the Required Supplied Amperage of SR 3.8.4.5 Prior to 2013, the battery load study calculation was based on a battery duty cycle of one minute for a Loss of Offsite Power (LOOP)/Loss of Coolant Accident (LOCA) event. At the end of the one minute LOOP/LOCA duty cycle, the chargers are credited for supplying the DC system with sufficient margin available for battery recharge based on certain loads being transferred automatically back to their respective AC buses.

It was discovered during the 2013 NRG CDBI inspection (i.e., Inspection Report 50-325/2013-007 and 50-324/2013-007, dated December 6, 2013, ML13340A629) that certain non-safety loads, specifically the UPS lighting and communications inverters, were being credited in plant calculations as automatically transferring back to the AC buses. Because the specific loads are non-safety, their automatic transfer cannot be credited. If the UPS units and communications inverters fail to transfer to the AC supply, they will continue to be powered from the DC supply after the chargers are restored.

Under these conditions, the system load will exceed the charger capability, resulting in a continual discharge of the batteries. Recent analysis of the DC system loading with the UPS load remaining on the batteries without transferring to the AC source showed that voltage remained acceptable (i.e., greater than 107 V) for at least four hours. The revised calculation verified the analyzed duty cycle for the worst case loading remains bounded by the Maintenance Surveillance Test (MST) procedure test criteria, in regards to the batteries. The battery charger test criteria contained in the MST will be updated in accordance with the site's normal procedure update process based on the updated design bases. MST test history has shown the chargers each supply a minimum of 340 amps of the total DC load. The MST test data provides validation that this is well within the capability of each charger. Based on the above, the failure of the non-safety loads to transfer to the AC source when it becomes available would not affect the battery's ability to supply the required voltage to safety-related loads.

The BSEP Updated Final Safety Analysis Report (UFSAR), Section 8.3.2.1.2, discusses that the battery charges have been sized appropriately, taking into account worst case

BSEP 17-0078 Page 3 of 5 loading, to take the batteries from a minimum state (i.e., 105 V) to 95% of full charge in eight hours after an event. Further analysis of the worst case battery 1 B-2, demonstrated that sufficient charger capacity margin is available, if the UPS units are manually transferred to their AC source within the four hour time frame, for the battery to be recharged in eight hours as discussed in the BSEP UFSAR. Specifically, the analysis showed that with the chargers restored at one minute after the LOOP/LOCA event and with the UPS units remaining on the battery for a period of time not exceeding four hours, the battery chargers have adequate capacity to recharge the batteries within eight hours.

An Engineering Change (EC) has updated the battery load study calculation with a new post-LOOP/LOCA battery duty cycle based on the non-safety loads being transferred to their respective AC source, automatically or via manual operator action, within four hours instead of one minute based on increased loads remaining on battery power.

Administrative controls have been established to verify non-safety loads are transferred to AC sources within the four hour duty cycle. The Operations Standing Instruction (i.e., administrative controls) will be replaced by procedural requirements as part of an Abnormal Operating Procedure (AOP).

The difference between the increased duty load, in combination with the credited 300 amp chargers, and TS surveillance requirement of greater than or equal to 250 amps was not recognized until 2017. Based on this discovery, the electrical calculations were reviewed and it was determined that the testing requirements contained in TS SR 3.8.4.5 were not aligned with the design criteria contained in the electrical calculations. The 250 amp requirement contained in TS SR 3.8.4.5 is below the battery charger design continuous rating of 300 amps. The proposed TS change will bring the TS SR 3.8.4.5 criteria into alignment with the credited supplied amperage rating of the station battery chargers.

4.

Regulatory Evaluation 4.1.

Applicable Regulatory Requirements/Criteria 1 O CFR 50.90 provides direction to licensees seeking to revise their license to file an application for amendment with the NRG. The Technical Specifications constitutes Appendix A to the Operating License for each facility. This would require a license amendment to revise any portion of the Technical Specifications, such as requested here.

1 O CFR 50.36(c)(3) states that a facility's technical specification will include surveillance requirements, defined as "requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met." The TS Bases qualify TS SR 3.8.4.5 requirements as derived from the design capacity of the chargers so that required battery charger supply can restore the batteries from a minimum charge state to fully charged under any load condition.

As stated in the NRC's "Safety Evaluation of the Brunswick Steam Electric Station Units 1 and 2," dated November 1973, BSEP meets the intent of the General Design Criterion (GDC), published in the Federal Register on May 21, 1971, as Appendix A to

BSEP 17-0078 Page 4 of 5 1 O CFR Part 50. The proposed change does not affect compliance with the intent of the GDCs. In particular, the intent of GDC 17, "Electric power systems," and GDC 18, "Inspection and testing of electrical power systems," will continue to be met.

Duke Energy has determined that the proposed change does not require an exemption or relief from regulatory requirements and does not affect conformance with any GDC as described in the BSEP UFSAR.

4.2.

No Significant Hazards Consideration Determination In accordance with 1 O CFR 50.90, "Application for amendment of license, construction permit, or early site permit," Duke Energy Progress, LLC (Duke Energy), requests an amendment to the Facility Operating License for Brunswick Steam Electric Plant (BSEP) to revise Surveillance Requirement (SR) 3.8.4.5 contained in Technical Specification (TS} 3.8.4, "DC Sources - Operating." Specifically, the TS change proposes to amend the required supplied amperage of the battery chargers contained within SR 3.8.4.5.

The proposed change has been reviewed considering applicable requirements of 1 O CFR 50.36, 1 O CFR 50, Appendix A, and other applicable NRC documents. Duke Energy has evaluated the proposed change to the battery charger amperage requirements of SRs 3.8.4.5 and determined that the change does not involve a Significant Hazards Consideration. In support of this determination, an evaluation of each of the three standards, set forth in 1 O CFR 50.92, is provided below.

1) Does the proposed amendment involve a significant increase in the probability or consequences of an accident previously evaluated?

Response: No The proposed change to the battery charger amperage requirements of SR 3.8.4.5 contained in TS 3.8.4 does not impact the physical function of plant structures, systems, or components (SSC) or the manner in which SCCs perform their design function. The proposed change does not authorize the addition of any new plant equipment or systems, nor does it alter the assumptions of any accident analyses.

The DC electrical power system, including the battery chargers, is not an initiator of any accident sequence ana~zed in the Updated Final Safety Analysis Report.

Rather, the DC electrical power system supports operation of equipment used to mitigate accidents. Specifically, the purpose of the battery chargers is to continuously maintain their respective battery in a charged standby condition while providing power to the system loads. The proposed change does not adversely affect accident initiators or precursors, nor does it alter the desig.n assumptions, conditions, and configuration or the manner in which the plant is operated and maintained.

Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.

2) Does the proposed amendment create the possibility of a new or different kind of accident from any accident previously evaluated?

Response: No

BSEP 17-0078 Page 5 of 5 The proposed change to the battery charger amperage requirements of SR 3.8.4.5 contained in TS 3.8.4 does not require any modification to the plant or change equipment operation. The proposed change will not introduce failure modes that could result in a new accident, and the change does not alter assumptions made in the safety analysis. Performance of battery testing is not a precursor to any accident previously evaluated. The proposed change will not alter the design configuration, or method of operation of plant equipment beyond its normal functional capabilities. The proposed change does not create any new credible failure mechanisms, malfunctions, or accident initiators.

Therefore, the proposed change does not create the possibility of a new or different kind of accident from those that have been previously evaluated.

3) Does the proposed amendment involve a significant reduction in a margin of safety?

Response: No The proposed change to the battery charger amperage requirements of SR 3.8.4.5 contained in TS 3.8.4 does not alter or exceed a design basis or safety limit. There is no change being made to safety analysis assumptions or the safety limits that would adversely affect plant safety as a result of the proposed change. Margins of safety are unaffected by the proposed change and the applicable requirements of 1 O CFR 50.36(c)(2)(ii) and 1 O CFR 50, Appendix A will continue to be met.

Therefore, the proposed change does not involve any reduction in a margin of safety.

4.3.

Conclusions In conclusion, and based on the considerations discussed above, the proposed change does not involve a significant hazards consideration under the standards set forth in 1 O CFR 50.92(c), and, accordingly, a finding of "no significant hazards consideration" is justified. Also, there is a reasonable assurance that the health and safety of the public will not be impacted by the proposed change to revise the battery charger amperage requirements of SR 3.8.4.5 contained within TS 3.8.4. The change will be in compliance with the NRC regulations, and the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.

