{{#Wiki_filter:N.R.C. OPERATING   DATA REPORT DOCKET NO. 50-315 DATE 03/Nov/93 COMPLETED BY DG TURNER TELEPHONE 616-465-5901 OPERATING STATUS
{{#Wiki_filter:N.R.C.
: 1. Unit Name                       D. C. Cook Unit 1
OPERATING DATA REPORT DOCKET NO.
: 2. Reporting Period                             OCT 1993 notes
50-315 DATE 03/Nov/93 COMPLETED BY DG TURNER TELEPHONE 616-465-5901 OPERATING STATUS
: 3. Licensed Thermal Power (MWt)                     3250   Corrected YTD & Cumm.
: 1. Unit Name D.
: 4. Name Plate Rating (Gross MWe)                   1152   UCFs to use MDC=1000
C.
: 5. Design Electrical Rating (Net MWe)               1020   MWe Net. Retro. 07/91
Cook Unit 1
: 6. Maximum Dependable Capacity (GROSS MWe) 1056             02/Nov/93 DG Turner
: 2. Reporting Period OCT 1993
: 7. Maximum Dependable Capacity (Net MWe )           1000 8 ~ If   Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons See notes above. No ion er usin seasonall ad usted values.
: 3. Licensed Thermal Power (MWt) 3250 4.
If Any:If
Name Plate Rating (Gross MWe) 1152
: 9. Power Level To Which Restricted.            Any (Net MWe)
: 5. Design Electrical Rating (Net MWe) 1020 6.
: 10. Reasons      For Restrictions.
Maximum Dependable Capacity (GROSS MWe) 1056 7.
This Mo.. Yr. to Date   Cumm.
Maximum Dependable Capacity (Net MWe 1000 notes Corrected YTD & Cumm.
: 11. Hours   in Reporting Period                 745.0       7296.0   165096.0
UCFs to use MDC=1000 MWe Net. Retro.
: 12. No. of Hrs. Reactor Was Critical       745 '       7296.0   124190.4
07/91 02/Nov/93 DG Turner 9.
: 13. Reactor Reserve Shutdown Hours                 0.0         0.0     4'63 ~ 0
Power Level To Which Restricted. If Any (Net MWe) 10.
: 14. Hours Generator on Line                     745 '       7296 '   122144.6
Reasons For Restrictions. If Any:
: 15. Unit Reserve Shutdown Hours                     0.0         0 0     321 0
)
: 16. Gross Therm. Energy Gen. (MWH)           2410091     23357580   358799903
8 ~ If Changes Occur in Capacity Ratings (Items no.
: 17. Gross Elect. Energy Gen. (MWH)             778010       7544210   116487570
3 through 7) Since Last Report Give Reasons See notes above.
: 18. Net Elect. Energy Gen. (MWH)               750796       7277346   112039711
No ion er usin seasonall ad usted values.
: 19. Unit Service Factor                         100.0       100 '       74 '
This Mo..
20;   Unit Availability Factor                     100.0       100.0       74 '
Yr. to Date Cumm.
: 21. Unit Capacity Factor (MDC Net)               100.8         99.7         67.6
: 11. Hours in Reporting Period 745.0 7296.0 165096.0 12.
: 22. Unit Capacity Factor (DER Net)                 98 '         97 '         65 '
No. of Hrs. Reactor Was Critical 745 '
: 23. Unit Forced Outage Rate                         0'           0.0         6'
7296.0 124190.4
: 24. Shutdowns Scheduled over Next Six Months (Type, Date,and Duration)-
: 13. Reactor Reserve Shutdown Hours 0.0 0.0 4'63
Refuelin Outa e to be in Februar 5, 1994 for an estimated duration of 70 da s.
~ 0 14.
Hours Generator on Line 745 '
7296 '
122144.6
: 15. Unit Reserve Shutdown Hours 0.0 0
0 321 0
16.
Gross Therm.
Energy Gen.
(MWH) 2410091 23357580 358799903 17.
Gross Elect.
Energy Gen.
(MWH) 778010 7544210 116487570
: 18. Net Elect.
Energy Gen.
(MWH) 750796 7277346 112039711
: 19. Unit Service Factor 100.0 100 '
74 '
20; Unit Availability Factor 100.0 100.0 74 '
: 21. Unit Capacity Factor (MDC Net) 100.8 99.7 67.6
: 22. Unit Capacity Factor (DER Net) 98 '
97 '
65 '
: 23. Unit Forced Outage Rate 0 '
0.0 6 '
24.
Shutdowns Scheduled over Next Six Months (Type, Date,and Duration)-
Refuelin Outa e to be in Februar 5,
1994 for an estimated duration of 70 da s.
: 25. If Shut Down At End of Report Period, Estimated Date of Startup:
: 25. If Shut Down At End of Report Period, Estimated Date of Startup:
: 26. Units in Test Status (prior to Commercial Operation):
: 26. Units in Test Status (prior to Commercial Operation):
Forcast     Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 9311160030 931105 t
Forcast INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved 9311160030 931105 t
            'DR   ADOCK 05000315 R               PDR
'DR ADOCK 05000315
- R PDR


