| number = ML17312A632
| number = ML17312A632
| issue date = 03/26/1996
| issue date = 03/26/1996
| title = Proposed Tech Specs,Revising TS 3/4.9.6 to Relocate Refueling Machine Overload Cut Off Limit from TS 3/4.9.6 to Plant UFSAR Per Criteria in 10CFR50.36 & Rev 1 of NUREG-1432 STS for C-E Plants.
| title = Proposed Tech Specs,Revising TS 3/4.9.6 to Relocate Refueling Machine Overload Cut Off Limit from TS 3/4.9.6 to Plant UFSAR Per Criteria in 10CFR50.36 & Rev 1 of NUREG-1432 STS for C-E Plants
| author name =  
| author name =  
| author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
| author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:REFUEL ING OPERAT IONS a
{{#Wiki_filter:REFUEL ING OPERAT IONS a
  . 3/4.9.6   REFUELING MACHINE LIMITING CONDITION   FOR OPERATION 3.9.6   The refueling machine   shall   be used   for movement of fuel assemblies   and shall   be OPERABLE with:
. 3/4.9.6 REFUELING MACHINE LIMITING CONDITION FOR OPERATION 3.9.6 The refueling machine shall be used for movement of fuel assemblies and shall be OPERABLE with:
: a. A minimum   capacity of 3590   pou.>ds   and an overload cut off limit.
a.
APPLICABILITY: During movement       of fuel assemblies within the refueling cavity.
A minimum capacity of 3590 pou.>ds and an overload cut off limit.
APPLICABILITY: During movement of fuel assemblies within the refueling cavity.
ACTION:
ACTION:
With the above requirements for the refueling machine not satisfied,             suspend use of the refue1ing machine from operations involving the movement             of fuel assemblies.
With the above requirements for the refueling machine not satisfied, suspend use of the refue1ing machine from operations involving the movement of fuel assemblies.
SURVEILLANCE RE UIREMENTS 4.9.6. 1   The refueling machine used for movement of fuel assemblies shall be demonstrated     OPERABLE within 72 hours prior to the start of such operations by performing       load test of at least 3590 pounds and demonstrating an automatic d<<       ff a
SURVEILLANCE RE UIREMENTS 4.9.6.
1   1    1'1g       df     1   1     '-d I+5 cse rico   ddoc c 4 0(F (l rrl(P 9aoo020035 9soms PDR   ADQCK 05000529 i, P                   PDR PALO VERDE UNIT 2                       3/4 9-6                       AMENDMENT NO.   ~76
1 The refueling machine used for movement of fuel assemblies shall be demonstrated OPERABLE within 72 hours prior to the start of such operations by performing a load test of at least 3590 pounds and demonstrating an automatic d<< ff 1
1 1'1g df 1
1
'-d I+5 cse rico ddoc c 4 0(F (lrrl(P 9aoo020035 9soms PDR ADQCK 05000529 i, P
PDR PALO VERDE UNIT 2 3/4 9-6 AMENDMENT NO.~76


U 4 i ~}}
U 4 i
~}}

Latest revision as of 00:14, 8 January 2025

Proposed Tech Specs,Revising TS 3/4.9.6 to Relocate Refueling Machine Overload Cut Off Limit from TS 3/4.9.6 to Plant UFSAR Per Criteria in 10CFR50.36 & Rev 1 of NUREG-1432 STS for C-E Plants
ML17312A632
Person / Time
Site: Palo Verde 
Issue date: 03/26/1996
From:
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17312A631 List:
References
RTR-NUREG-1432 NUDOCS 9604020035
Download: ML17312A632 (2)


Text

REFUEL ING OPERAT IONS a

. 3/4.9.6 REFUELING MACHINE LIMITING CONDITION FOR OPERATION 3.9.6 The refueling machine shall be used for movement of fuel assemblies and shall be OPERABLE with:

a.

A minimum capacity of 3590 pou.>ds and an overload cut off limit.

APPLICABILITY: During movement of fuel assemblies within the refueling cavity.

ACTION:

With the above requirements for the refueling machine not satisfied, suspend use of the refue1ing machine from operations involving the movement of fuel assemblies.

SURVEILLANCE RE UIREMENTS 4.9.6.

1 The refueling machine used for movement of fuel assemblies shall be demonstrated OPERABLE within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> prior to the start of such operations by performing a load test of at least 3590 pounds and demonstrating an automatic d<< ff 1

1 1'1g df 1

1

'-d I+5 cse rico ddoc c 4 0(F (lrrl(P 9aoo020035 9soms PDR ADQCK 05000529 i, P

PDR PALO VERDE UNIT 2 3/4 9-6 AMENDMENT NO.~76

U 4 i

~