5.

Environmental Consideration The proposed amendment would change a requirement with respect to installed facility components located within the restricted area of the plant as defined in 1 O CFR Part 20.

However, the proposed amendment does not involve: (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion set forth in 1 O CFR 51.22(c)(9). Therefore, pursuant to 1 O CFR 51.22(b),

no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendment.

Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Request for License Amendment - DC Sources - Operating Surveillance Requirements (SRs) 3.8.4.5 Proposed Unit 1 BSEP TS (Markups)

BSEP 17-0078

DC Sources-Operating 3.8.4 SURVEILLANCE REQUIREMENTS (continued)

SR 3.8.4.4 SR 3.8.4.5 SR 3.8.4.6 Brunswick Unit 1 SURVEILLANCE Remove visible corrosion and verify battery cell to cell and terminal connections are coated with anti-corrosion material.

Verify each required battery charger supplies

~ 2-aQ amps at ~ 135 V for ~ 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.


NOTES--------------------

1.

The modified performance discharge test in SR 3.8.4.7 may be performed in lieu of the service test in SR 3.8.4.6 once per 60 months.

2.

This Surveillance shall not be performed in MODE 1 or 2 for the Unit 1 DC electrical power subsystems. However, credit may be taken for unplanned events that satisfy this SR.

3.

A single test at the specified Frequency will satisfy this Surveillance for both units.

Verify battery capacity is adequate to supply, and maintain in OPERABLE status, the required emergency loads for the design duty cycle when subjected to a battery service test.

3.8-25 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program (continued)

Amendment No. m I

Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Request for License Amendment - DC Sources - Operating Surveillance Requirements (SRs) 3.8.4.5 Proposed Unit 2 BSEP TS (Markups)

BSEP 17-0078

300 DC Sources-Operating 3.8.4 SURVEILLANCE REQUIREMENTS (continued)

SR 3.8.4.4 SR 3.8.4.5 SR 3.8.4.6 Brunswick Unit 2 SURVEILLANCE Remove visible corrosion and verify battery cell to cell and terminal connections are coated with anti-corrosion material.

Verify each required battery charger supplies

2W amps at ~ 135 V for ~ 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

NOTES-----------------------

1.

The modified performance discharge test in SR 3.8.4.7 may be performed in lieu of the service test in SR 3.8.4.6 once per 60 months.

2.

This Surveillance shall not be performed in MODE 1 or 2 for the Unit 2 DC electrical power subsystems. However, credit may be taken for unplanned events that satisfy this SR.

3.

A single test at the specified Frequency will satisfy this Surveillance for both units.

Verify battery capacity is adequate to supply, and maintain in OPERABLE status, the required emergency loads for the design duty cycle when subjected to a battery service test.

3.8-25 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program (continued)

Amendment No. aG4 I

Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Request for License Amendment - DC Sources - Operating Surveillance Requirements (SRs) 3.8.4.5 Proposed Unit 1 BSEP TS (Retyped Pages)

BSEP 17-0078

DC Sources-Operating 3.8.4 SURVEILLANCE REQUIREMENTS (continued)

SR 3.8.4.4 SR 3.8.4.5 SR 3.8.4.6 Brunswick Unit 1 SURVEILLANCE Remove visible corrosion and verify battery cell to cell and terminal connections are coated with anti-corrosion material.

Verify each required battery charger supplies

~ 300 amps at ~ 135 V for ~ 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.


NO TES-------------------------------

1.

The modified performance discharge test in SR 3.8.4.7 may be performed in lieu of the service test in SR 3.8.4.6 once per 60 months.

2.

This Surveillance shall not be performed in MODE 1 or 2 for the Unit 1 DC electrical power subsystems. However, credit may be taken for unplanned events that satisfy this SR.

3.

A single test at the specified Frequency will satisfy this Surveillance for both units.

Verify battery capacity is adequate to supply, and maintain in OPERABLE status, the required emergency loads for the design duty cycle when subjected to a battery service test.

3.8-25 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program (continued)

Amendment No.

Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Request for License Amendment - DC Sources - Operating Surveillance Requirements (SRs) 3.8.4.5 Proposed Unit 2 BSEP TS (Retyped Pages)

BSEP 17-0078

DC Sources-Operating 3.8.4 SURVEILLANCE REQUIREMENTS (continued)

SR 3.8.4.4 SR 3.8.4.5 SR 3.8.4.6 Brunswick Unit 2 SURVEILLANCE Remove visible corrosion and verify battery cell to cell and terminal connections are coated with anti-corrosion material.

Verify each required battery charger supplies

~ 300 amps at ~ 135 V for ~ 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.


~~---~-~-~----NOl"ES-~-~-~-~-~--------------

1.

"The modified performance discharge test in SR 3.8.4.7 may be performed in lieu of the service test in SR 3.8.4.6 once per 60 months.

2.

This Surveillance shall not be performed in MODE 1 or 2 for the Unit 2 DC electrical power subsystems. However, credit may be taken for unplanned events that satisfy this SR.

3.

A single test at the specified Frequency will satisfy this Surveillance for both units.

Verify battery capacity is adequate to supply, and maintain in OPERABLE status, the required emergency loads for the design duty cycle when subjected to a battery service test.

3.8-25 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program (continue9)

Amendment No.

Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Request for License Amendment - DC Sources - Operating Surveillance Requirements (SRs) 3.8.4.5 BSEP 17-0078 BSEP Calculation BNP-E-6.079, Revision 6, "125 V DC Battery Charger Sizing Calculation" (Enclosure 6 contains six pages)

(_~DUKE

~ ENERGY.

Facility Code :

Applicable Facilities :

Document Number :

Document Revision Number :

Document EC Number :

Change Reason :

Document Title :

Field, Rex S.

Kuffour, Edward 0.

Anderson, Jon J.

Notes:

BNP BNP BNP-E-6.079 006 AR02096967 UNIT 1 & 2 - 125 V DC BATTERY CHARGER SIZING CALCULATION Preparer 6/27/2017 Design Verifier 6/27/2017 Approver 6/27/2017

Unit 1 & 2 - 125 VDC Battery Charger Sizing Calculation Calculation Number:

BNP-E-6.079 Rev#

6 System: 5230, 5240, 5245 DSD List: 0 Yes [8J No

[BNP, HNP, RNP] Sub-Type: ELE Microfiche Attachment List:

D Yes [8J No

~------------

Quality Level A

~------------

DAii

[8J BNP Unit

__ 1 & 2 __ _ 0 CNS Unit D ONS Unit D LNP Unit 0 MNS Unit 0 WLS Unit D General Office D Keowee Hydro Station Originated By Design Verification Review By Signature Signature E-sign E-sign Verification Method 1 [8J 2 D 3 D Other D Printed Name Printed Name Rex S Field Ed Kuffour Date Date E-date E-date Priority E: [8J Yes D No D HNP Unit D RNP Unit D HAR Unit Approved By Signature E-sign Printed Name Jon Anderson Date E-date D YES [8J NO Check Box for Multiple Originators or Design Verifiers (see next page)

For Vendor Calculations:

Vendor: N/A Vendor Document#: N/A Owners Review By: N/A Date: N/A Approval By: N/A Date: N/A

3.1.2.3 LOCA/LOOP Calculation BNP-E-6.079 Revision 6 Page 8 The battery load profile resulting from a coincident LOCA/LOOP DBE is defined as a four (4) hour discharge profile in the battery load study (ref.

2.3). Aging and temperature derating factors will be used to determine the minimum allowable state of battery charge. This profile consists of two (2) discharge periods. The first period is one (1) minute in duration in which time zero is the initiation of a OBA LOCA/LOOP. All DC loads are fed from the batteries for the first 10 seconds (until the respective EDGs start and close the output breaker. At that point, the battery chargers are fed by the EOG and assume 300A of the DC load. Any remaining load is fed by the batteries.

The maximum uncorrected discharge at the one (1) minute mark is 10.32 Ah and at the four (4) hour mark is 688.66 Ah (ref 2.3; battery 1 B-2 Att D pg 121/322).

The minimum voltage requirement for the first minute is 107Vdc (1.78 Vpc).