AVERAGE DAILY POWER LEVEL       (MWe-Net)
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO UNIT DATE
MONTH DOCKET NO~,, 50-315 UNIT ONE DATE 02/Nov/93 COMPLETED BY DG TURNER TELEPHONE 616-465-5901 OCT 1993 DAY 10/01/93 10/02/93 10/03/93 10/04/93 10/05/93 10/06/93 10/07/93 10/08/93 10/09/93 10/10/93 10/11/93 10/12/93 10/13/93 10/14/93 10/15/93 10/16/93 AVERAGE DAILY POWER LEVEL 1010 1009 1009 1010 1010 1011 1011 1010 1011 1013'009 1013 995 983 1005 1015 DAY 10/17/93 10/18/93 10/19/93 10/20/93 10/21/93 10/22/93 10/23/93 10/24/93 10/25/93 10/26/93 10/27/93 10/28/93 10/29/93 10/30/93 10/31/93 AVERAGE DAIL POWER LEVEL 1007 1008 1008 1006 1012 1016 1016 1017 1007 1022 1002 1017 1008 998 1016
                                  ~,,       50-315 ONE 02/Nov/93 COMPLETED BY   DG TURNER TELEPHONE   616-465-5901 MONTH            OCT 1993 AVERAGE DAILY                              AVERAGE DAIL DAY     POWER LEVEL                DAY            POWER LEVEL 10/01/93       1010                  10/17/93             1007 10/02/93       1009                  10/18/93             1008 10/03/93       1009                  10/19/93             1008 10/04/93       1010                  10/20/93             1006 10/05/93       1010                  10/21/93             1012 10/06/93       1011                  10/22/93             1016 10/07/93       1011                  10/23/93             1016 10/08/93       1010                  10/24/93             1017 10/09/93       1011                  10/25/93             1007 10/10/93       1013'009              10/26/93             1022 10/11/93                             10/27/93             1002 10/12/93       1013                  10/28/93             1017 10/13/93         995                10/29/93             1008 10/14/93         983                10/30/93             998 10/15/93       1005                  10/31/93             1016 10/16/93       1015


UNIT SHUTDOWNS AND POWER REDUCTIONS                                   UNIT NAME       D. C. COOK UNIT 1.
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: OCTOBER 1993 UNIT NAME DATE:
DATE:            Nov. 4, 1993 REPORT MONTH: OCTOBER 1993                                        COMPLETED BY$    R. D. Reynnells TELEPHONE:      (616) 465-590I Page 1 of 1 METHOD OF SHUTTING'ICENSEE DURATION            DOWN         EVENT       SYSTEM   COMPONENT     CAUSE AND CORRECTIVE ACTION NO. DATE  TYPE      HOURS      REASON   REACTOR -    REPORT NO. CODE     CODE         TO PREVENT RECURRENCE None                                                                                         There wer no unit shutdown or significant power reductions from 100% RTP this month.
COMPLETED BY$
1               2                                    3                    4                              5 F Forced       Reason:
TELEPHONE:
A: Equipment Failure (Explain)
Page 1 of 1 D. C.
Method:              Exhibit G  Instructions      Exhibit I:  Same S  Scheduled                                          1: Manual            for preparation of data                    Source B! Maintenance or Test               2: Manual Scram      entry sheets for Licensee C: Refueling                         3:  Automatic Scram  Event Report (LER)  File D: Regulatory Restriction           4: Other (Explain)  (NUREG 1061)
COOK UNIT 1.
E:  Operator Training and License Examination F: Administrative G: Operational Error (Explain)
Nov. 4, 1993 R. D. Reynnells (616) 465-590I DURATION NO.
H: Other (Explain)
DATE TYPE HOURS METHOD OF SHUTTING'ICENSEE DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION REASON REACTOR REPORT NO.
CODE CODE TO PREVENT RECURRENCE None There wer no unit shutdown or significant power reductions from 100%
RTP this month.
1 F
S Forced Scheduled 2
Reason:
A:
Equipment Failure (Explain)
B!
Maintenance or Test C:
Refueling D:
Regulatory Restriction E:
Operator Training and License Examination F:
Administrative G:
Operational Error (Explain)
H:
Other (Explain) 3 Method:
1:
Manual 2:
Manual Scram 3:
Automatic Scram 4:
Other (Explain) 4Exhibit G Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 1061) 5Exhibit I:
Same Source


