ML17312A632: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 2: | Line 2: | ||
| number = ML17312A632 | | number = ML17312A632 | ||
| issue date = 03/26/1996 | | issue date = 03/26/1996 | ||
| title = Proposed Tech Specs,Revising TS 3/4.9.6 to Relocate Refueling Machine Overload Cut Off Limit from TS 3/4.9.6 to Plant UFSAR Per Criteria in 10CFR50.36 & Rev 1 of NUREG-1432 STS for C-E Plants | | title = Proposed Tech Specs,Revising TS 3/4.9.6 to Relocate Refueling Machine Overload Cut Off Limit from TS 3/4.9.6 to Plant UFSAR Per Criteria in 10CFR50.36 & Rev 1 of NUREG-1432 STS for C-E Plants | ||
| author name = | | author name = | ||
| author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR | | author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR | ||
| Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter:REFUEL ING OPERAT IONS a | {{#Wiki_filter:REFUEL ING OPERAT IONS a | ||
. 3/4.9.6 REFUELING MACHINE LIMITING CONDITION FOR OPERATION 3.9.6 The refueling machine shall be used for movement of fuel assemblies and shall be OPERABLE with: | |||
a. | |||
APPLICABILITY: During movement | A minimum capacity of 3590 pou.>ds and an overload cut off limit. | ||
APPLICABILITY: During movement of fuel assemblies within the refueling cavity. | |||
ACTION: | ACTION: | ||
With the above requirements for the refueling machine not satisfied, | With the above requirements for the refueling machine not satisfied, suspend use of the refue1ing machine from operations involving the movement of fuel assemblies. | ||
SURVEILLANCE RE UIREMENTS 4.9.6. 1 | SURVEILLANCE RE UIREMENTS 4.9.6. | ||
1 | 1 The refueling machine used for movement of fuel assemblies shall be demonstrated OPERABLE within 72 hours prior to the start of such operations by performing a load test of at least 3590 pounds and demonstrating an automatic d<< ff 1 | ||
1 1'1g df 1 | |||
1 | |||
'-d I+5 cse rico ddoc c 4 0(F (lrrl(P 9aoo020035 9soms PDR ADQCK 05000529 i, P | |||
PDR PALO VERDE UNIT 2 3/4 9-6 AMENDMENT NO.~76 | |||
U 4 i ~}} | U 4 i | ||
~}} | |||
Latest revision as of 00:14, 8 January 2025
| ML17312A632 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 03/26/1996 |
| From: | ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | |
| Shared Package | |
| ML17312A631 | List: |
| References | |
| RTR-NUREG-1432 NUDOCS 9604020035 | |
| Download: ML17312A632 (2) | |
Text
REFUEL ING OPERAT IONS a
. 3/4.9.6 REFUELING MACHINE LIMITING CONDITION FOR OPERATION 3.9.6 The refueling machine shall be used for movement of fuel assemblies and shall be OPERABLE with:
a.
A minimum capacity of 3590 pou.>ds and an overload cut off limit.
APPLICABILITY: During movement of fuel assemblies within the refueling cavity.
ACTION:
With the above requirements for the refueling machine not satisfied, suspend use of the refue1ing machine from operations involving the movement of fuel assemblies.
SURVEILLANCE RE UIREMENTS 4.9.6.
1 The refueling machine used for movement of fuel assemblies shall be demonstrated OPERABLE within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> prior to the start of such operations by performing a load test of at least 3590 pounds and demonstrating an automatic d<< ff 1
1 1'1g df 1
1
'-d I+5 cse rico ddoc c 4 0(F (lrrl(P 9aoo020035 9soms PDR ADQCK 05000529 i, P
PDR PALO VERDE UNIT 2 3/4 9-6 AMENDMENT NO.~76
U 4 i
~