From ref 2.3 (Att H), the one (1) minute discharge is limited to 1020 A.

The average current during the first minute is 10.32 Ah I 1 min

  • 60 min =

619.2 A.

The allowable one (1) minute discharge is:

1020 A I (1.11)(1.25) = 735.14 A and, the maximum capacity discharged over a one (1) minute period, in ampere-hours is:

735.14 A* 1 min/ 60 min= 12.25 Ah For the initial minute, (ref 2.3; Att G, Table 1) demonstrates that the actual value of (uncorrected) ampere-hours discharged under this scenario (LOCA/LOOP) is enveloped by the above. The MST one (1) minute test value of 725A is also bounded by this maximum value of 735A.

The basis for the allowable time to recharge the batteries is to 95% of their capacity is not specifically identified for this scenario. Therefore, it will be considered to be approximately eight (8) hours (ref UFSAR 8.3.2.1.2).

For a four (4) hour duration, the discharge is limited to 244 A [976 Ah] (ref 2.3 Att H pg 4). Four (4) hours is chosen because from ref 2.3 analysis, this is the maximum amount of time the DC load (specifically B division and battery 2A-1) can be continuously energized without operator action

Calculation BNP-E-6.079 Revision 6 Page 9 to decrease the load and begin recharging the batteries. The remainder of A division batteries would not require operator action to prevent the batteries from continually discharging.

The allowable discharge is:

Eqn (6) 244 A I (1.11 )(1.25) = 175.86 A This is enveloped by the MST test value of 200A from 30 minutes to four (4) hours.

From on the worst case battery 1B-2 as noted in BNP-E-6.120 R10 Attachment D, depleted amp-hour totals and battery amps (negative values indicating recharging) were taken at the four (4) hour time mark to determine the amount of time to recharge. The values are corrected for a battery charger voltage of 135V as opposed to a battery voltage of 125 V as calculated in ref 2.3 (Attachment B1) and noted below in Table A.

Battery Voltages After Restoration of the Battery Chargers IEEE 485-1983 requires that the batteries be capable of supplying load to the DC system when the DC load exceeds the output capability of the system battery chargers. EC 93932 included the effects of battery voltage due to charger output being less than the load of the DC system. EC 300753 and 407321 evaluated battery voltages and loading after the first minute in situations when the DC loading remained greater than the battery charger amperage output limit (300A).

Analysis in BNP-E-6.120 R10 determined loading after the first minute is greater than 300A for the B batteries and battery 2A-1, therefore, these batteries are continually depleting after the first minute rather than recharging. For the B batteries this is due primarily to the L TG/COMM UPS units which contribute approximately 185-195A. Battery 2A-1 loading is slightly above 300A due to miscellaneous loads. A reduction in loading will permit these batteries to be recharged.

Based on UFSAR, the batteries must be able to recharge within eight (8) hours for any load condition.

Based on the worst case battery 1 B-2, depleted amp hour totals and battery amps (negative values indicating recharging) were taken at the four (4) hour time mark (Attachment D page 121 I 322) to determine the amount of time to recharge.

This table indicates if the L TG/COMM UPS' units are transferred to their appropriate AC source within four (4) hours, the B batteries are capable of recharging within eight (8) hours.

TABLE A Load (r)

Load (k)

Battery Amps Amps (A)

(8)

(C) 1B-2 101.34 23.54

=(B)*135/125

=(C)*125/135 Calculation BNP-E-6.079 Revision 6 Page 10 Load (i)

Load (t)

Amps Amps (D)

(E)=(B)+(C)+(D) 73.19 198.07

=(D)

Adjusted Load (t) 1 B-2 (adjusted) 109.45 21.80 73.19 204.43 Battery Adjusted Loading = 204.43 - 198.07 = 6.36 TABLE B Charging Add'I Isolate UPS 18-2 Amps after Battery after this no.

Depleted UPS Adjusted Time to of hours Ah rs 10%

Offline Loading Recharge (A)

(B)

(C)

(D)

(E)

(F)

Ref Att D pg Ref Att D pg F

120 I 322 C=B*1.1 121 I 322 Table A

=CI (D + E) 2 350.16 385.18

-105.73 6.36 3.88 3

521.84 574.02

-105.73 6.36 5.78 4

694.44 763.88

-105.73 6.36 7.69 If the batteries were depleted to a maximum value based on four (4) hours from ref 2.3 (Att H), the maximum amount of DC load the battery chargers could feed is:

Eqn (7)

Ac= 300- l.l x244*4AH = 165.8A 8.

The minimum amount of current to recharge the batteries in approximately eight (8) hours would be:

Eqn (8) 300 A-165.8 A= 134.2 A However, as noted in Table B [from ref 2.3 analysis], at four (4) hours, the recharge rate is 106. 78 A. Therefore, the maximum battery charger rate to feed a DC load while recharging the batteries is:

Eqn (9) 300 Amps - (105.73 - 6.27) A= 200.63 A

Calculation BNP-E-6.079 Revision 6 Page 11 This is greater than the value in Eqn (7 (200.63 >165.8 A) because the batteries have not been depleted to their maximum value within four (4) hours. Also, the battery recharge rate is less than the maximum allowed (106. 78 < 134.2 A) 3.1.2.4 Reg. Guide 1.155 Station Black Out (SBO)

The Station Blackout Coping Report (Ref. 2.30) establishes that the BSEP plant is required to maintain a four (4) hour coping duration during a Station Black Out event. However, "AOP-36.2 defines a means to cross tie AC power from the non-blacked out Unit to the blacked out Unit battery chargers within one (1) hour rather than providing a list of DC loads to be stripped". Based on a one (1) hour cross-tie capability, the aging and temperature derated, one (1) hour discharge state of the battery is used.

The one ( 1) hour rating for the battery to accomplish the 1. 783 V /cell requirement established in Ref. 2.29 is 553 A. This is based off of a linear interpolation between the 1.78 V/Cell and 1.81 V/Cell one (1) hour ratings (Ref. 2.15).

1.78-1.81=1.78-1.783 => X = 553A 558-510 558-X Therefore, the allowable discharge capacity is:

1 Hour x 553 A I (1.11 )(1.25) = 398.56 Ah Table 1 of Attachment G to ref 2.3 demonstrates that the actual value of (uncorrected) ampere-hours discharged under this scenario (SBO) is enveloped by the above.

The basis for the allowable time to recharge.the batteries to 95% of their capacity is not specifically identified for this scenario. Therefore, it will be considered to be eight (8) hours, per bases 3.2.1.g.

Therefore, the allowable continuous ampere load on the DC distribution system while.recharging is:

Ac= 300- I.Ix 398.56 AH = 245.2 A 8

Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Request for License Amendment - DC Sources - Operating Surveillance Requirements (SRs) 3.8.4.5 BSEP 17-0078 BSEP Calculation BNP-E-6.120, Revision 10, "DC System Battery Load Study" (Enclosure 7 contains seventeen pages)

J_~DUKE

~ ENERGY.

Facility Code :

Applicable Facilities :

Document Number :

Document Revision Number :

Document EC Number :

Change Reason :

Document Title :

Field, Rex Kuffour, Edward 0.

Anderson, Jon J.

Notes:

BNP BNP BNP-E-6.120 010 EC000029647... EC0000297Zll.ECOOOC129956l.EC00002995M.ECOOOOJCIOll7l.EC0000407321:EC0000299514.EC0000299437.fCOOl>040IM9".EC00004CW218.EC00004013'0 125/250 voe SYSTEM BATTERY LOAD STUDY Preparer 6/27/2017 Design Verifier 6/27/2017 Approver 6/27/2017

125/250 voe SYSTEM BATTERY LOAD STUDY Calculation Number:

BNP-E-6.120 Rev#

10 System:

5230, 5245 DSD List:

D Yes ~No

[BNP, HNP, RNP] Sub-Type:

ELE Microfiche Attachment List:

D Yes ~No

~----------~

Quality Level A


~

DAii

~ BNP Unit __ 1 & 2. __ _ 0 CNS Unit D ONS Unit D LNP Unit D MNS Unit D WLS Unit D General Office D Keowee Hydro Station Originated By Design Verification Review By Signature Signature E-sign E-sign Verification Method 1 ~ 2 D 3 D Other D Printed Name Printed Name Rex S Field Ed Kuffour Date Date E-date E-date Priority E:

~Yes D No D HNP Unit D RNP Unit D HAR Unit Approved By Signature E-sign Printed Name Jon Anderson Date E-date D YES ~ NO Check Box for Multiple Originators or Design Verifiers (see next page)

For Vendor Calculations:

Vendor: N/A Vendor Document#: NIA Owners Review By: N/A Date: N/A Approval By: N/A Date: N/A

3.0 BODY OF CALCULATION 3.1 Discussion/Calculation 3.1.1 125/250 VDC Distribution System Description Calculation BNP-E-6.120 Revision 7 Page5 Each division of the Class 1 E 125/250V DC system is powered by two (2) 125V DC batteries, in series, and their respective battery chargers, as depicted in Figures 1 & 2.