DOC     NO-'-     50-315 UNIT NAME:        D.C. Cook   Unit 1 COMPLETED BY:      R. D. Reynnells TELEPHONE:          (616) 465-5901 DATE:              Nov 4, 1993 PAGE:              Page 1 of 1 MONTHLY OPERATING   ACTIVITIES OCTOBER 1993 HIGHLIGHTS The unit entered the reporting period in     Mode 1 at   100 4 RTP.
DOC NO-'-
The unit exited this reporting period in     Mode 1 at   100 4 RTP.
UNIT NAME:
There were no challenges   to the pressurizer safety valves or     power operated relief valves.
COMPLETED BY:
Gross Electrical generation for the   month of October   was 778010 MWH.
TELEPHONE:
DETAILS 10-13-93   1900 Commenced   reactor power decrease to     95% RTP for scheduled MTC testing.
DATE:
2300 Reactor power   is at 95% RTP.
PAGE:
10-14-93   1515 Commenced   reactor power increase to     1004 RTP.
50-315 D.C.
Cook Unit 1 R.
D. Reynnells (616) 465-5901 Nov 4, 1993 Page 1 of 1 HIGHLIGHTS MONTHLY OPERATING ACTIVITIES OCTOBER 1993 The unit entered the reporting period in Mode 1 at 100 4 RTP.
The unit exited this reporting period in Mode 1 at 100 4 RTP.
There were no challenges to the pressurizer safety valves or power operated relief valves.
Gross Electrical generation for the month of October was 778010 MWH.
DETAILS 10-13-93 1900 Commenced reactor power decrease to 95% RTP for scheduled MTC testing.
2300 Reactor power is at 95% RTP.
10-14-93 1515 Commenced reactor power increase to 1004 RTP.
1700 Reactor power is at 100% RTP.
1700 Reactor power is at 100% RTP.
10-29-93   2200 Commenced reactor power decrease to     90< RTP for turbine valve testing.
10-29-93 2200 Commenced reactor power decrease to 90< RTP for turbine valve testing.
10-30-93   0020 Reactor power is at 904 RTP.
10-30-93 0020 Reactor power is at 904 RTP.
0400 Commenced 'reactor power increase to     1004 RTP.
0400 Commenced 'reactor power increase to 1004 RTP.
0715 Reactor power is at 1004 RTP.
0715 Reactor power is at 1004 RTP.


DOCKET NO:     50-315 UNIT NAME:    D.C. Cook Unit 1 COMPLETED BY: M. E. Russo TELEPHONE:    (616) 465-5901 DATE:        November 5, 1993 PAGE          1 of 1 MAJOR SAFETY-RELATED MAINTENANCE October   1993 No major safety-related maintenance items are included   for the month of October.}}
DOCKET NO:
UNIT NAME:
COMPLETED BY:
TELEPHONE:
DATE:
PAGE 50-315 D.C.
Cook Unit 1 M. E. Russo (616) 465-5901 November 5, 1993 1 of 1 MAJOR SAFETY-RELATED MAINTENANCE October 1993 No major safety-related maintenance items are included for the month of October.}}

Latest revision as of 14:19, 7 January 2025

Monthly Operating Rept for Oct 1993 for DC Cook Nuclear Plant Unit 1
ML17331B047
Person / Time
Site: Cook 
Issue date: 10/31/1993
From: Doreen Turner
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17331B046 List:
References
NUDOCS 9311160034
Download: ML17331B047 (5)


Text

N.R.C.

OPERATING DATA REPORT DOCKET NO.

50-315 DATE 03/Nov/93 COMPLETED BY DG TURNER TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit Name D.

C.

Cook Unit 1

2. Reporting Period OCT 1993
3. Licensed Thermal Power (MWt) 3250 4.

Name Plate Rating (Gross MWe) 1152

5. Design Electrical Rating (Net MWe) 1020 6.

Maximum Dependable Capacity (GROSS MWe) 1056 7.

Maximum Dependable Capacity (Net MWe 1000 notes Corrected YTD & Cumm.

UCFs to use MDC=1000 MWe Net. Retro.

07/91 02/Nov/93 DG Turner 9.

Power Level To Which Restricted. If Any (Net MWe) 10.

Reasons For Restrictions. If Any:

)

8 ~ If Changes Occur in Capacity Ratings (Items no.

3 through 7) Since Last Report Give Reasons See notes above.

No ion er usin seasonall ad usted values.

This Mo..

Yr. to Date Cumm.

11. Hours in Reporting Period 745.0 7296.0 165096.0 12.

No. of Hrs. Reactor Was Critical 745 '

7296.0 124190.4

13. Reactor Reserve Shutdown Hours 0.0 0.0 4'63

~ 0 14.