The battery chargers are fed from the Class 1 E onsite AC distribution system and normally supply power to all DC loads while maintaining the batteries in a fully charged state. Charger output is interrupted upon a loss of offsite power (LOOP) and is restored when the Emergency Diesel Generators re-energize the Emergency AC buses. During this period the batteries must be able to supply their load without charger support.

The 125/250V DC battery cells are GNB type NCN-17. Their discharge characteristics are included in Attachment H. Each 125V battery consists of 60 cells connected in series.

There are two 125V DC batteries in each division of each unit. The two batteries in each division are connected in series with their connection point (labeled NP), forming the common leg of the 125/250V DC system. Buses connected between the common leg and the remaining leg of either battery, i.e., P-NP or NP-N, receive 125V nominal. Buses connected between the outer legs of the two batteries (i.e., P-N) receive 250V nominal.

As shown in Figures 1 & 2, many panels in the DC distribution system are capable of being supplied from two power sources, the normal source and the alternate source.

These alternate feeds will be taken into consideration in this study. Voltage calculations are performed in accordance with the recommendations of Reference 2.3.

3.1.2 Battery Loading Scenarios Battery capacity must be evaluated for the following operating/loading scenarios:

1.

Design Basis Event (DBE) - LOCA with LOOP Large Break LOCA with LOOP Small Break LOCA with LOOP

2.
  • Station Blackout (SBO)
3.

Appendix R Fire Safety Analysis Safe Shutdown

p NP N

(-)

GK1 Gl6 GIB (CB).

DP3A DP18 BATI 1A-2 I f GJ& I I GJ01 (OGBI DP1A DPSA DP9A (SWVD)

(SWYD)

DP38 (CB) p GLBj I GKB:

I GK& I I

GLDI I

GMO NP N

GM21 I GM3 Ml

~

BATI BATI 1B-1 1 I 1B-2 FIGURE 1 UNIT 1125/250VDC DISTRIBUTION SYSTEM G.J.4 Gl71 (CB)

DP11A DP 118 GK7 SWITCHBOARD 1A Gl9 GJ3 (SWYDI GJ2 (RB)

CHARGER 1A-1 (TB)

MCC1CA

~

GJO' I I

I I

I I I

I I

I I

I I

I I

I f:

DP7A:

1XDA 1TDA 11DP17 DP3A8 (CB)

I I

I I

I I

I DP78 I (SWVOI RBEMRG LIGHTING Gl.71 I Gt(g SWITCHBOARD 1 B 1XD8 1TD8 (RB)

Gl.3 (TB)

Gl2 MCC1CB MCC 1XB

'---v--'

SWBO 28(+)

SWBD 2A(+)

~

I I (R'MJ)

I I I I I

I I I I I I

I I I I I I

I TBEMRG LIGHTING I

I I

I GL1 1 I GLB GM11 I

GM4 13711 CHARGER 18-2 1 L-MCC1CB l..--- MCC 1XB CHARGER 1A-2 GJS Gl5 Gl.9 Calculation BNP-E-6.120 Revision 5 Page6 SWBD2B

~

I I

I I

I I

I I

I I

I GJB I NORMAL FEED ALTERNATE FEED

p NP N

p NP N

FIGURE 2 Calculation BNP-E-6.120 Revision 5 Page?

UNIT 2 125/250VDC DISTRIBUTION SYSTEM BATT 11~ I BATT 2A-1 2A-2

!:U

(*)

~**

Gl<2

~I I JI J~

j I GJO: I I I GJ* I I Gl71 I I I (CO)

(0081 (CB)

DP4A DP2A I

DP12A I

tr-I (TO)

(SWID) 1 DP10A DP6A DP28 DP48

~~

(008)

(CB)

(CB)

I WTSYS I CONTPNL I

GLS Gl<ll I

Ol.D GMO Ol.4 C><1 I

I I

I I

GM2 GM3

-0

(*)

BATT BATT Uc*>

2B-1 ITT>

2B-2

~

CHARGER IL.I 2A-1

+

1£1 CHARGER

+

2A-2 SWITCHBOARD 2A GKO I I GKJ 11 aoo I I M l I I G.121 I I GJ1 1 I

~

IRlll (TO) l'MiSEI I DP 17 DPBA' I I

2XDA 2TDA DP4A8 I I'

-r-I I

S~(<) sweo 1A<'l (CB)

I I

I I

I I

2XDB 2TDB I I DP88 1 :

1 : DP 13 TG EBOP (SWID)

(Rll)

(TB)

........ )

IRWBEMRG I LIGHTING I

TBEMRG I LIGHTING 00..7 GK9 GLJ Gl.2 SWITCHBOARD 2B GMI GM4 CHARGER

+

+

CHARGER 28-1

!!JI.

!!JI.

28-2 MCC2CB I

I MCC2CB MCC2XD ----J

'---- MCC2XD 11°"

sweo 1e SWB01B

~,,...,._.,

I I U2LTG U1 LTG STD8Y

&COMM

&COMM p~

UPS UPS I

I I

I I

I I

I I

I I

Gt.*

au DJI I -

NORMAL FEED I

- - -

  • ALTERNATE FEED

3.2 Bases and Assumptions 3.2.1 Battery Loading for a Design Basis Event (DBE)

Calculation BNP-E-6.120 Revision 10 Page8 3.2.1.1 The DBE for which the batteries are evaluated is assumed to be a simultaneous loss of coolant accident (LOCA), coincident with a loss of offsite power (LOOP) and a single equipment failure (Reference 2.18, Section 2.1.1.1 ).

For a design basis event, the enveloping single failure is assumed to be the complete loss of one (1) DC division. The remaining DC division must be capable of supplying power to the ESF loads required for accident mitigation, as well as to BOP loads that are connected to the 125/250 VDC system. For the available DC division, AC power to the battery chargers will be restored by the diesel generator in approximately 10 sec from LOOP initiation. However, because the first minute peak loading could exceed the maximum output of the battery charger, this analysis is based on the batteries not having charger support for the entire first minute (Reference 2.18, Section 4.2.3.11 ). In addition, DC loading after the first minute (the "B" batteries) exceeds the battery charger rating of 300A. Load greater than 300A is carried by the respective battery; however, the loading will continue to deplete.

EC 407321 determined this loading condition could last approximately four (4) hours before operation action would require reducing the DC load sufficiently (transfer to an ac source or secure L TG/COMM UPS Units) to permit the battery chargers to recharge their respective battery. Therefore, the battery duty cycle for the DBE event is considered four (4) hours.

During a LOCA event, the High Pressure Coolant Injection (HPCI) and Reactor Core Isolation Cooling (RCIC) systems, supported by Division I and Division II batteries, respectively, will start as a result of high drywell pressure and/or reactor pressure vessel Low Level 2 (LL2) signal. Their operation is dependent on the type of LOCA event. This study examines two types of LOCA events for battery loading:

a) Large Break LOCA - pipe break which results in a loss of reactor coolant inventory that is more than the make-up capability of the HPCI system. In this case, the HPCI system starts first as a result of a high drywell pressure signal, followed by the subsequent start of the RCIC system, when the reactor vessel water level 2 (LL2) is reached.

b) Small Break LOCA - pipe br~ak which results in a loss of reactor coolant inventory that is less than the make-up capability of HPCI. In this case, it is assumed that HPCI will start on high drywell pressure signal and will maintain the reactor vessel water level above LL2. Therefore, the RCIC system will not be called upon to start. In the case of a loss of the Division I batteries which feeds the HPCI system, the HPCI System flow will maintain the reactor vessel water level between LL2 and "High Level" (Reference 2.55).

HPCI and RCIC pumps are assumed to start and secure once during the first minute and then run continuously which is a more conservative loading than system cycling.

Therefore, no system cycling is considered. For a conservative analysis (i.e., maximum number of DC MOV motor starts), both systems' MOVs are assumed to start and shutdown due to low steam pressure during the first minute.

Calculation BNP-E-6.120 Revision 10 Page9 For additional conservatism, and to minimize the need for separate databases, only one LOCA/LOOP analysis will be performed which envelopes both the small break LOCA and the large break LOCA scenarios.

3.2.1.2 This calculation is based on the analyzed DBE occurring on one (1) Unit only, with the concurrent, orderly shutdown of the other unit.

Only the loads associated with these events, or those that could be transferred from the opposite unit (loads which have an alternate power source from the other unit), are applied to the batteries of the DBE unit.

3.2.1.3 For conservatism, all loads on the non-DBE unit which have alternate power supplies from the DBE unit batteries are assumed to be powered by the DBE unit batteries (Reference subsection 3.2.1.4 for the application of this assumption to the plant Uninterruptible Power Supplies and Lighting and Communication Inverters).

3.2.1.4 The plant vital power Uninterruptible Power Supply (UPS) distribution panels are normally aligned to the Primary Power Conversion Unit 1 (2)A, which is fed from the Division I Emergency AC power supply, and backed-up by Division I batteries 1(2)A-1 and 1(2)A-2.

If the primary unit fails, the standby unit can be manually placed in service (Reference 2.14 and 2.21 ). The Standby Power Conversion Unit 1 (2)B is aligned to the Division II batteries 1(2)B-1and1(2)B-2 (Reference 2.14 and 2.21).

When determining the first minute LOCA/LOOP loading for the Division I and II batteries, the Primary Power Conversion Unit 1A is assumed to be fed from the Division I batteries; however, Tech Spec 3.8.7.2 requires verification that no combination of more than two (2) power conversion modules (consisting of either two (2) lighting inverters or one (1) lighting inverter and one (1) plant UPS unit) are aligned to Division II bus B.

Based on this criteria, the two (2) Lighting and Communications Inverters represent the greatest load of any two (2) inverters and are lined up to the Division II bus B batteries. In accordance with Reference 2.2, Section 3.8.7.2, Division II shall be determined to be operable at least once per seven (7) days.

3.2.1.5 This analysis is based on a complete failure or unavailability of one (1) DC Division. All loads that could be transferred from the failed division to the division under review are assumed to be transferred.

3.2.1.6 In accordance with Reference 2.3, "if a discrete sequence of momentary loads occurring within the same one (1) minute period can be established, the load for the one (1) minute period shall be assumed to be the maximum current at any instant". This analysis credits the discrete operation of momentary loads within the first minute LOCA/LOOP profile.

3.2.1. 7 No manual power circuit breaker or motor-operated disconnect switch operations are assumed to occur in the switchyard due to the LOOP or within the first sixty (60) seconds of the DBE. There are no undervoltage relaying schemes which would cause multiple power circuit breakers to trip due to loss of voltage in the switchyard. Tripping of multiple power circuit breakers could occur either by over-current conditions or if one of the Unit breakers feeding the main transformers has a failure to trip. However, this will not affect the battery load profile since the battery chargers would still have ac power until the last of the power circuit breakers has tripped. Additionally, if the power circuit breakers were to

Calculation BNP-E-6.120 Revision 10 Page 10 trip, there would not be any additional load drawn from the batteries in the form of spring charging motors.

Therefore, only the normal, continuous loading associated with this equipment is considered in the load profile.

3.2.1.8 The circuit breakers for motor loads powered from 4 kV Buses C and D trip on undervoltage detection via the actuation of relay 27/59S (and 27X, 27Y) at 5-6 sec following a LOOP. The same breakers are also equipped with LOCA load shed (LLS) and unit trip load shed (UTLS) circuitry that, when enabled, will trip selected 4 kV motor loads upon receipt of a LOCA signal or a unit trip signal. Keyed selector switches are installed on the affected breaker cubicle doors to enable or disable the LLS and/or UTLS feature for each specific load, based on the Eastern Transmission Area grid loading and voltage conditions. Breakers whose UTLS feature is enabled will trip at t=O (i.e., prior to the 5-6 sec undervoltage detection). Breakers whose LLS feature is enabled will trip when the LOCA signal is generated (LL3). For maximum coincident battery loading, 4kV bus C and D load shedding is assumed to occur at t=5 sec (see Table 3-12).

3.2.1.9 Per Attachment 2 of Reference 2.34, during a design basis LOCA event, reactor vessel Low Level 2 (LL2) and Low Level 3 (LL3) can be reached as early as 1.8 sec and 4.5 sec respectively.

3.2.1.10 Per Reference 2.33, during a design basis LOCA event, drywell pressure rises to the "high" setpoint level almost instantaneously (<< 1 sec).

3.2.1.11 4160V breakers typically trip within three (3) - five (5) cycles. (Ref 2.49). Six (6) cycles is assumed for conservatism. Since dcPRO 3.0 analyzes in one (1) second intervals, the energy dissipated by a trip coil is assumed to be 10% (6 cycles I 60 cycles) of rated amperage over a one (1) second interval.

The breakers are not assumed to trip simultaneously but dispersed (normal distribution) within a one (1) second interval.

Therefore, the cumulative effect is 10% of each individual contributing item.

3.2.1.12 4160V breaker spring charging motors have an inrush of 6 to 8 times normal operating current (1 OA) (Ref. 2.50). This inrush has been measured from testing to be 60A for 0.050 seconds in duration (peak at 0.025 second) (Attachment R). The current lowers to 20A, rises to 25A within 0.50 seconds and lowers to 1 OA for the remainder of the operation. The entire cycle is 1.6 seconds. The published value from ITE for the Type HK medium voltage circuit breakers is two (2) seconds for spring charging time. The energy dissipated over the first second as noted in Attachment R is 12.9 A-s.

The energy dissipated over the remaining 0.6 seconds is 6 A-s. Breakers are not assumed to close and recharge sim.ultaneously but dispersed within a one (1) second interyal. A total of two (2) seconds per closing operation is used based on vendor information and testing noted in Attachment R. An additional 20% is added to the energy dissipated for conservatism.

The first second of operation to the batteries is calculated at 15.4 A-s and the remainder of operation (over the 2"d second) is 7.2 A-s. Spring charging motor required voltage range is95-125 Vdc (ref 2.74). This is below the battery Vmin of 107 Vdc.

3.2.1.13 The DG field flash is modeled based on testing that was performed 07 /22/03 and evaluation conducted 10/24/13. The data and evaluation are in Attachment M. Testing

Calculation BNP-E-6.120 Revision 10 Page 11 indicated the DG field flash can take up to five (5) seconds (modeled 5 to 10 seconds);

however, analysis determined that the field flash from the batteries is typically three (3) seconds (modeled from 7 to 9 seconds) because the field flash from self-excitation will eventually exceed the field flash from the batteries. At that point, the field flash current from the batteries is isolated (blocking diode) and the diesel begins self-excitation. For modeling purposes, all four (4) diesels are presumed to flash for five (5) seconds.

3.2.1.14 TG EBOP inrush is modeled based on trace information from Ref 2.51 and estimated no more than two (2) seconds. The data and evaluation are in Attachment N.

3.2.1.15 The RFPT EOP inrush time is assumed no greater than two (2) second. From Ref 2.67, the motor is rated at 7.5Hp, 230V, 85% efficiency with a bHp of 6.5Hp (normal operating current of 24.8A). The inrush is estimated at 2.67

  • FLA which is based on data from Ref 2.28.

3.2.1.16 NCR 630621 identified that BNP was crediting voltages in excess of what was verified during battery capacity performance testing. EC 94834 and EC 95835 determined that based on the maximum instantaneous demand of approximately 700 A minimum a voltage of 107Vdc could occur at minimum battery temperatures and at the end of battery life. Therefore, the battery voltages for the LOCA/LOOP analyses were set at 107Vdc for both Unit 1 and 2.