Hours Generator on Line 745 '

7296 '

122144.6

15. Unit Reserve Shutdown Hours 0.0 0

0 321 0

16.

Gross Therm.

Energy Gen.

(MWH) 2410091 23357580 358799903 17.

Gross Elect.

Energy Gen.

(MWH) 778010 7544210 116487570

18. Net Elect.

Energy Gen.

(MWH) 750796 7277346 112039711

19. Unit Service Factor 100.0 100 '

74 '

20; Unit Availability Factor 100.0 100.0 74 '

21. Unit Capacity Factor (MDC Net) 100.8 99.7 67.6
22. Unit Capacity Factor (DER Net) 98 '

97 '

65 '

23. Unit Forced Outage Rate 0 '

0.0 6 '

24.

Shutdowns Scheduled over Next Six Months (Type, Date,and Duration)-

Refuelin Outa e to be in Februar 5,

1994 for an estimated duration of 70 da s.

25. If Shut Down At End of Report Period, Estimated Date of Startup:
26. Units in Test Status (prior to Commercial Operation):

Forcast INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved 9311160030 931105 t

'DR ADOCK 05000315

- R PDR

AVERAGE DAILY POWER LEVEL (MWe-Net)

MONTH DOCKET NO~,, 50-315 UNIT ONE DATE 02/Nov/93 COMPLETED BY DG TURNER TELEPHONE 616-465-5901 OCT 1993 DAY 10/01/93 10/02/93 10/03/93 10/04/93 10/05/93 10/06/93 10/07/93 10/08/93 10/09/93 10/10/93 10/11/93 10/12/93 10/13/93 10/14/93 10/15/93 10/16/93 AVERAGE DAILY POWER LEVEL 1010 1009 1009 1010 1010 1011 1011 1010 1011 1013'009 1013 995 983 1005 1015 DAY 10/17/93 10/18/93 10/19/93 10/20/93 10/21/93 10/22/93 10/23/93 10/24/93 10/25/93 10/26/93 10/27/93 10/28/93 10/29/93 10/30/93 10/31/93 AVERAGE DAIL POWER LEVEL 1007 1008 1008 1006 1012 1016 1016 1017 1007 1022 1002 1017 1008 998 1016

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: OCTOBER 1993 UNIT NAME DATE:

COMPLETED BY$

TELEPHONE:

Page 1 of 1 D. C.

COOK UNIT 1.

Nov. 4, 1993 R. D. Reynnells (616) 465-590I DURATION NO.

DATE TYPE HOURS METHOD OF SHUTTING'ICENSEE DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION REASON REACTOR REPORT NO.

CODE CODE TO PREVENT RECURRENCE None There wer no unit shutdown or significant power reductions from 100%

RTP this month.

1 F

S Forced Scheduled 2

Reason:

A:

Equipment Failure (Explain)

B!

Maintenance or Test C:

Refueling D:

Regulatory Restriction E:

Operator Training and License Examination F:

Administrative G:

Operational Error (Explain)

H:

Other (Explain) 3 Method:

1:

Manual 2:

Manual Scram 3:

Automatic Scram 4:

Other (Explain) 4Exhibit G Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 1061) 5Exhibit I:

Same Source

DOC NO-'-

UNIT NAME:

COMPLETED BY:

TELEPHONE:

DATE:

PAGE:

50-315 D.C.

Cook Unit 1 R.

D. Reynnells (616) 465-5901 Nov 4, 1993 Page 1 of 1 HIGHLIGHTS MONTHLY OPERATING ACTIVITIES OCTOBER 1993 The unit entered the reporting period in Mode 1 at 100 4 RTP.

The unit exited this reporting period in Mode 1 at 100 4 RTP.

There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross Electrical generation for the month of October was 778010 MWH.

DETAILS 10-13-93 1900 Commenced reactor power decrease to 95% RTP for scheduled MTC testing.

2300 Reactor power is at 95% RTP.

10-14-93 1515 Commenced reactor power increase to 1004 RTP.

1700 Reactor power is at 100% RTP.

10-29-93 2200 Commenced reactor power decrease to 90< RTP for turbine valve testing.

10-30-93 0020 Reactor power is at 904 RTP.

0400 Commenced 'reactor power increase to 1004 RTP.

0715 Reactor power is at 1004 RTP.

DOCKET NO:

UNIT NAME:

COMPLETED BY:

TELEPHONE:

DATE:

PAGE 50-315 D.C.

Cook Unit 1 M. E. Russo (616) 465-5901 November 5, 1993 1 of 1 MAJOR SAFETY-RELATED MAINTENANCE October 1993 No major safety-related maintenance items are included for the month of October.