This has been corrected and IEEE 485 methodology is used for analysis. Battery voltages are no longer set at 107V de*

For the purposes of the LOCNLOOP evaluation, the GNB type batteries are noted as"CON 17", in 'Nhich the output of the battery is fixed at 1.783 Vpc (107Vdc). CON 17 is a dummy battery cell used with the dcPRO software to simulate the results of the battery discharge test. It is composed of 17 plates (same number of plates as the actual NCN 17cell) *.*1hose characteristics have been set to yield a constant output voltage of 1.783V(107V) battery terminal 1Joltage) irrespecti1Je of the battery load during the one minute LOCNLOOP duty cycle. This v1as done to match the minimum battery voltage recorded during the first minute of the battery capacity discharge test.

3.2.2 Battery Loading for Station Blackout 3.2.2.1 In ac~ordance with Reference 2.23, the BNP SBO coping dwation is 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. However, in order to service the loads required for coping, for this period of time, the station batteries will require charger support. To accomplish this, the normally open crosstie from the non-blacked out unit will be closed within one (1) hour following the inception of the event, restoring the blacked out unit's battery chargers, thereby extending the capacity of the batteries. Consequently, this analysis established a one (1) hour SBO load profile for each of the 125/250V batteries.

3.2.2.2 With the exception of HPCl/RCIC isolation valve closures that occur due to insufficient steam supply pressure, all SBO unit specific LOCA loads considered to be energized in the LOCA/LOOP scenario are also considered to be energized for the SBO event.

Additionally, loads in the LOCA/LOOP scenario that transferred to the AC source at 10 sec upon the successful starting of the Emergency Diesel Generators, including the UPS

DUKB SNERGY BRUNSNICK MJCL1!llR PLANT UNITS l

& 2 125/250 VDC DISTRIBUTION SYSTEM STUDY SOFTtiARB USED: dcPRO 3. 0 BY CTA VOLTAGE/ LOAD FLOW CALCULATION REPORT CONDITION l: LOCA WI771 LOOP (CONTINUEDJ Calculation BNP-E-6.120 Revision 10 Attachment D Page 121 of 322

              • a**********D*********=***=********************=***==***=**=***=*************=****=*=***=*******=*=*=============*====~=*=a*sa~a=:uaa=====***=3*=*=**=

BUS: (#41 BA'.ITBRY JB-2 (CONTINUlWJ INITIAL BATTERY STATE: FULLY CHARGHD DUTY CYCLE TIHE:

5:00:00 BATTERY MANUFACTURER: GNB CBLL TYPE: NCN-11 MINIMUM ELECTROLYTE TEMPERATURE:

60. 0°F TEMP CORRECTION FACTOR: l.llO
  • a* SBGHBNT ****

FR<>>I TO

      • =a**

2150:00 2:55:00 3:00:00 3:05:00 3:10:00 3:15:00 3:20:00 3:25100 3:30:00 3:35:00 3:40:00 3t45:00 3150:00 3:55:00 4:00:00 4:05:00 4il0:00 4:15:00 4:20:00 4:25:00 4:30:00 4:35:00 4:40:00 4:45:00 4:50100 4:55:00 2:55100 3:00:00 3:05:00 3:10:00 3:15:00 3:20:00 3:25:00 3130:00 3:35100 3:40:00 3:45:00 3t50100 3:55:00 4:00:00 4:05:00 4:10:00 4:15:00 4:20:00 4:25:00 4:30:00 4:35:00 4140:00 4:45:00 4:50:00 4155:00 5:00:00 BATTERY AMPS m:sm:m**=

123.88 123. 93 123.97 124.03 124.08 124.l.J 124.20 124.21 124.35 124.43 124.53 124. 63 124. 75 124.81

-105. 75

  • 105. 13

-105. 71

-105.69

-105. 67

-105.65

  • 105.63

-105.62

-105.60

-105.58

-105.57

  • 105.55 TEMP/AGE CORR AMPS a****=*=*

171.88 171.95 172.02 172. 09 172.16 172.24 172.JJ 112.42 172.53 172. 65 172. 78 l72.9J 113.09 173.26

  • 146. 73

-146. 70

-146.61

  • 146.64
  • 146.62

-146.59

-146.51

-146.54

-146.52

-146.49

-146.41

  • 146.45 SBt:HJINr S2'ART *******************

AMPS AMP-HRS CELL PER PP PER PP VOLTS 21.48 21.49 21.50 2l.5l 21.52 21.53 21.54 21,5s 21.57 2l.58 21.60 2l.62 21.64 21.66

-18.34

  • 18.34
  • l8.JJ

-18.JJ

-18. JJ

-l8.J2

-18.32

-18.32

-18.Jl

-18.Jl

-18.Jl

  • l8.Jl aacaamm 6l,65 63.44 65.23 61.02 68.Bl 70.61 12.40 14.20 16.00 77.79 19.59 81.39 83.19 85.00 86.80 86.08 85.36 84.64 83.92 83.20 82.48 Bl. 76 81.04 80.Jl 19.59 79.87
    • ===*

l.936 l.934 l.933 l.932 l.930 l.929 l.927 l.925 l.923 l.921 l.919 l.917

l. 914 l.912 l.987 l.1187 l.988 l.989 l.989 l.990 l.990 l.991 1.991 1.992 1.992 l.992 BATTBRY VOLTS
  • sr*****

ll6.l 116.l ll6.0 115.9 115,8 115. 7 llS.6 ll5.5 llS.4 115.3 115.l 115.0 114. 9 ll4.'

119.2 119.2 119.J 119.3 119.J 119.4 ll9.4 ll9.4 119.5 119.5 ll9.5 119.5 POSTl'IVE PLATES:

8 NUMBER OF CBLLS:

60 AGE CORRECTION FACTOR: l.250

                • =*=************** SEGHEN'l' END **************************

BATTERY TEMP/ AGE AMPS CORR AMPS

      • 1111*11 123.93 l2J.97 124.03 124.08 124.lJ

.124.20 124. 27 124,JS l24.43 124.53 124. 63 124. 75 l24.87 125.00

  • 105. 73
  • 105. 71
  • 105.69
  • 105.67
  • .105.65
  • 105.63
  • 105.62
  • 105.60

-105.58

  • 105.57
  • 105.55
  • 105.54

=

l7l.95 172. 02 172. 09 172.16 172.24 l72.JJ 172.42 172.SJ 172.65 172. 78 172.93 113.09

.113.26 113.44

-146. 70

-146.67

-146.64

-146. 62

-146.59

  • 146.57
  • 146.54

-146.52

-146.49

  • 146.41
  • 146 *.f5
  • 146.43 AHPS NIP*HRS CVHULATIVE PER PP PER PP AHP*HRS/PP

=***

21.49 21.50 21.51 21.52 2l.5J 21.54 21.55 21.57 21,5B 2.l.60 21.62 21.64 21. 66 21.68

  • 18. 34
  • 18.JJ
  • lB.33

- 18,JJ

  • l8.J2
  • l8.J2
  • 18.32

-18.Jl

-18.Jl

  • 18.Jl

-18. Jl

  • IS.JO
  • ==*=*=
l. 79 l.79 l.79
l. 79 1.79 1.79 1.80 1.80 1.80 1.80 l.80 l.80 l.80 1.81

-l.53

  • l.SJ

-1.SJ

  • l.SJ
  • l.SJ
  • l.53

-1.SJ

  • l.53

-1,53

  • l.SJ
  • l. SJ
  • l.53

======a=i:n:

63.44 65.23 61.02 68.Bl 70.61 12.40 14.20 16.00

'17. 19 19.59 BJ.39 BJ.Jg 85.00 86.80 86.08 85.36 84.64 83.92 83.20 82.48

81. 76 Bl.04 80.Jl 19.59 18.87 78.15 CELL VOLT.S

=*=*1:1*

l.934

.l.933 l.932 l..930 1.929 l.927 l.925 l,923 l.92l 1.919 l.91'1 l.914 1.912 1.909 J.981 1.988 l.989 l.989 1.990 1.990 1.991 1,991 1.992 1.992 1.992 l.993 BA2TERY VOLTS

-.aa**a*

116.l 116.0 llS.9 llS.8 115.'

115.6 ll5.5 ll5.4 115.3 ll5.l ll5.0 114.9 114.7 ll4.6 ll9.2 ll9.3 119.J ll9.J 119.4 ll9.4 ll9.4 ll9.5 119.5 ll9.5 119.5 119.6 Ct!Nl1LATI'Vli AHP*ROURS DISCHAllGEJ 0*11*a****n 507.51 521. 84 536.11 550.52 564.87 579.22 593.59 607.96 622.34 636. 14 65l.l4 665.56 619.99 694.44 688.66 682.89 677.12 671.JS 665.58 659.82 654.05 648.28 642.52 636. 15 630.99 625.23 Daaa**a*Ga:m:z:i:aasaa*m*2==**Daa**==**=*n:aaaaaa*************c****m**a***=*=aa~~ ** m=aa:maa*:aaaacaco=**aaaaaaaaaeca:a:aaaaaaaaaamaa*a*********~a2*2:*:~*=~***

BUS: {#121 BA7TlfRY lB-2*

      • SEGMENT *=**

FRCW TO 0:00:00 0:00:03 0:00:06 0:00:09 0:00:12 0:00:15 0:00:01 0:00:04 0:00:07 0:00:10 0:00:.13 0:00:16 SBGHENT START AMPS VOLTS 487.6 491.3 517.4 453.0 436.6 436.?

109.l 109.l 108.6 109.7 llO. 0 110. 0 SEGHEN:r END AMPS 487.6 491.3 517.4 453.0 436.6 436.1 VOLTS 109.l 109. l 108.6 109. 7 llO.O 110.0 PONER SOURCE: BATTERY lB*2

    • = SEGMENT====

FROM TO

==*1;-m::ra 0:00:01 0:00:04 0:00:07 0:00:10 0:00:13 0:00:16 0:00:02 0:00:05 Ot00t08 O:OO:ll 0:00:14 O:OO:l 1 Sf.'GHEBT START AMPS VOLTS 487.l 484.6 474. 8 443.2 436.2 437.l

- 120 -

109.l 109.2 109.3 109.9 llO.O 110.0 SSXlHENJ' END AMPS VOLTS 487.l 484.6 414.8 443.2 436.2 437.l 109.l 109.2 109.3 109.9 110.0 110.0 c c2 SBGHSJlr an**

FROM TO 0:00:02 0:00:05 0:00:08 O:OO:ll 0:00:14 0: 00:11 0:00:03 0:00:06 0:00:09 0:00:12 0:00:15 0:00:18 SEGMENT START AMPS VOLTS 491.5 661.l 477. 7 431.0 436.2 436.7 109.0 105.9 109.J llO,O 110.0 llO.O SSGHENr END AMPS VOLTS 491.5 667.l 477. 7 431.0 436.2 436,1 109.0 105.9 109.3 llO,O l.IO. 0 llO.O

ATTACHMENT G Calculation BNP-E-6.120 Revision 10 Attachment G Page 1 BATTERY DISCHARGE STATE AND CHARGER LOAD FOR NORMAL, POST-LOCA/LOOP AND POST-SBO OPERATION (FOR BATTERY CHARGER SIZE VERIFICATION)

EVALUATION OF BATTERY VOL TAG ES AFTER RESTORATION OF BATTERY CHARGERS

Calculation BNP-E-6.120 Revision 10 Attachment G Page2 This attachment provides a summary of the battery discharged ampere-hours for the LOCA w/LOOP and the SBO scenarios, as well as the battery charger loading during normal operation, post LOCA/LOOP duty cycle operation and post SBO duty cycle operation. This data is used by calculation BNP-E-6.079 for sizing the battery chargers. Refer to section 3.3.2 of base calculation for additional discussion on post duty cycle operation of equipment.

It should be noted that calculation BNP-E-6.079 corrects the battery discharged ampere-hours for aging (factor of 1.25) and minimum electrolyte temperature (factor of 1.11 for 60°F).

Attachment D of this calculation provides the battery discharged ampere-hours for the LOCA/LOOP and the SBO events also corrected for aging and temperature. To avoid double correction of the discharged ampere-hours, Table 1 below establishes the uncorrected ampere-hours from the corrected ampere-hours found in Attachment D.

TABLE 1 BATTERY DISCHARGED AMPERE-HOURS DISCHARGED AMPERE-HOURS DISCHARGED AMPERE-HOURS 125V Corrected for Aging Not Corrected for Aging BATTERY and Electrolyte Temperature and Electrolyte Temperature LOCA/LOOP LOCA/LOOP SBO LOCA/LOOP LOCA/LOOP SBO (Att. D)

(Att. D)

(Att. D)

(Att. D)

(Att. D)

(Att. D) at 60 Sec at 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />s*

at 60 Min) at60 Sec at 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> at 60 Min) 1A-1 8.05 0

335.49 5.80 0

241.79 1A-2 7.31 0

262.61 5.27 0

189.27 1B-1 9.91 511.22 441.10 7.14 368.45 317.91 1B-2 10.32 688.66 522.41 7.44 496.33 376.51 2A-1 8.50 31.83 360.51 6.13 22.94 259.83 2A-2 7.32 0

256.26 5.28 0.00 184.69 2B-1 9.98 524.36 466.39 7.19 377.92 336.14 2B-2 9.85 610.12 500.40 7.10 439.73 360.65 Note: Uncorrected Ampere-Hours = Corrected Ampere-Hours + (1.25 x 1.11)

  • Those batteries with zero amp-hours are effectively recharged by the battery charger during operation.

TABLE 2 BATTERY CHARGER LOADING (AMPERES NORMAL POST OPERATION BATTERY (max allowable LOCA/LOOP CHARGER voltage) (from Att.

(from Att. B1) (> 4 B1 DC 52) hrs) 1A-1 96.00 287.78 1A-2 44.70 238.36 1B-1 77.60 163.57 1B-2 99.50 198.06 2A-1 95.60 304.73*

2A-2 41.80 235.68 2B-1 80.60 164.16 28-2 99.30 180.05 Calculation BNP-E-6.120 Revision 10 Attachment G Page3 POST SBO (from Att. B2 at 61 min) 158.74 103.91 124.11 163.13 147.61 89.49 134.40 151.27

  • Loading exceeds battery charger rating; therefore, battery charger remains fully loaded after four (4) hours and battery continues to deplete unless load is removed.

The battery charger loading in Table 2 for normal operation is obtained from the charger load tabulation found in Attachment 81 (pg 51). It is based on a system voltage of 140 VDC, which is the charger equalize voltage.

Per the mentioned tabulation, this load is primarily from resistive type devices (as compared with constant power devices). Therefore, correction of this load to the maximum system voltage is conservative.

The Post LOCA/LOOP is found in 1 and Post 880 in Attachment 82. From this information all battery charger loads are less than 300A with the exception of battery 2A-1.

Refer to BNP-E-6.079 for analysis of the battery chargers.

ATTACHMENT H GNB BATTERY DISCHARGE CHARACTERISTICS BNP E-6.120 Revision 0 Attachment H Page 1

NUCLEAR CLASS 1 E BAfTERIES TYPE NANt -

LEAD ANTIMONY TYPE NCNt -

LEAD CALCIUM CAPACITIES -

550 A.H. to 2550 A.H.

aNP--6. 12..0 fl.i::v'1 s,"'"' ¢ ATTltl..HMeNT H PAC,E 2

,ect1on 35.40

@ 8 HOUR RATE TO 1.75 V.P.C. AVERAGE 20 VEAR LIFE EXPECTANCY SPECIFICATIONS

  • Jar-Styrene-Acrylonitrile (SAN) Plastic
  • Cover -

Acrylonitrite Butadiene Styrene (ABS) Plastic Separators -

Microporous Material Retainers -

Fiberglass Mats Posts -

NAN/NCN 7*17 two-1.5" (38.1 mm) square NAN/NCN 19-27 four-1.0" (25.4 mm) square NAN/NCN 29-35 four-1.5" (38.1 mm) square Post Seals -

Floating "O" Ring - Seal Nut Vents -

GNB "Pre-Vent" Flame Arrester Level Lines -

High and Low - All Jar Faces Electrolyte~ Height above plates - 2.75" (69.9 mm)

Electrolyte Withdrawal Tubes -

2 per cell Sediment Space -

1 _06" (26.9 mm)

Specific Gravity -

1.215 @ 77°F {25°C)

H Inter-Cell Connectors -

Lead Plated Copper tNAN and NCN are the nuclear variant of GNB's commercial NAX/NCX line.

Plate Dimensions

  • Optional -

Polycarbonate Jar and Cover

  • UL 94-V-O

Qualified according to IEEE 535 Tested according to IEEE 450 Positive Plate Negative Plate Height Width 15.0 in.

12.5 in.

381.0 mm 317.5 mm 15.0 in.

12.5 in.

381.0 mm 317.5 mm NOM Amperes To 1.75 V.P.C. Average Overall Dimensions Approximate Weight Cell Type AH CAP 8 Hr. 5 Hr. 3 Hr. 1 Hr. 30 Min. 15Min. 1 Min. Length Width Height Net Packed 550 69 96 134 245 300 340 436 7.38 in 14.55 in 22.13 in 160lbs 187mm 368mm 562mm 72 k 690 86 124 165 300 454 515 582 7.38 in 14.55 in 22.13in 1771bs 187mm 388mm 562mm 80 k 825 103 149 200 375 561 686 727 7.38 in 14.55 in 22.13 in 1951bs 187 mm 388mm 562mm 89 k 950 119 171 238 450 666 814 873 7.38 in 14.55 in 22.13in 2131bs 187mm 388mm 562mm 97k 1070 134 194 277 525 768 939 1018 7.38in 14.55 in 22.13in 231 lbs 187 mm 368mm 562mm 105 k 1200 150 216 312 600

~67 1060 1165 7.38in 14.55 in 22.13 in 2691bs 187 mm 368mm 562mm 112 k 1370 171 246 357 675 953 1165 1260 9.25in 14.55 in 22.5 in 2821bs 235mm 368mm 572mm 128 k 1495 187 270 390 750 1033 1263 1400 9.25 in 14.55 in 22.5 in 301 lbs 235mm 368mm 572mm 137 k 1670 209 301 436 825 1136 1389 1540 11.38 in 14.55 in 22.5 in 3481bs 289 mm 36Bmm 572mm 158 k 1810 226 326 472 900 1232 1506 1680 11.38 in 14.55 in 22.5 in 3641bs 289mm 368mm 572mm 165 k 1945 243 351 507 975 1327 1622 1840 11.38 in 14.55 in 22.5 in 3801bs 289*mm 368mm 572mm 173 k 2150 269 389 555 1050 1429 1747 1932 14.56 in 14.55 in 22.5 in 4461bs 370mm 368mm 572mm 203 k 2280 285 411 595 1125 1531 1872 2070 14.56 in 14.55 in 22.5 in 462lbs 370mm 388mm 572mm 210 k 2415 302 435 629 1200 1633 1996 2220 14.56 in 14.55 in 22.5 in 4791bs 370mm 368mm 572mm 218 k 2550 319 459 663 1275 1735 2121 2350 14.56 in 14.55 in 22.5 in 496lbs 370mm 368mm 572mm 225 kg Thickness

.325 in.

8.26 mm

.220 in.

5.59 mm Eleclro*

lyte Per Cell 6.4 gal 24.2 li1er 6.0 ~al 22.7 iter 5.6 ~al 21.2 i1er 5.1 gal 19.3 liler 5.0 gal 18.9 liter 4.9 ~al 18.5 i1er 6.3 gal 23.8 liter 6.0 gal 22.7 liter 8.0 gal 30.3 liter 7.6 gal 28.8 liter 7.3~al 27.6 iler 11.5 gal 43.5 liter 10.9 gal 41.3 liter 10.3 gal 39.0 liter 9.7 gal 36.7 liter GNB offers a comple1e ine ol battery racks in !WO-tier. llVee*liel. and ttwo-slep mnfigurallons. and can be ordered lo suit your seismic zone reQu;rcmen&s. For lnlotmalion oo ballery racks. please refl!f lo brochure soc!ion 43.20.

N*N Nuclear Class 1 E Stationary Battery Rates Ill~ 111111111111111111111111ii1111111111111111111111111111111111111111 t~i1litijl11111111111111111111111111111 I II II Ill I I I I I I I I I I I~ 11 !::

200 190 180 170 160 1 so 140 cu 130

~ 120 II) 0 Q. 110 cu Q. 100
J 90 0 :c Q.

80 E

70 60 so 40 30 Min 20 10 0

~Min 0

10 20 30 40 so 60 70 80 90 100

, 10 120 130 140 Amp Per Positive Note: This Information represents the average performance of the line.

Qualified In accordance with IEEE Std 535*1986 Tested In accordance with IEEE Std 450-1987 Refer to the tables for actual discharge data.

(..,.,..

\\.

(

\\..

i i

I l

i l I

I 1

-I

  • I j

l f

! it)*

()**,

~

CELL TYPE 8 I End Voltage -

1. 75 NANINCN-7 69 NANINCN-9 86 NANINCN-11 103 NANINCN-13 119 NAN/NCN-15 134 NANINCN-17 150 NANINCN-19 171 NANINCN-21 187 NANINCN-23 209 NANINCN-25 226 NANINCN-27 243 NANINCN-29 269 NANINCN-31 285 NANINCN-33 302 NAN/NCN-35 319 End Voltage -
1. 78 NA.NINCN-7 67 NANINCN-9 83 NANINCN-11 100 NANINCN-13 115 NANINCN-15 130 NANtt4CN-17 146 NANINCN-19 165 NANINCN-21 182 NANINCN-23 202 NAN!flCN-25 219 NANINCN-27 237 NM-mCN-29 260 NAN!flCN-31 275 NANmCN-33 292 NAN/NCN-35 310 End Voltage -

1.81 NANINCN-7 65 NANINCN-9 81 NAN/NCN-11 97 NAN/NCN-13 112 NAN/NCN-15 127 NANINCN-17 141 NAN/NCN-19 161 NAN,t.!CN-21 176 NAN/NCN-23 197 NANINCN-25 213 NANINCN-27 229 NANINCN-29 254 NANINCN-31 268 NANtt4CN-33 284 NAN.INCN-35 300 AMP DATA NAN/NCN CELLS HOURS 5 I 4 I 3 I 2 I 1.5 I 96 11i 134 170 207 124 138 165 204 240 149 167 200 252 300 171 198 238 292 345 194

'121 m

350 412 216 254 312 405 465 246 290 357

48) 535 270 317 390 515 590 301 354 436 560 660 326 384 472 615 725 351 412 507 670 785 389 455 555 715 857 411 483 595 710 925 435 512 629 820 995 459 539 663 868 1053 93 108 129 165 197 120 132 156 196 228 144 162 193 242 285 166 190 228 280 328 187 220 261 336 391

?OQ 244 293 389 442 239 279 333 442 508 262 305 366 494 561 292 341 407 538 r;n 316 369 440 590 689 340 396 476 643 746 375 441 522 694 814 399 465 555 747 879 4'12 492 586 795 945 445 518 623 842 1000*

90 104 124 153 182 117 127 152 184 211 140 156 185 227 264 162 183 218 263 304 182 211 252 315 363 203 236 285 365 409 232 201 324 414 471 254 295 357 464 519 284 327 396 500 581 307 357 428 554 638 330 383 464 603 691 364 423 509 643 754 387 465 540 693 814 410 492 571 738 875 432 518 606 781 926 1

245 300 375 450 525 600 675 750 825 900 975 1050 1125 1200 1275 228 279 349 419 488 558 628 698 767 837 907

'D7 1046 1116 1186 208 255 319 383 446 510 574 638 701 765 829 893 956 1020 1084

"&Jp :..£-6. izo llJWJ SI o,../ fl!

ATr~cH~cwr H PA4 if MINUTES 30 I 15 I 1 300 340 436 454 515 582 561 686 7'Zl 666 814 873 768 939 1018 867 1060 1165 953 1165 1260 1033 1263 1400 1136 1389 1540 1232 1506 1680 1327 1622 1840 1429 1747 1932 1531 1872 2072 1633 1966 2220 1735 2121 2350 282 324 383 376 432 510 470 540 637 564 648 765 658 756 892 752 864 1020 846 972 1107 940 1080 1230 1034 1188 1287 1128 1296 1404 1222 1404 1521 1316 1512 1624 1410 1620 1740 1504 1728 1850 1598 1836 1970 255 285 330*

340 380 440 425 475 550 510 570 660 595 665 no 680 760 880 765 855 954 850 950 1060 935 1045 1100 1020 1140 1200 11n; 1235 1306 1190 1330 1386 1275 1425 1485 1360 1520 1600 1445 1615 1700